CN219195952U - Prestressed concrete pile positioner - Google Patents

Prestressed concrete pile positioner Download PDF

Info

Publication number
CN219195952U
CN219195952U CN202320350782.6U CN202320350782U CN219195952U CN 219195952 U CN219195952 U CN 219195952U CN 202320350782 U CN202320350782 U CN 202320350782U CN 219195952 U CN219195952 U CN 219195952U
Authority
CN
China
Prior art keywords
wall
cylinder
base
prestressed concrete
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320350782.6U
Other languages
Chinese (zh)
Inventor
郭瑞根
李恒章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Qiangyangsheng Technology Co ltd
Original Assignee
Wuhan Qiangyangsheng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Qiangyangsheng Technology Co ltd filed Critical Wuhan Qiangyangsheng Technology Co ltd
Priority to CN202320350782.6U priority Critical patent/CN219195952U/en
Application granted granted Critical
Publication of CN219195952U publication Critical patent/CN219195952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to the technical field of construction assistance of prestressed concrete pipe piles, in particular to a positioning device for a prestressed concrete pile, which comprises a first base and a positioning pin. The cylinder is sleeved into the lower cylinder, the outer wall of the lower cylinder is tightly attached to the cylinder, the outer wall of the supporting block on the first base is fixed to the upper cylinder along the inner wall groove of the cylinder, the round rod is rotated to drive the adjusting bolt on the fixing block to rotate, the adjusting bolt pushes the bearing plate to slide on the inner wall of the supporting frame, the supporting frame drives the straight rod to move, the straight rod drives the anchor ear to move towards the outer walls of the lower cylinder and the upper cylinder until the anchor ear is close to and fixed with the lower cylinder and the upper cylinder, a plurality of bolts do not need to be screwed, the lower cylinder and the upper cylinder can be fixedly welded, the workload of installation and disassembly is reduced, and the working efficiency is improved.

Description

Prestressed concrete pile positioner
Technical Field
The utility model relates to the technical field of construction assistance of prestressed concrete pipe piles, in particular to a positioning device for a prestressed concrete pile.
Background
The prestressed concrete pipe pile has been widely used in the foundation treatment process of construction because of the advantages of high single pile bearing capacity, wide application range, high pile forming quality and the like, and in order to effectively ensure the unification of pile forming quality, the prestressed concrete pipe pile is produced in a factory, and the prestressed concrete pipe pile is produced in a standardized way, so that the pile forming length is 10 meters generally, and the pile sinking depth is different according to different areas and geological conditions in normal construction.
For example, the authorized bulletin number of CN217734019U is a pile extension positioning device for a weak geological prestressed concrete pile, although the problem that the existing pile extension positioning device for a weak geological prestressed concrete pile is inconvenient to stand and walk on is solved, the existing pile extension positioning device for a weak geological prestressed concrete pile still exists, the pedal and the pile surface are connected by using bolts to the positioning anchor ear, and after a worker stands on the pedal, a plurality of bolts are needed to fix an upper column body and a lower column body on the anchor ear and the anchor ear plate, so that the workload of the worker is greatly increased, and after the work such as welding of the upper column body and the lower column body is finished, the workload is increased, and the work efficiency is greatly reduced.
Disclosure of Invention
The utility model aims to solve the problems that the prior pile splicing positioning device for the weak geological prestressed concrete pile needs a plurality of bolts to fix an upper column body and a lower column body on a hoop and a hoop plate, the workload is increased during disassembly, and the working efficiency is greatly reduced.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a prestressed concrete pile positioner, includes first base and locating pin, the lower extreme and the locating pin fixed connection of first base, the upper end of first base is equipped with positioner, positioner includes the support frame, the lower extreme and the first base fixed connection of support frame, the inner wall and the loading board swing joint of support frame, the outer wall and the straight-bar fixed connection of loading board, the tip and the staple bolt fixed connection of straight-bar, the inner wall and the rubber pad fixed connection of staple bolt, the outer wall of staple bolt is equipped with the opening.
Preferably, the surface of the first base is fixedly connected with the supporting block, the outer wall of the supporting block is in sliding connection with the cylinder, and the inner wall of the cylinder is attached to the lower cylinder.
Preferably, the inner wall of the support frame is in threaded connection with the adjusting bolt, the end part of the adjusting bolt is fixedly connected with the fixing block, and the inner wall of the fixing block is in sliding connection with the round rod.
Preferably, the inner wall of the anchor ear is attached to the lower column body, and the upper end of the anchor ear is attached to the upper column body.
Preferably, a hanging ring is arranged on the outer wall of the cylinder.
Preferably, the outer wall of first base and connecting block fixed connection, the inner wall of connecting block is laminated mutually with the connecting rod, the tip and the second base fixed connection of connecting rod.
The utility model provides a prestressed concrete pile positioning device, which has the beneficial effects that: the cylinder is sleeved into the lower cylinder, the outer wall of the lower cylinder is tightly attached to the cylinder, the outer wall of the supporting block on the first base is fixed to the upper cylinder along the inner wall groove of the cylinder, the round rod is rotated to drive the adjusting bolt on the fixing block to rotate, the adjusting bolt pushes the bearing plate to slide on the inner wall of the supporting frame, the supporting frame drives the straight rod to move, the straight rod drives the anchor ear to move towards the outer walls of the lower cylinder and the upper cylinder until the anchor ear is close to and fixed with the lower cylinder and the upper cylinder, a plurality of bolts do not need to be screwed, the lower cylinder and the upper cylinder can be fixedly welded, the workload of installation and disassembly is reduced, and the working efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic cross-sectional elevation view of the structure of FIG. 1;
FIG. 3 is an enlarged schematic view of the anchor ear of FIG. 1;
fig. 4 is an enlarged schematic view of the structure at a in fig. 2.
In the figure: 1. the device comprises a first base, 2, a locating pin, 3, a locating device, 301, a support frame, 302, a bearing plate, 303, a straight rod, 304, a hoop, 305, a rubber pad, 306, an opening, 4, a support block, 5, a cylinder, 6, a lower cylinder, 7, an adjusting bolt, 8, a fixed block, 9, a round rod, 10, an upper cylinder, 11, a hanging ring, 12, a connecting block, 13, a connecting rod, 14 and a second base.
Detailed Description
All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a prestressed concrete pile positioner, including first base 1 and locating pin 2, the lower extreme and the locating pin 2 fixed connection of first base 1, the upper end of first base 1 is equipped with positioner 3, slide into the fixed to last cylinder 10 along the inner wall recess of drum 5 through the outer wall of supporting shoe 4 on first base 1 and the second base 14, realize the fixed position welding to last cylinder 10 and lower cylinder 6, positioner 3 includes support frame 301, the lower extreme and the first base 1 fixed connection of support frame 301, the inner wall and the loading board 302 swing joint of support frame 301, the outer wall and the straight-bar 303 fixed connection of loading board 302, the tip and the staple bolt 304 fixed connection of straight-bar 303, the inner wall and rubber pad 305 fixed connection of staple bolt 304 are equipped with opening 306, the multiple opening 306 on the staple bolt 304 can directly see the fixed welded position of needs on last cylinder 10 and the lower cylinder 6, realize the direct welding of a plurality of positions etc. work;
the cylinder 5 is sleeved into the lower cylinder 6, the outer wall of the lower cylinder 6 is tightly attached to the cylinder 5, the outer wall of the supporting block 4 on the first base 1 slides into the upper cylinder 10 along the groove of the inner wall of the cylinder 5 to be fixed, the round rod 9 is rotated to drive the adjusting bolt 7 on the fixed block 8 to rotate, the adjusting bolt 7 pushes the bearing plate 302 to slide on the inner wall of the supporting frame 301, the supporting frame 301 drives the straight rod 303 to move, the straight rod 303 drives the hoop 303 to move towards the outer walls of the lower cylinder 6 and the upper cylinder 10 until the hoop 303 is closely fixed with the lower cylinder 6 and the upper cylinder 10, a plurality of bolts do not need to be screwed, the lower cylinder 6 and the upper cylinder 10 can be fixedly welded, the workload of installation and disassembly is reduced, and the working efficiency is improved.
Referring to fig. 1, 2 and 4, the surface of the first base 1 is fixedly connected with a supporting block 4, the outer wall of the supporting block 4 is slidably connected with a cylinder 5, and the inner wall of the cylinder 5 is attached to a lower column 6.
Referring to fig. 1 and 2, the inner wall of the supporting frame 301 is in threaded connection with the adjusting bolt 7, the end of the adjusting bolt 7 is fixedly connected with the fixing block 8, the inner wall of the fixing block 8 is in sliding connection with the round rod 9, the inner wall of the anchor ear 304 is attached to the lower column body 6, the upper end of the anchor ear 304 is attached to the upper column body 10, the outer wall of the cylinder 5 is provided with the hanging ring 11, the inner wall of the cylinder 5 can be installed according to the size of the lower column body 6, the lower column body 6 cannot be attached and fixed, meanwhile, the outer wall of the lower column body 6 is ensured to slide into the supporting block 4, the outer wall of the first base 1 is fixedly connected with the connecting block 12, the inner wall of the connecting block 12 is attached to the connecting rod 13, and the end of the connecting rod 13 is fixedly connected with the second base 14.
Working principle:
firstly, an external crane is used for hooking a hanging ring 11 on the outer wall of a cylinder 5, the cylinder 5 on the hanging ring 11 is sleeved into a lower column 6, the outer wall of the lower column 6 is tightly attached to the cylinder 5, a first base 1 is taken, the outer wall of a supporting block 4 on the first base 1 slides in along a groove on the inner wall of the cylinder 5, a positioning pin 2 at the lower end of the first base 1 is pricked into the ground, and the supporting block 4 on a second base 14 is operated as above, so that the cylinder 5 is fixedly sleeved into the lower column 6;
at this time, the upper column body 10 is hung by a crane, the lower column body 6 and the upper column body 10 are kept in the same vertical direction, the round rod 9 is inserted into the fixed block 8, the round rod 9 is rotated by using external equipment, the round rod 9 drives the adjusting bolt 7 on the fixed block 8 to rotate, the adjusting bolt 7 pushes the bearing plate 302 to slide on the inner wall of the supporting frame 301, the supporting frame 301 drives the straight rod 303 to move, the straight rod 303 drives the anchor ear 303 to move towards the outer walls of the lower column body 6 and the upper column body 10 until the anchor ear 303 is closely fixed with the lower column body 6 and the upper column body 10, the lower column body 6 and the upper column body 10 are welded through the opening on the anchor ear 303, the work is finished, and part of equipment is disassembled by the same operation.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a prestressed concrete stake positioner, includes first base (1) and locating pin (2), the lower extreme and the locating pin (2) fixed connection of first base (1), its characterized in that: the upper end of first base (1) is equipped with positioner (3), positioner (3) are including support frame (301), the lower extreme and the first base (1) fixed connection of support frame (301), the inner wall and the loading board (302) swing joint of support frame (301), the outer wall and the straight-bar (303) fixed connection of loading board (302), the tip and staple bolt (304) fixed connection of straight-bar (303), the inner wall and rubber pad (305) fixed connection of staple bolt (304), the outer wall of staple bolt (304) is equipped with opening (306).
2. A prestressed concrete pile positioning device according to claim 1, wherein: the surface of first base (1) and supporting shoe (4) fixed connection, the outer wall and the drum (5) sliding connection of supporting shoe (4), the inner wall and the lower cylinder (6) of drum (5) laminate mutually.
3. A prestressed concrete pile positioning device according to claim 1, wherein: the inner wall of the supporting frame (301) is in threaded connection with the adjusting bolt (7), the end part of the adjusting bolt (7) is fixedly connected with the fixed block (8), and the inner wall of the fixed block (8) is in sliding connection with the round rod (9).
4. A prestressed concrete pile positioning device according to claim 1, wherein: the inner wall of staple bolt (304) is laminated mutually with lower cylinder (6), the upper end of staple bolt (304) is laminated mutually with last cylinder (10).
5. A prestressed concrete pile positioning device according to claim 2, wherein: the outer wall of the cylinder (5) is provided with a hanging ring (11).
6. A prestressed concrete pile positioning device according to claim 1, wherein: the outer wall of the first base (1) is fixedly connected with the connecting block (12), the inner wall of the connecting block (12) is attached to the connecting rod (13), and the end part of the connecting rod (13) is fixedly connected with the second base (14).
CN202320350782.6U 2023-03-01 2023-03-01 Prestressed concrete pile positioner Active CN219195952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320350782.6U CN219195952U (en) 2023-03-01 2023-03-01 Prestressed concrete pile positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320350782.6U CN219195952U (en) 2023-03-01 2023-03-01 Prestressed concrete pile positioner

Publications (1)

Publication Number Publication Date
CN219195952U true CN219195952U (en) 2023-06-16

Family

ID=86712166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320350782.6U Active CN219195952U (en) 2023-03-01 2023-03-01 Prestressed concrete pile positioner

Country Status (1)

Country Link
CN (1) CN219195952U (en)

Similar Documents

Publication Publication Date Title
WO2019128155A1 (en) Open caisson construction structure and method
CN102493471B (en) Suspending installation construction process method of structural foot margin anchor bolt
CN202298628U (en) Automatic steel pipe column perpendicularity adjusting device using reverse construction method
CN211898338U (en) Device for preventing bored concrete pile steel reinforcement cage come-up
CN113562629B (en) Lattice column positioning and verticality adjusting system
CN102080417A (en) Construction method for split burying of large T-shaped sleeve bolt
CN113323011B (en) Novel underpinning construction method for steel pipe under existing building foundation
CN219195952U (en) Prestressed concrete pile positioner
CN111535318B (en) Precise installation and adjustment device for steel pipe column by reverse construction method and use method
CN209586290U (en) A kind of rotary digging stake drilling rod stable regulation support
CN105155545A (en) Method for fixing guide tube by using guide tube fixing device in diaphragm wall slot segment pouring process
CN115898047A (en) Pre-buried formula rag bolt locator
CN110735430A (en) single-row construction method for support-free precast support piles of foundation pit and middle-arranged inclined pile pressing machine
CN212956615U (en) Cover and dig accurate positioning platform of reverse construction method steel pipe center pillar based on BIM
CN209636882U (en) Underground piling bar column verticality-regulating system
CN204112325U (en) A kind of for anchor jacked pile pile pressing device
CN212506282U (en) Deep foundation pit supporting device
CN111827890A (en) Blasting drilling control construction equipment and construction method thereof
CN214150166U (en) Precast concrete component pendant connection structure strength test device
CN217758744U (en) Novel upright post pile positioning device
CN214574842U (en) Prefabricated wall body is built in room
CN114002032B (en) Sample preparation device of circular occlusion pile
CN217032338U (en) Device for monitoring local deformation of steel pipe during grouting of tunnel steel lining section
CN215482913U (en) Prestressed concrete tubular pile locking type mechanical quick joint
CN219881719U (en) Municipal administration tube well construction auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant