CN219026469U - Novel assembled manufacturing platform of steel tower structural module - Google Patents

Novel assembled manufacturing platform of steel tower structural module Download PDF

Info

Publication number
CN219026469U
CN219026469U CN202223316954.2U CN202223316954U CN219026469U CN 219026469 U CN219026469 U CN 219026469U CN 202223316954 U CN202223316954 U CN 202223316954U CN 219026469 U CN219026469 U CN 219026469U
Authority
CN
China
Prior art keywords
sliding
travelling trolley
rail
transverse
sliding rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223316954.2U
Other languages
Chinese (zh)
Inventor
黄道元
王庆伟
祝建明
苏群山
张永庆
段常智
张艳意
郭新
董新红
范艳超
王世杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan DR Construction Group Steel Structure Co ltd
Henan DR Construction Group Co Ltd
Original Assignee
Henan DR Construction Group Steel Structure Co ltd
Henan DR Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan DR Construction Group Steel Structure Co ltd, Henan DR Construction Group Co Ltd filed Critical Henan DR Construction Group Steel Structure Co ltd
Priority to CN202223316954.2U priority Critical patent/CN219026469U/en
Application granted granted Critical
Publication of CN219026469U publication Critical patent/CN219026469U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled manufacturing platform of a novel steel tower structure module, which comprises an assembly plane, wherein a transverse rail and a vertical rail are arranged on the assembly plane; the transverse rail is provided with a first travelling trolley and a second travelling trolley, and the first travelling trolley and the second travelling trolley are respectively provided with a transverse sliding rail and a vertical sliding rail; sliding upright posts capable of sliding along the sliding rails are arranged on the transverse sliding rail and the vertical sliding rail of the first travelling trolley and the second travelling trolley; the vertical rail is provided with a third travelling trolley, the third travelling trolley is provided with a transverse sliding rail, and the transverse sliding rail of the third travelling trolley is provided with two sliding upright posts capable of sliding along the sliding rail; two movable connectors capable of sliding up and down are arranged on the sliding upright post. Compared with the traditional fabricated manufacturing platform, the fabricated connecting structure is adopted, the fabricated connecting structure can adapt to the positioning and fixing requirements of components with different specifications, is convenient and quick, ensures that workers can more easily complete the positioning and calibration work of the prefabricated components, and improves the assembly efficiency.

Description

Novel assembled manufacturing platform of steel tower structural module
Technical Field
The utility model belongs to the technical field of structural engineering, and particularly relates to an assembled manufacturing platform of a novel steel tower structural module.
Background
The steel structure has the advantages of light weight, high strength, recyclable materials and the like, so that the steel structure is increasingly applied to a support structure system of a heat dissipation system. Because of the huge volume of the support structure of the heat dissipation system, factory prefabricated components are usually adopted, and then transported to the site for hoisting and splicing the prefabricated components. The assembly of the prefabricated components on the ground is usually completed on a ground component assembly platform, and is the earlier stage of the construction of the support structure of the heat dissipation system. The existing component assembling platform is a simple jig frame arranged on the ground, and the prefabricated components are directly welded on the simple jig frame. However, the existing fabricated manufacturing platform has various problems, including low precision, large welding workload, long time consumption, large difference between component connection effect and expected effect, serious influence on construction progress and construction quality, and even threaten the overall safety of the supporting structure after being assembled on the supporting structure. Therefore, aiming at the problems of the prior component assembly platform, a new assembly type manufacturing platform capable of meeting the requirements of assembly accuracy, high efficiency and high quality is needed to be provided.
Disclosure of Invention
Aiming at the problems, the utility model provides an assembled manufacturing platform of a novel steel tower structure module, which meets the requirements of rapid and accurate assembly of prefabricated parts, improves the construction speed and is simple and convenient to construct.
In order to achieve the above purpose, the utility model adopts the technical scheme that the novel fabricated manufacturing platform of the steel tower structural module comprises an assembly plane, wherein a transverse track and a vertical track are arranged on the assembly plane; the transverse rail is provided with a first travelling trolley and a second travelling trolley, and the first travelling trolley and the second travelling trolley are respectively provided with a transverse sliding rail and a vertical sliding rail; sliding upright posts capable of sliding along the sliding rails are arranged on the transverse sliding rail and the vertical sliding rail of the first travelling trolley and the second travelling trolley; the vertical rail is provided with a third travelling trolley, the third travelling trolley is provided with a transverse sliding rail, and the transverse sliding rail of the third travelling trolley is provided with two sliding upright posts capable of sliding along the sliding rail; two movable connectors capable of sliding up and down are arranged on the sliding upright post.
Preferably, the sliding upright post is a square steel pipe.
Preferably, the movable connector is provided with a flange connecting plate.
Preferably, the transverse sliding rail and the vertical sliding rail are made of steel bars.
The utility model has the beneficial effects that: the prefabricated component can be connected with the flange connecting plate on the movable connecting head sliding up and down by using high-strength bolts, and the prefabricated component can be adjusted and positioned by combining the travelling trolley and the sliding rail, so that the positioning accuracy is effectively improved, and the welding assembly operation difficulty is reduced. In addition, the assembled manufacturing platform of the novel steel tower structure module adopts an assembled connection structure relative to the traditional assembled manufacturing platform, can adapt to the positioning and fixing requirements of components with different specifications, is more convenient and rapid, enables workers to more easily complete the positioning and calibration work of the prefabricated components, and can complete the movement of the components in space only by the movable trolley, the horizontal sliding upright posts and the connecting joints, thereby greatly improving the assembly efficiency.
Drawings
FIG. 1 is a front view of an assembled manufacturing platform of the novel steel tower structural module;
FIG. 2 is a top view of an assembled fabrication platform of the novel steel tower structural module;
FIG. 3 is a left side view of the fabricated platform of the novel steel tower structural module;
fig. 4 is a partial enlarged view of the connection portion of the right prefabricated member and the up-down slidable connection head.
Wherein: 1. assembly plane, 2. Transverse track, 31. First travelling trolley, 32. Second travelling trolley, 33. Third travelling trolley, 4. Sliding upright, 5. Transverse slide rail, 51. Vertical slide rail, 6. Moving connector, 7. Left side splice position of triangular splice member, 8. Right side splice position of triangular splice member, 9. Lower side splice position of triangular splice member, 10. First part of triangular splice member, 11. Second part of triangular splice member, 12. Third part of triangular splice member, 13. Fourth part of triangular splice member, 14. Vertical track.
Detailed Description
Example 1
As shown in fig. 1-4, an assembled manufacturing platform of a novel steel tower structure module comprises an assembling plane 1, wherein a transverse track 2 and a vertical track 14 are arranged at the upper part of the assembling plane 1; the transverse track 2 is provided with a first travelling trolley 31 and a second travelling trolley 32, and the first travelling trolley 31 and the second travelling trolley 32 are respectively provided with a transverse sliding rail 5 and a vertical sliding rail 51; the transverse slide rail 5 and the vertical slide rail 51 of the first travelling trolley 31 and the second travelling trolley 32 are respectively provided with a sliding upright post 4 which can slide along the slide rails; the vertical track 14 is provided with a third travelling trolley 33, the third travelling trolley 33 is provided with a transverse sliding rail 5, and the transverse sliding rail of the third travelling trolley is provided with two sliding upright posts 4 which can slide along the sliding rail; two movable connectors 6 which can slide up and down are arranged on the sliding upright posts 4.
The sliding upright post 4 adopts square steel pipes, the movable connector 6 is provided with a flange connecting plate, and the transverse sliding rail 5 and the vertical sliding rail 51 are made of steel bars.
The third travelling trolley 33 slides vertically on the vertical rail 14, the vertical position of the fourth part 13 of the triangular assembly member being adjustable; the first travelling trolley 31 and the second travelling trolley 32 slide laterally on the lateral tracks, the lateral position of the first part 10 of the triangular splice member being adjustable.
The assembly plane 1 adopts a steel plate, and the transverse rail 2 and the vertical rail 14 welded at the upper part both adopt channel steel, so that the travelling trolley is ensured to travel along the rails.
The sliding upright column arranged at the upper part of the third travelling trolley 33 can transversely slide on a transverse sliding rail of the third travelling trolley to adjust the transverse position of the fourth part 13 of the triangular assembling member; the connector which is arranged on the sliding upright post and can move up and down on the sliding upright post, and the up-down position of the fourth part 13 of the triangular assembling component can be adjusted.
The flange connecting plate arranged on the sliding upright post can be connected and fixed with the prefabricated part by adopting a high-strength bolt.
The workflow of the assembled manufacturing platform of the novel steel tower structural module is described as follows:
firstly, adjusting all the movable connectors to enable the upper layer and the lower layer to be at the same height respectively, wherein the distance corresponds to the distance between the connecting nodes of the triangular assembly members;
the distance between sliding upright posts on the vertical track 14 is adjusted, and the fourth part 13 of the triangular assembly member and four movable connectors on a third travelling trolley above the vertical track are fixedly connected by high-strength bolts so as to be capable of moving together with the third travelling trolley 33;
the distance between two travelling trolleys on the transverse track 2 and the horizontal positions of the four sliding upright posts are adjusted, so that eight movable connectors can correspond to eight connecting nodes of the first part 10 of the triangular assembly member; the first part 10 of the triangular assembly component and eight movable connectors on two travelling trolleys above the transverse track are connected and fixed by high-strength bolts, so that the movable connectors can move together with the travelling trolleys;
and (3) moving the second part 11 of the triangular assembly member and the third part 12 of the triangular assembly member to a position between the first part 10 of the triangular assembly member and the fourth part 13 of the triangular assembly member by using lifting equipment or a jack, and completing the adjustment of the positions of all members by moving a travelling trolley below the first part 10 of the triangular assembly member and the fourth part 13 of the triangular assembly member, thereby completing the splicing work of splicing positions of two sides of the second part 11 of the triangular assembly member and two sides of the third part 12 of the triangular assembly member.
So far, the assembly of the first part 10, the second part 11, the third part 12 and the fourth part 13 of the triangular assembly member is completed, after the required strength is achieved, the whole triangular steel structure module can be jacked up by using lifting equipment or a jack, all the connecting positions are removed, and the high-strength bolts installed by the connectors can be moved in a vertical sliding manner, so that the triangular steel structure module can be lifted to the required position for installation.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (4)

1. The utility model provides a novel assembled manufacturing platform of steel tower structural module which characterized in that: the device comprises an assembly plane, wherein a transverse rail and a vertical rail are arranged on the assembly plane; the transverse rail is provided with a first travelling trolley and a second travelling trolley, and the first travelling trolley and the second travelling trolley are respectively provided with a transverse sliding rail and a vertical sliding rail; sliding upright posts capable of sliding along the sliding rails are arranged on the transverse sliding rail and the vertical sliding rail of the first travelling trolley and the second travelling trolley; the vertical rail is provided with a third travelling trolley, the third travelling trolley is provided with a transverse sliding rail, and the transverse sliding rail of the third travelling trolley is provided with two sliding upright posts capable of sliding along the sliding rail; two movable connectors capable of sliding up and down are arranged on the sliding upright post.
2. The fabricated platform for a new steel tower structural module according to claim 1, wherein: the sliding upright post adopts square steel pipes.
3. The fabricated platform for a new steel tower structural module according to claim 1, wherein: and the movable connector is provided with a flange connecting plate.
4. The fabricated platform for a new steel tower structural module according to claim 1, wherein: the transverse sliding rail and the vertical sliding rail are made of steel bars.
CN202223316954.2U 2022-12-12 2022-12-12 Novel assembled manufacturing platform of steel tower structural module Active CN219026469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223316954.2U CN219026469U (en) 2022-12-12 2022-12-12 Novel assembled manufacturing platform of steel tower structural module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223316954.2U CN219026469U (en) 2022-12-12 2022-12-12 Novel assembled manufacturing platform of steel tower structural module

Publications (1)

Publication Number Publication Date
CN219026469U true CN219026469U (en) 2023-05-16

Family

ID=86275575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223316954.2U Active CN219026469U (en) 2022-12-12 2022-12-12 Novel assembled manufacturing platform of steel tower structural module

Country Status (1)

Country Link
CN (1) CN219026469U (en)

Similar Documents

Publication Publication Date Title
CN103452052A (en) Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN111101718A (en) Steel truss assembling system and construction method
CN219026469U (en) Novel assembled manufacturing platform of steel tower structural module
CN112878933B (en) Large-span multi-section guide rail laying method
CN209903552U (en) Prefabricated beam rail-mounted steel bar mounting jig frame
CN201927268U (en) Practice teaching platform for steel structure installation
CN108952002B (en) Oversized and ultra-wide double-spliced combined I-shaped steel beam and sectional division and installation method thereof
CN113479816B (en) Variable-angle movable steel structure oblique beam hoisting adjusting and supporting system and construction method
CN103556835B (en) Floor slab trolley
CN208803363U (en) A kind of belt track free cantilever erection steel girder bridge
CN221029657U (en) Large steel member total splicing platform in canyon ladder space
CN219665617U (en) Control device for on-site accurate assembly of steel anchor beam and steel corbel
CN114477024B (en) Movable mounting platform for abdominal support, tail support and back support models
CN113967732B (en) Assembled slideway for replacing upper revolving body of bale revolving platform and installation method
CN217601215U (en) Steel pipe arch bridge linear adjusting device
CN219175020U (en) Large-curvature arc steel beam positioning device
CN216107854U (en) Installation frock of rubber tyer rail guided way
CN214696963U (en) Steel structure splicing platform slideway frame for sliding construction
CN219118850U (en) Integral lifting house structure of steel structure industrial factory building roof
CN219793476U (en) Rail replacing tool applicable to embedded magnetic levitation rail beam
CN218426563U (en) Diaphragm plate positioning device
CN219793682U (en) Bridge girder steel form location installation device
CN110082080B (en) PC track beam static load test pedestal suitable for different beam lengths and curvatures
CN209923781U (en) A interim strutting arrangement that is used for modularization adjustable gesture of prefabricated bent cap installation
CN218809988U (en) Heating power pipeline is to mouthful hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant