CN219033022U - Lifting ground column installation structure - Google Patents

Lifting ground column installation structure Download PDF

Info

Publication number
CN219033022U
CN219033022U CN202222845610.4U CN202222845610U CN219033022U CN 219033022 U CN219033022 U CN 219033022U CN 202222845610 U CN202222845610 U CN 202222845610U CN 219033022 U CN219033022 U CN 219033022U
Authority
CN
China
Prior art keywords
layer
lifting
ground column
lifting ground
cement leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222845610.4U
Other languages
Chinese (zh)
Inventor
时小斌
李勇
张宏毅
陈伟
何国栋
纪曲波
刘仍兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guizhou Engineering Co Ltd
Original Assignee
China Railway Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guizhou Engineering Co Ltd filed Critical China Railway Guizhou Engineering Co Ltd
Priority to CN202222845610.4U priority Critical patent/CN219033022U/en
Application granted granted Critical
Publication of CN219033022U publication Critical patent/CN219033022U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a lifting ground column installation structure which comprises a lifting ground column, a cement leveling layer, a concrete layer, a rammed soil layer, road bricks and a control box, wherein the cement leveling layer is paved at the bottom of a foundation pit, the upper end face of the cement leveling layer is horizontal, the lower part of the lifting ground column is leaned against the upper end face of the cement leveling layer, the concrete layer and the rammed soil layer are filled above the cement leveling layer from bottom to top, the lifting ground column is embedded in the concrete layer and the rammed soil layer, the road bricks are paved on the upper part of the rammed soil layer, the upper part of the road bricks are flush with the upper part of the lifting ground column, and the control box is connected with the lifting ground column through an embedded line. According to the utility model, the concrete layer is arranged at the lower part of the rammed earth layer, so that the water collecting well is arranged at one side of the cement leveling layer, the accumulated water near the lifting ground column can be collected and then discharged through the drainage pump, and the flushing pipe is arranged in the water collecting well, so that the water collecting well is conveniently and regularly flushed, and sediment deposition is avoided.

Description

Lifting ground column installation structure
Technical Field
The utility model belongs to the field of lifting ground column installation construction, and particularly relates to a lifting ground column installation structure.
Background
The lifting ground column is widely used in many occasions such as urban traffic, gate parking lots of institutions and the like at present, and effectively ensures traffic order and safety of main facilities and places through limiting passing vehicles. Because the lifting ground column is normally installed in the open air, when rainfall, although structures such as a motor in the lifting ground column are waterproof, gaps between the lifting section and the embedded section are easy to be permeated by rainwater, the accumulated water in the lifting ground column is required to be discharged, for example, an anti-collision lifting column disclosed in China patent with the application number 201922001399.6 is fixed on the lifting column by using a water seepage layer and a backfill layer, but the water permeability of the backfill layer is poor, the rainwater is prevented from permeating into the water seepage layer, and if the backfill layer with good water permeability is used, the structure of the lifting column disclosed in China patent with the application number 202010540.X is low in structural strength of the backfill layer, and comprises a plurality of mounting grooves formed in a road, a cylinder body is fixedly arranged in the mounting grooves, the lifting column is connected with the cylinder body in a sliding manner up and down, the water storage tank is arranged in the ground, and although the accumulated water can be effectively permeated, if the water is easy to be carried by using the backfill layer, and the rainwater is easy to drain in the water storage tank, and the efficiency of the water storage tank is not completely sealed. Therefore, the lifting ground column installation structure is needed, accumulated water in the lifting ground column can be effectively discharged, and the water collecting well is internally provided with the flushing pipe, so that flushing is conveniently carried out in the water collecting well, and the influence of sand and soil deposition on use is avoided.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a lifting ground column installation structure which can solve the problems of poor water seepage of a backfill layer and difficult flushing of a water collecting well in the prior art.
The utility model is realized by the following technical scheme.
The utility model provides a lifting ground column installation structure which comprises a lifting ground column, a cement leveling layer, a concrete layer, a rammed soil layer, road bricks and a control box, wherein the cement leveling layer is paved at the bottom of a foundation pit, the upper end face of the cement leveling layer is horizontal, the lower part of the lifting ground column is leaned against the upper end face of the cement leveling layer, the concrete layer and the rammed soil layer are filled above the cement leveling layer from bottom to top, the lifting ground column is embedded in the concrete layer and the rammed soil layer, the road bricks are paved on the upper part of the rammed soil layer, the upper part of the road bricks are flush with the upper part of the lifting ground column, and the control box is connected with the lifting ground column through an embedded line.
The cement leveling layer one side is equipped with the sump pit, and the pre-buried drain pipe in the cement leveling layer, each lift ground post bottom all communicates with the drain pipe, drain pipe one end and sump pit intercommunication.
The drainage pump is arranged in the water collecting well, is installed at the bottom of the water collecting well and is communicated with a sewer through a pipeline, and is connected with the control box through a wire.
Be equipped with the wash pipe in the sump pit, wash pipe one end is connected with municipal administration delivery pipe through the valve, and wash pipe other end extends to the sump pit lower part, and the opening of wash pipe is towards the sump pit lower part.
The rammed earth layer is equipped with the baffle in being close to the one side of sump pit, and the baffle lower part is embedded into the concrete layer, and the baffle middle part is equipped with a plurality of through-holes, and is equipped with the burlap and packs between baffle and the rammed earth layer.
The upper opening of the water collecting well is provided with a cover plate, the bottom of the water collecting well is provided with a sensor, and the sensor is connected with the control box through a lead.
The utility model has the beneficial effects that: through setting up concrete layer in rammed earth layer lower part, when guaranteeing to lift ground post is fixed, make things convenient for the infiltration of ponding, set up the sump pit in cement leveling layer one side, can collect the near ponding of lift ground post and discharge through the drain pump to set up the wash pipe in the sump pit, conveniently regularly wash the sump pit, avoid silt deposit.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
in the figure: 1-lifting ground column, 2-cement leveling layer, 3-concrete layer, 4-rammed soil layer, 5-road brick, 6-control box, 7-water collecting well, 8-drain pipe, 10-drainage pump, 11-flushing pipe, 12-baffle, 13-cover plate and 14-sensor.
Detailed Description
The technical solution of the present utility model is further described below, but the scope of the claimed utility model is not limited to the above.
As shown in fig. 1, the lifting ground column installation structure comprises a lifting ground column 1, a cement leveling layer 2, a concrete layer 3, a rammed earth layer 4, road bricks 5 and a control box 6, wherein the cement leveling layer 2 is paved at the bottom of a foundation pit, the upper end face of the cement leveling layer 2 is horizontal, the lower part of the lifting ground column 1 leans against the upper end face of the cement leveling layer 2, the concrete layer 3 and the rammed earth layer 4 are filled above the cement leveling layer 2 from bottom to top, the lifting ground column 1 is embedded in the concrete layer 3 and the rammed earth layer 4, the road bricks 5 are paved on the upper part of the rammed earth layer 4, the upper part of the road bricks 5 are flush with the upper part of the lifting ground column 1, and the control box 6 is connected with the lifting ground column 1 through pre-buried lines.
The cement leveling layer 2 is used for leveling at the bottom after foundation pit excavation to each lift ground post 1 can be in same level, and the pre-buried section of thick bamboo of lift ground post 1 is embedded into concrete layer 3, and concrete layer 3's structural strength is high, can fix lift ground post 1, avoids lift ground post 1 to receive lift ground post 1 not hard up when striking, and rammed earth layer 4 can support road brick 5, and road brick 5 is subsided when avoiding personnel to walk, and the rainwater that the road brick 5 infiltration can be given way to rammed earth layer 4 flows into sump pit 7 from rammed earth layer 4 side simultaneously, and the rainwater on road brick 5 upper portion is got rid of when fixed lift ground post 1. The lifting ground column 1 adopts the existing commercially available lifting ground column 1, a drain hole capable of draining water is arranged at the lower part of the lifting ground column 1, and accumulated water in the lifting ground column 1 can be drained into the water collecting well 7 through connecting the drain hole with the drain pipe 8, so that the influence on use caused by excessive accumulated water in the lifting ground column 1 is avoided.
The cement leveling layer 2 one side is equipped with sump pit 7, and pre-buried drain pipe 8 in the cement leveling layer 2, each lift ground post 1 bottom all communicates with drain pipe 8, and drain pipe 8 one end communicates with sump pit 7, and sump pit 7 is located the low side, can collect the rainwater that the soil layer 4 was tamped to 1 in the lift ground post and tamped to take out ponding through drain pump 10, avoid ponding to influence the operation of equipment.
Be equipped with drain pump 10 in the sump pit 7, drain pump 10 installs in sump pit 7 bottom, drain pump 10 passes through pipeline and sewer intercommunication, and drain pump 10 is connected with control box 6 through the wire, after ponding enters into sump pit 7 after, sensor 14 position senses ponding, gives control box 6 feedback response signal, the circuit intercommunication of PLC controller control drain pump 10 in the control box 6, drain pump 10 starts, takes out ponding in the sump pit 7, avoids ponding too much influence equipment's operation.
Be equipped with wash pipe 11 in the sump pit 7, wash pipe 11 one end passes through the valve and is connected with municipal administration delivery pipe, wash pipe 11 other end extends to sump pit 7 lower part, and wash pipe 11's opening is towards sump pit 7 lower part, the user can regularly wash sump pit 7, open the valve during the washing, after high-pressure water is spouted from wash pipe 11, strike sump pit 7 bottom, wash away silt, make its suspension in the aquatic, and take out in sump pit 7 under the cooperation of drain pump 10, accomplish the washing operation, avoid in the sump pit 7 siltation too much and influence the operation of drain pump 10.
The rammed earth layer 4 is provided with a baffle 12 on one side close to the water collecting well 7, the lower part of the baffle 12 is embedded into the concrete layer 3, a plurality of through holes are formed in the middle of the baffle 12, and linen is arranged between the baffle 12 and the rammed earth layer 4 to fill, so that sediment in water seepage can be blocked through the filling of the baffle 12 and the linen, sediment deposition speed in the water collecting well 7 is reduced, water and soil loss of the rammed earth layer 4 is notified to be reduced, and the road bricks 5 are prevented from collapsing.
The upper opening of the water collecting well 7 is provided with a cover plate 13, the bottom of the water collecting well 7 is provided with a sensor 14, the sensor 14 is connected with the control box 6 through a wire, the cover plate 13 is more convenient for people to overhaul than people stepping into the water collecting well 7, the sensor 14 adopts a water level sensor sold at present, after the position of the sensor 14 senses accumulated water, the accumulated water in the water collecting well 7 is described, at the moment, the drainage pump 10 can be started, and accumulated water in the water collecting well 7 is pumped out.

Claims (6)

1. A lifting ground column mounting structure, characterized in that: the concrete pavement system comprises a lifting ground column (1), a cement leveling layer (2), a concrete layer (3), a rammed soil layer (4), road bricks (5) and a control box (6), wherein the cement leveling layer (2) is paved at the bottom of a foundation pit, the upper end face of the cement leveling layer (2) is horizontal, and the lower part of the lifting ground column (1) leans against the upper end face of the cement leveling layer (2); the concrete layer (3) and the rammed soil layer (4) are filled above the cement leveling layer (2) from bottom to top, the lifting ground column (1) is embedded in the concrete layer (3) and the rammed soil layer (4), the road bricks (5) are paved on the upper part of the rammed soil layer (4), and the upper parts of the road bricks (5) are flush with the upper part of the lifting ground column (1); the control box (6) is connected with the lifting ground column (1) through an embedded wire.
2. A lifting column mounting structure according to claim 1, wherein: the cement leveling layer (2) one side is equipped with sump pit (7), pre-buried drain pipe (8) in cement leveling layer (2), and each lift ground post (1) bottom all communicates with drain pipe (8), drain pipe (8) one end and sump pit (7) intercommunication.
3. A lifting column mounting structure according to claim 2, wherein: the water collecting well (7) is internally provided with a water discharging pump (10), the water discharging pump (10) is arranged at the bottom of the water collecting well (7), the water discharging pump (10) is communicated with a sewer through a pipeline, and the water discharging pump (10) is connected with the control box (6) through a lead.
4. A lifting column mounting structure according to claim 2, wherein: be equipped with wash pipe (11) in sump pit (7), wash pipe (11) one end is connected with municipal administration delivery pipe through the valve, and wash pipe (11) other end extends to sump pit (7) lower part, and the opening of wash pipe (11) is towards sump pit (7) lower part.
5. A lifting column mounting structure according to claim 1, wherein: the rammed earth layer (4) is provided with a baffle (12) on one side close to the water collecting well (7), the lower part of the baffle (12) is embedded into the concrete layer (3), a plurality of through holes are formed in the middle of the baffle (12), and linen filling is arranged between the baffle (12) and the rammed earth layer (4).
6. A lifting column mounting structure according to claim 2, wherein: the upper opening of the water collecting well (7) is provided with a cover plate (13), the bottom of the water collecting well (7) is provided with a sensor (14), and the sensor (14) is connected with the control box (6) through a lead.
CN202222845610.4U 2022-10-26 2022-10-26 Lifting ground column installation structure Expired - Fee Related CN219033022U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222845610.4U CN219033022U (en) 2022-10-26 2022-10-26 Lifting ground column installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222845610.4U CN219033022U (en) 2022-10-26 2022-10-26 Lifting ground column installation structure

Publications (1)

Publication Number Publication Date
CN219033022U true CN219033022U (en) 2023-05-16

Family

ID=86277362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222845610.4U Expired - Fee Related CN219033022U (en) 2022-10-26 2022-10-26 Lifting ground column installation structure

Country Status (1)

Country Link
CN (1) CN219033022U (en)

Similar Documents

Publication Publication Date Title
CN205171636U (en) Urban road rainwater collection utilization system
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN212477844U (en) Basement drainage decompression anti-floating structure
CN113389257A (en) Town road drainage system
CN111395257A (en) Green road combined with green-planted ecological retaining wall and construction method thereof
CN213805707U (en) Road enhancement mode infiltration well and sleeve based on sponge city construction
CN113373963A (en) Drainage structure for water collection pit and elevator foundation pit and construction method
CN213267959U (en) Foundation pit bottom drainage integrated system completed after underground water level rises
CN219033022U (en) Lifting ground column installation structure
CN201137209Y (en) Underground drainage device
CN108005210A (en) A kind of drainage pipeline and its construction method
CN110055983B (en) Fast-assembling component formula protective structure of refuse dump side slope
CN216552030U (en) Basement outer wall fat groove falls drainage structures
CN210946876U (en) Barricade reinforced structure convenient to road surface is widened
CN209144964U (en) A kind of efficient rainwater isolation collection device
CN210086253U (en) Composite pile structure of water-rich super-thick sand pebble foundation pit
CN210331937U (en) Waste water recycling system
CN210140780U (en) Anti-clogging ecological permeable box culvert
CN209620125U (en) A kind of underground structure blind drainage system
CN113914342A (en) Basement outer wall fertilizer groove drainage construction method
CN218148496U (en) Integral cantilever type barricade that has filter-tank and escape canal
CN2929003Y (en) Water drain base for city road
CN211973590U (en) Seepage-proofing structure for water conservancy and hydropower foundation treatment
CN210031901U (en) Prevent subsiding retaining wall structure
CN218621625U (en) Light concrete road surface structure that permeates water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230516