CN2190680Y - Wedge fastening joint of scaffold - Google Patents
Wedge fastening joint of scaffold Download PDFInfo
- Publication number
- CN2190680Y CN2190680Y CN 94205594 CN94205594U CN2190680Y CN 2190680 Y CN2190680 Y CN 2190680Y CN 94205594 CN94205594 CN 94205594 CN 94205594 U CN94205594 U CN 94205594U CN 2190680 Y CN2190680 Y CN 2190680Y
- Authority
- CN
- China
- Prior art keywords
- button
- connector
- scaffold
- bowl
- following bowl
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a scaffold, particularly the joint of a scaffold. The wedge fastening function of two conical surfaces are used to wedgewise fasten the joint on the cross bar (inclined bar) of a scaffold with a lower bowl on an upright post; the included angle of two adjacent cross bars (inclined bars) can be selected randomly; the stability and the flexibility are improved, and the use can not be influenced when bulk cement piles up in the lower bowl; the utility model has the advantages of easy assembly and disassembly and low cost.
Description
The utility model relates to a kind of scaffold, particularly relates to its connector
The scaffold that building operations is used from original bamboo and wood colligation, to bolt connection, fastener type steel pipe scaffold, develops into modular at grade intersection, gate-type and integral frame-type scaffold, and its common shortcoming is described in the CN86201080 as the patent No..This patent development and the bowl button-type tubular scaffolding that has improved Britain SGB company, a kind of tubular scaffolding of tooth button-type is provided, be provided with recessed tooth at following bowl of button, be provided with double wedge in cross bar (brace) connector and following bowl of contact position of detaining, they intermesh when mounted, have improved the stability of scaffold.
But the connector of this teeth buckle formula, the star cement in addition that is often fallen down from above in practice of construction bonds, and clears up these dry slags and will spend a large amount of work, not so can't re-use.And this horizontal direction that is connected can not rotate arbitrarily, can only do stepping with a tooth pitch.The processing of upper and lower bowl button shaggy tooth has increased manufacturing cost.
The purpose of this utility model is to provide a kind of improvements over the prior art, the contact surface that is about to following bowl button and connector be provided with can self-locking taper surface, easy construction, fastening easy, installation, dismantle more convenient, cheap.
The utility model is made up of column, following bowl of button, cross bar (brace) connector, alignment pin, following bowl button is welded on the precalculated position of column, it is characterized in that: the following bowl of button 2 and the contact surface of connector 1 are the taper surfaces of angle together, the inwall of promptly following bowl of button 2 is the conical surfaces of falling the garden, the part that connector 1 inserts following bowl of button 2 is the little down big taper surface of, when mounted, connector 1 inserts column 5 and detains in 2 the cone tank with following bowl, knocking connector 1 can make connector 1 hug column 5 easily by wedging.On two taper surfaces, can carry out annular knurl, to increase its friction factor.
Several small openings 7 that leaks cement slurry are arranged at the bottom of following bowl button 2, so that remove the cement slurry that may accumulate in the following bowl of button 2.
The upper end of bowl button 2 all is welded with an alignment pin 4 under welding on the column 5, and clip 3 is enclosed within on the column 5, and the upper end of clip 3 is face 9 in the shape of a spiral, and its inwall has a keyhole 8.After connector 1 inserted 2 lockings of following bowl button, the keyhole that makes clip 3 dropped on the top of connector 14 times and is rotated through alignment pin, and alignment pin 4 is risen along helicoid 9, and soon clip 3 prevents that to pressing down column 5 and combining of connector 1 are subjected to becoming flexible of unexpected power.Especially when highrise building, the stability and the safety of scaffold have been guaranteed.
The utility model compared with prior art has the following advantages:
1. compare with the product of SGB company, stability is strong;
2. be that CN86201080 compares higher stability is arranged with the patent No., the cement slurry that can not cause to fall and break when construction is smashed accumulation at following bowl, and the angle of adjacent two cross bars (brace) can be selected arbitrarily, and use is flexible;
3. mounting or dismounting are convenient;
4. processing is simple, and cost is lower.
Description of drawings:
Fig. 1 is a general assembly drawing of the present utility model
1. 2. times bowl buttons of connector
3. clip 4. alignment pins
5. column 6. cross bars
7. small opening
Fig. 2 is the vertical view of Fig. 1
1. 2. times bowl buttons of connector
3. clip
Fig. 3 is following bowl of button of figure 2 part drawings
7. small opening
Fig. 4 is the vertical view of Fig. 3
Fig. 5 is the part drawing of clip 3
8. keyhole 9. helicoids
Fig. 6 is the vertical view of Fig. 5
8. keyhole
Fig. 7 is connector 1 part drawing
Fig. 8 is the vertical view of Fig. 7
Accompanying drawing is described in conjunction with the embodiments
Embodiment of the present utility model as shown in Figure 1, form by column 5, following bowl of button 2, cross bar (brace) connector 1, alignment pin 4, following bowl button 2 is welded on the precalculated position of column 5, every root post 5 is welded with several following bowl button 2, when mounted, connector 1 is tight to be inserted column 5 and detains in 2 the cone tank with following bowl, makes connector 1 hug column 5.On two taper surfaces, rolled decorative pattern.
All be welded with an alignment pin 4 in the upper end of 5 times bowl buttons 2 of column, clip 3 is enclosed within on the column 5, and the upper end of clip 3 is face in the shape of a spiral, and its inwall has a keyhole.After connector 1 inserts 2 lockings of following bowl of button, the keyhole that makes clip 3 drops on the top of connector 14 times and is rotated through alignment pin, alignment pin 4 is risen along helicoid, be about to clip 3 and compress connector 1 downwards, prevented that column 5 is subjected to the loosening of unexpected power with combining of connector 1.
Claims (2)
1, a kind of scaffold wedging type connector is made up of following bowl of button, cross bar (brace) connector, it is characterized in that:
(1) inwall of following bowl of button (2) and cross bar (brace) connector (1) are the garden conical surfaces of a same angle (tapering) with the contact surface of following bowl of button (2), the inwall of promptly following bowl of button (2) is the little big conical surface of falling the garden of, the part that connector (1) inserts following bowl of button (2) is the little down big taper surface of, during installation, connector (1) tightly is inserted in down in the cone tank between bowl button (2) and column (5);
(2) bottom of following bowl of button (2) has several to leak the small opening (7) of cement slurry.
2, according to the said scaffold wedging type of claim 1 connector, it is characterized in that following bowl of button inwall of (2) and cross bar (brace) connector (1) with following bowl detain (2) but the contact surface annular knurl.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 94205594 CN2190680Y (en) | 1994-03-29 | 1994-03-29 | Wedge fastening joint of scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 94205594 CN2190680Y (en) | 1994-03-29 | 1994-03-29 | Wedge fastening joint of scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2190680Y true CN2190680Y (en) | 1995-03-01 |
Family
ID=33824466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 94205594 Expired - Fee Related CN2190680Y (en) | 1994-03-29 | 1994-03-29 | Wedge fastening joint of scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2190680Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704669A (en) * | 2012-06-24 | 2012-10-03 | 郑德春 | Crossbar insert piece for bowl-locking scaffold and mounting method thereof |
CN105421754A (en) * | 2015-11-20 | 2016-03-23 | 武汉达顺创新科技有限公司 | Connecting device for rapidly putting up building scaffold |
CN105863244A (en) * | 2016-05-16 | 2016-08-17 | 江苏业强脚手架科技发展有限公司 | Scaffold |
CN105863245A (en) * | 2016-05-20 | 2016-08-17 | 江苏业强脚手架科技发展有限公司 | Straight inserting type scaffold |
CN105863249A (en) * | 2016-05-16 | 2016-08-17 | 江苏业强脚手架科技发展有限公司 | Detachable scaffold connecting piece |
WO2021147141A1 (en) * | 2020-01-22 | 2021-07-29 | 青岛理工大学 | Steel-wood composite engagement slot joint and installation method therefor |
-
1994
- 1994-03-29 CN CN 94205594 patent/CN2190680Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704669A (en) * | 2012-06-24 | 2012-10-03 | 郑德春 | Crossbar insert piece for bowl-locking scaffold and mounting method thereof |
CN102704669B (en) * | 2012-06-24 | 2015-09-30 | 郑德春 | The total sub-semigroup mounting method of cross bar inserted sheet |
CN105421754A (en) * | 2015-11-20 | 2016-03-23 | 武汉达顺创新科技有限公司 | Connecting device for rapidly putting up building scaffold |
CN105863244A (en) * | 2016-05-16 | 2016-08-17 | 江苏业强脚手架科技发展有限公司 | Scaffold |
CN105863249A (en) * | 2016-05-16 | 2016-08-17 | 江苏业强脚手架科技发展有限公司 | Detachable scaffold connecting piece |
CN105863245A (en) * | 2016-05-20 | 2016-08-17 | 江苏业强脚手架科技发展有限公司 | Straight inserting type scaffold |
WO2021147141A1 (en) * | 2020-01-22 | 2021-07-29 | 青岛理工大学 | Steel-wood composite engagement slot joint and installation method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2005201422B2 (en) | Structural bracing system | |
AU719125B2 (en) | Connector with concave seat | |
CN2190680Y (en) | Wedge fastening joint of scaffold | |
WO2003012212A1 (en) | A joint for connecting the members of preformed prestressed concrete pipe pile | |
US20040109729A1 (en) | Soil-nail apparatus and method for constructing soil reinforced earthen retaining walls | |
CN1179100C (en) | Cover board for steel pipe pile | |
CN110005087B (en) | Assembled and drawn movable plank house roof wind-resistant system | |
JP3479516B2 (en) | Slope stabilization method and slope stabilization device | |
WO1991013222A1 (en) | Improved balustrade anchorage assembly | |
JPH08312164A (en) | Clamp for post and reinforcing material with the clamp | |
KR200397951Y1 (en) | Scaffold pipe structure | |
KR102130526B1 (en) | Anchor bolt to be used first for formwork | |
KR200232471Y1 (en) | Safety handrail clamp for wall attachment | |
CN107558749A (en) | Easy firm assembly type edge protection fence | |
KR200284897Y1 (en) | A construction guardrail pole for ship | |
CN207392784U (en) | Easy firm assembly type edge protection fence | |
CN2739285Y (en) | Steel pipe scaffold connecting piece | |
CN2225515Y (en) | Buckle self-locking multifunctional scaffold | |
KR100279192B1 (en) | Masonry and Assembly Method for Concrete Block Assembly | |
CN2147293Y (en) | Joint head | |
KR200150719Y1 (en) | Clamp for connecting concrete forms | |
JP2890121B1 (en) | Bolt pull-out prevention structure at transmission tower junction | |
KR970006245Y1 (en) | Anchor | |
CN219490701U (en) | Assembled hanging platform | |
JP3049207B2 (en) | Safety railing for formwork blocks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |