CN219060611U - Connecting structure of bored pile steel bars - Google Patents

Connecting structure of bored pile steel bars Download PDF

Info

Publication number
CN219060611U
CN219060611U CN202223311086.9U CN202223311086U CN219060611U CN 219060611 U CN219060611 U CN 219060611U CN 202223311086 U CN202223311086 U CN 202223311086U CN 219060611 U CN219060611 U CN 219060611U
Authority
CN
China
Prior art keywords
steel bar
sleeve
steel
bar
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223311086.9U
Other languages
Chinese (zh)
Inventor
张婷
袁华崧
黎兴望
袁国发
杨平
魏领先
石增翔
贾秋硕
王加辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
China Railway Erju 5th Engineering Co Ltd
Original Assignee
Nanjing Forestry University
China Railway Erju 5th Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University, China Railway Erju 5th Engineering Co Ltd filed Critical Nanjing Forestry University
Priority to CN202223311086.9U priority Critical patent/CN219060611U/en
Application granted granted Critical
Publication of CN219060611U publication Critical patent/CN219060611U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种钻孔灌注桩钢筋的连接结构,包括第一钢筋和第二钢筋,所述第一钢筋和第二钢筋相近的一端均可拆卸连接有连接部件,两个连接部件通过同一套筒连接,套筒与连接部件通过卡接组件相连,套筒上安装有固定第一钢筋和第二钢筋连接处的加强连接件。本实用新型结构简单,先将第一钢筋和第二钢筋分别与对应的连接部件螺纹连接,然后将第一钢筋和第二钢筋端部的连接部件插入套筒中,外楔形件与内楔形件卡接,为第一钢筋和第二钢筋提供束缚力,通过旋转六角头螺栓,将六角头螺栓压在第一钢筋和第二钢筋的连接处,增强二者连接的稳定性。

Figure 202223311086

The utility model discloses a connection structure for steel bars of bored cast-in-place piles. The same sleeve is connected, the sleeve and the connecting part are connected through a clamping assembly, and the sleeve is equipped with a reinforcing connector for fixing the joint between the first steel bar and the second steel bar. The utility model has a simple structure. First, the first steel bar and the second steel bar are screwed to the corresponding connecting parts respectively, and then the connecting parts at the ends of the first steel bar and the second steel bar are inserted into the sleeve, and the outer wedge and the inner wedge Clamping provides binding force for the first steel bar and the second steel bar, and by rotating the hexagonal head bolt, the hexagonal head bolt is pressed against the connection between the first steel bar and the second steel bar to enhance the stability of the connection between the two.

Figure 202223311086

Description

一种钻孔灌注桩钢筋的连接结构A connection structure for reinforced steel bars of bored piles

技术领域technical field

本实用新型涉及土木施工技术领域,尤其涉及一种钻孔灌注桩钢筋的连接结构。The utility model relates to the technical field of civil construction, in particular to a connection structure for steel bars of bored cast-in-place piles.

背景技术Background technique

随着我国加大对城市空间的利用开发,部分区域的基坑处于城市高架桥之下,在低净空的情况下钻孔灌注桩钢筋笼的下放存在空间不足的问题,钢筋笼只能分段下放,需要一种钢筋连接方式在有限的时间内实现钢筋快速连接的要求。钢筋连接的传统方法主要采用直螺纹连接、焊接等手法。直螺纹连接接头处钢筋不直、变形、丝扣损坏,导致钢筋连接困难;焊接钢筋所需时间长,虽然保证了钢筋连接的刚度但是延长施工时间增加成本。As my country increases the utilization and development of urban space, foundation pits in some areas are under urban viaducts, and there is a problem of insufficient space for the lowering of the reinforced cages of bored piles under the condition of low headroom, and the reinforced cages can only be lowered in sections , a steel bar connection method is needed to realize the requirement of fast connection of steel bars in a limited time. The traditional method of steel bar connection mainly adopts straight thread connection, welding and other methods. Straight threaded joints are not straight, deformed, and threaded buckles are damaged, which makes it difficult to connect the steel bars; welding the steel bars takes a long time, although the rigidity of the steel bar connection is guaranteed, but the construction time increases the cost.

因此需要研究一种快速的钢筋连接方式来解决钢筋笼分段连接问题。Therefore, it is necessary to study a fast steel bar connection method to solve the problem of segmental connection of steel cages.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种钻孔灌注桩钢筋的连接结构,在低净空条件下,钢筋笼需要分段下放,针对目前钢筋连接方式存在的问题,通过本实用新型有效解决钢筋快速连接,操作简单同时提高工作效率。The purpose of this utility model is to solve the shortcomings existing in the prior art, and propose a connection structure of steel bars for bored piles. Under low headroom conditions, the steel cages need to be lowered in sections. problem, the utility model effectively solves the fast connection of steel bars, and the operation is simple and the work efficiency is improved at the same time.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种钻孔灌注桩钢筋的连接结构,包括第一钢筋和第二钢筋,所述第一钢筋和第二钢筋相近的一端均可拆卸连接有连接部件,两个连接部件通过同一套筒连接,套筒与连接部件通过卡接组件相连,套筒上安装有固定第一钢筋和第二钢筋连接处的加强连接件。A connection structure for steel bars of bored piles, comprising a first steel bar and a second steel bar, the ends of the first steel bar and the second steel bar are detachably connected to a connecting part, and the two connecting parts are connected through the same sleeve, The sleeve and the connecting part are connected through a clamping assembly, and the sleeve is equipped with a strengthening connecting piece for fixing the joint between the first steel bar and the second steel bar.

优选地,所述卡接组件包括等角度固定在连接部件外侧壁的外楔形件,套筒内壁设有安装槽,安装槽的内壁通过弹性件连接有与外楔形件卡接的内楔形件。Preferably, the clamping assembly includes an outer wedge fixed to the outer wall of the connecting part at an equal angle, an installation groove is provided on the inner wall of the sleeve, and an inner wedge connected to the outer wedge is connected to the inner wall of the installation groove through an elastic member.

优选地,所述加强连接件包括六角头螺栓,六角头螺栓与套筒侧壁设置的螺栓孔洞螺纹连接,六角头螺栓的端部压在第一钢筋和第二钢筋的连接处。Preferably, the reinforcing connector includes a hexagon head bolt, which is threadedly connected to the bolt hole provided on the side wall of the sleeve, and the end of the hexagon head bolt is pressed against the junction of the first steel bar and the second steel bar.

优选地,所述连接部件的内圈设有连接部件内螺纹,第一钢筋和第二钢筋的端部设有与连接部件内螺纹相对应的钢筋外螺纹。Preferably, the inner ring of the connecting part is provided with internal thread of the connecting part, and the ends of the first steel bar and the second steel bar are provided with external thread of steel bar corresponding to the internal thread of the connecting part.

优选地,所述六角头螺栓、外楔形件和内楔形件均有多个,且各部件等角度分布。Preferably, there are multiple hexagon head bolts, outer wedges and inner wedges, and the parts are equiangularly distributed.

与现有技术相比,本实用新型的有益效果是:本实用新型结构简单,先将第一钢筋和第二钢筋分别与对应的连接部件螺纹连接,然后将第一钢筋和第二钢筋端部的连接部件插入套筒中,外楔形件与内楔形件卡接,为第一钢筋和第二钢筋提供束缚力,通过旋转六角头螺栓,将六角头螺栓压在第一钢筋和第二钢筋的连接处,增强二者连接的稳定性,通过套筒的形式可以提前将连接部件与钢筋组合成整体结构,连接时只需将钢筋与套筒配合安装,减少了施工时间,提高了工作效率。Compared with the prior art, the beneficial effect of the utility model is: the utility model has a simple structure, and the first steel bar and the second steel bar are screwed to the corresponding connecting parts respectively, and then the ends of the first steel bar and the second steel bar are screwed together. The connecting part of the connecting part is inserted into the sleeve, and the outer wedge is clamped with the inner wedge to provide binding force for the first steel bar and the second steel bar. By rotating the hexagonal head bolt, the hexagonal head bolt is pressed against the first steel bar and the second steel bar. At the joint, the stability of the connection between the two can be enhanced. The connecting part and the steel bar can be combined into an integral structure in advance through the form of a sleeve. When connecting, only the steel bar and the sleeve need to be installed together, which reduces construction time and improves work efficiency.

附图说明Description of drawings

为了更具体直观地说明本发明实施例或者现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简要介绍。In order to illustrate the embodiments of the present invention or the technical solutions in the prior art in a more specific and intuitive manner, the following briefly introduces the drawings that are required in the description of the embodiments or the prior art.

图1为本实用新型提出的结构示意图;Fig. 1 is the structural representation that the utility model proposes;

图2为连接部件的结构示意图;Fig. 2 is the structural representation of connection part;

图3为图1中A-A截面示意图。Fig. 3 is a schematic cross-sectional view of A-A in Fig. 1 .

图中:第一钢筋1、第二钢筋2、连接部件3、连接部件内螺纹31、外楔形件32、套筒4、内楔形件41、弹性件42、凹槽43、螺栓孔洞44、钢筋外螺纹5、六角头螺栓6。In the figure: the first steel bar 1, the second steel bar 2, the connecting part 3, the internal thread 31 of the connecting part, the outer wedge 32, the sleeve 4, the inner wedge 41, the elastic part 42, the groove 43, the bolt hole 44, the steel bar External thread 5, hex head bolt 6.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.

参照图1-3,一种钻孔灌注桩钢筋的连接结构,包括第一钢筋1和第二钢筋2,第一钢筋1和第二钢筋2相近的一端均可拆卸连接有连接部件3,两个连接部件3通过同一套筒4连接,套筒4与连接部件3通过卡接组件相连,套筒4上安装有固定第一钢筋1和第二钢筋2连接处的加强连接件。Referring to Figures 1-3, a connection structure for bored cast-in-situ pile reinforcement, including a first reinforcement 1 and a second reinforcement 2, the first reinforcement 1 and the second reinforcement 2 are detachably connected to a connecting part 3 at one end thereof, the two The two connecting parts 3 are connected through the same sleeve 4, and the sleeve 4 is connected with the connecting part 3 through a snap-fit assembly, and the sleeve 4 is equipped with a reinforcing connector for fixing the connection between the first steel bar 1 and the second steel bar 2.

本实施方案中,卡接组件包括等角度固定在连接部件3外侧壁的外楔形件32,套筒4内壁设有安装槽,安装槽的内壁通过弹性件42连接有与外楔形件32卡接的内楔形件41,套筒4与连接部件3通过外楔形件32和内楔形件41相互卡接实现连接,从而第一钢筋1和第二钢筋2的固定。In this embodiment, the clamping assembly includes an outer wedge 32 fixed at an equal angle to the outer wall of the connecting part 3, and the inner wall of the sleeve 4 is provided with a mounting groove, and the inner wall of the mounting groove is connected to the outer wedge 32 through an elastic member 42. The inner wedge 41, the sleeve 4 and the connecting part 3 are connected through the mutual clamping of the outer wedge 32 and the inner wedge 41, so that the first steel bar 1 and the second steel bar 2 are fixed.

本实施方案中,加强连接件包括六角头螺栓6,六角头螺栓6与套筒4侧壁设置的螺栓孔洞44螺纹连接,六角头螺栓6的端部压在第一钢筋1和第二钢筋2的连接处,通过旋转六角头螺栓6,将六角头螺栓6压在第一钢筋1和第二钢筋2的连接处,增强二者连接的稳定性。In this embodiment, the reinforcing connector includes a hexagonal head bolt 6, which is threadedly connected with the bolt hole 44 provided on the side wall of the sleeve 4, and the end of the hexagonal head bolt 6 is pressed against the first steel bar 1 and the second steel bar 2 By rotating the hexagon head bolt 6, the hexagon head bolt 6 is pressed against the connection between the first steel bar 1 and the second steel bar 2 to enhance the stability of their connection.

本实施方案中,连接部件3的内圈设有连接部件内螺纹31,第一钢筋1和第二钢筋2的端部设有与连接部件内螺纹31相对应的钢筋外螺纹5,实现第一钢筋1和第二钢筋2与连接部件3的连接固定。In this embodiment, the inner ring of the connecting part 3 is provided with a connecting part internal thread 31, and the ends of the first steel bar 1 and the second steel bar 2 are provided with a steel bar external thread 5 corresponding to the connecting part internal thread 31, realizing the first The connection between the reinforcing bar 1 and the second reinforcing bar 2 and the connecting part 3 is fixed.

本实施方案中,六角头螺栓6、外楔形件32和内楔形件41均有多个,且各部件等角度分布,使各部分连接力均匀分布。In this embodiment, there are multiple hexagon head bolts 6 , outer wedges 32 and inner wedges 41 , and each part is distributed at an equal angle, so that the connecting force of each part is evenly distributed.

本案中,先将第一钢筋1和第二钢筋2分别与对应的连接部件3螺纹连接,然后将第一钢筋1和第二钢筋2端部的连接部件3插入套筒4中,外楔形件32与内楔形件41卡接,为第一钢筋1和第二钢筋2提供束缚力,通过旋转六角头螺栓6,将六角头螺栓6压在第一钢筋1和第二钢筋2的连接处,增强二者连接的稳定性。In this case, the first steel bar 1 and the second steel bar 2 are screwed to the corresponding connecting parts 3 respectively, and then the connecting parts 3 at the ends of the first steel bar 1 and the second steel bar 2 are inserted into the sleeve 4, and the outer wedge 32 is clamped with the inner wedge 41 to provide binding force for the first steel bar 1 and the second steel bar 2, and by rotating the hexagonal head bolt 6, the hexagonal head bolt 6 is pressed on the joint of the first steel bar 1 and the second steel bar 2, Enhance the stability of the connection between the two.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.

Claims (5)

1. The utility model provides a connection structure of bored concrete pile reinforcing bar, includes first reinforcing bar (1) and second reinforcing bar (2), its characterized in that, the connecting component (3) are all dismantled to the one end that first reinforcing bar (1) and second reinforcing bar (2) are close, and two connecting components (3) are connected through same sleeve (4), and sleeve (4) link to each other through joint subassembly with connecting component (3), install the strengthening connection piece of fixed first reinforcing bar (1) and second reinforcing bar (2) junction on sleeve (4).
2. A connecting structure of bored pile steel bars according to claim 1, characterized in that the clamping assembly comprises an outer wedge (32) fixed on the outer side wall of the connecting part (3) at equal angles, the inner wall of the sleeve (4) is provided with a mounting groove, and the inner wall of the mounting groove is connected with an inner wedge (41) clamped with the outer wedge (32) through an elastic piece (42).
3. A connecting structure of bored pile steel bars according to claim 2, characterized in that the reinforcing connecting piece comprises a hexagonal head bolt (6), the hexagonal head bolt (6) is in threaded connection with a bolt hole (44) formed in the side wall of the sleeve (4), and the end of the hexagonal head bolt (6) is pressed at the joint of the first steel bar (1) and the second steel bar (2).
4. A connecting structure of bored pile steel bars according to claim 3, characterized in that the inner ring of the connecting member (3) is provided with connecting member female screw threads (31), and the ends of the first steel bar (1) and the second steel bar (2) are provided with steel bar male screw threads (5) corresponding to the connecting member female screw threads (31).
5. A connecting structure of bored pile reinforcing steel bars according to claim 4, characterized in that the hexagonal head bolts (6), the outer wedge (32) and the inner wedge (41) are all plural and the parts are equiangularly distributed.
CN202223311086.9U 2022-12-09 2022-12-09 Connecting structure of bored pile steel bars Active CN219060611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223311086.9U CN219060611U (en) 2022-12-09 2022-12-09 Connecting structure of bored pile steel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223311086.9U CN219060611U (en) 2022-12-09 2022-12-09 Connecting structure of bored pile steel bars

Publications (1)

Publication Number Publication Date
CN219060611U true CN219060611U (en) 2023-05-23

Family

ID=86375541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223311086.9U Active CN219060611U (en) 2022-12-09 2022-12-09 Connecting structure of bored pile steel bars

Country Status (1)

Country Link
CN (1) CN219060611U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116752701A (en) * 2023-07-05 2023-09-15 中国建筑第五工程局有限公司 BIM-based fabricated building element

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116752701A (en) * 2023-07-05 2023-09-15 中国建筑第五工程局有限公司 BIM-based fabricated building element
CN116752701B (en) * 2023-07-05 2023-11-28 中国建筑第五工程局有限公司 BIM-based fabricated building element

Similar Documents

Publication Publication Date Title
CN101525904A (en) Square steel tube concrete combined special-shaped column sleeve beam column node and manufacturing method
CN105442760A (en) Steel bar connection mode used for connection among prefabricated reinforced concrete members
CN204825619U (en) Assembled concrete bridge mound
CN202248298U (en) Section steel concrete frame node
CN206815547U (en) A kind of frame-type bean column node
CN105155781A (en) Reinforced connecting structure and method between precast reinforced concrete components
CN108868008B (en) Ductile steel bar connecting device with replaceable threaded sleeve and installation and replacement method
CN202248283U (en) Connecting piece of joint part of steel and concrete combined structure
CN104032956A (en) Construction method for connecting reinforced concrete beams with steel reinforced concrete columns
CN219060611U (en) Connecting structure of bored pile steel bars
CN103469967B (en) Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member
CN111851737A (en) Prefabricated concrete frame beam-column dry connection joint
CN216305149U (en) A tooth-holding extrusion check steel bar connector
CN215256602U (en) A prefabricated tower of wind power mixed tower connected by bolt U ring
CN208106921U (en) The single side fastening bolt of replaceable anti-vertically and horizontally bidirectional load
CN205637158U (en) Device for connecting completely assembling formula precast concrete structure
CN109944361B (en) T-shaped node of steel concrete combined pipe with high shear strength
CN105064622B (en) Telescopic bar connecting external member
CN112726965A (en) Detachable assembly type prefabricated floor slab steel bar connecting device, structure and method
CN207934341U (en) The sleeve connection structure of reinforcing bar and steel reinforced concrete
CN118728420A (en) Clamp for fixing segments of sharp curve tunnel and its use method
CN113339198B (en) A prefabricated wind power tower connected by self-tightening high-strength bolts and its construction method
CN211172434U (en) Pipe truss butt joint interface
CN204551806U (en) Steel frame infilled wood shear wall structure connected by embedded steel bars
CN210049441U (en) T-shaped joint of T-shaped steel and threaded sleeve assembled and connected type steel concrete combined pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant