CN219196548U - Balcony guardrail structure - Google Patents

Balcony guardrail structure Download PDF

Info

Publication number
CN219196548U
CN219196548U CN202223314502.0U CN202223314502U CN219196548U CN 219196548 U CN219196548 U CN 219196548U CN 202223314502 U CN202223314502 U CN 202223314502U CN 219196548 U CN219196548 U CN 219196548U
Authority
CN
China
Prior art keywords
vertical rod
montant
balcony guardrail
thread
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223314502.0U
Other languages
Chinese (zh)
Inventor
邱朝立
肖珍
郑鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Xinji Construction Group Co ltd
Original Assignee
Fujian Xinji Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Xinji Construction Group Co ltd filed Critical Fujian Xinji Construction Group Co ltd
Priority to CN202223314502.0U priority Critical patent/CN219196548U/en
Application granted granted Critical
Publication of CN219196548U publication Critical patent/CN219196548U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a technical field of building discloses a balcony guardrail structure, has improved the unable problem of adjusting of pole setting interval of balcony guardrail, including two horizontal poles, be connected with the pole setting between two horizontal poles, a plurality of spliced eyes that supply pole setting adaptation to peg graft have been seted up to horizontal pole one side, the pole setting includes first montant and second montant, first montant and second montant keep away from the one end of pegging graft with the horizontal pole and are equipped with first screw thread and the second screw thread of mutually supporting and connecting respectively, when first montant and second montant revolve nearly, the pole setting can be placed between two horizontal poles; when the first vertical rod and the second vertical rod are mutually rotated far, two ends of the vertical rod can be inserted into the inserting holes, and the clamping ring is sleeved on the screwed-off part of the first thread and the second thread. The threads of the first vertical rod and the second vertical rod are mutually screwed close or far to assemble and disassemble the vertical rods, so that the assembly and disassembly are more convenient, and the connecting structure is stable and ensures the safety of the guardrail.

Description

Balcony guardrail structure
Technical Field
The application relates to the technical field of building construction, in particular to a balcony guardrail structure.
Background
The balcony guardrail is a facility for beautifying and protecting the outer edge of a balcony, is generally formed by splicing a plurality of cross bars and upright bars in a longitudinal and transverse mode, and is welded with the cross bars and the upright bars and then fixedly installed on a wall or the ground when the guardrail is installed. The cross bars and the vertical bars of the guardrail cannot be adjusted any more, namely, the distance between the cross bars or the distance between the vertical bars cannot be adjusted, and the guardrail cannot adapt to the use requirements of different families or places.
Along with the continuous development of house building construction technology, a plurality of balcony guardrails with adjustable heights exist, vertical guardrails are conveniently adjusted through a general lifting device, and the protection effect with higher safety can be achieved for households with different heights.
However, the prior art only adjusts the height of the guardrails, but cannot adjust the gap between the uprights, if the gap is too large, many children or pets such as cats and dogs fall from the guardrails easily when the ages are too small, and if the gap is too small, the lamp is not attractive and can shield the light. The inventor considers that the defect that the vertical rod spacing of the balcony guardrail cannot be adjusted exists.
Disclosure of Invention
In order to improve the defect that the pole setting interval of balcony guardrail can't be adjusted, this application provides a balcony guardrail structure.
The application provides a balcony guardrail structure, adopts following technical scheme:
the balcony guardrail structure comprises two cross bars, wherein a vertical rod is connected between the two cross bars, a plurality of inserting holes for the vertical rod to be inserted in an adaptive manner are formed in one side of the cross bar, the vertical rod comprises a first vertical rod and a second vertical rod, a first thread is arranged at one end, away from the end, inserted with the cross bar, of the first vertical rod, a second thread connected with the first thread in an adaptive manner is arranged at one end, away from the end, inserted with the cross bar, of the second vertical rod, and when the first vertical rod and the second vertical rod are screwed close, the vertical rod can be placed between the two cross bars; when the first vertical rod and the second vertical rod are mutually far rotated, two ends of the vertical rod can be inserted into the inserting holes, and the parts, from which the first threads and the second threads are separated, are sleeved with clamping rings.
By adopting the technical scheme, before the vertical rod is installed, the first vertical rod and the second vertical rod are mutually screwed close through the first thread and the second thread, and the vertical rod with shorter length can be placed between the two cross rods; then the first vertical rod and the second vertical rod are mutually rotated far, the two ends of the vertical rod can be inserted into the inserting holes in an extending mode, and the clamping ring can limit the first vertical rod and the second vertical rod to be continuously close to each other, so that the vertical rod and the cross rod are stably connected together.
Optionally, the first montant keep away from with the one end that the horizontal pole is connected is provided with connecting portion, connecting portion inwards sunken form and have open-ended inner chamber, first screw thread set up in the inner chamber is close to on the inner wall of opening part, the second montant keep away from with the one end that the horizontal pole is connected is provided with the spliced pole, the second screw thread set up in on the outer wall of spliced pole.
Through adopting above-mentioned technical scheme, first montant cover is located the second montant and is passed through threaded connection, and connection structure is more stable.
Optionally, the external diameter of connecting portion is less than the external diameter of first montant, the lateral wall of second montant towards the spliced pole direction extends the sheath, the internal diameter of sheath with the external diameter of connecting portion is unanimous.
Through adopting above-mentioned technical scheme, still insert in locating the sheath when connecting portion and spliced pole are connected, further improved the compactness that first montant and second montant are connected.
Optionally, the snap ring cover is located the connecting portion outside, the snap ring includes first semicircle ring and the second semicircle ring of mutual butt joint.
Through adopting above-mentioned technical scheme, when first montant and second montant are through first screw thread and second screw thread mutual the far-reaching, establish first semicircle ring and second semicircle ring cover again and establish the butt joint cover on connecting portion, the top of sheath and the bottom of connecting portion respectively with the two sides looks butt of snap ring, make the state that first montant and second montant are connected more stable.
Optionally, a positioning groove is formed in the outer wall of the connecting portion, and a positioning block matched with the positioning groove is arranged on the clamping ring.
Through adopting above-mentioned technical scheme, the snap ring is installed towards appointed position, can make the junction orientation of first semicircle ring and second semicircle ring unified, improves the aesthetic property of balcony guardrail, can also improve the compactness that snap ring and pole setting are connected.
Optionally, the horizontal pole orientation be provided with the elastic component on the inner wall of spliced eye, the elastic component is connected with the separation blade and drives the separation blade is toward the spliced eye direction removes.
Through adopting above-mentioned technical scheme, the separation blade is driven to by the elastic component to support tightly with the tip of first montant or second montant, has reduced the possibility that the montant rocked.
Optionally, a limiting part for limiting the separation of the blocking piece from the cross rod from the inserting hole is arranged at the edge of the blocking piece.
Through adopting above-mentioned technical scheme, when the montant was dismantled, the separation blade can not break away from spacing portion and can cover and establish the spliced eye.
Optionally, when the separation blade butt in on the horizontal pole is close to on the inner wall of spliced eye, the separation blade can seal the spliced eye just the separation blade sets up to the diameter with the arc that the horizontal pole is unanimous.
Through adopting above-mentioned technical scheme, when the montant was dismantled, separation blade sealed spliced eye and appearance and horizontal pole are unanimous moreover, not only can reduce the possibility that impurity such as water or dust got into in the horizontal pole, can also guarantee the aesthetic property of guardrail.
Optionally, a sealing gasket is arranged on the side wall of the plug hole.
Through adopting above-mentioned technical scheme, sealed pad can further reduce impurity such as water or dust and get into in the horizontal pole, can also make the montant insert more closely do not rock when locating in the spliced eye.
In summary, the present application includes at least one of the following beneficial effects:
1. when children or pets in the house are too small, the vertical rods can be all arranged between the transverse rods, so that the safety of the guardrail is improved, when the children and the pets grow up, part of the vertical rods are disassembled, the attractiveness of the guardrail is guaranteed, and the length of the vertical rods is adjusted by mutually screwing the threads of the first vertical rods and the second vertical rods to be close or far away, so that the vertical rods are disassembled and assembled more conveniently;
2. through the cooperation of snap ring, sealed pad and separation blade and elastic component, can make the structure of installing on the horizontal pole after first montant and the connection of second montant more stable, further improve the security of guardrail.
Drawings
FIG. 1 is a schematic view of a balcony guardrail according to an embodiment of the present application;
FIG. 2 is a cross-sectional view of a cross-bar and pole installation in an embodiment of the present application;
FIG. 3 is a cross-sectional view of a cross-bar and pole connection in an embodiment of the present application;
fig. 4 is a cross-sectional view of a snap ring in an embodiment of the present application.
Reference numerals illustrate: 1. a cross bar; 11. a plug hole; 2. a vertical rod; 3. a first vertical rod; 31. a first thread; 32. a connection part; 33. an opening; 34. an inner cavity; 35. a positioning groove; 4. a second vertical rod; 41. a second thread; 42. a connecting column; 43. a sheath; 5. a clasp; 51. a first semi-circular ring; 52. a second semicircle ring; 53. a positioning block; 6. an elastic member; 7. a baffle; 71. a limit part; 8. a sealing gasket; 9. and (3) a sealing ring.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-4.
Referring to fig. 1, this application embodiment discloses balcony guardrail structure, including two horizontal poles 1, be connected with pole setting 2 between two horizontal poles 1, pole setting 1 one side has been seted up a plurality of spliced eye 11 that supply pole setting 2 adaptation to peg graft, pole setting 2 is including dismantling first montant 3 and the second montant 4 of connection, children or pet in the house are too little, can connect first montant 3 and second montant 4 and all install pole setting 2 between horizontal pole 1, improve the security of guardrail, dismantle partial montant after children and pet grow up again, guaranteed the aesthetic property of guardrail again.
Referring to fig. 2, the first vertical rod 3 and the second vertical rod 4 are specifically connected through screw fit, one end of the first vertical rod 3, which is far away from the connection with the cross rod 1, is provided with a connecting part 32, the connecting part 32 is inwards recessed to form an inner cavity 34 with an opening 33, a first screw thread 31 is arranged on the inner wall of the inner cavity 34, which is close to the opening 33, one end of the second vertical rod 4, which is far away from the connection with the cross rod 1, is provided with a connecting column 42 which can extend into the inner cavity 34, the outer wall of the connecting column 42 is provided with a second screw thread 41, and when the first vertical rod 3 and the second vertical rod 4 are screwed close, the vertical rod 2 can be placed between the two cross rods 1; when first montant 3 and second montant 4 are mutually revolved far away, the spliced eye 11 can be inserted at the both ends of pole setting 2, and the mutual spiral through the screw thread is close or revolve far away and make can be close to relatively when first montant 3 and second montant 4 are connected with keeping away from to adjust the length of montant, thereby the dismouting of montant is more convenient.
Further, referring to fig. 2, the outer diameter of the connecting portion 32 is smaller than the outer diameter of the first vertical rod 3 to form a step surface, the side wall of the second vertical rod 4 extends out of the sheath 43 towards the connecting post 42, the inner diameter of the sheath 43 is consistent with the outer diameter of the connecting portion 32, and the connecting portion 32 is inserted into the sheath 43 while being connected with the connecting post 42, so that the connection tightness of the first vertical rod 3 and the second vertical rod 4 is further improved.
In order to make the installation of the upright 2 and the cross bar 1 more stable, referring to fig. 2 and 3, the inner wall of the cross bar 1 facing the plugging hole 11 is provided with an elastic member 6, the elastic member 6 may be a spring or a rubber thick pad, and the elastic member 6 may be directly abutted against two ends of the upright 2. Further, the elastic piece 6 may be connected with the blocking piece 7, the elastic piece 6 may drive the blocking piece 7 to move towards the direction of the insertion hole 11, the edge of the blocking piece 7 is provided with a limiting portion 71 for limiting the blocking piece 7 to separate from the cross bar 1 from the insertion hole 11, and the limiting portion 71 may be disposed on two sides of the edge of the blocking piece 7 or may be disposed on a periphery of the edge. In order to ensure the aesthetic property of the guardrail, when the baffle 7 is abutted on the inner wall of the cross rod 1 close to the plug hole 11, the baffle 7 can seal the plug hole 11 and the baffle 7 is arranged into an arc shape with the diameter consistent with the cross rod 1.
In addition, referring to fig. 3, the ends of the first vertical rod 3 and the second vertical rod 4, which are respectively abutted against the blocking piece 7, may be provided in an arc shape which is desired to be cut, so that the stability of the connection between the vertical rod 2 and the cross rod 1 can be further improved.
Optionally but not limited to, be provided with sealed pad 8 on the lateral wall of spliced eye 11, sealed pad 8 can further reduce impurity such as water or dust and get into in horizontal pole 1, can also make the montant insert and locate more closely not rock in spliced eye 11.
Referring to fig. 2, when the first thread 31 and the second thread 41 are relatively far away, the outer side of the connecting portion 32 is sleeved with the snap ring 5, the top end of the sheath 43 and the bottom end of the connecting portion 32 are respectively abutted against two sides of the snap ring 5, so that the connection state of the first vertical rod 3 and the second vertical rod 4 is more stable, as a preferred embodiment, sealing rings 9 can be arranged at two ends of the snap ring 5, the sealing rings 9 are abutted against the top end of the sheath 43 and the bottom end of the connecting portion 32, the sealing rings 9 can be made of waterproof elastic rubber materials, and the connection stability of the first vertical rod 3 and the second vertical rod 4 can be improved.
Referring to fig. 4, the snap ring 5 includes a first semicircular ring 51 and a second semicircular ring 52 which are butted with each other, the first semicircular ring 51 and the second semicircular ring 52 are connected through bolts, the outer wall of the connecting portion 32 is provided with a positioning groove 35, the snap ring 5 is provided with positioning blocks 53 adapted to the positioning groove 35, preferably, the positioning groove 35 is provided with two symmetrical positioning blocks, and the positioning blocks 53 are respectively arranged on the inner walls of the first semicircular ring 51 and the second semicircular ring 52.
The implementation principle of the balcony guardrail structure provided by the embodiment of the application is as follows:
before the vertical rod 2 is installed, the first vertical rod 3 and the second vertical rod 4 are mutually screwed close to each other through the first thread 31 and the second thread 41, at the moment, the vertical rod 2 is short in length and can be placed between the two cross rods 1, then the first vertical rod 3 and the second vertical rod 4 are mutually screwed far, two ends of the vertical rod 2 can be inserted into the inserting holes 11 in an extending mode and respectively abutted against the two blocking sheets 7, and then the clamping ring 5 is sleeved on the connecting part 32 so as to limit the first vertical rod 3 and the second vertical rod 4 to be continuously close to each other, so that the vertical rod 2 and the cross rods 1 can be stably installed; when the vertical rod 2 needs to be detached, the clamping ring 5 is detached firstly, and then the first vertical rod 3 and the second vertical rod 4 are screwed to shorten the length of the vertical rod 2, so that the vertical rod 2 can be taken down from the cross rod 1.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (9)

1. The utility model provides a balcony guardrail structure, includes two horizontal poles (1), its characterized in that: a vertical rod (2) is connected between the two transverse rods (1), a plurality of plug holes (11) for the plug connection of the vertical rod (2) are formed in one side of the transverse rod (1), the vertical rod (2) comprises a first vertical rod (3) and a second vertical rod (4), a first thread (31) is arranged at one end, which is plugged with the transverse rod (1), of the first vertical rod (3), a second thread (41) which is connected with the first thread (31) in a matching mode is arranged at one end, which is plugged with the transverse rod (1), of the second vertical rod (4), and when the first vertical rod (3) and the second vertical rod (4) are screwed close, the vertical rod (2) can be placed between the two transverse rods (1); when the first vertical rod (3) and the second vertical rod (4) are mutually screwed away, two ends of the vertical rod (2) can be inserted into the inserting hole (11), and a clamping ring (5) is sleeved on the screwing-off position of the first thread (31) and the second thread (41).
2. A balcony guardrail structure as claimed in claim 1, characterized in that: the utility model discloses a horizontal pole, including horizontal pole (1) and first montant (3), first montant (3) keep away from with the one end that horizontal pole (1) is connected is provided with connecting portion (32), connecting portion (32) inwards sunken form inner chamber (34) that have opening (33), first screw thread (31) set up in inner chamber (34) are close to on the inner wall of opening (33) department, second montant (4) keep away from with one end that horizontal pole (1) is connected is provided with spliced pole (42), second screw thread (41) set up in on the outer wall of spliced pole (42).
3. A balcony guardrail structure as claimed in claim 2, characterized in that: the external diameter of connecting portion (32) is less than the external diameter of first montant (3), the lateral wall of second montant (4) towards spliced pole (42) direction extends sheath (43), the internal diameter of sheath (43) with the external diameter of connecting portion (32) unanimity.
4. A balcony guardrail structure as claimed in claim 3, characterized in that: the clamping ring (5) is sleeved outside the connecting portion (32), and the clamping ring (5) comprises a first semicircular ring (51) and a second semicircular ring (52) which are in butt joint with each other.
5. A balcony guardrail structure as claimed in claim 4, characterized in that: the outer wall of the connecting part (32) is provided with a positioning groove (35), and the clamping ring (5) is provided with a positioning block (53) which is matched with the positioning groove (35).
6. A balcony guardrail structure as claimed in claim 1, characterized in that: the transverse rod (1) faces to the inner wall of the plug hole (11), an elastic piece (6) is arranged on the inner wall of the plug hole (11), and the elastic piece (6) is connected with a baffle (7) and drives the baffle (7) to move towards the plug hole (11).
7. A balcony guardrail structure as claimed in claim 6, characterized in that: the edge of the baffle (7) is provided with a limiting part (71) which limits the baffle (7) to be separated from the inserting hole (11) and separate from the cross rod (1).
8. A balcony guardrail structure as claimed in claim 7, characterized in that: when the baffle (7) is abutted to the inner wall of the cross rod (1) close to the plug hole (11), the baffle (7) can seal the plug hole (11) and the baffle (7) is arranged into an arc shape with the diameter consistent with that of the cross rod (1).
9. A balcony guardrail structure as claimed in claim 7, characterized in that: and a sealing gasket (8) is arranged on the side wall of the plug hole (11).
CN202223314502.0U 2022-12-07 2022-12-07 Balcony guardrail structure Active CN219196548U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223314502.0U CN219196548U (en) 2022-12-07 2022-12-07 Balcony guardrail structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223314502.0U CN219196548U (en) 2022-12-07 2022-12-07 Balcony guardrail structure

Publications (1)

Publication Number Publication Date
CN219196548U true CN219196548U (en) 2023-06-16

Family

ID=86702230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223314502.0U Active CN219196548U (en) 2022-12-07 2022-12-07 Balcony guardrail structure

Country Status (1)

Country Link
CN (1) CN219196548U (en)

Similar Documents

Publication Publication Date Title
US7824082B2 (en) Outdoor lighting assembly
CA2670194C (en) Universal light ball and tube light system
US10386048B2 (en) Landscape light mounting system with orientation adjustment feature
WO2003024204A2 (en) Fence assembly with connectors
CN219196548U (en) Balcony guardrail structure
CN202139895U (en) Improved fence
KR20130135429A (en) Apparatus for repelling birds
CN206506973U (en) A kind of New Forestry tree erecting device
US20060027796A1 (en) Fencing attachment
CN109162233B (en) Glass hollow upright post pile burying structure for green belt
KR200457069Y1 (en) Controlling apparatus of supports in the tree
KR20120100847A (en) Small greenhouse type vinyl house product method
CN212428311U (en) Guardrail for municipal garden
CN105604261B (en) Stable type glass guardrail
CN212802080U (en) Green building energy-saving wall
KR20130092831A (en) Support of the crops for assembly-type
KR20130101699A (en) Fixing structure of light pole and communication pillar for portable type
CN202056710U (en) Lighting lamp with conveniently disassembled and assembled lamp body
CN208755498U (en) Assembly type fence
CN218715711U (en) Combined fence
CN211396902U (en) Hollow-out high-low flower box connection combined guardrail
CN216753359U (en) Insect-proof illuminating lamp for landscape greening
CN205277013U (en) Fence structure
CN216197052U (en) Wire pole bottom fixing device
CN212078917U (en) Municipal afforestation rail guard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant