CN219169547U - Casting head structure - Google Patents

Casting head structure Download PDF

Info

Publication number
CN219169547U
CN219169547U CN202320013276.8U CN202320013276U CN219169547U CN 219169547 U CN219169547 U CN 219169547U CN 202320013276 U CN202320013276 U CN 202320013276U CN 219169547 U CN219169547 U CN 219169547U
Authority
CN
China
Prior art keywords
casting
block
plate
fixedly connected
head structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320013276.8U
Other languages
Chinese (zh)
Inventor
韩庆
朱耿露
陈韬任
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shantui Cast Steel Co ltd
Original Assignee
Shantui Cast Steel Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shantui Cast Steel Co ltd filed Critical Shantui Cast Steel Co ltd
Priority to CN202320013276.8U priority Critical patent/CN219169547U/en
Application granted granted Critical
Publication of CN219169547U publication Critical patent/CN219169547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

本实用新型涉及浇铸技术领域,尤其涉及一种浇冒口结构,包括浇铸口、过滤板、两组安装机构和支撑板,过滤板设置在浇铸口内,过滤板上设置有多个过滤孔,安装机构包括固定板、支杆、夹持件、弹簧和块体,支撑板与浇铸口固定连接,支撑板设置有两个滑槽,两个夹持件分别与对应的滑槽滑动连接,固定板与支撑板固定连接,支杆的一端与块体固定连接,支杆的另一端贯穿固定板,并与夹持件固定连接,弹簧的一端与块体固定连接,弹簧的另一端与固定板固定连接,且弹簧套设支杆,以此不会对浇铸口进行损坏,便于下次使用,节约了成本。

Figure 202320013276

The utility model relates to the technical field of casting, in particular to a pouring riser structure, which includes a casting mouth, a filter plate, two sets of installation mechanisms and a support plate, the filter plate is arranged in the casting mouth, and a plurality of filter holes are arranged on the filter plate, and the installation The mechanism includes a fixed plate, a support rod, a clamping piece, a spring and a block. The supporting plate is fixedly connected with the casting port. Fixedly connected with the support plate, one end of the pole is fixedly connected with the block, the other end of the pole runs through the fixed plate, and is fixedly connected with the clamping piece, one end of the spring is fixedly connected with the block, and the other end of the spring is fixed with the fixed plate Connected, and the spring is sleeved with a support rod, so that the casting port will not be damaged, which is convenient for the next use and saves the cost.

Figure 202320013276

Description

一种浇冒口结构A pouring riser structure

技术领域technical field

本实用新型涉及浇铸技术领域,尤其涉及一种浇冒口结构。The utility model relates to the technical field of casting, in particular to a casting riser structure.

背景技术Background technique

浇铸(铸造)方法是将金、银熔化成液态状,采用范模浇铸而制成器物的方法,它是最早的金银加工方法之一,浇铸是把经混合后的药浆浇铸到模具壳体内,固化后形成符合设计要求的工件,浇铸工艺在我国新石器时代末期就已经出现,原本是青铜器的制作工艺,因青铜器的兴盛而发展、成熟起来,在浇铸过程中由于浆液中难免会残留有杂质,从而会影响所浇铸的产品的成型效果。The casting (casting) method is to melt gold and silver into a liquid state, and use a mold to cast it to make utensils. It is one of the earliest gold and silver processing methods. Casting is to pour the mixed slurry into the mold shell. In the body, after solidification, it forms a workpiece that meets the design requirements. The casting process has already appeared at the end of the Neolithic Age in my country. It was originally a bronze production process. It developed and matured due to the prosperity of bronzes. There are impurities, which will affect the molding effect of the cast product.

为了解决上述问题,通常是在浇冒口上进行优化,在浇冒口上设置有过滤板,过滤板上设置多个过滤孔,通过多个过滤孔对杂志进行过滤后注入至模具内,以此不会影响浇铸的产品的成型效果。In order to solve the above problems, optimization is usually carried out on the sprue riser, and a filter plate is arranged on the sprue riser, and a plurality of filter holes are arranged on the filter plate, and the impurities are filtered through the plurality of filter holes and then injected into the mold, so as not to It will affect the molding effect of the cast product.

但在上述方式中,在浇铸完成后通常是将浇冒口进行切割分离,所切割下来的浇冒口无法再次使用,从而使得成本较高。However, in the above method, the riser is usually cut and separated after the casting is completed, and the cut riser cannot be used again, which makes the cost higher.

实用新型内容Utility model content

本实用新型的目的在于提供一种浇冒口结构,旨在解决现有技术中在浇铸完成后通常是将浇冒口进行切割分离,所切割下来的浇冒口无法再次使用,从而使得成本较高的技术问题。The purpose of this utility model is to provide a pouring riser structure, which aims to solve the problem that in the prior art, after the casting is completed, the pouring riser is usually cut and separated, and the cut pouring riser cannot be used again, thus making the cost relatively high high technical problems.

为实现上述目的,本实用新型采用的一种浇冒口结构,包括浇铸口、过滤板、两组安装机构和支撑板,所述过滤板设置在所述浇铸口内,所述过滤板上设置有多个过滤孔,所述安装机构包括固定板、支杆、夹持件、弹簧和块体,所述支撑板与所述浇铸口固定连接,所述支撑板设置有两个滑槽,两个所述夹持件分别与对应的所述滑槽滑动连接,所述固定板与所述支撑板固定连接,所述支杆的一端与所述块体固定连接,所述支杆的另一端贯穿所述固定板,并与所述夹持件固定连接,所述弹簧的一端与所述块体固定连接,所述弹簧的另一端与所述固定板固定连接,且所述弹簧套设所述支杆。In order to achieve the above purpose, a casting riser structure adopted by the utility model includes a casting mouth, a filter plate, two sets of installation mechanisms and a support plate, the filter plate is arranged in the casting mouth, and the filter plate is provided with A plurality of filter holes, the installation mechanism includes a fixed plate, a pole, a clamp, a spring and a block, the support plate is fixedly connected with the casting port, the support plate is provided with two chute, two The clamping pieces are respectively slidably connected to the corresponding chute, the fixed plate is fixedly connected to the support plate, one end of the pole is fixedly connected to the block, and the other end of the pole penetrates The fixed plate is fixedly connected with the clamping member, one end of the spring is fixedly connected with the block, the other end of the spring is fixedly connected with the fixed plate, and the spring is sleeved on the strut.

其中,所述安装机构还包括防护件,所述防护件设置在所述夹持件上,并位于所述夹持件远离所述支杆的一侧。Wherein, the installation mechanism further includes a protective piece, the protective piece is arranged on the clamping piece and is located on a side of the clamping piece away from the pole.

其中,所述夹持件包括滑块和夹板,所述滑块与对应的所述滑槽滑动连接,所述夹板与所述滑块固定连接,且所述夹板与所述支杆远离所述块体的一端固定连接。Wherein, the clamping member includes a slider and a splint, the slider is slidably connected to the corresponding chute, the splint is fixedly connected to the slider, and the splint and the pole are far away from the One end of the block is fixedly connected.

其中,所述安装机构还包括连接杆和拉环,所述连接杆的一端与所述块体固定连接,所述连接杆的另一端与所述拉环固定连接,所述连接杆位于所述块体远离所述支杆的一侧。Wherein, the installation mechanism also includes a connecting rod and a pull ring, one end of the connecting rod is fixedly connected to the block, the other end of the connecting rod is fixedly connected to the pull ring, and the connecting rod is located on the The side of the block away from the pole.

其中,所述安装机构还包括环块,所述环块设置在所述拉环上,并位于所述拉环的内表壁。Wherein, the installation mechanism further includes a ring block, and the ring block is arranged on the pull ring and located on the inner surface wall of the pull ring.

本实用新型的一种浇冒口结构,通过设置两组安装机构和支撑板,在具体使用时,首先拉动两个所述块体,所述块体带动所述支杆在对应的所述固定板上滑动,且所述块体带动对应的所述弹簧伸长,此时所述支杆带动所述夹持件在对应的所述滑槽内滑动,滑动至指定位置后,将所述支撑板放置在模具上,此时使得所述浇铸口置于模具的开口处,之后将混合后的药浆经所述浇铸口注入,此时混合后的药浆中的杂质经所述过滤板上的多个所述过滤孔进行过滤,杂质残留在所述过滤板上,符合要求的液体进入模具内,完成浇铸后,仅需拉动两个所述块体,所述块体带动所述支杆在对应的所述固定板上滑动,且所述块体带动对应的所述弹簧伸长,此时所述支杆带动所述夹持件在对应的所述滑槽内滑动,从而使得两个所述夹持件不再抵持在模具上,之后将所述支撑板拆下下来即可,以此不会对浇铸口进行损坏,便于下次使用,节约了成本。A pouring riser structure of the present utility model is provided with two sets of installation mechanisms and support plates. In specific use, the two blocks are first pulled, and the blocks drive the support rods to the corresponding fixed slide on the board, and the block drives the corresponding spring to elongate. At this time, the support rod drives the clamping piece to slide in the corresponding chute. After sliding to the designated position, the support The plate is placed on the mold, at this time, the casting port is placed at the opening of the mold, and then the mixed slurry is injected through the casting port, and the impurities in the mixed slurry pass through the filter plate The filter holes are used for filtering, the impurities remain on the filter plate, and the liquid that meets the requirements enters the mold. After the casting is completed, only two of the blocks need to be pulled, and the blocks drive the rods Slide on the corresponding fixed plate, and the block drives the corresponding spring to elongate. At this time, the pole drives the clamping part to slide in the corresponding chute, so that the two The clamping part is no longer held against the mold, and the support plate can be removed later, so that the casting port will not be damaged, which is convenient for the next use and saves the cost.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1是本实用新型的第一实施例的结构示意图。Fig. 1 is a structural schematic diagram of the first embodiment of the present utility model.

图2是本实用新型的图1的A-A线结构剖视图。Fig. 2 is a sectional view of the A-A line structure of Fig. 1 of the present utility model.

图3是本实用新型的图1的B-B线结构剖视图。Fig. 3 is a sectional view of the B-B line structure of Fig. 1 of the present utility model.

图4是本实用新型的第二实施例的结构示意图。Fig. 4 is a schematic structural diagram of the second embodiment of the present invention.

101-浇铸口、102-过滤板、103-支撑板、104-固定板、105-支杆、106-弹簧、107-块体、108-防护件、109-滑块、110-夹板、111-滑槽、112-过滤孔、201-连接杆、202-拉环、203-环块。101-casting port, 102-filter plate, 103-support plate, 104-fixed plate, 105-strut, 106-spring, 107-block, 108-protector, 109-slider, 110-splint, 111- Chute, 112-filter hole, 201-connecting rod, 202-pull ring, 203-ring block.

具体实施方式Detailed ways

第一实施例:First embodiment:

请参阅图1~图3,图1是本实用新型的第一实施例的结构示意图,图2是本实用新型的图1的A-A线结构剖视图,图3是本实用新型的图1的B-B线结构剖视图。Please refer to Fig. 1~Fig. 3, Fig. 1 is the structural representation of the first embodiment of the utility model, Fig. 2 is the A-A line structural sectional view of Fig. 1 of the utility model, Fig. 3 is the B-B line of Fig. 1 of the utility model Sectional view of the structure.

本实用新型提供一种浇冒口结构:包括浇铸口101、过滤板102、两组安装机构和支撑板103,所述安装机构包括固定板104、支杆105、夹持件、弹簧106、块体107和防护件108,所述夹持件包括滑块109和夹板110,前述方案解决了现有技术中在浇铸完成后通常是将浇冒口进行切割分离,所切割下来的浇冒口无法再次使用,从而使得成本较高的技术问题。The utility model provides a pouring riser structure: it includes a casting port 101, a filter plate 102, two sets of installation mechanisms and a support plate 103, and the installation mechanism includes a fixing plate 104, a support rod 105, a clamping piece, a spring 106, a block Body 107 and protective piece 108, the clamping piece includes a slider 109 and a splint 110. The aforementioned solution solves the problem that in the prior art, after the casting is completed, the riser is usually cut and separated, and the cut riser cannot Re-use, thus making the technical problem of higher cost.

针对本具体实施方式,所述过滤板102设置在所述浇铸口101内,所述过滤板102上设置有多个过滤孔112,将混合后的药浆经所述浇铸口101注入,此时混合后的药浆中的杂质经所述过滤板102上的多个所述过滤孔112进行过滤,杂质残留在所述过滤板102上,符合要求的液体进入模具内。For this specific embodiment, the filter plate 102 is arranged in the casting port 101, and the filter plate 102 is provided with a plurality of filter holes 112, and the mixed medicine slurry is injected through the casting port 101, at this time Impurities in the mixed slurry are filtered through a plurality of filter holes 112 on the filter plate 102 , impurities remain on the filter plate 102 , and qualified liquid enters the mold.

其中,所述支撑板103与所述浇铸口101固定连接,所述支撑板103设置有两个滑槽111,两个所述夹持件分别与对应的所述滑槽111滑动连接,所述固定板104与所述支撑板103固定连接,所述支杆105的一端与所述块体107固定连接,所述支杆105的另一端贯穿所述固定板104,并与所述夹持件固定连接,所述弹簧106的一端与所述块体107固定连接,所述弹簧106的另一端与所述固定板104固定连接,且所述弹簧106套设所述支杆105,通过设置两组安装机构和支撑板103,在具体使用时,首先拉动两个所述块体107,所述块体107带动所述支杆105在对应的所述固定板104上滑动,且所述块体107带动对应的所述弹簧106伸长,此时所述支杆105带动所述夹持件在对应的所述滑槽111内滑动,滑动至指定位置后,将所述支撑板103放置在模具上,此时使得所述浇铸口101置于模具的开口处,之后将混合后的药浆经所述浇铸口101注入,此时混合后的药浆中的杂质经所述过滤板102上的多个所述过滤孔112进行过滤,杂质残留在所述过滤板102上,符合要求的液体进入模具内,完成浇铸后,仅需拉动两个所述块体107,所述块体107带动所述支杆105在对应的所述固定板104上滑动,且所述块体107带动对应的所述弹簧106伸长,此时所述支杆105带动所述夹持件在对应的所述滑槽111内滑动,从而使得两个所述夹持件不再抵持在模具上,之后将所述支撑板103拆下下来即可,以此不会对浇铸口101进行损坏,便于下次使用,节约了成本。Wherein, the support plate 103 is fixedly connected with the casting port 101, the support plate 103 is provided with two chute 111, and the two clamping parts are slidably connected with the corresponding chute 111 respectively. The fixed plate 104 is fixedly connected with the support plate 103, one end of the strut 105 is fixedly connected with the block 107, the other end of the strut 105 passes through the fixed plate 104, and is connected with the clamping member fixedly connected, one end of the spring 106 is fixedly connected with the block 107, the other end of the spring 106 is fixedly connected with the fixed plate 104, and the spring 106 is sleeved with the pole 105, by setting two The set of installation mechanism and support plate 103, in specific use, first pull the two blocks 107, the blocks 107 drive the pole 105 to slide on the corresponding fixed plate 104, and the blocks 107 drives the corresponding spring 106 to elongate. At this time, the support rod 105 drives the clamping part to slide in the corresponding chute 111. After sliding to the designated position, the support plate 103 is placed on the mold At this time, the pouring port 101 is placed at the opening of the mould, and then the mixed slurry is injected through the casting port 101. At this time, the impurities in the mixed slurry pass through the filter plate 102. A plurality of filter holes 112 are used for filtering, and impurities remain on the filter plate 102, and the liquid that meets the requirements enters the mold. After the casting is completed, only two blocks 107 need to be pulled, and the blocks 107 drive the The pole 105 slides on the corresponding fixed plate 104, and the block 107 drives the corresponding spring 106 to elongate. Slide in the slot 111, so that the two clamping parts are no longer against the mold, and then the support plate 103 can be removed, so that the casting port 101 will not be damaged, and it is convenient for the next use , saving costs.

其次,所述防护件108设置在所述夹持件上,并位于所述夹持件远离所述支杆105的一侧,通过设置所述防护件108,所述防护件108采用橡胶制成,以此能够对所述夹持件与模具之间起到防滑效果。Secondly, the protective piece 108 is arranged on the clamping piece and is located on the side of the clamping piece away from the pole 105. By setting the protective piece 108, the protective piece 108 is made of rubber , so as to provide an anti-slip effect between the clamping member and the mold.

同时,所述滑块109与对应的所述滑槽111滑动连接,所述夹板110与所述滑块109固定连接,且所述夹板110与所述支杆105远离所述块体107的一端固定连接,通过设置所述滑块109和所述夹板110,所述支杆105移动时,所述支杆105带动所述夹板110移动,所述夹板110带动所述滑块109在所述滑槽111内滑动。At the same time, the slider 109 is slidably connected to the corresponding sliding groove 111, the splint 110 is fixedly connected to the slider 109, and the splint 110 and the end of the pole 105 away from the block 107 Fixedly connected, by setting the slider 109 and the splint 110, when the pole 105 moves, the pole 105 drives the splint 110 to move, and the splint 110 drives the slider 109 on the slide Sliding in the groove 111.

使用本实施例的一种浇冒口结构,通过设置两组安装机构和支撑板103,在具体使用时,首先拉动两个所述块体107,所述块体107带动所述支杆105在对应的所述固定板104上滑动,且所述块体107带动对应的所述弹簧106伸长,此时所述支杆105带动所述夹持件在对应的所述滑槽111内滑动,滑动至指定位置后,将所述支撑板103放置在模具上,此时使得所述浇铸口101置于模具的开口处,之后将混合后的药浆经所述浇铸口101注入,此时混合后的药浆中的杂质经所述过滤板102上的多个所述过滤孔112进行过滤,杂质残留在所述过滤板102上,符合要求的液体进入模具内,完成浇铸后,仅需拉动两个所述块体107,所述块体107带动所述支杆105在对应的所述固定板104上滑动,且所述块体107带动对应的所述弹簧106伸长,此时所述支杆105带动所述夹持件在对应的所述滑槽111内滑动,从而使得两个所述夹持件不再抵持在模具上,之后将所述支撑板103拆下下来即可,以此不会对浇铸口101进行损坏,便于下次使用,节约了成本。Using a sprue riser structure of this embodiment, by setting two sets of installation mechanisms and support plates 103, in specific use, first pull the two blocks 107, and the blocks 107 drive the poles 105 to Sliding on the corresponding fixing plate 104, and the block 107 drives the corresponding spring 106 to elongate, at this time, the support rod 105 drives the clamping member to slide in the corresponding chute 111, After sliding to the designated position, the support plate 103 is placed on the mold, so that the casting port 101 is placed at the opening of the mold, and then the mixed slurry is injected through the casting port 101, and the mixing Impurities in the final slurry are filtered through a plurality of filter holes 112 on the filter plate 102, and the impurities remain on the filter plate 102, and the liquid that meets the requirements enters the mold. After casting, it is only necessary to pull Two blocks 107, the blocks 107 drive the pole 105 to slide on the corresponding fixed plate 104, and the blocks 107 drive the corresponding spring 106 to elongate, at this time the The support rod 105 drives the clamping member to slide in the corresponding chute 111, so that the two clamping members are no longer against the mold, and then the support plate 103 can be removed. In this way, the casting port 101 will not be damaged, which is convenient for the next use and saves the cost.

第二实施例:Second embodiment:

在第一实施例的基础上,请参阅图4,图4是本实用新型的第二实施例的结构示意图。On the basis of the first embodiment, please refer to FIG. 4 , which is a schematic structural diagram of a second embodiment of the present invention.

本实用新型提供了一种浇冒口结构包括两组安装机构,所述安装机构还包括连接杆201、拉环202和环块203。The utility model provides a pouring riser structure which includes two sets of installation mechanisms, and the installation mechanisms also include a connecting rod 201 , a pull ring 202 and a ring block 203 .

针对本具体实施方式,所述连接杆201的一端与所述块体107固定连接,所述连接杆201的另一端与所述拉环202固定连接,所述连接杆201位于所述块体107远离所述支杆105的一侧,通过设置所述连接杆201和所述拉环202,通过拉动所述拉环202,所述拉环202带动所述连接杆201移动,所述连接杆201带动所述块体107移动,以此能够更方便的拉动所述块体107。For this specific embodiment, one end of the connecting rod 201 is fixedly connected to the block 107, the other end of the connecting rod 201 is fixedly connected to the pull ring 202, and the connecting rod 201 is located on the block 107. On the side away from the pole 105, by setting the connecting rod 201 and the pull ring 202, by pulling the pull ring 202, the pull ring 202 drives the connecting rod 201 to move, and the connecting rod 201 Drive the block body 107 to move, so that the block body 107 can be pulled more conveniently.

其中,所述环块203设置在所述拉环202上,并位于所述拉环202的内表壁,通过设置所述环块203,所述环块203采用橡胶制成,以此能够提升所述拉环202与手部之间的防滑效果。Wherein, the ring block 203 is arranged on the pull ring 202 and is located on the inner surface wall of the pull ring 202. By setting the ring block 203, the ring block 203 is made of rubber, so that the Anti-slip effect between the pull ring 202 and the hand.

使用本实施例的一种浇冒口结构,通过设置所述连接杆201和所述拉环202,通过拉动所述拉环202,所述拉环202带动所述连接杆201移动,所述连接杆201带动所述块体107移动,以此能够更方便的拉动所述块体107,通过设置所述环块203,所述环块203采用橡胶制成,以此能够提升所述拉环202与手部之间的防滑效果。Using a sprue riser structure of this embodiment, by setting the connecting rod 201 and the pull ring 202, by pulling the pull ring 202, the pull ring 202 drives the connecting rod 201 to move, and the connection The rod 201 drives the block body 107 to move, so that the block body 107 can be pulled more conveniently. By setting the ring block 203, the ring block 203 is made of rubber, so that the pull ring 202 can be lifted Anti-slip effect between the hand and the hand.

以上所揭露的仅为本实用新型一种较佳实施例而已,当然不能以此来限定本实用新型之权利范围,本领域普通技术人员可以理解实现上述实施例的全部或部分流程,并依本实用新型权利要求所作的等同变化,仍属于实用新型所涵盖的范围。What is disclosed above is only a preferred embodiment of the present utility model, and of course it cannot be used to limit the scope of rights of the present utility model. Those of ordinary skill in the art can understand all or part of the process of realizing the above-mentioned embodiments, and according to this Equivalent changes made to the claims of the utility model still fall within the scope of the utility model.

Claims (5)

1. The casting head structure comprises a casting nozzle and a filter plate, wherein the filter plate is arranged in the casting nozzle, a plurality of filter holes are arranged on the filter plate,
still include two sets of installation mechanism and backup pad, installation mechanism includes fixed plate, branch, holder, spring and block, the backup pad with casting nozzle fixed connection, the backup pad is provided with two spouts, two the holder respectively with corresponding spout sliding connection, the fixed plate with backup pad fixed connection, the one end of branch with block fixed connection, the other end of branch runs through the fixed plate, and with holder fixed connection, the one end of spring with block fixed connection, the other end of spring with fixed plate fixed connection, just the spring housing is established branch.
2. The casting head structure of claim 1, wherein the casting head structure comprises a plurality of casting heads,
the mounting mechanism further comprises a protection piece, wherein the protection piece is arranged on the clamping piece and is positioned on one side, away from the supporting rod, of the clamping piece.
3. The casting head structure of claim 2, wherein the casting head structure comprises a plurality of casting heads,
the clamping piece comprises a sliding block and a clamping plate, the sliding block is correspondingly connected with the sliding groove in a sliding mode, the clamping plate is fixedly connected with the sliding block, and the clamping plate is fixedly connected with one end, away from the block, of the supporting rod.
4. The casting head structure of claim 3, wherein the casting head structure comprises a plurality of casting heads,
the installation mechanism further comprises a connecting rod and a pull ring, one end of the connecting rod is fixedly connected with the block body, the other end of the connecting rod is fixedly connected with the pull ring, and the connecting rod is located on one side, away from the supporting rod, of the block body.
5. The casting head structure of claim 4, wherein the casting head structure comprises a plurality of casting heads,
the mounting mechanism further comprises a ring block which is arranged on the pull ring and positioned on the inner surface wall of the pull ring.
CN202320013276.8U 2023-01-04 2023-01-04 Casting head structure Expired - Fee Related CN219169547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320013276.8U CN219169547U (en) 2023-01-04 2023-01-04 Casting head structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320013276.8U CN219169547U (en) 2023-01-04 2023-01-04 Casting head structure

Publications (1)

Publication Number Publication Date
CN219169547U true CN219169547U (en) 2023-06-13

Family

ID=86671188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320013276.8U Expired - Fee Related CN219169547U (en) 2023-01-04 2023-01-04 Casting head structure

Country Status (1)

Country Link
CN (1) CN219169547U (en)

Similar Documents

Publication Publication Date Title
CN102806310B (en) Metal component casting process
CN206464506U (en) A kind of casting mold suitable for annular cast
CN202239599U (en) Molten iron filter sprue cup for sand faced iron mould casting
CN219169547U (en) Casting head structure
CN206263236U (en) A mobile phone back cover mold
CN204953824U (en) A mould for casing casting parts
CN216540748U (en) Sand box for casting
CN217889742U (en) Cutting machine at foundry goods mouth of a river
CN206374141U (en) A slider submerged glue structure
CN211437998U (en) Casting mold capable of preventing casting defects
CN206382507U (en) A kind of mould of improved high-precision gearing casing
CN222217337U (en) A mold for jewelry manufacturing
CN207592749U (en) Cold-chamber die casting machine and its mold
CN221909792U (en) A precision casting automated casting device
CN217293320U (en) Front mould insert pin convenient to replace
CN215467898U (en) Aluminum intermediate gold casting mold
CN215279865U (en) Filterable foundry goods casting device
CN217293319U (en) Lens injection mold
CN103042174A (en) Pouring cup for pouring iron mold coated sand
CN215615924U (en) Casting mold for producing rapidly-formed flux-cored wire
CN218050295U (en) Casting fixture for aircraft engine blade
CN221158534U (en) Sand core mould for producing chair support
CN207481117U (en) A kind of mold for being used to produce threeway silica gel sheath
CN220805441U (en) Casting mould mechanism with protective structure
CN204747416U (en) A pouring basin device that is used for swage to cover sand casting making

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230613

CF01 Termination of patent right due to non-payment of annual fee