CN219061202U - Fence for construction - Google Patents

Fence for construction Download PDF

Info

Publication number
CN219061202U
CN219061202U CN202320245976.XU CN202320245976U CN219061202U CN 219061202 U CN219061202 U CN 219061202U CN 202320245976 U CN202320245976 U CN 202320245976U CN 219061202 U CN219061202 U CN 219061202U
Authority
CN
China
Prior art keywords
fence
construction
railing
connecting plate
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320245976.XU
Other languages
Chinese (zh)
Inventor
孟银红
张茂成
王帅
代海峰
董长征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qihan Electric Power Construction Group Co ltd
Original Assignee
Qihan Electric Power Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qihan Electric Power Construction Group Co ltd filed Critical Qihan Electric Power Construction Group Co ltd
Priority to CN202320245976.XU priority Critical patent/CN219061202U/en
Application granted granted Critical
Publication of CN219061202U publication Critical patent/CN219061202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a fence for construction, which comprises two brackets, wherein one side of each bracket, which is far away from the other side, is provided with a railing, a worker can move a second device according to the actual situation by installing an embedded rod, the railing and a connecting plate of the second device drive the inserted rod of the second device to move, so that the inserted rod at the bottom of the embedded rod of the second device penetrates through the inner side of a plug bush of the first device, simultaneously, the elastic rope, the connecting plate and the hanging rope of the second device penetrate through the plug bush, the embedded rod of the second device is placed on the top of the plug bush of the first device at the corresponding position, then the connecting plate stretches the hanging rope of the second device, the connecting plate of the second device drives the elastic rope to move to the inner side of a groove of the second device, and the connecting plate, the groove, the elastic rope and the hanging rope are matched, so that the plug of the first device can be inserted into an inner ferrule, and the tail connection of the device is firmer.

Description

Fence for construction
Technical Field
The utility model relates to the technical field of fences, in particular to a construction fence.
Background
The rail is one of the indispensable devices in construction work, and it can place around the construction site according to actual conditions's needs for enclose the construction site, play the effect of protection and warning, in view of this, traditional device is not perfect enough, does not have the more firm facility that can conveniently make a plurality of devices head and tail connect, and is not firm enough, and a rail for construction can provide convenience for the staff.
The prior fence only has the fence protection facility, so that people cannot conveniently and firmly connect a plurality of fences end to end, and the connection firmness is lower.
Disclosure of Invention
The utility model aims to provide a fence for construction, which can solve the technical problem that a plurality of devices cannot be connected end to end more conveniently and firmly in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a fence for construction comprises a support frame, wherein a railing is arranged on one surface of each support frame, which is far away from each other;
one of them a set of plug bush is installed to one side of railing, and another a set of connecting plate is installed to one side of railing, the gomphosis pole is installed to the one end of connecting plate, the inserted bar is installed to the top and the bottom of gomphosis pole, the recess is seted up to one side of inserted bar, and the front and the back of the inserted bar that are close to the bottom install string, the bottom of string is installed and is linked the board, link between two liang of board and install the elastic cord.
Preferably, the bottom of the bracket is provided with a support leg.
Preferably, a fence is arranged between every two of the supporting frames, a plurality of fixed rods are arranged at the top of the fence, and a fence plate is arranged between the two fixed rods close to the center.
Preferably, ejector rods are arranged between the top ends of the two railings, and the ejector rods are positioned at the top of the fixed rod.
Preferably, the top of breast board is installed and is stored up the shell, and the internally mounted that the top of storing up the shell runs through the ejector pin has logical section of thick bamboo, and the supporting legs is installed to the inboard that leads to the section of thick bamboo, and the inboard that leads to the section of thick bamboo runs through the top gomphosis and installs the stopper, and the stopper is located the top of supporting legs, and the handle is installed at the top of stopper.
Preferably, the front of the storage shell is provided with a support plate, one side of the support plate is provided with a water pump, the top output end of the water pump is provided with a calandria, one side input end of the water pump penetrates through the support plate to be provided with a suction pipe, and the suction pipe is connected with the storage shell.
Preferably, side pipes are arranged on two sides of the calandria, and an atomizing head is arranged on the top of each side pipe.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, by installing the embedded rod, a worker can move the second device according to the actual situation, and drive the inserted rod of the second device to move through the railing and the connecting plate of the second device, so that the inserted rod at the bottom of the embedded rod of the second device is inserted into the inner side of the insertion sleeve of the first device, and simultaneously, the elastic rope, the connecting plate and the hanging rope of the second device are ensured to penetrate through the insertion sleeve, the embedded rod of the second device is placed at the top of the insertion sleeve of the first device at the corresponding position, and then the hanging rope of the second device is stretched through the connecting plate, so that the connecting plate of the second device drives the elastic rope to move to the inner side of the groove of the second device, and the connecting plate, the groove, the elastic rope and the hanging rope are matched to enable the insertion sleeve ring of the first device to be inserted into the inner side, so that the plurality of devices can be conveniently and firmly connected end to end, and end connection of the device is firmer.
2. According to the utility model, the storage shell is arranged, the storage shell can provide a storage space for water, a worker can hold the handle according to the actual situation, and pull the plug upwards through the handle, so that the plug is separated from the supporting leg and is taken out from the inner side of the through barrel, the effect of opening the opening of the through barrel is realized, then water is injected into the inner side of the through barrel, so that the water can enter the inner side of the storage shell through the through barrel for storage, then the worker can start the water pump under the support of the support plate, so that the water pump can suck out the water stored in the inner side of the storage shell through the suction pipe and transmit the water to the calandria, the calandria distributes the water to the side pipe, and then the water can be atomized and sprayed out from the top of the atomizing head under the effect of the water pump, so that dust fall work can be carried out on a construction site by utilizing the atomized and sprayed water.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a schematic perspective view of a shell according to the present utility model;
FIG. 3 is a schematic perspective view of a bayonet according to the present utility model;
FIG. 4 is a schematic view of a through-tube structure of the present utility model;
fig. 5 is a schematic view of a structure of a fixing rod according to the present utility model.
In the figure: 1. a supporting frame; 2. a support leg; 3. railing; 4. a fence; 5. a fixed rod; 6. a breast board; 7. a push rod; 8. a plug bush; 9. a connecting plate; 10. a fitting rod; 11. a rod; 12. a groove; 13. hanging ropes; 14. a connecting plate; 15. an elastic rope; 16. a storage shell; 17. a through cylinder; 18. supporting feet; 19. a plug; 20. a handle; 21. a support plate; 22. a water pump; 23. a calandria; 24. a side pipe; 25. an atomizing head; 26. a suction pipe.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. It will be apparent to those skilled in the art that the specific meaning of the terms described above in the present utility model may be practiced in specific cases.
Referring to fig. 1 and 5, a construction fence;
including strut 1, stabilizer blade 2 is installed to the bottom of strut 1, strut 1 can provide firm support for all facilities of its both sides and top installation, stabilizer blade 2 can increase the area of contact of strut 1 with ground, make strut 1 can firmly place job site department, railing 3 is installed to the one side that two strut 1 kept away from each other, install rail 4 between two liang of strut 1, a plurality of solid poles 5 are installed at the top of rail 4, install breast board 6 between two solid poles 5 near the center, strut 1 can firm support railing 3 and rail 4, rail 4 can firm support a plurality of solid poles 5 under the support of strut 1, solid pole 5 can firm support breast board 6, gu pole 5, breast board 6, rail 4 and railing 3 cooperation can play the effect of enclosing, install ejector pin 7 between two liang of tops of railing 3, and ejector pin 7 is located gu pole 5's top, ejector pin 7 can play the guard action under the support of railing 3 and solid pole 5.
Referring to fig. 1, 3 and 5, a construction fence;
including railing 3, a set of plug bush 8 is installed to one side of one of them railing 3, a set of connecting plate 9 is installed to one side of another railing 3, the inserted bar 11 is installed to the one end of connecting plate 9, the inserted bar 11 is installed to the top and the bottom of embedded bar 10, recess 12 is seted up to one side of inserted bar 11, the front and the back of inserted bar 11 near the bottom are installed and are hung rope 13, link plate 14 is installed to the bottom of hanging rope 13, install elastic cord 15 between the two of link plate 14, the plug bush 8 can provide the through-channel for inserted bar 11 under the support of railing 3, elastic cord 15 and hanging rope 13 have certain elasticity, can warp under the effect of external force, then can rebound after the external force disappears, the staff can remove the second device according to actual conditions's needs, the inserted bar 11 through railing 3 and connecting plate 9 of the second device, make the inserted bar 11 of the bottom of the embedded bar 10 of second device run through the inboard of inserting the plug bush 8 of first device, simultaneously guarantee that elastic cord 15 of second device, link plate 15 and hanging rope 13 are connected to the corresponding device 13, can make the first and the inside of the device draw down, the device is more firm and the connection of the device is put down to the recess 12, the device is more firm in the top of the device is placed to the second device, the 13 can make the device is more firm to the top of the device is connected to the 13, and is more than the device is connected to the 13.
Referring to fig. 1, 2 and 4, a fence for construction is shown;
comprises a breast board 6, a storage shell 16 is arranged at the top of the breast board 6, a through barrel 17 is arranged at the top of the storage shell 16 penetrating through the inside of a mandril 7, a supporting foot 18 is arranged at the inner side of the through barrel 17, a plug 19 is arranged at the top of the supporting foot 18 in a jogged manner at the inner side penetrating through the top of the through barrel 17, a handle 20 is arranged at the top of the plug 19, a support plate 21 is arranged at the front of the storage shell 16, a water pump 22 is arranged at one side of the support plate 21, a calandria 23 is arranged at the top output end of the water pump 22, a suction pipe 26 is arranged at one side input end of the water pump 22 penetrating through the support plate 21, the suction pipe 26 is connected with the storage shell 16, side pipes 24 are arranged at two sides of the calandria 23, an atomizing head 25 is arranged at the top of the side pipe 24, the breast board 6 can provide stable support for the storage shell 16, the staff can hold the handle 20 according to the needs of actual conditions, and pull up the stopper 19 through the handle 20, make stopper 19 and spike 18 separation and take out from the inboard of leading to a section of thick bamboo 17, realize opening the effect of opening a section of thick bamboo 17, again pour into the inboard of leading to a section of thick bamboo 17, make water can pass a section of thick bamboo 17 and get into the inboard of storing shell 16 and store, afterwards, the staff can start water pump 22 under the support of backup pad 21, make water pump 22 can suck out the water that the storing shell 16 inboard stored through straw 26 and transmit to calandria 23, make calandria 23 distribute side pipe 24 with water, afterwards water can pass side pipe 24 and spray to the top from atomising head 25 under the effect of water pump 22, and then utilize the water of atomizing blowout to carry out dust fall work to the construction site.
Working principle: before the device is used, whether the device has the problem of influencing the use or not is checked, when a worker needs to use the device, the device is firmly placed at a working place by using the support legs 2, a plurality of the devices are connected end to end according to the actual situation, enclosure work is carried out, the device is electrified, water is injected into the inner side of the storage shell 16 for storage, and then the water pump 22 is started to spray the water for dust fall.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a rail is used in construction, includes strut (1), its characterized in that: the two support frames (1) are provided with a railing (3) on the surface far away from each other;
one of them a set of plug bush (8) is installed to one side of railing (3), and the other a set of connecting plate (9) is installed to one side of railing (3), chimeric pole (10) are installed to one end of connecting plate (9), inserted bar (11) are installed to top and bottom of chimeric pole (10), recess (12) are seted up to one side of inserted bar (11), and front and back installation that is close to inserted bar (11) of bottom have string rope (13), link plate (14) are installed to the bottom of string rope (13), link plate (14) install elastic cord (15) between two liang.
2. A construction fence according to claim 1, characterized in that: the bottom of the support frame (1) is provided with a supporting leg (2).
3. A construction fence according to claim 1, characterized in that: the fence (4) is arranged between every two of the supporting frames (1), the plurality of fixed rods (5) are arranged at the top of the fence (4), and the fence plate (6) is arranged between the two fixed rods (5) close to the center.
4. A construction fence according to claim 3 wherein: and ejector rods (7) are arranged between the top ends of the two railings (3), and the ejector rods (7) are positioned at the top of the fixed rod (5).
5. The construction fence of claim 4, wherein: the top of breast board (6) is installed and is stored up shell (16), and the internally mounted that the top of storing up shell (16) runs through ejector pin (7) has logical section of thick bamboo (17), and the supporting legs (18) are installed to the inboard of logical section of thick bamboo (17), and the inboard of logical section of thick bamboo (17) runs through top gomphosis and installs stopper (19), and stopper (19) are located the top of supporting legs (18), and handle (20) are installed at the top of stopper (19).
6. A construction fence according to claim 5 wherein: the front of store up shell (16) is installed extension board (21), and water pump (22) are installed to one side of extension board (21), and calandria (23) are installed at the top output of water pump (22), and straw (26) are installed in one side input penetration extension board (21) of water pump (22), and straw (26) are connected with store up shell (16).
7. The construction fence of claim 6, wherein: side pipes (24) are arranged on two sides of the calandria (23), and an atomizing head (25) is arranged at the top of each side pipe (24).
CN202320245976.XU 2023-02-17 2023-02-17 Fence for construction Active CN219061202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320245976.XU CN219061202U (en) 2023-02-17 2023-02-17 Fence for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320245976.XU CN219061202U (en) 2023-02-17 2023-02-17 Fence for construction

Publications (1)

Publication Number Publication Date
CN219061202U true CN219061202U (en) 2023-05-23

Family

ID=86343940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320245976.XU Active CN219061202U (en) 2023-02-17 2023-02-17 Fence for construction

Country Status (1)

Country Link
CN (1) CN219061202U (en)

Similar Documents

Publication Publication Date Title
CN204762466U (en) Watermelon rattan support
CN219061202U (en) Fence for construction
CN215054347U (en) Glass curtain wall convenient for indoor installation
CN214364795U (en) Anti-seismic anti-compression scaffold for house construction
CN205445450U (en) Foldable safe cat ladder
CN208767727U (en) A kind of portable cable fixed mount
CN218206130U (en) Vertical fence
CN206928890U (en) A kind of anti-skid power maintenance ladder
CN211342730U (en) Simple ladder
CN213806527U (en) Scaffold protective structure with telescopic function
CN210798485U (en) Safety device is used in building engineering construction
CN105952369A (en) Maintenance ladder in butt joint with fixed ladder of transmission tower pole
CN210380014U (en) A high altitude davit formula operation frame for transmission line overhauls
CN205595550U (en) High reliability net twine socket for communication engineering
CN214785839U (en) Fast assembly's high protection type hanging flower basket for construction
CN210013654U (en) Hanging ladder for power transmission tower
CN217657594U (en) Movable animal epidemic prevention fence
CN205106103U (en) Insecticidal lamp support
CN213523211U (en) Vegetable planting greenhouse convenient to installation
CN218413006U (en) Motor car servicing garage column position identification equipment installation and wiring integrated device
CN220478013U (en) Supporting device for supporting horizontal bar on door and indoor body building device
CN211775964U (en) A nimble reassembling type safety barrier for during building interior decoration
CN114589042B (en) Portable sprayer and fixing structure thereof
CN215717754U (en) Railing with adjustable height
CN216372005U (en) Assembled explosion-proof rubber ring puller

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant