CN219010967U - Bridge construction pier maintenance device - Google Patents

Bridge construction pier maintenance device Download PDF

Info

Publication number
CN219010967U
CN219010967U CN202223166453.0U CN202223166453U CN219010967U CN 219010967 U CN219010967 U CN 219010967U CN 202223166453 U CN202223166453 U CN 202223166453U CN 219010967 U CN219010967 U CN 219010967U
Authority
CN
China
Prior art keywords
pipeline
curing
bridge construction
clamping plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223166453.0U
Other languages
Chinese (zh)
Inventor
颉文浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Qiaoli Survey And Design Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223166453.0U priority Critical patent/CN219010967U/en
Application granted granted Critical
Publication of CN219010967U publication Critical patent/CN219010967U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge construction pier maintenance device which comprises a pipeline, spray heads and a water inlet pipe, wherein the spray heads are arranged in the pipeline, the water inlet pipe is inserted into the center of the left side of the pipeline, and supporting members are arranged at four corners of the top end of the pipeline; the maintenance component is arranged around the bottom end of the pipeline; wherein, the support component is used for carrying out the erection bracing to the pipeline, maintenance component is used for increasing the maintenance effect. The utility model provides a bridge construction pier curing device, which can perform water spraying curing work on piers through the use work of the arranged pipelines, the spray heads and the water inlet pipe, and can perform supporting and mounting work on the pipelines through the arranged supporting members in the use process, so that the curing effect on the piers can be improved by matching the water spraying of the spray heads during the use process of the curing members, the evaporation speed of water can be slowed down, and the different curing degrees of the top ends and the bottom ends of the piers can be prevented.

Description

Bridge construction pier maintenance device
Technical Field
The utility model relates to the field of bridge construction, in particular to a bridge construction pier maintenance device.
Background
In order to ensure sufficient supporting strength and longer service life, the bridge piers are generally cast with concrete
The anti-rust agent can effectively prevent corrosion, infiltration and deformation, and provides guarantee for bridge safety; however, maintenance needs to be performed for a period of time after the construction of the concrete structure is finished, so that normal hardening and strength increase of the bridge pier are ensured, the concrete can be gradually hardened and increased in strength, the concrete is the result of cement hydration, and certain temperature and humidity conditions are required for cement hydration; therefore, in general, it is necessary to start curing after 12 to 18 hours after the concrete of the bridge pier is poured, and the curing time lasts for about 3 to 4 weeks;
at present, most of bridge pier curing processes are performed by sprinkling water to the bridge pier, so that when the weather is hot, water gradually decreases when flowing downwards from the top end of the bridge pier, and the curing effect is different.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model aims to provide a bridge construction pier maintenance device.
The technical scheme adopted for solving the technical problems is as follows: the bridge construction pier maintenance device comprises a pipeline, spray heads and a water inlet pipe, wherein a plurality of spray heads are arranged in the pipeline, the water inlet pipe is inserted into the center of the left side of the pipeline, and supporting members are arranged at four corners of the top end of the pipeline; the maintenance component is arranged around the bottom end of the pipeline; wherein, the support component is used for carrying out the erection bracing to the pipeline, maintenance component is used for increasing the maintenance effect.
Further, the spray head is an atomization spray head.
Further, the support member includes: the support plates are connected with four corners of the top end of the pipeline through threads; the supporting plate is fixedly connected to the outer side of the supporting plate; the vertical rods are in threaded connection with the inside of the supporting plate; the fixed plate is fixedly connected to the top end of the vertical rod; wherein, the fagging can be from the top installation dismantlement of pipeline through the bolt.
Further, the maintenance member includes: the first clamping plate is fixedly connected to the periphery of the bottom end of the pipeline; the first thread block is rotationally connected to the inside of the first clamping plate; the second clamping plate is in threaded connection with the outer wall of the first threaded block; the maintenance film is arranged between the first clamping plate and the second clamping plate; the annular plate is arranged at the bottom end of the maintenance film; the second thread block is in threaded connection with the inside of the annular plate; the second thread block is used for installing and fixing the annular plate and the curing membrane.
Further, rubber pads are machined on the inner sides of the second clamping plate and the first clamping plate.
The beneficial effects of the utility model are as follows: the utility model provides a bridge construction pier curing device, which can perform water spraying curing work on piers through the use work of the arranged pipelines, the spray heads and the water inlet pipe, and can perform supporting and mounting work on the pipelines through the arranged supporting members in the use process, so that the curing effect on the piers can be improved by matching the water spraying of the spray heads during the use process of the curing members, the evaporation speed of water can be slowed down, and the different curing degrees of the top ends and the bottom ends of the piers can be prevented.
Drawings
Fig. 1 is a schematic diagram of the present utility model.
Fig. 2 is a detailed view of the top-down connection structure of fig. 1.
Fig. 3 is a detailed view of the bottom connection structure of fig. 1.
Reference numerals illustrate: 1. pipeline, 2, shower nozzle, 3, inlet tube, 4, supporting component, 401, extension board, 402, extension board, 403, montant, 404, fixed plate, 5, maintenance component, 501, first splint, 502, first screw thread piece, 503, second splint, 504, maintenance membrane, 505, annular plate, 506, second screw thread piece.
Detailed Description
The utility model will be further illustrated with reference to specific examples, which are to be understood as illustrative only and are not intended to limit the scope of the utility model. Further, it is understood that various changes and modifications may be made by those skilled in the art after reading the teachings of the present utility model, and such equivalents are intended to fall within the scope of the claims appended hereto.
Referring to fig. 1, fig. 2 and fig. 3, which are schematic structural views of the present utility model, a bridge construction pier curing device comprises a pipeline 1, a spray head 2 and a water inlet pipe 3, wherein a plurality of spray heads 2 are installed in the pipeline 1, the pipeline 1 and the spray head 2 are used for spraying water to the piers, the water inlet pipe 3 is inserted in the center of the left side of the pipeline 1, the water inlet pipe 3 is used for delivering water to the interior of the pipeline 1, supporting members 4 are installed at four corners of the top end of the pipeline 1, curing members 5 are installed around the bottom end of the pipeline 1, wherein the supporting members 4 are used for installing and supporting the pipeline 1, and the curing members 5 are used for increasing curing effect.
The spray head 2 is an atomization spray head, and the atomization spray head can uniformly spray water to the bridge pier.
Specifically, as shown in fig. 1 and 2, the support member 4 includes a stay 401, a stay 402, a vertical rod 403, and a fixed plate 404;
in order to support and install pipeline 1, extension board 401 threaded connection is in pipeline 1's top four corners, and extension board 401 is used for supporting pipeline 1, and extension board 402 rigid coupling is in the outside of extension board 401, and montant 403 threaded connection is in the inside of extension board 402, and fixed plate 404 rigid coupling is in the top of montant 403, and fixed plate 404 is connected with the top of pier, and wherein, extension board 402 can be followed pipeline 1's top installation and dismantlement through the bolt.
More specifically, as shown in fig. 1 and 3, the curing member 5 includes a first clamping plate 501, a first screw block 502, a second clamping plate 503, a curing membrane 504, a ring plate 505, and a second screw block 406;
in order to increase the maintenance effect, first splint 501 rigid coupling is around the bottom of pipeline 1, first screw thread piece 502 rotates the inside of connecting at first splint 501, second splint 503 threaded connection is at the outer wall of first screw thread piece 502, can drive second splint 503 and remove when screw thread piece 502 rotates, second splint 503 cooperation first splint 501 can press from both sides tightly fixedly to maintenance membrane 504, maintenance membrane 504 sets up between first splint 501 and second splint 503, the material of maintenance membrane 504 is thicker plastic film, the bottom of setting at maintenance membrane 504 of annular plate 505, second screw thread piece 506 threaded connection is in the inside of annular plate 505, wherein, second screw thread piece 506 is used for installing fixed annular plate 505 and maintenance membrane 504.
It should be noted that, rubber pads are machined on the inner sides of the second clamping plate 503 and the first clamping plate 501, and the rubber pads are used for increasing protection and friction force to the curing film.
When the water spraying device is used, a user firstly fixes the support plate 401 on the pipeline 1 through bolts, after the water spraying device is installed, the user firstly sleeves the top end of the maintenance film 504 on the top end of the bridge, after the water spraying device is sleeved, the annular plate 505 moves downwards on the outer wall of the bridge pier, when the annular plate 505 moves to the bottom of the bridge pier, the user rotates the first threaded block 502, the first threaded block 502 can drive the second clamping plate 503 to move inwards when rotating, the maintenance film 504 can be clamped and fixed when the second clamping plate 503 moves inwards, the user inserts the bottom end of the maintenance film 504 into the top end of the annular plate 505 after fixing, the annular plate 505 is inserted into the top end of the annular plate 505 through the second threaded block 506, after the annular plate 505 is sleeved, the annular plate 505 is driven to be sleeved on the outer wall of the bridge pier, the user sleeves the pipeline 1 on the top end of the outer wall of the bridge pier, the pipeline 1 is fixed on the top end of the bridge pier through the supporting member 4 after the annular plate is sleeved, the maintenance film 504 is connected with an external water conveying pipeline through the water inlet pipe 3, the water spraying device can perform water spraying on the bridge pier through the water spraying device, and the water spraying device can perform water spraying and maintenance on the bridge pier after the water spraying device is used for water spraying.

Claims (5)

1. The utility model provides a bridge construction pier curing means, includes pipeline (1), shower nozzle (2) and inlet tube (3), internally mounted of pipeline (1) has a plurality of shower nozzles (2), peg graft in the left side center department of pipeline (1) has inlet tube (3), its characterized in that, bridge construction pier curing means still includes:
a support member (4) mounted at four corners of the top end of the pipe (1);
and the maintenance component (5) is arranged around the bottom end of the pipeline (1).
2. The bridge construction pier maintenance apparatus according to claim 1, wherein the spray head (2) is an atomizing spray head.
3. The bridge construction pier maintenance apparatus according to claim 2, wherein said supporting member (4) comprises:
the support plates (401) are connected with four corners at the top end of the pipeline (1) in a threaded manner;
a supporting plate (402) fixedly connected to the outer side of the supporting plate (401);
the vertical rods (403) are in threaded connection with the inside of the supporting plate (402);
the fixed plate (404) is fixedly connected to the top end of the vertical rod (403).
4. A bridge construction pier curing device according to claim 3, characterized in that the curing member (5) comprises:
the first clamping plate (501) is fixedly connected to the periphery of the bottom end of the pipeline (1);
a first screw block (502) rotatably connected to the inside of the first clamping plate (501);
a second clamping plate (503) which is in threaded connection with the outer wall of the first threaded block (502);
a curing membrane (504) disposed between the first clamping plate (501) and the second clamping plate (503);
the annular plate (505) is arranged at the bottom end of the curing membrane (504);
a second threaded block (506) threaded inside the ring plate (505).
5. The bridge construction pier maintenance apparatus according to claim 4, wherein rubber pads are formed on the inner sides of the second clamping plate (503) and the first clamping plate (501).
CN202223166453.0U 2022-11-28 2022-11-28 Bridge construction pier maintenance device Active CN219010967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223166453.0U CN219010967U (en) 2022-11-28 2022-11-28 Bridge construction pier maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223166453.0U CN219010967U (en) 2022-11-28 2022-11-28 Bridge construction pier maintenance device

Publications (1)

Publication Number Publication Date
CN219010967U true CN219010967U (en) 2023-05-12

Family

ID=86267920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223166453.0U Active CN219010967U (en) 2022-11-28 2022-11-28 Bridge construction pier maintenance device

Country Status (1)

Country Link
CN (1) CN219010967U (en)

Similar Documents

Publication Publication Date Title
CN202073113U (en) Foundation bolt base post-grouting supporting device
CN219010967U (en) Bridge construction pier maintenance device
CN112044664A (en) Anticorrosive treatment's coating device is used in cement culvert pipe production
CN114227897A (en) Device and method for prefabricating UHPC column mold shell
CN112144589A (en) Construction method for reinforcing steel pipe pile pier by underwater glass fiber sleeve
CN109763571A (en) It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method
CN210858069U (en) Concrete curing device for ultrahigh independent structure column
WO2022052438A1 (en) End plugging device for pre-stressed pipeline press-grouting
CN110904819A (en) Device for limiting transverse displacement of curved beam bridge and construction method thereof
US20110132525A1 (en) Mold And A Method Of Manufacturing Large Diameter FRP Flues
CN217924979U (en) Automatic concrete curing means of elevartor shaft inner wall
CN212405168U (en) Steel bracing joint design
CN215803358U (en) Concrete column curing means
CN213290731U (en) Prefabricated case roof beam case room watering curing means
CN104405171A (en) Anticorrosion chimney and anti-corrosion construction method thereof
CN213174794U (en) Novel reserved hole formwork tool
CN220840769U (en) Maintenance device for building concrete structure
CN218843381U (en) Sectional type water stop screw device for heat preservation and structure integrated system and wall structure
CN220203411U (en) Water stop screw rod and template supporting system
CN218843380U (en) Connecting device for building insulation structure integrated system and wall structure comprising same
CN219387174U (en) Upright post template fixing structure for building engineering construction
CN219886578U (en) Temporary support capable of being rapidly detached
CN219773593U (en) Reinforcing template applied to parapet construction
CN214615536U (en) Wall body sprays curing means
CN213654865U (en) Tunnel trolley can dismantle curing means

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230818

Address after: Room 8, Floor 10, Building C1, Lot A03, Greenland International Finance City, No. 750, Heping Avenue, Wuchang District, Wuhan City, Hubei Province, 430000

Patentee after: Wuhan Qiaoli Survey and Design Co.,Ltd.

Address before: Room 105, Tianchuang Garden, Chengji Avenue West Road, Qinzhou District, Tianshui City, Gansu Province, 741200

Patentee before: Jia Wenhao

TR01 Transfer of patent right