CN219023419U - Efficient sewage treatment structure - Google Patents

Efficient sewage treatment structure Download PDF

Info

Publication number
CN219023419U
CN219023419U CN202223379273.0U CN202223379273U CN219023419U CN 219023419 U CN219023419 U CN 219023419U CN 202223379273 U CN202223379273 U CN 202223379273U CN 219023419 U CN219023419 U CN 219023419U
Authority
CN
China
Prior art keywords
treatment
sewage
plate
box
slag discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223379273.0U
Other languages
Chinese (zh)
Inventor
张善有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongchuang United Tianjin Environmental Protection Technology Co ltd
Original Assignee
Zhongchuang United Tianjin Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongchuang United Tianjin Environmental Protection Technology Co ltd filed Critical Zhongchuang United Tianjin Environmental Protection Technology Co ltd
Priority to CN202223379273.0U priority Critical patent/CN219023419U/en
Application granted granted Critical
Publication of CN219023419U publication Critical patent/CN219023419U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to the technical field of sewage treatment, in particular to a high-efficiency sewage treatment structure which comprises a treatment box, a top plate and a slag discharge pipe, wherein a mounting block is fixedly arranged at the lower end of the top plate, and a buffer slope is fixedly arranged on the inner wall of the treatment box. This high-efficient sewage treatment structure, pour sewage into through the inlet tank treatment incasement portion, the inside movable mounting of two inlet openings has the screen cloth, the screen cloth is woven for the wire of taking the mesh and is formed, can block large granule grit entering treatment case, can twist the bolt and get off the screen cloth from the installation piece, clear up the silt on the screen cloth, when the sewage that has been filtered large granule silt is discharged into treatment case, can strike earlier and reduce the impact force of sewage on the buffering slope, the filtration of filter is carried out to the sewage that gets into treatment case at last, the direct effect of too big impact on the filter has been avoided, the life of high-efficient sewage treatment structure filter has been improved, and then the treatment efficiency of high-efficient sewage treatment structure is improved.

Description

一种高效污水处理结构An efficient sewage treatment structure

技术领域technical field

本实用新型涉及污水处理技术领域,具体为一种高效污水处理结构。The utility model relates to the technical field of sewage treatment, in particular to an efficient sewage treatment structure.

背景技术Background technique

污水处理:为使污水达到排入某一水体或再次使用的水质要求对其进行净化的过程。污水处理被广泛应用于建筑、农业、交通、能源、石化、环保、城市景观、医疗、餐饮等各个领域,污水处理时,过滤是污水处理中基本的处理方式,通过滤板进行过滤。Sewage treatment: the process of purifying sewage to meet the water quality requirements for discharge into a certain water body or for reuse. Sewage treatment is widely used in various fields such as construction, agriculture, transportation, energy, petrochemical, environmental protection, urban landscape, medical treatment, catering, etc. During sewage treatment, filtration is the basic treatment method in sewage treatment, and it is filtered through filter plates.

例如授权公告号“CN217340276U”名为一种高效污水处理结构,虽然能够在过滤箱的顶部固定安装有带动所述升降柱和所述升降杆升降运动的升降装置;本申请实现污水的过滤处理,可以自动清理滤渣,无需人工操作,极大地节省人工,同时提高污水处理,使用质量高,易于推广,但依然存在,现有的高效污水处理结构,其污水进水孔直接设置在过滤板端部上方,污水未过滤之前,内部会夹杂的大量的固体杂质泥沙,这样会导致污水的重量很大,所以污水在进入处理箱后会直接带有很大的力度砸向过滤板,然而过滤板的一端是通过软皮带连接的,这就使得过滤板在被污水冲击下会震荡波动,在过滤长时间的使用工作下,会导致过滤板的使用寿命大幅度缩减,进而使得过滤板的过滤效果变差,最终降低了高效污水处理结构的处理污水的效率。For example, the authorized announcement number "CN217340276U" is called a high-efficiency sewage treatment structure. Although a lifting device that drives the lifting column and the lifting rod can be fixedly installed on the top of the filter box; the application realizes the filtration treatment of sewage. It can automatically clean the filter residue without manual operation, which greatly saves labor, and at the same time improves sewage treatment. It has high quality and is easy to promote. However, it still exists. The existing high-efficiency sewage treatment structure, its sewage inlet hole is directly set at the end of the filter plate Above, before the sewage is filtered, there will be a large amount of solid impurities and sand inside, which will cause the weight of the sewage to be heavy, so the sewage will directly hit the filter plate with great force after entering the treatment tank, but the filter plate One end of the filter plate is connected by a soft belt, which makes the filter plate vibrate and fluctuate under the impact of sewage. Under the long-term use of filtration, the service life of the filter plate will be greatly reduced, and the filtering effect of the filter plate will be greatly reduced. become worse, and ultimately reduce the sewage treatment efficiency of the high-efficiency sewage treatment structure.

同时高效污水处理结构,在实际的工作中,最终滤板上的杂质物会通过排渣管排出过滤箱内部,排渣管长时间进行排渣工作,会使得排渣管的内壁上附着有一层泥沙污渍,泥沙污渍粘附在排渣管的内壁难以清理,会减小高效污水处理结构排渣管的内径,导致了过滤箱后续内部杂质的排出变得困难,最终使得高效污水处理结构的杂质处理结果变差。At the same time, the high-efficiency sewage treatment structure, in actual work, the impurities on the final filter plate will be discharged from the inside of the filter box through the slag discharge pipe, and the slag discharge pipe will perform slagging work for a long time, which will cause a layer of Sediment stains. Sediment stains adhere to the inner wall of the slag discharge pipe and are difficult to clean, which will reduce the inner diameter of the slag discharge pipe of the high-efficiency sewage treatment structure, making it difficult to discharge the impurities inside the filter box, and ultimately make the high-efficiency sewage treatment structure The results of impurity treatment become worse.

实用新型内容Utility model content

本实用新型的目是为了解决现有高效污水处理结构存在处理效率降低和杂质处理结果差的问题,而提出的一种高效污水处理结构。The purpose of the utility model is to solve the problems of reduced treatment efficiency and poor impurity treatment results in the existing high-efficiency sewage treatment structure, and propose a high-efficiency sewage treatment structure.

为实现上述目的,本实用新型提供如下技术方案:一种高效污水处理结构,包括处理箱、顶板和排渣管,所述处理箱的内部设有污水初处理装置,所述污水初处理装置包括进水孔、安装块和筛网,两个所述进水孔固定安装在处理箱的上方两侧,两个所述进水孔的内部活动安装有筛网,两个所述筛网的上端活动卡接在安装块的内部,所述安装块的一侧螺纹连接有螺栓,所述螺栓的端部贯穿安装块,且螺栓的端部与筛网相抵紧,所述安装块固定安装在顶板下端,所述处理箱的内壁固定安装有缓冲坡,两个所述缓冲坡的上方与进水孔相对设置。In order to achieve the above purpose, the utility model provides the following technical solutions: a high-efficiency sewage treatment structure, including a treatment box, a top plate and a slag discharge pipe, the interior of the treatment box is provided with a sewage primary treatment device, and the sewage primary treatment device includes Water inlet, installation block and screen cloth, two described water inlet holes are fixedly installed on both sides of the top of the treatment tank, the inside of the two described water inlet holes is equipped with screen cloth, and the upper ends of the two described screen cloths It is movable clamped inside the installation block, one side of the installation block is threaded with a bolt, the end of the bolt penetrates the installation block, and the end of the bolt is pressed against the screen, and the installation block is fixed on the top plate At the lower end, buffer slopes are fixedly installed on the inner wall of the treatment box, and the tops of the two buffer slopes are arranged opposite to the water inlet holes.

优选的,所述处理箱的内侧设有排渣装置;Preferably, a slagging device is provided inside the treatment box;

所述排渣装置包括电动伸缩杆、盖板和过滤板;The slag discharge device includes an electric telescopic rod, a cover plate and a filter plate;

所述电动伸缩杆固定安装在处理箱的顶端,所述电动伸缩杆的上方固定连接有顶板,所述顶板的两侧固定连接有连接杆,两个所述连接杆下端固定连接有盖板,所述顶板的下端两侧固定连接有拉动杆,两根所述拉动杆的下方通过销轴活动连接有连接板,两个所述连接板的下端通过销轴活动连接在过滤板的上方,两个所述过滤板一端通过销轴活动连接在排渣管的端部,两个所述过滤板的另一端活动连接有皮带,两根所述皮带的端部固定安装在处理箱的内壁。The electric telescopic rod is fixedly installed on the top of the processing box, the top of the electric telescopic rod is fixedly connected with a top plate, the two sides of the top plate are fixedly connected with connecting rods, and the lower ends of the two connecting rods are fixedly connected with cover plates, Both sides of the lower end of the top plate are fixedly connected with pull rods, and the bottom of the two pull rods is movably connected with a connecting plate through a pin shaft, and the lower ends of the two connecting plates are movably connected above the filter plate through a pin shaft. One end of each of the filter plates is movably connected to the end of the slag discharge pipe through a pin shaft, the other ends of the two filter plates are movably connected to belts, and the ends of the two belts are fixedly installed on the inner wall of the treatment box.

优选的,所述排渣管固定安装在处理箱的底端,所述盖板活动连接在排渣管的顶部,所述盖板的下方设有污泥处理装置;Preferably, the slag discharge pipe is fixedly installed at the bottom of the treatment box, the cover plate is movably connected to the top of the slag discharge pipe, and a sludge treatment device is arranged below the cover plate;

所述污泥处理装置包括电机、横板和刷板;The sludge treatment device includes a motor, a horizontal plate and a brush plate;

所述电机固定安装在盖板的下端,所述电机的输出轴通过连轴器固定连接有转动轴,所述转动轴的两侧固定连接有多根横板,多个所述横板的端部固定安装有刷板,多个所述刷板活动连接在排渣管的内壁。The motor is fixedly installed on the lower end of the cover plate, the output shaft of the motor is fixedly connected with a rotating shaft through a shaft coupling, and a plurality of horizontal plates are fixedly connected to both sides of the rotating shaft, and the ends of the plurality of horizontal plates A brush plate is fixedly installed on the upper part, and multiple brush plates are movably connected to the inner wall of the slag discharge pipe.

优选的,所述过滤板的下方设有排水坡,两个所述排水坡固定安装在处理箱的底部,两个所述排水坡的端部连通有排水孔,两个所述排水孔固定开设在处理箱的底端。Preferably, the bottom of the filter plate is provided with a drainage slope, and the two drainage slopes are fixedly installed on the bottom of the treatment box. The ends of the two drainage slopes are connected with drainage holes, and the two drainage holes are fixedly opened. at the bottom of the disposal box.

优选的,所述处理箱的外壁固定安装有控制器,所述控制器与电动伸缩杆电性相连,所述控制器的两侧设有观察窗,两个所述观察窗固定安装在处理箱的外壁,所述处理箱的下端固定连接有多根支撑柱。Preferably, a controller is fixedly installed on the outer wall of the processing box, and the controller is electrically connected to the electric telescopic rod. Both sides of the controller are provided with observation windows, and the two observation windows are fixedly installed in the processing box. The outer wall of the processing box is fixedly connected with a plurality of support columns at the lower end.

本实用新型提出的一种高效污水处理结构,有益效果在于:该高效污水处理结构,通过进水孔箱处理箱内部倒入污水,两个进水孔的内部活动安装有筛网,筛网为带网眼的金属丝编织而成,可以阻挡大颗粒砂石进入处理箱,可以拧动螺栓将筛网从安装块上取下来,对筛网上的泥沙进行清理,当被过滤完大块颗粒泥沙的污水排入处理箱时,会先撞击在缓冲坡上减少污水的冲击力,最后进入处理箱的污水进行过滤板的过滤,避免了过大的冲击直接作用在过滤板上,提高了高效污水处理结构过滤板的使用寿命,进而使得高效污水处理结构的处理效率得到提高。The utility model proposes a high-efficiency sewage treatment structure, which has the beneficial effect that: the high-efficiency sewage treatment structure pours sewage through the inside of the water inlet box treatment box, and the inside of the two water inlet holes is movable. The screen mesh is Weaving metal wire with mesh can prevent large particles of sand and gravel from entering the treatment box. You can twist the bolts to remove the screen from the mounting block and clean the sand on the screen. When the large particles of mud are filtered When the sandy sewage is discharged into the treatment tank, it will hit the buffer slope first to reduce the impact force of the sewage, and finally the sewage entering the treatment tank will be filtered by the filter plate, which avoids excessive impact directly acting on the filter plate and improves the efficiency. The service life of the filter plate of the sewage treatment structure improves the treatment efficiency of the high-efficiency sewage treatment structure.

当排渣管内部堆积泥沙时,连接外接电源启动电机,电机的输出轴带着转动轴转动,转动轴带动横板在排渣管内部转动,转动的横板带动刷板将排渣管的内部刮干净,利用电机带动刷板的工作,将排渣管内部清理,减少了排渣管因为污泥的堵塞而内径减少问题发生,进而提高了高效污水处理结构杂质处理结果更优。When sediment is accumulated inside the slag discharge pipe, connect the external power supply to start the motor, the output shaft of the motor rotates with the rotating shaft, and the rotating shaft drives the horizontal plate to rotate inside the slag discharge pipe, and the rotating horizontal plate drives the brush plate to move the The inside is scraped clean, and the brush plate is driven by the motor to clean the inside of the slag discharge pipe, which reduces the problem of reducing the inner diameter of the slag discharge pipe due to the clogging of sludge, and thus improves the efficient sewage treatment structure. Impurity treatment results are better.

附图说明Description of drawings

图1为本实用新型的立体示意图;Fig. 1 is the three-dimensional schematic view of the utility model;

图2为图1的正面示意图;Figure 2 is a schematic front view of Figure 1;

图3为图2的剖视示意图;Figure 3 is a schematic cross-sectional view of Figure 2;

图4为图3中A部位放大剖视图;Fig. 4 is an enlarged sectional view of part A in Fig. 3;

图5为图3中B部位放大剖面图。FIG. 5 is an enlarged cross-sectional view of part B in FIG. 3 .

图中:1、处理箱,2、顶板,3、排渣装置,31、电动伸缩杆,32、连接杆,33、盖板,34、拉动杆,35、连接板,36、过滤板,37、皮带,4、排渣管,5、支撑柱,6、污水初处理装置,61、进水孔,62、安装块,63、螺栓,64、筛网,65、缓冲坡,7、污泥处理装置,71、电机,72、转动轴,73、横板,74、刷板,81、排水坡,82、排水孔,9、控制器,10、观察窗。In the figure: 1. processing box, 2. top plate, 3. slag discharge device, 31. electric telescopic rod, 32. connecting rod, 33. cover plate, 34. pulling rod, 35. connecting plate, 36. filter plate, 37 , belt, 4, slag discharge pipe, 5, support column, 6, sewage primary treatment device, 61, water inlet hole, 62, installation block, 63, bolt, 64, screen, 65, buffer slope, 7, sludge Processing device, 71, motor, 72, rotating shaft, 73, horizontal plate, 74, brush plate, 81, drainage slope, 82, drainage hole, 9, controller, 10, observation window.

具体实施方式Detailed ways

下面结合附图对本实用新型作进一步说明:Below in conjunction with accompanying drawing, the utility model is further described:

请参阅图1-5,一种高效污水处理结构,包括处理箱1、顶板2和排渣管4,处理箱1的内部设有污水初处理装置6,污水初处理装置6包括进水孔61、安装块62和筛网64,两个进水孔61固定安装在处理箱1的上方两侧,通过进水孔61箱处理箱1内部倒入污水,两个进水孔61的内部活动安装有筛网64,筛网64为带网眼的金属丝编织而成,可以阻挡大颗粒砂石进入处理箱1,两个筛网64的上端活动卡接在安装块62的内部,安装块62的一侧螺纹连接有螺栓63,螺栓63的端部贯穿安装块62,可以拧动螺栓63将筛网64从安装块62上取下来,且螺栓63的端部与筛网64相抵紧,安装块62固定安装在顶板2下端,处理箱1的内壁固定安装有缓冲坡65,当被过滤完大块颗粒泥沙的污水排入处理箱1时,会先撞击在缓冲坡65上减少污水的冲击力,两个缓冲坡65的上方与进水孔61相对设置;Please refer to Figure 1-5, an efficient sewage treatment structure, including a treatment box 1, a top plate 2 and a slag discharge pipe 4, the interior of the treatment box 1 is provided with a sewage preliminary treatment device 6, and the sewage preliminary treatment device 6 includes a water inlet 61 , installation block 62 and screen cloth 64, two water inlets 61 are fixedly installed on both sides above the treatment box 1, pour sewage into the inside of the treatment box 1 through the water inlets 61, and the internal activities of the two water inlets 61 are installed Screen cloth 64 is arranged, and screen cloth 64 is the metal wire weaving with mesh and forms, can stop large-grained sand and stone from entering processing box 1, and the upper end of two screen cloths 64 is movably clamped in the inside of mounting block 62, and the inside of mounting block 62 One side is threadedly connected with a bolt 63, the end of the bolt 63 runs through the mounting block 62, the bolt 63 can be twisted and the screen cloth 64 is taken off from the mounting block 62, and the end of the bolt 63 is pressed against the screen cloth 64, and the mounting block 62 is fixedly installed on the lower end of the top plate 2, and the inner wall of the treatment box 1 is fixedly equipped with a buffer slope 65. When the sewage that has been filtered out of large particles of sediment is discharged into the treatment box 1, it will hit the buffer slope 65 first to reduce the impact of the sewage Force, the top of the two buffer slopes 65 is set opposite to the water inlet 61;

通过进水孔61箱处理箱1内部倒入污水,两个进水孔61的内部活动安装有筛网64,筛网64为带网眼的金属丝编织而成,可以阻挡大颗粒砂石进入处理箱1,可以拧动螺栓63将筛网64从安装块62上取下来,对筛网64上的泥沙进行清理,当被过滤完大块颗粒泥沙的污水排入处理箱1时,会先撞击在缓冲坡65上减少污水的冲击力,最后进入处理箱1的污水进行过滤板的过滤,避免了过大的冲击直接作用在过滤板上,提高了高效污水处理结构过滤板的使用寿命,进而使得高效污水处理结构的处理效率得到提高。Sewage is poured into the treatment tank 1 through the water inlet holes 61. A screen 64 is movable inside the two water inlet holes 61. The screen mesh 64 is made of metal wire with meshes, which can prevent large particles of sand and gravel from entering the treatment. Box 1, the bolt 63 can be screwed to remove the screen 64 from the mounting block 62, and the sediment on the screen 64 will be cleaned. First impact on the buffer slope 65 to reduce the impact force of the sewage, and finally the sewage entering the treatment tank 1 is filtered by the filter plate, avoiding excessive impact directly acting on the filter plate, and improving the service life of the high-efficiency sewage treatment structure filter plate , so that the treatment efficiency of the high-efficiency sewage treatment structure is improved.

请参阅图1-3和图5,处理箱1的内侧设有排渣装置3,排渣装置3包括电动伸缩杆31、盖板33和过滤板36,电动伸缩杆31固定安装在处理箱1的顶端,电动伸缩杆31的上方固定连接有顶板2,连接外接电源启动电动伸缩杆31,电动伸缩杆31可推动顶板2向上运动,顶板2的两侧固定连接有连接杆32,两个连接杆32下端固定连接有盖板33,顶板2可以通过连接杆32带动盖板33向上运动,顶板2的下端两侧固定连接有拉动杆34,两根拉动杆34的下方通过销轴活动连接有连接板35,同时顶板2可以通过拉动杆34带动连接板35向上运动,两个连接板35的下端通过销轴活动连接在过滤板36的上方,连接板35可以带动过滤板36沿着销轴转动翻转,两个过滤板36一端通过销轴活动连接在排渣管4的端部,两个过滤板36的另一端活动连接有皮带37,皮带37为软性结构可以适应于过滤板36的翻转与污水过滤,两根皮带37的端部固定安装在处理箱1的内壁,过滤板36的下方设有排水坡81,两个排水坡81固定安装在处理箱1的底部,两个排水坡81的端部连通有排水孔82,经过过滤板36过滤后的水沿着排水坡81流向排水孔82,最终在处理箱1内部排出,两个排水孔82固定开设在处理箱1的底端,处理箱1的外壁固定安装有控制器9,控制器9与电动伸缩杆31电性相连,控制器9用控制电动伸缩杆31的开启,控制器9的两侧设有观察窗10,两个观察窗10固定安装在处理箱1的外壁,处理箱1的下端固定连接有多根支撑柱5。Please refer to Fig. 1-3 and Fig. 5, the inner side of processing box 1 is provided with slag discharge device 3, and slag discharge device 3 comprises electric telescopic rod 31, cover plate 33 and filter plate 36, and electric telescopic rod 31 is fixedly installed in processing box 1 The top of the electric telescopic rod 31 is fixedly connected with the top plate 2, connected to an external power supply to start the electric telescopic rod 31, the electric telescopic rod 31 can push the top plate 2 to move upward, and the two sides of the top plate 2 are fixedly connected with connecting rods 32, two connected The lower end of the rod 32 is fixedly connected with a cover plate 33, and the top plate 2 can drive the cover plate 33 to move upward through the connecting rod 32. The lower end of the top plate 2 is fixedly connected with a pull rod 34 on both sides, and the bottom of the two pull rods 34 is movably connected with a pin shaft. The connecting plate 35, while the top plate 2 can drive the connecting plate 35 to move upward through the pull rod 34, the lower ends of the two connecting plates 35 are movably connected above the filter plate 36 through the pin shaft, and the connecting plate 35 can drive the filter plate 36 along the pin shaft Rotate and turn over, one end of the two filter plates 36 is movably connected to the end of the slag discharge pipe 4 through a pin shaft, and the other end of the two filter plates 36 is movably connected with a belt 37, the belt 37 is a flexible structure and can be adapted to the position of the filter plate 36. Overturning and sewage filtration, the ends of the two belts 37 are fixedly installed on the inner wall of the treatment box 1, and the bottom of the filter plate 36 is provided with a drainage slope 81, and the two drainage slopes 81 are fixedly installed on the bottom of the treatment box 1, and the two drainage slopes The end of 81 is communicated with drainage hole 82, and the water filtered by filter plate 36 flows along drainage slope 81 to drainage hole 82, and finally is discharged inside treatment box 1, and two drainage holes 82 are fixedly opened at the bottom of treatment box 1 A controller 9 is fixedly installed on the outer wall of the processing box 1, and the controller 9 is electrically connected with the electric telescopic rod 31. An observation window 10 is fixedly installed on the outer wall of the processing box 1, and the lower end of the processing box 1 is fixedly connected with a plurality of support columns 5.

请参阅图1-5,排渣管4固定安装在处理箱1的底端,盖板33活动连接在排渣管4的顶部,盖板33的下方设有污泥处理装置7,污泥处理装置7包括电机71、横板73和刷板74,在选用电机71时,可采用能够符合使用要求的电机型号即可,电机71固定安装在盖板33的下端,电机71的输出轴通过连轴器固定连接有转动轴72,当排渣管4内部堆积泥沙时,连接外接电源启动电机71,电机71的输出轴带着转动轴72转动,转动轴72的两侧固定连接有多根横板73,转动轴72带动横板73在排渣管4内部转动,多个横板73的端部固定安装有刷板74,转动的横板73带动刷板74将排渣管4的内部刮干净,多个刷板74活动连接在排渣管4的内壁;Please refer to Figure 1-5, the slag discharge pipe 4 is fixedly installed at the bottom of the treatment box 1, the cover plate 33 is movably connected to the top of the slag discharge pipe 4, and the sludge treatment device 7 is arranged below the cover plate 33, and the sludge treatment The device 7 includes a motor 71, a horizontal plate 73 and a brush plate 74. When selecting the motor 71, the motor type that can meet the requirements for use can be used. The motor 71 is fixedly installed on the lower end of the cover plate 33, and the output shaft of the motor 71 is connected to the motor 71. The shaft device is fixedly connected with a rotating shaft 72. When sediment is accumulated inside the slag discharge pipe 4, an external power supply is connected to start the motor 71, and the output shaft of the motor 71 rotates with the rotating shaft 72. There are multiple shafts fixedly connected to both sides of the rotating shaft 72. The horizontal plate 73, the rotating shaft 72 drives the horizontal plate 73 to rotate inside the slag discharge pipe 4, and the ends of the multiple horizontal plates 73 are fixed with brush plates 74, and the rotating horizontal plate 73 drives the brush plate 74 to clean the inside of the slag discharge pipe 4. To scrape cleanly, a plurality of brush plates 74 are movably connected to the inner wall of the slag discharge pipe 4;

当排渣管4内部堆积泥沙时,连接外接电源启动电机71,电机71的输出轴带着转动轴72转动,转动轴72带动横板73在排渣管4内部转动,转动的横板73带动刷板74将排渣管4的内部刮干净,利用电机带动刷板的工作,将排渣管内部清理,减少了排渣管因为污泥的堵塞而内径减少问题发生,进而提高了高效污水处理结构杂质处理结果更优。When silt is accumulated inside the slag discharge pipe 4, connect the external power supply to start the motor 71, the output shaft of the motor 71 rotates with the rotating shaft 72, and the rotating shaft 72 drives the horizontal plate 73 to rotate inside the slag discharge pipe 4, and the rotating horizontal plate 73 Drive the brush plate 74 to scrape the inside of the slag discharge pipe 4 clean, and use the motor to drive the brush plate to clean the inside of the slag discharge pipe, reducing the problem of the inner diameter of the slag discharge pipe being reduced due to the blockage of sludge, thereby improving the efficiency of sewage. Dealing with structural impurities has better results.

工作原理:working principle:

首先通过进水孔61箱处理箱1内部倒入污水,两个进水孔61的内部活动安装有筛网64,筛网64为带网眼的金属丝编织而成,可以阻挡大颗粒砂石进入处理箱1,可以拧动螺栓63将筛网64从安装块62上取下来,对筛网64上的泥沙进行清理,当被过滤完大块颗粒泥沙的污水排入处理箱1时,会先撞击在缓冲坡65上减少污水的冲击力,最后进入处理箱1的污水进行过滤板的过滤;Firstly, sewage is poured into the treatment tank 1 through the water inlet holes 61. A screen 64 is installed inside the two water inlet holes 61. The screen mesh 64 is made of metal wire with mesh, which can prevent the entry of large particles of sand and gravel. The treatment box 1 can turn the bolt 63 to remove the screen 64 from the mounting block 62, and clean up the silt on the screen 64. It will first impact on the buffer slope 65 to reduce the impact of the sewage, and finally the sewage entering the treatment tank 1 is filtered by the filter plate;

然后,流入处理箱1内部的污水经过过滤板36的过滤,当过滤板36过滤完成后,为了处理过滤板36上的杂质,控制器9用控制电动伸缩杆31的开启,需要连接外接电源启动电动伸缩杆31,电动伸缩杆31可推动顶板2向上运动,顶板2可以通过连接杆32带动盖板33向上运动,同时顶板2可以通过拉动杆34带动连接板35向上运动,连接板35可以带动过滤板36沿着销轴转动翻转,皮带37为软性结构可以适应于过滤板36的翻转与污水过滤,经过过滤板36过滤后的水沿着排水坡81流向排水孔82,最终在处理箱1内部排出,Then, the sewage flowing into the treatment box 1 is filtered by the filter plate 36. After the filter plate 36 is filtered, in order to process the impurities on the filter plate 36, the controller 9 controls the opening of the electric telescopic rod 31 and needs to be connected to an external power supply to start the process. The electric telescopic rod 31, the electric telescopic rod 31 can push the top board 2 to move upward, the top board 2 can drive the cover plate 33 to move upward through the connecting rod 32, and the top board 2 can drive the connecting plate 35 to move upward by pulling the rod 34, and the connecting plate 35 can drive The filter plate 36 rotates and flips along the pin shaft, and the belt 37 is a flexible structure that can be adapted to the flipping of the filter plate 36 and sewage filtration. The water filtered by the filter plate 36 flows along the drainage slope 81 to the drainage hole 82, and finally flows in the treatment tank. 1 internal discharge,

最后当排渣管4内部堆积泥沙时,连接外接电源启动电机71,电机71的输出轴带着转动轴72转动,转动轴72带动横板73在排渣管4内部转动,转动的横板73带动刷板74将排渣管4的内部刮干净,利用电机带动刷板的工作,将排渣管内部清理。Finally, when silt is accumulated inside the slag discharge pipe 4, connect the external power supply to start the motor 71, the output shaft of the motor 71 rotates with the rotating shaft 72, and the rotating shaft 72 drives the horizontal plate 73 to rotate inside the slag discharge pipe 4, and the rotating horizontal plate 73 drives the brush plate 74 to scrape the inside of the slag discharge pipe 4 clean, and utilizes the work of the motor to drive the brush plate to clean the inside of the slag discharge pipe.

虽然本实用新型已通过参考优选的实施例进行了图示和描述,但是,本专业普通技术人员应当了解,在权利要求书的范围内,可作形式和细节上的各种各样变化。Although the present invention has been illustrated and described with reference to preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made within the scope of the claims.

Claims (5)

1.一种高效污水处理结构,包括处理箱(1)、顶板(2)和排渣管(4),其特征在于:所述处理箱(1)的内部设有污水初处理装置(6),所述污水初处理装置(6)包括进水孔(61)、安装块(62)和筛网(64),两个所述进水孔(61)固定安装在处理箱(1)的上方两侧,两个所述进水孔(61)的内部活动安装有筛网(64),两个所述筛网(64)的上端活动卡接在安装块(62)的内部,所述安装块(62)的一侧螺纹连接有螺栓(63),所述螺栓(63)的端部贯穿安装块(62),且螺栓(63)的端部与筛网(64)相抵紧,所述安装块(62)固定安装在顶板(2)下端,所述处理箱(1)的内壁固定安装有缓冲坡(65),两个所述缓冲坡(65)的上方与进水孔(61)相对设置。1. A high-efficiency sewage treatment structure, comprising a treatment box (1), a roof (2) and a slag discharge pipe (4), characterized in that: the inside of the treatment box (1) is provided with a sewage preliminary treatment device (6) , the sewage primary treatment device (6) includes a water inlet (61), a mounting block (62) and a screen (64), and the two water inlets (61) are fixedly installed above the treatment box (1) On both sides, screens (64) are movably installed inside the two water inlet holes (61), and the upper ends of the two screens (64) are movably clamped inside the mounting block (62). One side of the block (62) is threadedly connected with a bolt (63), and the end of the bolt (63) passes through the mounting block (62), and the end of the bolt (63) is pressed against the screen (64), and the The mounting block (62) is fixedly installed on the lower end of the top plate (2), and the inner wall of the processing box (1) is fixedly equipped with a buffer slope (65), and the top of the two buffer slopes (65) is connected to the water inlet hole (61) relative settings. 2.根据权利要求1所述的一种高效污水处理结构,其特征在于:所述处理箱(1)的内侧设有排渣装置(3);2. A high-efficiency sewage treatment structure according to claim 1, characterized in that: the inner side of the treatment tank (1) is provided with a slagging device (3); 所述排渣装置(3)包括电动伸缩杆(31)、盖板(33)和过滤板(36);The slag discharge device (3) includes an electric telescopic rod (31), a cover plate (33) and a filter plate (36); 所述电动伸缩杆(31)固定安装在处理箱(1)的顶端,所述电动伸缩杆(31)的上方固定连接有顶板(2),所述顶板(2)的两侧固定连接有连接杆(32),两个所述连接杆(32)下端固定连接有盖板(33),所述顶板(2)的下端两侧固定连接有拉动杆(34),两根所述拉动杆(34)的下方通过销轴活动连接有连接板(35),两个所述连接板(35)的下端通过销轴活动连接在过滤板(36)的上方,两个所述过滤板(36)一端通过销轴活动连接在排渣管(4)的端部,两个所述过滤板(36)的另一端活动连接有皮带(37),两根所述皮带(37)的端部固定安装在处理箱(1)的内壁。The electric telescopic rod (31) is fixedly mounted on the top of the processing box (1), the top of the electric telescopic rod (31) is fixedly connected with a top plate (2), and the two sides of the top plate (2) are fixedly connected with connecting Rod (32), the lower ends of the two connecting rods (32) are fixedly connected with cover plates (33), the lower ends of the top plate (2) are fixedly connected with pull rods (34), and the two pull rods ( The bottom of 34) is movably connected with connecting plate (35) by pin shaft, and the lower end of two described connecting plates (35) is movably connected on the top of filter plate (36) by pin shaft, and two described filter plates (36) One end is movably connected to the end of the slag discharge pipe (4) through a pin shaft, and the other ends of the two filter plates (36) are movably connected to belts (37), and the ends of the two belts (37) are fixedly installed On the inner wall of the treatment box (1). 3.根据权利要求2所述的一种高效污水处理结构,其特征在于:所述排渣管(4)固定安装在处理箱(1)的底端,所述盖板(33)活动连接在排渣管(4)的顶部,所述盖板(33)的下方设有污泥处理装置(7);3. A high-efficiency sewage treatment structure according to claim 2, characterized in that: the slag discharge pipe (4) is fixedly installed at the bottom of the treatment box (1), and the cover plate (33) is movably connected to On the top of the slag discharge pipe (4), a sludge treatment device (7) is provided below the cover plate (33); 所述污泥处理装置(7)包括电机(71)、横板(73)和刷板(74);The sludge treatment device (7) includes a motor (71), a horizontal plate (73) and a brush plate (74); 所述电机(71)固定安装在盖板(33)的下端,所述电机(71)的输出轴通过连轴器固定连接有转动轴(72),所述转动轴(72)的两侧固定连接有多根横板(73),多个所述横板(73)的端部固定安装有刷板(74),多个所述刷板(74)活动连接在排渣管(4)的内壁。The motor (71) is fixedly mounted on the lower end of the cover plate (33), and the output shaft of the motor (71) is fixedly connected with a rotating shaft (72) through a shaft coupling, and both sides of the rotating shaft (72) are fixed A plurality of horizontal plates (73) are connected, brush plates (74) are fixedly installed on the ends of the plurality of horizontal plates (73), and the plurality of brush plates (74) are movably connected to the slag discharge pipe (4). inner wall. 4.根据权利要求2所述的一种高效污水处理结构,其特征在于:所述过滤板(36)的下方设有排水坡(81),两个所述排水坡(81)固定安装在处理箱(1)的底部,两个所述排水坡(81)的端部连通有排水孔(82),两个所述排水孔(82)固定开设在处理箱(1)的底端。4. A high-efficiency sewage treatment structure according to claim 2, characterized in that: a drainage slope (81) is provided below the filter plate (36), and the two drainage slopes (81) are fixedly installed in the treatment At the bottom of the box (1), the ends of the two drainage slopes (81) are connected with drainage holes (82), and the two drainage holes (82) are fixedly set at the bottom of the treatment box (1). 5.根据权利要求1所述的一种高效污水处理结构,其特征在于:所述处理箱(1)的外壁固定安装有控制器(9),所述控制器(9)与电动伸缩杆(31)电性相连,所述控制器(9)的两侧设有观察窗(10),两个所述观察窗(10)固定安装在处理箱(1)的外壁,所述处理箱(1)的下端固定连接有多根支撑柱(5)。5. A high-efficiency sewage treatment structure according to claim 1, characterized in that: a controller (9) is fixedly installed on the outer wall of the treatment box (1), and the controller (9) is connected with the electric telescopic rod ( 31) are electrically connected, the two sides of the controller (9) are provided with observation windows (10), and the two observation windows (10) are fixedly installed on the outer wall of the treatment box (1), and the treatment box (1) ) is fixedly connected to a plurality of support columns (5).
CN202223379273.0U 2022-12-15 2022-12-15 Efficient sewage treatment structure Expired - Fee Related CN219023419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223379273.0U CN219023419U (en) 2022-12-15 2022-12-15 Efficient sewage treatment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223379273.0U CN219023419U (en) 2022-12-15 2022-12-15 Efficient sewage treatment structure

Publications (1)

Publication Number Publication Date
CN219023419U true CN219023419U (en) 2023-05-16

Family

ID=86273231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223379273.0U Expired - Fee Related CN219023419U (en) 2022-12-15 2022-12-15 Efficient sewage treatment structure

Country Status (1)

Country Link
CN (1) CN219023419U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116808684A (en) * 2023-07-03 2023-09-29 中国港湾工程有限责任公司 Building sewage treatment device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116808684A (en) * 2023-07-03 2023-09-29 中国港湾工程有限责任公司 Building sewage treatment device

Similar Documents

Publication Publication Date Title
CN219231574U (en) A construction engineering drainage device
CN218011316U (en) Rural integration filter
CN219023419U (en) Efficient sewage treatment structure
CN114405151A (en) Gravity rotary type sewage treatment device and sewage treatment method
CN218458784U (en) Prevent blockking up high-efficient sewage treatment plant
CN212262565U (en) A filter for carbon tetrachloride gets rid of
CN211097696U (en) Slag scraping machine for sewage treatment
CN212001529U (en) Improved efficient slag scraping and mud sucking integrated machine
CN210127143U (en) A multistage adsorption purification device for river course waste water
CN218608310U (en) Filtration liquid filtering device for phosphogypsum slag yard
CN212476377U (en) Central transmission efficient thickener
CN214829486U (en) Oil-separating sewage lifting integrated equipment
CN116060365A (en) Silicon carbide cleaning device and cleaning method thereof
CN221771649U (en) Wastewater filtering and screening device
CN211873301U (en) A sewer sewage device
CN211445452U (en) Sewage treatment tank capable of automatically cleaning sludge at tank bottom
CN209530213U (en) A kind of mechanical sieve of sewage treatment
CN211189260U (en) A muddy water filter equipment for cutting of prestressing force board
CN222567092U (en) A construction wastewater discharge treatment equipment
CN219149415U (en) Interception device for sewage treatment tank
CN211385374U (en) Spiral Sand Settler
CN221693001U (en) Construction vehicle for hydraulic engineering
CN218530125U (en) Integrated sewage treatment equipment
CN219558871U (en) Sewage filtration and separation device for slag outlet
CN220467686U (en) Purification equipment for surface water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230516

CF01 Termination of patent right due to non-payment of annual fee