CN219119315U - Primary support seepage drainage device for tunnel - Google Patents
Primary support seepage drainage device for tunnel Download PDFInfo
- Publication number
- CN219119315U CN219119315U CN202223534546.4U CN202223534546U CN219119315U CN 219119315 U CN219119315 U CN 219119315U CN 202223534546 U CN202223534546 U CN 202223534546U CN 219119315 U CN219119315 U CN 219119315U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- drainage
- waterproof board
- top surface
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a tunnel primary support water seepage drainage device, which comprises a waterproof plate, wherein the waterproof plate is connected with the inner wall of a tunnel vault surface; the tunnel arch top surface inner wall below the waterproof board is connected with a plurality of reinforcing bars as the support frame, is connected with drainage tank and water drainage tank on the support frame. The device has solved in the prior art tunnel construction under certain operating mode have the infiltration problem, influence the operating efficiency easily and reduce the problem of construction security, has simple structure, lays conveniently, can effectively avoid the infiltration drip to the characteristics of construction area of tunnel top surface.
Description
Technical Field
The utility model belongs to the field of tunnel engineering, and particularly relates to a primary support water seepage drainage device for tunnels.
Background
When the hydropower station diversion tunnel, urban underground engineering, highway, railway tunnel and other engineering are constructed, according to different geological conditions, the vault water seepage protection is needed by adopting waterproof measures, so that the construction of an operation surface is prevented from being influenced by water seepage; in the tunnel engineering excavation construction process, groundwater permeates downwards through the vault, and people wear a raincoat during construction, so that flexible actions of the workers are not facilitated; on the other hand, water flow permeates underground, so that the ground in the area behind the tunnel face is muddy, and personnel and equipment slip easily cause safety accidents; aiming at the problem of water seepage and dripping in tunnel construction, a tunnel primary support water seepage drainage device is required to be designed to solve the problem.
Disclosure of Invention
The utility model aims to solve the technical problems of providing a primary support water seepage drainage device for a tunnel, which solves the problems of water seepage under certain working conditions, easy influence on the operation efficiency and reduction of the construction safety in the tunnel construction in the prior art, and has the characteristics of simple structure, convenient arrangement and capability of effectively avoiding water seepage on the top surface of the tunnel from dripping into a construction area.
In order to solve the technical problems, the utility model adopts the following technical scheme: the utility model provides a tunnel preliminary bracing infiltration drainage device, includes the waterproof board, and waterproof board is connected with tunnel vault face inner wall; the tunnel arch top surface inner wall below the waterproof board is connected with a plurality of reinforcing bars as the support frame, is connected with drainage tank and water drainage tank on the support frame.
Preferably, the waterproof plate comprises a plurality of hot-melt gaskets, and the plurality of hot-melt gaskets are nailed on the inner wall of the arch top surface of the tunnel to form the waterproof plate.
Further, a plurality of hot-melt gaskets are fixed on the inner wall of the vault face of the tunnel through shooting nails.
Preferably, the drainage groove is arranged right below the edge of the lower part of the waterproof plate, and the drainage groove is of a semicircular tubular structure.
Further, the drainage groove adopts a semicircular PVC pipe which is made by cutting a PVC pipe.
Preferably, the drainage tank is a circular tube structure which is obliquely arranged, one end of the drainage tank is in plug-in fit with the drainage tank, and the other end of the drainage tank extends to the drainage ditch.
Further, the drainage groove can incline to a certain gradient to facilitate drainage, and the drainage groove is arranged in an inclined way; the drainage tank is made of a whole PVC round tube.
The beneficial effects of the utility model are as follows:
the device for preventing the vault from infiltrating water provided by the utility model avoids the conditions that the vault seepage affects the construction of an operation surface, accumulated water of a tunnel, muddy water and the like in the construction process, improves the construction environment in the tunnel, saves resources and cost, is simple and practical, is convenient to construct and improves the construction efficiency; the whole structure is simple and easy to use, the reusability is good, water seepage and drainage can be effectively carried out, and dripping to a construction area is avoided.
Drawings
FIG. 1 is an overall schematic of the present utility model;
FIG. 2 is an upper oblique view of the present utility model;
FIG. 3 is a partial large scale view of the present utility model;
FIG. 4 is an exploded view of the structure of the present utility model;
the reference numerals in the drawings are: waterproof board 1, penetrating nail 2, drainage groove 3, drainage groove 4, tunnel arch top surface 5.
Detailed Description
As shown in fig. 1-4, a primary support water seepage drainage device for a tunnel comprises a waterproof board 1, wherein the waterproof board 1 is connected with the inner wall of a tunnel arch top surface 5; the tunnel arch top surface 5 inner wall below the waterproof board 1 is connected with a plurality of reinforcing bars as the support frame, is connected with drainage tank 3 and drainage tank 4 on the support frame.
Preferably, the waterproof board 1 comprises a plurality of hot melt gaskets 11, and the plurality of hot melt gaskets 11 are nailed on the inner wall of the tunnel arch top surface 5 to form the waterproof board 1.
Further, a plurality of hot-melt shims 11 are fixed to the inner wall of the tunnel dome 5 by means of nails.
Preferably, the drainage groove 3 is arranged right below the lower edge of the waterproof board 1, and the drainage groove 3 is of a semicircular tubular structure.
Further, the drainage groove 3 adopts a semicircular PVC pipe which is made by cutting a PVC pipe.
Preferably, the drainage tank 4 is of a circular tube structure which is obliquely arranged, one end of the drainage tank 4 is in plug-in fit with the drainage tank 3, and the other end of the drainage tank extends to the drainage ditch.
Further, the drainage groove 3 can incline to a certain gradient to facilitate drainage, and the drainage groove 4 is arranged in an inclined way; the drainage tank 4 is made of a whole PVC round tube.
The working principle of the utility model is as follows:
when the waterproof board is used, a plurality of hot-melt gaskets 11 are fixed on the inner wall of the tunnel arch top surface 5 through a nail gun by using nails to form the required area of the waterproof board 1; then, a row of reinforcing steel bars are arranged below the waterproof board 1 to serve as a supporting frame, and the drainage grooves 3 and the drainage grooves 4 are connected to the supporting frame in a lap joint or binding mode, so that water seepage on the inner wall can be discharged from the rear of the waterproof board to the drainage grooves 3 below.
The foregoing embodiments are merely preferred embodiments of the present utility model, and should not be construed as limiting the present utility model, and the embodiments and features of the embodiments in the present application may be arbitrarily combined with each other without collision. The protection scope of the present utility model is defined by the claims, and the protection scope includes equivalent alternatives to the technical features of the claims. I.e., equivalent replacement modifications within the scope of this utility model are also within the scope of the utility model.
Claims (4)
1. The utility model provides a tunnel preliminary support infiltration drainage device which characterized in that: comprises a waterproof board (1), wherein the waterproof board (1) is connected with the inner wall of the tunnel arch top surface (5); the inner wall of the tunnel arch top surface (5) below the waterproof board (1) is connected with a plurality of reinforcing steel bars as a supporting frame, and the supporting frame is connected with a drainage groove (3) and a drainage groove (4).
2. The tunnel primary support water seepage drainage device of claim 1, wherein: the waterproof board (1) comprises a plurality of hot-melt gaskets (11), and the hot-melt gaskets (11) are nailed on the inner wall of the tunnel arch top surface (5) to form the waterproof board (1).
3. The tunnel primary support water seepage drainage device of claim 1, wherein: the drainage groove (3) is arranged right below the edge of the lower part of the waterproof board (1), and the drainage groove (3) is of a semicircular tubular structure.
4. The tunnel primary support water seepage drainage device of claim 1, wherein: the drainage tank (4) is of a circular tube structure which is obliquely arranged, one end of the drainage tank (4) is in plug-in fit with the drainage tank (3), and the other end of the drainage tank extends to the drainage ditch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223534546.4U CN219119315U (en) | 2022-12-29 | 2022-12-29 | Primary support seepage drainage device for tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223534546.4U CN219119315U (en) | 2022-12-29 | 2022-12-29 | Primary support seepage drainage device for tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219119315U true CN219119315U (en) | 2023-06-02 |
Family
ID=86529054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223534546.4U Active CN219119315U (en) | 2022-12-29 | 2022-12-29 | Primary support seepage drainage device for tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219119315U (en) |
-
2022
- 2022-12-29 CN CN202223534546.4U patent/CN219119315U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102661171B (en) | Frost damage prevention drainage system for tunnel | |
CN107090851B (en) | The inverted side-wall construction method of downtown area open cut groove | |
CN206386150U (en) | A kind of Underground Subway Station draining and examination and repair system | |
CN103670448B (en) | A kind of underground utilities protective device and apply the supporting method of this device | |
CN208884526U (en) | Deep basal pit faces side security protection system | |
CN208844415U (en) | For changing the aqueduct of the flow direction in the river above piping lane to be onstructed | |
CN109457709A (en) | A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable | |
CN106498952A (en) | The high steep spray in arid area mixes slope ecological protective slope structure | |
CN203939509U (en) | The waterproof construction of bolt-spary supports traffic tunnel | |
CN110106867A (en) | Manual digging pile construction method between railcar station track | |
CN108824348A (en) | A kind of water-break system and its construction using steel structure derrick formula withdrawal nozzle | |
CN219119315U (en) | Primary support seepage drainage device for tunnel | |
CN211144498U (en) | Novel shield cutter head | |
CN109578035A (en) | Steel pipe draining lock foot stake and construction method | |
CN212958749U (en) | Drainage device is collected in infiltration of underworkings roof | |
CN109024645B (en) | Integrated waterproof curtain, sponge urban water circulation system and method | |
CN208183773U (en) | Building foundation pit water blocking platform | |
CN102974179B (en) | Anti-dust water curtain system and its making method | |
CN211144525U (en) | Water stopping structure of shield tunnel segment in middle air shaft | |
CN211948539U (en) | Road structure of half roadbed and half tunnel | |
CN209083291U (en) | A kind of suspension device for Used in Shallow Mining Tunnel with Large Span | |
CN208563239U (en) | A kind of water-break system using steel structure derrick formula withdrawal nozzle | |
CN209687506U (en) | Wear river shallow buried covered excavation electric power tunnel constructing structure | |
CN206815338U (en) | Hydraulic sheeting operation fluidic device | |
CN202893126U (en) | Raise dust preventing water curtain system |