CN219196692U - Building climbing frame net member capable of being fast fixed - Google Patents
Building climbing frame net member capable of being fast fixed Download PDFInfo
- Publication number
- CN219196692U CN219196692U CN202320733024.2U CN202320733024U CN219196692U CN 219196692 U CN219196692 U CN 219196692U CN 202320733024 U CN202320733024 U CN 202320733024U CN 219196692 U CN219196692 U CN 219196692U
- Authority
- CN
- China
- Prior art keywords
- climbing frame
- frame net
- net member
- arc
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Tents Or Canopies (AREA)
Abstract
The utility model relates to the technical field of constructional engineering and discloses a quickly-fixed building climbing frame net member, which comprises two groups of clamping hoops I, wherein the outer cambered surface of each clamping hoop I is provided with a strip-shaped chute, an arc-shaped sliding piece is arranged at the strip-shaped chute in a sliding manner, and an adjusting component is rotationally arranged between the arc-shaped sliding pieces; and the opposite sides of the clamping hoop I are respectively provided with a clamping hoop II, so that the scaffold is conveniently fixed. The utility model can realize the installation with higher adaptability through a simple structural member in actual use, and is convenient for the actual use.
Description
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a construction climbing frame net member capable of being quickly fixed.
Background
The publication number CN217106086U discloses a building climbing frame net member capable of being quickly fixed, which comprises a climbing frame, a fixed rod and a connecting component, wherein one end of the fixed rod is detachably connected to the climbing frame through the connecting component; the other end of the fixed rod is provided with a motor, one end of the motor is connected with a ball screw in a transmission mode, and the ball screw sequentially penetrates through the first fixed plate and the second fixed plate. According to the utility model, the device and the climbing frame round rod can be flexibly disassembled and fixed through the arrangement of the connecting component, the motor is matched with the ball screw, the climbing frame net is placed between the first fixing plate and the second fixing plate, the ball screw is driven by the motor to rotate, the second fixing plate can be driven to move towards the first fixing plate, automatic fixing is realized, the extrusion blocks are arranged on the inner sides of the two fixing plates, and the anti-slip latch on the extrusion blocks can have an anti-slip effect on the climbing frame net.
However, the motor, the ball screw and other devices are used in actual use, so that the cost of the device is greatly increased in actual installation, the angle of the whole device is not easy to adjust in use, and certain limitations exist in installation and use. For this purpose we propose a construction climbing frame net member that can be fixed fast.
Disclosure of Invention
The utility model aims to provide a building climbing frame net member capable of being quickly fixed, and solves the problems in the background technology.
The embodiment of the application provides a building climbing frame net member capable of being quickly fixed, which comprises two groups of clamping hoops I, wherein a strip-shaped sliding groove is formed in the outer arc surface of each clamping hoop I, an arc-shaped sliding piece is arranged at the strip-shaped sliding groove in a sliding mode, an adjusting component is rotatably arranged between the arc-shaped sliding pieces, the angles of the two groups of adjusting components are conveniently adjusted, and practical installation is convenient;
the clamping hoops II are arranged on the opposite sides of the clamping hoops I, so that the scaffold can be conveniently fixed;
one side fixed mounting of adjusting part has the connecting rod, one side of connecting rod is equipped with two sets of stable anchor clamps, one side that stable anchor clamps are close to each other all is equipped with the recess, and convenient and scaffold frame between lock is established fixedly, the lock is equipped with adjusting screw between the stable anchor clamps, realizes stabilizing the holistic stable installation of anchor clamps, provides the assurance for in-service use.
Optionally, wear to be equipped with locking screw on the ear of clamp I, install fixed screwed pipe on the ear of clamp II, just the one end screw thread of clamp I wears to establish in the fixed screwed pipe, realize the effective locking of clamp I and clamp II and fix.
Optionally, all wear to be equipped with conflict screw on the arc slide to realize the position locking of arc slide and clamp I effectively, convenient actual angle modulation lock is dead, the in-service installation of being convenient for uses.
Optionally, the adjusting part include with the connecting pipe that the connecting rod is connected, the middle part fixed mounting of connecting pipe has the division board, the upper and lower both ends of connecting pipe all rotate be provided with corresponding arc slide piece fixed connection's dwang, the dwang is located the equal fixedly connected with connecting plate of the inside one end of connecting pipe avoids taking place to drop.
Optionally, a plurality of groups of locking screw are worn to be equipped with in the outside of connecting pipe, just locking screw is used for realizing the conflict to the dwang, and then guarantees the holistic angular adjustment and the locking of the fixed component that two sets of clamp I and clamp II constitute.
Optionally, expansion screw can be worn to establish on the stable anchor clamps, conveniently in actual installation use.
Compared with the prior art, the beneficial effects of the technical scheme are as follows:
1. the angle between the two groups of clamping bands I can be effectively and freely adjusted in actual use, and the angle adjusting device is convenient to adapt to actual installation and use;
2. through the setting of stable anchor clamps and adjusting screw and expansion screw, can guarantee that equipment adjusts the assistance according to the service environment of difference when the installation is used for equipment obtains better steady rest, guarantees the stability of in-service use.
The application can realize the higher installation of suitability through simple structure when in actual use, the in-service use of being convenient for.
Drawings
Other features, objects and advantages of the present utility model will become more apparent upon reading of the detailed description of non-limiting embodiments, given with reference to the accompanying drawings in which:
FIG. 1 is a schematic view of a construction climbing frame net member capable of being quickly fixed according to the present utility model;
FIG. 2 is a schematic cross-sectional view of an adjustment assembly of a quickly fixable building climbing frame net member in accordance with the present utility model;
fig. 3 is a schematic structural view of another embodiment of a stabilization clip for a rapidly fixable building climbing frame net member of the present utility model.
In the figure: 1. a clamp I; 2. a clamp II; 3. fixing a solenoid; 4. locking the screw rod; 5. an arc-shaped slide plate; 6. a contact screw; 7. an adjustment assembly; 71. a connecting pipe; 72. a locking screw; 73. a partition plate; 74. a rotating lever; 75. a connecting plate; 8. a connecting rod; 9. stabilizing the clamp; 10. adjusting a screw; 11. expansion screw.
Detailed Description
Referring to fig. 1-3, the present utility model provides a technical solution: the utility model provides a but quick fixed building climbs frame net component, includes two sets of clamp I1, and clamp I1's outside cambered surface is equipped with the bar spout to slide in bar spout department and be provided with arc slide 5, rotate between the arc slide 5 and be equipped with adjusting part 7, the angle of two sets of adjusting part 7 of convenient regulation is convenient for install in fact;
the opposite sides of the clamp I1 are respectively provided with a clamp II 2, so that the scaffold can be conveniently fixed;
one side fixed mounting of adjusting part 7 has connecting rod 8, and one side of connecting rod 8 is equipped with two sets of stable anchor clamps 9, and one side that stable anchor clamps 9 are close to each other all is equipped with the recess, and convenient and scaffold frame between lock establish fixedly, the lock is equipped with adjusting screw 10 between the stable anchor clamps 9, realizes the holistic stable installation of stable anchor clamps 9, provides the assurance for the in-service use.
Further, the ear piece of the clamp I1 is provided with the locking screw 4 in a penetrating manner, the ear piece of the clamp II 2 is provided with the fixed screw tube 3, and one end of the clamp I1 is provided with the fixed screw tube 3 in a penetrating manner by threads, so that the clamp I1 and the clamp II 2 can be effectively locked and fixed.
Further, the arc-shaped sliding piece 5 is provided with the supporting screws 6 in a penetrating way, so that the position locking of the arc-shaped sliding piece 5 and the clamping hoop I1 is effectively realized, the actual angle adjustment locking is convenient, and the actual installation and use are convenient.
Further, the adjusting component 7 comprises a connecting pipe 71 connected with the connecting rod 8, a partition plate 73 is fixedly arranged in the middle of the connecting pipe 71, rotating rods 74 fixedly connected with the corresponding arc-shaped sliding plates 5 are respectively and rotatably arranged at the upper end and the lower end of the connecting pipe 71, and one ends of the rotating rods 74, which are positioned in the connecting pipe 71, are fixedly connected with connecting plates 75, so that falling-off is avoided.
Specifically, a plurality of sets of locking screws 72 are arranged on the outer side of the connecting pipe 71 in a penetrating manner, and the locking screws 72 are used for realizing the interference to the rotating rod 74, so that the integral angle adjustment and locking of the fixing member consisting of the two sets of clamping hoops I1 and II 2 are ensured.
Furthermore, the expansion screw 11 can be arranged on the stabilizing clamp 9 in a penetrating way, so that the stabilizing clamp is convenient to install and use in practice.
When the clamping device is used, the actual installation angle of the clamping device I1 is adjusted by sliding the two groups of arc-shaped sliding plates 5, then the angles of the two groups of clamping devices I1 relative to the adjusting component 7 are adjusted by rotating the rotating rod 74, so that the clamping devices I1 and II 2 are conveniently adjusted according to the actual condition of a scaffold, and in the installation process, the clamping devices I1 and II 2 are tightly installed outside the scaffold through the locking screw 4 and the fixed screw 3 between the clamping devices I1 and II 2;
during installation, the equipment can be firmly clamped outside other scaffolds by the arrangement of the stabilizing clamp 9 and the adjusting screw 10, so that a further stable foundation is provided for the installation of the device;
if the wall surface is relied on, only one group of stabilizing clamps 9 are needed to penetrate through the expansion screw 11, so that the equipment is stably clamped on the wall surface, and the stability in actual use is further ensured.
Claims (6)
1. The utility model provides a but quick fixed building climbs frame net component which characterized in that: the novel clamping device comprises two groups of clamping hoops I (1), wherein a strip-shaped chute is arranged on the outer arc surface of the clamping hoops I (1), arc-shaped sliding sheets (5) are slidably arranged at the strip-shaped chute, and an adjusting assembly (7) is rotatably arranged between the arc-shaped sliding sheets (5);
one side opposite to the clamping hoop I (1) is provided with a clamping hoop II (2);
one side fixed mounting of adjusting part (7) has connecting rod (8), one side of connecting rod (8) is equipped with two sets of steady anchor clamps (9), one side that steady anchor clamps (9) are close to each other all is equipped with the recess, and convenient and scaffold frame between lock establish fixedly, the lock is equipped with adjusting screw (10) between steady anchor clamps (9).
2. The building climbing frame net member capable of being quickly fixed according to claim 1, wherein a locking screw rod (4) is arranged on an ear piece of the clamp hoop I (1) in a penetrating mode, a fixing screw tube (3) is arranged on an ear piece of the clamp hoop II (2), and one end of the clamp hoop I (1) is arranged in the fixing screw tube (3) in a penetrating mode through threads.
3. The quickly fixable building climbing frame net member according to claim 1, wherein the arc-shaped sliding plates (5) are respectively provided with a supporting screw (6) in a penetrating manner.
4. The building climbing frame net member capable of being quickly fixed according to claim 1, wherein the adjusting assembly (7) comprises a connecting pipe (71) connected with the connecting rod (8), a partition plate (73) is fixedly arranged in the middle of the connecting pipe (71), rotating rods (74) fixedly connected with corresponding arc sliding plates (5) are rotatably arranged at the upper end and the lower end of the connecting pipe (71), and one ends of the rotating rods (74) located in the connecting pipe (71) are fixedly connected with connecting plates (75).
5. The quickly fixable building climbing frame net member according to claim 4, wherein the outer side of the connecting pipe (71) is provided with a plurality of sets of locking screws (72).
6. A quickly fixable building climbing frame net member according to claim 1, wherein expansion screws (11) are penetratingly provided on the stabilizing jigs (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320733024.2U CN219196692U (en) | 2023-04-06 | 2023-04-06 | Building climbing frame net member capable of being fast fixed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320733024.2U CN219196692U (en) | 2023-04-06 | 2023-04-06 | Building climbing frame net member capable of being fast fixed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219196692U true CN219196692U (en) | 2023-06-16 |
Family
ID=86714949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320733024.2U Active CN219196692U (en) | 2023-04-06 | 2023-04-06 | Building climbing frame net member capable of being fast fixed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219196692U (en) |
-
2023
- 2023-04-06 CN CN202320733024.2U patent/CN219196692U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SE9800663L (en) | mounting bracket | |
CN111243829B (en) | Transformer | |
CN219196692U (en) | Building climbing frame net member capable of being fast fixed | |
CN211286629U (en) | Device for supporting aluminum template | |
JP3241624U (en) | Mounting device and communication device | |
CN210690937U (en) | Telescope lens assembling sleeve | |
CN207994520U (en) | A kind of fixed cable door frame of crosspiece rotation | |
WO2020001398A1 (en) | Fixing apparatus | |
CN107756294B (en) | A kind of dedicated installs fixture of angle steel tower | |
CN213304828U (en) | Electric power installation tensioner bullwheel | |
CN214738845U (en) | Connecting structure of steel structure concrete column | |
CN211289495U (en) | Subway station 5G equipment fixing support | |
CN208289755U (en) | A kind of adjustable steel channel beam fixing clamp | |
CN219611301U (en) | Strain clamp | |
CN113007513A (en) | Adjustable mounting bracket | |
CN111585001A (en) | Sharing iron tower type base station antenna support | |
CN213692996U (en) | Photovoltaic cable laying support | |
CN218972001U (en) | Oblique pipeline fixing device | |
CN217620201U (en) | Adjustable V-shaped pressing plate and clamp | |
CN218971996U (en) | Support hanger suitable for air pipe installation in narrow space | |
CN214034760U (en) | Climbing formwork supporting structure | |
CN220927940U (en) | Self-locking assembly top plate | |
CN212062657U (en) | Sharing iron tower type base station antenna support | |
CN220313296U (en) | Clamping device for fixing metal spliced frame | |
CN217115456U (en) | Cable installation fixing device for electrical engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |