CN219034702U - Mining drilling parameter monitoring drainage device - Google Patents

Mining drilling parameter monitoring drainage device Download PDF

Info

Publication number
CN219034702U
CN219034702U CN202223106450.8U CN202223106450U CN219034702U CN 219034702 U CN219034702 U CN 219034702U CN 202223106450 U CN202223106450 U CN 202223106450U CN 219034702 U CN219034702 U CN 219034702U
Authority
CN
China
Prior art keywords
pipe
gas
ball valve
wall
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223106450.8U
Other languages
Chinese (zh)
Inventor
吴建臣
吴兵克
倪克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanzheng Group Co ltd
Original Assignee
Sanzheng Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanzheng Group Co ltd filed Critical Sanzheng Group Co ltd
Priority to CN202223106450.8U priority Critical patent/CN219034702U/en
Application granted granted Critical
Publication of CN219034702U publication Critical patent/CN219034702U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model relates to the technical field of gas extraction, and discloses a mining drilling parameter monitoring water discharging device, which comprises a four-way pipeline, wherein a gas collecting tube is arranged on the side surface of the four-way pipeline, a first clamping hoop is fixedly sleeved on the outer edge of the four-way pipeline, the four-way pipeline is fixedly assembled with the gas collecting tube through the first clamping hoop, a clamp plug is fixedly assembled at one end, far away from the four-way pipeline, of the gas collecting tube, an m32 pipe joint is fixedly assembled at the top of the gas collecting tube, a first ball valve is fixedly sleeved on the outer edge, close to the top, of the m32 pipe joint, and a ball valve measuring nozzle is arranged on the outer edge of the first ball valve. This gas drainage structure uses through the cooperation of gas collecting channel and four-way pipeline, and the gas collecting channel guide m32 coupling butt joint gas is to U type pipe to detect through gas drainage pipeline gas determination appearance, compare traditional device, this device utilizes the guide of being responsible for of being in charge of, thereby makes the device erect and puts more stably reasonable.

Description

Mining drilling parameter monitoring drainage device
Technical Field
The utility model relates to the technical field of gas extraction, in particular to a mining drilling parameter monitoring drainage device.
Background
Drilling holes in coal seam and gas gathering area, connecting the drilling holes to special pipeline, and pumping the gas in the coal seam and goaf to ground by using extraction equipment for utilization; or to the total return air flow.
On one hand, the traditional gas extraction structure is used for placing the extraction pipe body in actual construction and messy construction sites, so that the arrangement and installation effects of the extraction pipe are relatively disordered, the extraction pipe is easily affected by external sundries, the use of the device is affected, on the other hand, when the traditional device is used, water in a coal seam is easily extracted, and water in the pipe is not discharged in time, so that the quality of gas extraction is affected.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a mining drilling parameter monitoring drainage device, which has the advantages of more reasonable arrangement of extraction pipes and more stable gas extraction quality, and solves the problem that the quality of gas is influenced by water in the gas extraction pipes in the traditional device.
The utility model provides the following technical scheme: mining drilling parameter monitoring drainage device, including the four-way pipe, the side of four-way pipe is provided with the gas collecting channel, the outer edge of four-way pipe is fixed to be cup jointed first clamping hoop, and the four-way pipe passes through first clamping hoop and gas collecting channel fixed assembly, the one end fixed mounting that the four-way pipe was kept away from to the gas collecting channel has the clamp end cap, the fixed m32 coupling that is equipped with in top of gas collecting channel, the outer edge that the m32 coupling is close to the top is fixed to be cup jointed first ball valve, the outer edge of first ball valve is provided with ball valve air tap.
As a preferable technical scheme of the utility model, the inner wall of the first ball valve is fixedly provided with an m32 claw locking joint, and the m32 claw locking joint is fixedly assembled with the m32 pipe joint through the first ball valve.
As a preferable technical scheme of the utility model, the top of the four-way pipeline is fixedly sleeved with a second ball valve, the inner wall, close to the top, of the second ball valve is fixedly sleeved with a straight tube pipeline, the outer edge, close to the top, of the straight tube pipeline is fixedly sleeved with a second clamping hoop, and the inner wall of the second clamping hoop is fixedly sleeved with a U-shaped tube.
As a preferable technical scheme of the utility model, the top of the U-shaped pipe is fixedly provided with a gas meter of a gas extraction pipeline, the bottom of the U-shaped pipe is fixedly sleeved with a third clamping hoop, the inner wall of the third clamping hoop is fixedly sleeved with a cylinder, the top of the cylinder is fixedly provided with a first fixing plate, and the bottom of the first fixing plate is fixedly provided with a second fixing plate through screws.
As a preferable technical scheme of the utility model, a first m40 claw locking joint is fixedly arranged at the bottom of the inner wall of the four-way pipeline, a drain pipe is fixedly sleeved on the inner wall of the first m40 claw locking joint, a second m40 claw locking joint is fixedly sleeved on the inner wall of the drain pipe close to the bottom, and a drainage three-way pipe is fixedly sleeved on the inner wall of the second m40 claw locking joint.
As a preferable technical scheme of the utility model, the inner wall of the drainage three-way pipe is fixedly sleeved with the mc63 claw locking joint, the inner wall of the mc63 claw locking joint is fixedly sleeved with the connecting pipe, and the side surface of the connecting pipe is fixedly provided with the water draining device.
Compared with the prior art, the utility model has the following beneficial effects:
1. this mining drilling parameter monitoring drainage device uses through the cooperation of gas collecting tube and four-way pipeline, and the gas collecting tube guide m32 coupling butt joint gas is to U type pipe to detect through gas extraction pipeline gas survey appearance, compare traditional device, this device utilizes the guide of being responsible for of being in charge of, thereby makes the device erect and puts more stable reasonable.
2. This mining drilling parameter monitoring drainage device uses through the cooperation of gas collecting channel and four-way pipe, utilizes the gas extraction of the m32 coupling extraction that the gas collecting channel top is connected to the gas collecting channel, later leads gas to the middle part of four-way pipe through the gas collecting channel, and the inside water of gas collecting channel gets into the drainage three-way pipe through the drain pipe this moment to guide to the ware that drains, compare traditional device, this device is convenient for utilize the cooperation of ware and four-way pipe of draining to use, and the inside water emission of guide gas collecting channel, thereby makes the gas extraction result more stable.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is an enlarged schematic view of the structure of FIG. 1A according to the present utility model;
FIG. 3 is a schematic view of the front cross-section of the present utility model;
fig. 4 is a schematic view of another angle perspective structure of the present utility model.
In the figure: 1. a four-way pipe; 2. a first clamping ring; 3. a gas collecting tube; 4. a clamp plug; 5. m32 pipe joint; 6. a first ball valve; 7. m32 claw locking joint; 8. a second ball valve; 9. a straight tube pipe; 10. a second clamping ring; 11. a U-shaped tube; 12. a gas meter for a gas extraction pipeline; 13. a third clamping ring; 14. a cylinder; 15. a first fixing plate; 16. a second fixing plate; 17. a first m40 jaw locking joint; 18. a drain pipe; 19. a second m40 jaw locking joint; 20. a water drainage three-way pipe; 21. mc63 claw locking joint; 22. a connecting pipe; 23. a water draining device.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the mining drilling parameter monitoring drainage device comprises a four-way pipeline 1, a gas collecting tube 3 is arranged on the side face of the four-way pipeline 1, a first clamping hoop 2 is fixedly sleeved on the outer edge of the four-way pipeline 1, the four-way pipeline 1 is fixedly assembled with the gas collecting tube 3 through the first clamping hoop 2, a clamp plug 4 is fixedly assembled at one end, far away from the four-way pipeline 1, of the gas collecting tube 3, an m32 pipe joint 5 is fixedly assembled at the top of the gas collecting tube 3, a first ball valve 6 is fixedly sleeved on the outer edge, close to the top, of the m32 pipe joint 5, a ball valve air measuring nozzle is arranged on the outer edge of the first ball valve 6, and the inner part of the gas collecting tube 3 is guided by the m32 pipe joint 5, and the ball valve air measuring nozzle is additionally assembled, so that the stable use of the first ball valve 6 is ensured, and the first ball valve 6 is used for controlling the use and closing between each branch pipes, so that the device operates more stably.
Wherein, the inner wall of first ball valve 6 is fixed to be equipped with m32 jack catch locking joint 7, and m32 jack catch locking joint 7 is through first ball valve 6 and the fixed assembly of m32 coupling 5, installs additional through m32 jack catch locking joint 7 to the be convenient for utilize m32 jack catch locking joint 7 to dock with outside part pipe, and then make the external circuit put more neat stability.
Wherein, the fixed second ball valve 8 that has cup jointed in top of four-way pipe 1, the inner wall that second ball valve 8 is close to the top is fixed to be cup jointed straight bobbin way 9, the outer edge that straight bobbin way 9 is close to the top is fixed to be cup jointed second clamping hoop 10, the fixed U type pipe 11 that has cup jointed in inner wall of second clamping hoop 10 uses through the cooperation of second ball valve 8 and straight bobbin way 9 to be convenient for utilize the extraction of the inside gas of second ball valve 8 control gas-collecting tube 3, install additional through second clamping hoop 10, thereby make straight bobbin way 9 and U type pipe 11 dock more stably.
Wherein, the top fixed mounting of U type pipe 11 has gas extraction pipeline gas determination appearance 12, the fixed third clamping hoop 13 that has cup jointed in bottom of U type pipe 11, the fixed drum 14 that has cup jointed of inner wall of third clamping hoop 13, the fixed first fixed plate 15 that is equipped with in top of drum 14, the bottom of first fixed plate 15 is equipped with second fixed plate 16 through the screw fixation, install additional through gas extraction pipeline gas determination appearance 12, thereby be convenient for utilize gas extraction pipeline gas determination appearance 12 to detect gas concentration, will send the warning after the concentration exceeds standard, thereby guarantee personnel's life and property safety.
Wherein, the fixed assembly in bottom of four-way pipe 1 inner wall has first m40 jack catch locking joint 17, and the fixed drain pipe 18 that has cup jointed of inner wall that connects of first m40 jack catch locking joint 17, the fixed second m40 jack catch locking joint 19 that has cup jointed of inner wall that is close to the bottom of drain pipe 18, the fixed drainage three-way pipe 20 that has cup jointed of inner wall that connects 19 of second m40 jack catch locking joint, thereby use with the cooperation of drain pipe 18 through first m40 jack catch locking joint 17 and make drain pipe 18 dock more stable.
Wherein, the inner wall of drainage tee pipe 20 has fixedly cup jointed mc63 jack catch locking joint 21, and the inner wall of mc63 jack catch locking joint 21 has fixedly cup jointed connecting pipe 22, and the side of connecting pipe 22 is fixed to be equipped with and is put down water ware 23, and when gas was taken out the pipe by the top and is led to U type pipe 11, the inside water of coal seam was got into to put down water ware 23 inside through drain pipe 18.
When the device is needed to be used, the m32 claw locking joint 7 is in butt joint with an external extraction branch pipe, then the external extraction branch pipe enters the gas collecting pipe 3 through the m32 claw locking joint 7, the first ball valve 6 and the m32 pipe joint 5, at the moment, the U-shaped pipe 11 at the top of the four-way pipeline 1 guides gas to enter, the gas is detected through the gas extraction pipeline gas detector 12, and coal bed water enters the water discharger 23 through the first m40 claw locking joint 17, the water discharge pipe 18, the second m40 claw locking joint 19 and the water discharge three-way pipe 20.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Mining drilling parameter monitoring drainage device, including four-way pipe (1), its characterized in that: the side of four-way pipeline (1) is provided with gas collecting tube (3), the outer edge of four-way pipeline (1) has fixedly cup jointed first clamping hoop (2), and four-way pipeline (1) is through first clamping hoop (2) and gas collecting tube (3) fixed assembly, the one end fixed assembly that four-way pipeline (1) was kept away from to gas collecting tube (3) has clamp end cap (4), the fixed m32 coupling (5) that is equipped with in top of gas collecting tube (3), the outer edge that m32 coupling (5) is close to the top has fixedly cup jointed first ball valve (6), the outer edge of first ball valve (6) is provided with ball valve test cock.
2. The mining drilling parameter monitoring water drainage device of claim 1, wherein: the inner wall of the first ball valve (6) is fixedly provided with an m32 claw locking joint (7), and the m32 claw locking joint (7) is fixedly assembled with the m32 pipe joint (5) through the first ball valve (6).
3. The mining drilling parameter monitoring water drainage device of claim 1, wherein: the top of four-way pipeline (1) has fixedly cup jointed second ball valve (8), the inner wall that second ball valve (8) are close to the top has fixedly cup jointed straight section of thick bamboo pipeline (9), the outer edge that straight section of thick bamboo pipeline (9) are close to the top has fixedly cup jointed second clamping hoop (10), the inner wall of second clamping hoop (10) has fixedly cup jointed U type pipe (11).
4. A mining drilling parameter monitoring water drain according to claim 3, wherein: the gas extraction pipeline gas analyzer comprises a U-shaped pipe (11), wherein a gas extraction pipeline gas analyzer (12) is fixedly assembled at the top of the U-shaped pipe (11), a third clamping hoop (13) is fixedly sleeved at the bottom of the U-shaped pipe (11), a cylinder (14) is fixedly sleeved on the inner wall of the third clamping hoop (13), a first fixing plate (15) is fixedly assembled at the top of the cylinder (14), and a second fixing plate (16) is fixedly assembled at the bottom of the first fixing plate (15) through screws.
5. The mining drilling parameter monitoring water drainage device of claim 1, wherein: the bottom of four-way pipeline (1) inner wall is fixed to be equipped with first m40 jack catch locking joint (17), the inner wall of first m40 jack catch locking joint (17) is fixed to be cup jointed drain pipe (18), the inner wall that drain pipe (18) are close to the bottom is fixed to be cup jointed second m40 jack catch locking joint (19), the inner wall of second m40 jack catch locking joint (19) is fixed to be cup jointed drainage three-way pipe (20).
6. The mining drilling parameter monitoring water drainage device of claim 5, wherein: the inner wall of the drainage three-way pipe (20) is fixedly sleeved with a mc63 claw locking joint (21), the inner wall of the mc63 claw locking joint (21) is fixedly sleeved with a connecting pipe (22), and the side surface of the connecting pipe (22) is fixedly provided with a water draining device (23).
CN202223106450.8U 2022-11-23 2022-11-23 Mining drilling parameter monitoring drainage device Active CN219034702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223106450.8U CN219034702U (en) 2022-11-23 2022-11-23 Mining drilling parameter monitoring drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223106450.8U CN219034702U (en) 2022-11-23 2022-11-23 Mining drilling parameter monitoring drainage device

Publications (1)

Publication Number Publication Date
CN219034702U true CN219034702U (en) 2023-05-16

Family

ID=86285034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223106450.8U Active CN219034702U (en) 2022-11-23 2022-11-23 Mining drilling parameter monitoring drainage device

Country Status (1)

Country Link
CN (1) CN219034702U (en)

Similar Documents

Publication Publication Date Title
CN107882587B (en) Automatic drainage device for down gas extraction drilling compressed air
CN108679451B (en) High-rise building drainage pipeline blocking fault positioning and monitoring device
CN219034702U (en) Mining drilling parameter monitoring drainage device
CN110736592B (en) Device for automatically clamping and preventing water leakage and checking waterproof effect of waterproof material
CN212808262U (en) Water quality on-line monitoring device convenient to sample
CN105525941A (en) Method for improving stability of permanent gas extraction system of outburst mine
KR20120016742A (en) Drain valve having sight glass
CN107701221B (en) High negative pressure pipeline gas extraction metering device and use method thereof
CN108037546B (en) Building outer wall rainfall detection device
CN207469360U (en) A kind of tap water supply device with leak self-checking function
CN109594613A (en) Tap water supply device and leak detection method with leak self-checking function
CN208152190U (en) A kind of water supply and sewage work building leakage preventing structure
CN204027898U (en) A kind of water quality online analyzer pretreatment unit
CN219016285U (en) Sampling detection equipment for water supply and drainage
CN208595292U (en) A kind of water segregator having flow monitoring function
CN113251319A (en) Coal gas drainage device and use method thereof
CN215294566U (en) Descending pipe sampling device of gas drainer
CN220568728U (en) Coal mine goaf wall-closing multifunctional observation hole device
CN214709327U (en) Irrigation equipment convenient to energy-conserving water conservation
CN214320209U (en) Open-air drilling gas collection device that gushes out water
CN215718918U (en) Measurement and drainage integrated device of orifice plate flowmeter of gas extraction pump station
CN220039947U (en) Pipeline sampling device is used in mineral water production
CN210767014U (en) Fire hydrant and fire hydrant mounting structure
CN209894102U (en) Detachable rain sewage pipeline measurement auxiliary rod
CN204804837U (en) Between take out and open producing well spike agent automatic sampler between, between

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant