CN219136873U - Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge - Google Patents

Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge Download PDF

Info

Publication number
CN219136873U
CN219136873U CN202320203136.7U CN202320203136U CN219136873U CN 219136873 U CN219136873 U CN 219136873U CN 202320203136 U CN202320203136 U CN 202320203136U CN 219136873 U CN219136873 U CN 219136873U
Authority
CN
China
Prior art keywords
reinforcing rib
plate
rib plates
reactor
large cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320203136.7U
Other languages
Chinese (zh)
Inventor
刘洋
邓余红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zunyi Titanium Industry Co Ltd
Original Assignee
Zunyi Titanium Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zunyi Titanium Industry Co Ltd filed Critical Zunyi Titanium Industry Co Ltd
Priority to CN202320203136.7U priority Critical patent/CN219136873U/en
Application granted granted Critical
Publication of CN219136873U publication Critical patent/CN219136873U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The supporting device for assembling the large cover and the reactor in the preparation process of producing the titanium sponge is characterized in that a groove steel column is arranged on a bottom plate, and a reinforcing rib plate A is arranged at the contact position of the bottom plate and the groove steel column; the bottom plate of the bottom plate is connected with the ground foundation through bolts; barrel rib plates are respectively arranged in the middle and the upper parts of the groove steel columns; the top of the groove steel column is provided with a circular plate, the upper part of the circular plate is provided with a cylinder, the contact part of the circular plate and the cylinder is provided with reinforcing rib plates B, and the number of the reinforcing rib plates B is 4-12 and the reinforcing rib plates B are uniformly distributed on the circumference; the upper part of the cylinder body is provided with a flange, the contact part of the cylinder body and the flange is provided with reinforcing rib plates C, and the number of the reinforcing rib plates C is 4-12 and the reinforcing rib plates C are uniformly distributed on the circumference. The utility model realizes the supporting function of the supporting device on the reactor when the reactor is assembled with the large cover, is convenient for the assembly of the reactor and the large cover, and ensures that the production of the titanium sponge is normally and orderly carried out; the device has simple structure and durability.

Description

Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge
Technical Field
The utility model relates to a production device of titanium sponge, in particular to a supporting device for assembling a large cover and a reactor in a preparation process of producing titanium sponge.
Background
The preparation process in the production of the titanium sponge is to assemble a large cover of equipment for producing the titanium sponge and a reactor, and then put the equipment into a heating furnace for production after the equipment is qualified, wherein a closed cavity is arranged in the large cover, and after the equipment is overhauled on the ground, the leakage detection can be directly pressed on all welding seams. The large cover is connected with the reactor through a bolt, a sealing ring is arranged between the large cover and the reactor, the large cover and the sealing ring form a closed production system, and then the closed system is subjected to argon filling leakage detection. The reactor is of a cylinder structure with an open lower seal and an open upper seal, the mass of the reactor is more than 12 tons, the reactor and the large cover cannot be assembled on the ground, the reactor is required to be placed on a supporting device during assembly, and the supporting device for assembling the large cover and the reactor is provided at present, so that the large cover and the reactor can be assembled conveniently.
Disclosure of Invention
The utility model aims to solve the technical problem that a reactor and a large cover cannot be assembled on the ground.
In order to solve the technical problems, the utility model adopts the following technical scheme:
the supporting device for assembling the large cover and the reactor in the preparation process of producing the titanium sponge comprises a bottom plate, a reinforcing rib plate A, a channel steel column, a cylinder rib plate, a ring plate, a reinforcing rib plate B, a cylinder body, a flange and a reinforcing rib plate C;
the bottom plate is provided with a channel steel column, and a reinforcing rib plate A is arranged at the contact position of the bottom plate and the channel steel column;
the bottom plate is connected with the ground foundation through bolts;
barrel rib plates are respectively arranged in the middle and the upper parts of the groove steel columns;
the top of the groove steel column is provided with a circular plate, the upper part of the circular plate is provided with a cylinder, the contact part of the circular plate and the cylinder is provided with reinforcing rib plates B, and the number of the reinforcing rib plates B is 4-12 and the reinforcing rib plates B are uniformly distributed on the circumference;
the upper part of the cylinder body is provided with a flange, the contact part of the cylinder body and the flange is provided with reinforcing rib plates C, and the number of the reinforcing rib plates C is 4-12 and the reinforcing rib plates C are uniformly distributed on the circumference.
The beneficial effects of adopting above-mentioned technical scheme are:
the utility model realizes the supporting function of the supporting device on the reactor when the reactor is assembled with the large cover, is convenient for the assembly of the reactor and the large cover, and ensures that the production of the titanium sponge is normally and orderly carried out; the device has simple structure and durability.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic top view of the present utility model
In the figure: 1-bottom plate, 2-deep reinforcement plate A, 3-groove steel column, 4-cylinder rib plate, 5-circular plate, 6-deep reinforcement plate B, 7-cylinder, 8-flange, 9-deep reinforcement plate C.
Detailed Description
The present utility model will be described in further detail with reference to the accompanying drawings, but it should not be construed that the scope of the subject matter of the present utility model is limited to the following embodiments, and various modifications, substitutions and alterations made according to the ordinary skill and familiar means of the art to which this utility model pertains are included within the scope of the present utility model without departing from the above technical idea of the present utility model.
A supporting device for assembling a large cover and a reactor in a preparation process of producing titanium sponge is shown in fig. 1: the reinforcing steel plate comprises a bottom plate 1, a reinforcing steel plate A2, a groove steel column 3, a cylinder rib plate 4, a circular ring plate 5, a reinforcing rib plate B6, a cylinder 7, a flange 8 and a reinforcing rib plate C9;
the bottom plate 1 is provided with a channel steel column 3, and a reinforcing rib plate A2 is arranged at the contact position of the bottom plate 1 and the channel steel column 3;
the bottom plate 1 is connected with the ground foundation through bolts;
the middle part and the upper part of the channel steel column 3 are respectively provided with a cylinder rib plate 4;
the top of the groove steel column 3 is provided with a circular ring plate 5, the upper part of the circular ring plate 5 is provided with a cylinder body 7, the contact part of the circular ring plate 5 and the cylinder body 7 is provided with reinforcing rib plates B6, and the number of the reinforcing rib plates B6 is 4-12 and is uniformly distributed on the circumference;
the upper part of the cylinder body 7 is provided with a flange 8, the contact part of the cylinder body 7 and the flange 8 is provided with reinforcing rib plates C9, and the number of the reinforcing rib plates C9 is 4-12 and the reinforcing rib plates C9 are uniformly distributed on the circumference.
When the reactor and the large cover are assembled, firstly, the reactor is hung into a cylinder body 7 on a supporting device, a flange of the reactor is placed on a flange 8, an opening of the reactor is upward, a sealing gasket is placed on the flange of the reactor, then, a crane is used for hanging the large cover, the large cover is placed on the sealing gasket, and the reactor is connected with the large cover through bolts, so that the assembly of the reactor and the large cover is completed.

Claims (1)

1. The utility model provides a strutting arrangement of big lid and reactor equipment in production titanium sponge preparation process which characterized in that: the reinforcing steel plate comprises a bottom plate (1), a reinforcing steel plate A (2), a groove steel column (3), a cylinder rib plate (4), a circular ring plate (5), a reinforcing steel plate B (6), a cylinder (7), a flange (8) and a reinforcing steel plate C (9);
the bottom plate (1) is provided with a groove steel column (3), and a reinforcing rib plate A (2) is arranged at the contact part of the bottom plate (1) and the groove steel column (3);
the bottom plate (1) is connected with the ground foundation through bolts;
barrel rib plates (4) are respectively arranged in the middle and the upper parts of the groove steel columns (3);
the top of the groove steel column (3) is provided with a circular ring plate (5), the upper part of the circular ring plate (5) is provided with a cylinder body (7), the contact part of the circular ring plate (5) and the cylinder body (7) is provided with reinforcing rib plates B (6), and the number of the reinforcing rib plates B (6) is 4-12 and the reinforcing rib plates B are uniformly distributed on the circumference;
the upper part of the cylinder body (7) is provided with a flange (8), the contact part of the cylinder body (7) and the flange (8) is provided with reinforcing rib plates C (9), and the number of the reinforcing rib plates C (9) is 4-12 and the reinforcing rib plates C are uniformly distributed on the circumference.
CN202320203136.7U 2023-02-14 2023-02-14 Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge Active CN219136873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320203136.7U CN219136873U (en) 2023-02-14 2023-02-14 Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320203136.7U CN219136873U (en) 2023-02-14 2023-02-14 Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge

Publications (1)

Publication Number Publication Date
CN219136873U true CN219136873U (en) 2023-06-06

Family

ID=86559116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320203136.7U Active CN219136873U (en) 2023-02-14 2023-02-14 Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge

Country Status (1)

Country Link
CN (1) CN219136873U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116065040A (en) * 2023-02-14 2023-05-05 遵义钛业股份有限公司 Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116065040A (en) * 2023-02-14 2023-05-05 遵义钛业股份有限公司 Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge

Similar Documents

Publication Publication Date Title
CN219136873U (en) Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge
CN207362265U (en) A kind of converter slag is vertical pressure hot disintegrating device
CN116065040A (en) Supporting device for assembling large cover and reactor in preparation process of producing titanium sponge
CN108728661A (en) A kind of vacuum continuous feeding
CN204276909U (en) A kind of super large tungsten crucible production assembling die
CN214131601U (en) Reation kettle with rotatory dead structure of lock
CN2841658Y (en) Coketank cover for dry coke quenching lifter slings
CN202430753U (en) Prefabricated steel pipe column for static load detection of cast-in-place pile
CN207042491U (en) A kind of ion exchange column
CN206876383U (en) A kind of motor for submerged pump part pressure testing device
CN215730895U (en) Lead shielding container for waste filter element
CN103836218B (en) A kind of coking tower valve
CN216025877U (en) Graphite electrode device
CN201401785Y (en) High temperature and high pressure resistant manhole maintenance door
CN211289192U (en) Plugging device for large-cover vertical pipe in titanium sponge production
CN214641662U (en) Sealing washer assembly device
CN209981179U (en) Cover type sand seal annealing furnace
CN210334106U (en) Novel manhole cover profiling mould
CN110762326B (en) Plugging device of large cover vertical pipe in titanium sponge production
CN208072470U (en) A kind of anti-stealing manhole cover of environmental improvement
CN218939766U (en) Multilayer high-pressure standing tank device
CN201003969Y (en) Monitoring hole cover for oil level at oil filling station
CN216192193U (en) Vinasse fermentation tank
CN219083750U (en) Furnace cover of roasting furnace
CN212900041U (en) Electric worm gear convenient to assemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant