CN218962965U - Metal shower shell - Google Patents

Metal shower shell Download PDF

Info

Publication number
CN218962965U
CN218962965U CN202223452132.7U CN202223452132U CN218962965U CN 218962965 U CN218962965 U CN 218962965U CN 202223452132 U CN202223452132 U CN 202223452132U CN 218962965 U CN218962965 U CN 218962965U
Authority
CN
China
Prior art keywords
mounting hole
shower
panel
mounting
elastic sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223452132.7U
Other languages
Chinese (zh)
Inventor
魏祖增
许友元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Debaoda Precision Technology Co ltd
Original Assignee
Xiamen Debaoda Precision Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Debaoda Precision Technology Co ltd filed Critical Xiamen Debaoda Precision Technology Co ltd
Priority to CN202223452132.7U priority Critical patent/CN218962965U/en
Application granted granted Critical
Publication of CN218962965U publication Critical patent/CN218962965U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources

Landscapes

  • Nozzles (AREA)

Abstract

The utility model relates to a gondola water faucet technical field provides a metal gondola water faucet casing, which comprises a body, the gondola water faucet panel, a plurality of erection column, a plurality of screw thread post, a plurality of fastening bolt and a plurality of first elastic sealing washer, a plurality of erection column locate the body inboard and set up along body circumference interval, a plurality of erection column all set up first mounting hole and the second mounting hole that are linked together, the diameter of each first mounting hole is greater than the diameter of each second mounting hole, each first mounting hole is equipped with the butt ring with each second mounting hole junction, a plurality of screw thread posts locate the gondola water faucet panel and peg graft respectively in each second mounting hole, a plurality of fastening bolt one end wears to locate each first mounting hole and butt ring and threaded connection respectively in proper order in each screw thread post, a plurality of first elastic sealing washer both sides support respectively tightly in each butt ring and each screw thread post, and a plurality of first elastic sealing washer overlap respectively and locate each fastening bolt. Based on this, can reduce water and flow out from between body and the gondola water faucet panel.

Description

Metal shower shell
Technical Field
The application relates to the field of showers, in particular to a metal shower shell.
Background
The shower head is a common shower device for bathing, and the types of the shower head are generally divided into a hand-held shower head, a top shower head and a body position shower head. In order to improve the texture of the shower, the shower housing is generally made of a metal material.
As shown in fig. 1, the metal shower housing comprises a body 1, a shower panel 2, a plurality of threaded columns 4 and a plurality of fastening bolts 5, wherein the threaded columns 4 are fixedly connected to one side of the shower panel 2 and are arranged at intervals along the circumferential direction of the shower panel 2, and the threaded columns 4 penetrate through the body 1 and are respectively in threaded connection with the fastening bolts 5, so that the installation between the body 1 and the shower panel 2 is realized.
Wherein, metal gondola water faucet casing is in the use, under the continuous impact of water, produces the clearance easily between screw thread post and the body for water flows out easily from between body and the gondola water faucet panel, consequently needs the improvement.
Disclosure of Invention
In order to reduce water outflow from between body and the shower panel, the present application provides a metal shower housing.
The application provides a metal gondola water faucet casing adopts following technical scheme:
the utility model provides a metal gondola water faucet casing, includes body, gondola water faucet panel, a plurality of erection columns, a plurality of screw thread post, a plurality of fastening bolt and a plurality of first elastic sealing washer, a plurality of the erection column is located the body inboard and along body circumference interval sets up, a plurality of the erection column has all been seted up first mounting hole and the second mounting hole that is linked together, each first mounting hole diameter is greater than each second mounting hole's diameter, each first mounting hole is located in each second mounting hole keep away from gondola water faucet panel one end, each first mounting hole and each second mounting hole junction is equipped with the butt ring, a plurality of the screw thread post is located the gondola water faucet panel and peg graft respectively in each second mounting hole, a plurality of fastening bolt one end respectively wear to locate in proper order in each first mounting hole and butt ring and threaded connection in each screw thread post, a plurality of first elastic sealing washer both sides are respectively in each butt ring and each screw thread post, and a plurality of first elastic sealing washer are located in each fastening bolt is overlapped respectively.
Through adopting above-mentioned technical scheme, when installing metal gondola water faucet casing, each screw thread post peg graft in each second mounting hole for each first elastic sealing washer butt is between each screw thread post and each butt ring, wears to locate each first mounting hole and each butt ring and with each screw thread post threaded connection in proper order with each fastening bolt again, in order to realize the fixed of body and gondola water faucet panel. The first elastic sealing ring is tightly propped against the deformation and is sleeved on the fastening bolt, and even under the impact of water, the tightness among the mounting column, the threaded column and the fastening bolt can be ensured, so that the water flowing out from the space between the body and the shower panel is reduced.
Preferably, the device further comprises a plurality of rubber plungers, and the plurality of rubber plungers are respectively clamped in the first mounting holes through elasticity.
Through adopting above-mentioned technical scheme, through setting up the rubber plunger, when partial water flows in first mounting hole from the second mounting hole, the rubber plunger can prevent water from flowing out from first mounting hole, further reduces water and flows out between body and the gondola water faucet panel.
Preferably, the rubber plunger comprises a column body and a plug strip, the plug strip is arranged on the periphery of the column body, the mounting column is arranged on the periphery of the first mounting hole, a plug groove is formed in the periphery of the mounting column, and the plug strip is plugged in the plug groove.
Through adopting above-mentioned technical scheme, through setting up grafting strip and jack groove to the rubber plunger quick positioning installation of being convenient for, and make the more stable chucking of rubber plunger in first mounting hole.
Preferably, the rubber plunger is attached to the outer side of the body.
Through adopting above-mentioned technical scheme, laminate mutually with the body outside through setting up the rubber plunger to guarantee that the body outside is smooth and even, improve the use experience and the pleasing to the eye degree of metal sprinkler casing.
Preferably, the shower head further comprises a plurality of second elastic sealing rings, wherein the second elastic sealing rings are respectively arranged at one end of each mounting column close to the shower head panel and sleeved on each threaded column.
By adopting the technical scheme, the second elastic sealing ring is arranged to reduce the inflow of water into the second mounting hole, and further reduce the outflow of water from between the body and the shower panel; and, reduce water and fastening bolt contact to improve fastening bolt's life.
Preferably, the shower head further comprises a sealing gasket, wherein the sealing gasket is arranged between the body and the shower head panel.
Through adopting above-mentioned technical scheme, through setting up sealed the pad to improve the leakproofness between body and the gondola water faucet panel.
Preferably, the shower head further comprises a plurality of positioning columns, the positioning columns are arranged on one side, close to the shower head panel, of the body, the sealing gasket is provided with a plurality of first positioning holes, and the positioning columns are inserted into the first positioning holes respectively.
Through adopting above-mentioned technical scheme, through setting up reference column and first locating hole to the quick location installation of sealing gasket of being convenient for.
Preferably, the shower panel is provided with a plurality of second positioning holes, and the positioning columns are respectively inserted into the second positioning holes.
Through adopting above-mentioned technical scheme, through setting up the second locating hole to the gondola water faucet panel quick positioning installation of being convenient for.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the first elastic sealing ring is tightly propped against and deformed and sleeved on the fastening bolt, so that the tightness among the mounting column, the threaded column and the fastening bolt can be ensured even under the impact of water, and the water flowing out from the space between the body and the shower panel is reduced;
2. by arranging the rubber plunger, when part of water flows into the first mounting hole from the second mounting hole, the rubber plunger can prevent the water from flowing out of the first mounting hole, so that the water flowing out of the space between the body and the shower panel is further reduced;
3. the second elastic sealing ring is arranged to reduce water flowing into the second mounting hole, so that water flowing out from between the body and the shower panel is further reduced; and, reduce water and fastening bolt contact to improve fastening bolt's life.
Drawings
FIG. 1 is a schematic view of an explosion structure of a metal sprinkler housing in the background art;
fig. 2 is a schematic view of the overall structure of a metal shower housing in an embodiment of the present application;
FIG. 3 is a schematic view of an explosion structure of a metal sprinkler housing in an embodiment of the present application;
fig. 4 is a schematic sectional view of a metal shower housing according to an embodiment of the present application.
Reference numerals: 1. a body; 2. a shower panel; 21. a second positioning hole; 3. a mounting column; 31. a first mounting hole; 32. a second mounting hole; 33. an abutment ring; 34. a plug-in groove; 4. a threaded column; 5. a fastening bolt; 6. a first elastic sealing ring; 7. a second elastic sealing ring; 8. a rubber plunger; 81. a column; 82. a plug strip; 9. a sealing gasket; 91. a first positioning hole; 10. and positioning columns.
Detailed Description
The present application is described in further detail below in conjunction with figures 2-4.
The embodiment of the application discloses a metal shower shell.
Referring to fig. 2 and 3, the metal shower housing includes a body 1, a shower panel 2, a plurality of mounting posts 3, a plurality of screw posts 4, a plurality of fastening bolts 5 and a plurality of first elastic sealing rings 6, the body 1 is located above the shower panel 2, and the upper side of the shower panel 2 is abutted to the lower end of the body 1.
Referring to fig. 3 and 4, a plurality of mounting posts 3 are integrally connected to the inside of the body 1 and vertically extend upward to the outside of the body 1, and the plurality of mounting posts 3 are uniformly spaced along the circumferential direction of the body 1. Wherein, a plurality of erection columns 3 all offer first mounting hole 31 and the second mounting hole 32 of intercommunication along vertical direction, and first mounting hole 31 is located the top of second mounting hole 32 and the diameter of first mounting hole 31 is greater than the diameter of second mounting hole 32. The mounting post 3 is integrally connected to an abutment ring 33 at a junction between the first mounting hole 31 and the second mounting hole 32.
The number of the plurality of mounting posts 3, the plurality of screw posts 4, the plurality of fastening bolts 5, and the plurality of first elastic sealing rings 6 is the same, and the plurality of first elastic sealing rings are uniformly and correspondingly arranged. A plurality of screw thread post 4 body coupling are close to body 1 one side in gondola water faucet panel 2, and screw thread post 4 pegging graft in second mounting hole 32, and simultaneously, fastening bolt 5 one end wears to locate first mounting hole 31 and butt ring 33 in proper order and with screw thread post 4 threaded connection, and the other end butt is located the diapire of first mounting hole 31 in mounting post 3 to realize the fixed of body 1 and gondola water faucet panel 2. The two sides of the first elastic sealing ring 6 are respectively abutted against the lower side of the abutting ring 33 and the upper end of the threaded column 4, and the first elastic sealing ring 6 is tightly sleeved on the fastening bolt 5.
When the metal shower shell is installed, each threaded column 4 is inserted into each second installation hole 32, so that each first elastic sealing ring 6 is abutted between each threaded column 4 and each abutting ring 33, and each fastening bolt 5 is sequentially penetrated into each first installation hole 31 and each abutting ring 33 and is in threaded connection with each threaded column 4, so that the body 1 and the shower panel 2 are fixed. Wherein, the first elastic sealing ring 6 is tightly propped against and deformed and sleeved on the fastening bolt 5, and even under the impact of water, the tightness among the mounting column 3, the threaded column 4 and the fastening bolt 5 can be ensured, thereby reducing the outflow of water from between the body 1 and the shower panel 2.
Further, the shower head further comprises a plurality of second elastic sealing rings 7, the plurality of second elastic sealing rings 7 are in one-to-one correspondence with the mounting columns 3, the second elastic sealing rings 7 are fixedly adhered to the lower ends of the mounting columns 3 and are tightly sleeved on the threaded columns 4, so that water flowing into the second mounting holes 32 is reduced, and water flowing out from between the shower head panel 2 and the shower body 1 is further reduced; and, the contact of water with the fastening bolt 5 is reduced to improve the service life of the fastening bolt 5.
Further, still include a plurality of rubber plungers 8 with a plurality of first mounting holes 31 one-to-one, rubber plungers 8 are in first mounting hole 31 through elasticity chucking to seal first mounting hole 31, when some water flows in first mounting hole 31 from second mounting hole 32, rubber plungers 8 can prevent water from flowing out in first mounting hole 31, further reduce water and flow out between body 1 and the gondola water faucet panel 2. Wherein, rubber plunger 8 laminates mutually with body 1 outside to guarantee that body 1 outside is smooth and smooth, improve the use experience of metal gondola water faucet casing.
Specifically, rubber plunger 8 includes cylinder 81 and grafting strip 82, and grafting strip 82 body coupling is in cylinder 81 week side, and spliced groove 34 has been seted up to the erection column 3 in first mounting hole 31 week side, and cylinder 81 is through elasticity chucking in first mounting hole 31, and grafting strip 82 is pegged graft in spliced groove 34 to the quick location installation of rubber plunger 8 of being convenient for.
Further, the shower head panel further comprises a sealing gasket 9 and a plurality of positioning columns 10, wherein the sealing gasket 9 is positioned between the body 1 and the shower head panel 2 and is fixed at the lower end of the body 1 through bonding. The positioning columns 10 are fixedly connected to the lower end of the body 1, the sealing gasket 9 is provided with a plurality of first positioning holes 91, the shower panel 2 is provided with a plurality of second positioning holes 21, and the positioning holes penetrate through the first positioning holes 91 and the second positioning holes 21 in sequence so as to facilitate quick positioning and installation of the sealing gasket 9 and the shower panel 2.
The implementation principle of the embodiment is as follows: when the metal shower shell is installed, each threaded column 4 is inserted into each second installation hole 32, so that each first elastic sealing ring 6 is abutted between each threaded column 4 and each abutting ring 33, and each fastening bolt 5 is sequentially penetrated into each first installation hole 31 and each abutting ring 33 and is in threaded connection with each threaded column 4, so that the body 1 and the shower panel 2 are fixed. Wherein, the first elastic sealing ring 6 is tightly propped against and deformed and sleeved on the fastening bolt 5, and even under the impact of water, the tightness among the mounting column 3, the threaded column 4 and the fastening bolt 5 can be ensured, thereby reducing the outflow of water from between the body 1 and the shower panel 2.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (8)

1. A metal sprinkler shell, characterized in that: comprises a body (1), a shower panel (2), a plurality of mounting posts (3), a plurality of threaded posts (4), a plurality of fastening bolts (5) and a plurality of first elastic sealing rings (6), wherein the plurality of mounting posts (3) are arranged on the inner side of the body (1) and are arranged along the circumferential direction of the body (1) at intervals, the plurality of mounting posts (3) are provided with first mounting holes (31) and second mounting holes (32) which are communicated with each other, the diameter of each first mounting hole (31) is larger than that of each second mounting hole (32), each first mounting hole (31) is positioned at one end of each second mounting hole (32) away from the shower panel (2), each first mounting hole (31) is provided with a butt ring (33) at the joint of each second mounting hole (32), the plurality of threaded posts (4) are arranged on the shower panel (2) and are respectively spliced in each second mounting hole (32), one end of each fastening bolt (5) is respectively arranged at one end of each fastening bolt (5) in sequence in a penetrating way through the first mounting hole (31) and each butt ring (33) and each elastic sealing ring (33) are respectively spliced on two sides of each first mounting hole (32), and a plurality of first elastic sealing rings (6) are respectively sleeved on each fastening bolt (5).
2. A metal shower housing as claimed in claim 1, wherein: the novel rubber plug structure further comprises a plurality of rubber plugs (8), and the rubber plugs (8) are respectively clamped in the first mounting holes (31) through elasticity.
3. A metal shower housing as claimed in claim 2, wherein: the rubber plunger (8) comprises a column body (81) and a plug strip (82), the plug strip (82) is arranged on the periphery of the column body (81), the mounting column (3) is located on the periphery of the first mounting hole (31) and provided with a plug groove (34), and the plug strip (82) is plugged in the plug groove (34).
4. A metal shower housing as claimed in claim 2, wherein: the rubber plunger (8) is attached to the outer side of the body (1).
5. A metal shower housing as claimed in claim 1, wherein: the shower head panel also comprises a plurality of second elastic sealing rings (7), wherein the second elastic sealing rings (7) are respectively arranged at one end of each mounting column (3) close to the shower head panel (2) and sleeved on each threaded column (4).
6. A metal shower housing as claimed in claim 1, wherein: the shower head further comprises a sealing gasket (9), and the sealing gasket (9) is arranged between the body (1) and the shower head panel (2).
7. The metal shower housing of claim 6, wherein: the shower head structure further comprises a plurality of positioning columns (10), wherein the positioning columns (10) are arranged on one side, close to the shower head panel (2), of the body (1), a plurality of first positioning holes (91) are formed in the sealing gasket (9), and the positioning columns (10) are respectively inserted into the first positioning holes (91).
8. The metal shower housing of claim 7, wherein: the shower panel (2) is provided with a plurality of second positioning holes (21), and a plurality of positioning columns (10) are respectively inserted into the second positioning holes (21).
CN202223452132.7U 2022-12-22 2022-12-22 Metal shower shell Active CN218962965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223452132.7U CN218962965U (en) 2022-12-22 2022-12-22 Metal shower shell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223452132.7U CN218962965U (en) 2022-12-22 2022-12-22 Metal shower shell

Publications (1)

Publication Number Publication Date
CN218962965U true CN218962965U (en) 2023-05-05

Family

ID=86150583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223452132.7U Active CN218962965U (en) 2022-12-22 2022-12-22 Metal shower shell

Country Status (1)

Country Link
CN (1) CN218962965U (en)

Similar Documents

Publication Publication Date Title
CN218962965U (en) Metal shower shell
CN202091578U (en) Fixed structure of non return valve core
CN105805450A (en) Magnetic conductance type flange connecting piece
CN206742554U (en) A kind of connector sealing structure
CN211609646U (en) Basin dish washer easy to assemble
CN216629507U (en) Improved fire-fighting spray head
CN211609647U (en) Connect reliable basin dish washer
CN218609929U (en) Shower head shell
CN217471812U (en) Shower end sealing structure and shower
CN211314666U (en) Connecting structure for submersible pump shells
CN214146709U (en) High-pressure gas check valve
CN212131761U (en) Flange for fixing nitrogen spring
CN221443626U (en) Leakage-proof structure for pipeline
CN205534705U (en) Connecting pipe subassembly and air conditioner for air conditioner
CN110657306B (en) PE pipe
CN213629034U (en) Water separator valve sealing structure
CN213330936U (en) Glass fiber reinforced plastic downhole oil pipe with seal ring in socket joint connection
CN218598818U (en) Regulating valve with high sealing performance
CN220416560U (en) Socket steel belt pipe
CN211270591U (en) Respirator assembly structure subassembly
CN221004161U (en) Easily install hydraulic pipe joint
CN220890480U (en) Anti-seepage pump cover structure
CN221097579U (en) Novel check valve
CN217590133U (en) Device for fixing basement comprehensive pipe network through wall
CN219692580U (en) Quick-connection type three-way joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant