CN218954231U - Energy storage system is fast-assembling wall joint Assembly is worn to ready-package for pipeline - Google Patents
Energy storage system is fast-assembling wall joint Assembly is worn to ready-package for pipeline Download PDFInfo
- Publication number
- CN218954231U CN218954231U CN202222362330.8U CN202222362330U CN218954231U CN 218954231 U CN218954231 U CN 218954231U CN 202222362330 U CN202222362330 U CN 202222362330U CN 218954231 U CN218954231 U CN 218954231U
- Authority
- CN
- China
- Prior art keywords
- chuck
- mounting
- quick
- external thread
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004146 energy storage Methods 0.000 title claims abstract description 18
- 238000009434 installation Methods 0.000 claims abstract description 42
- 238000007789 sealing Methods 0.000 claims abstract description 15
- 230000000149 penetrating effect Effects 0.000 claims abstract description 7
- 230000000670 limiting effect Effects 0.000 claims description 16
- 230000000712 assembly Effects 0.000 claims 1
- 238000000429 assembly Methods 0.000 claims 1
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 239000000110 cooling liquid Substances 0.000 description 3
- 239000000945 filler Substances 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/16—Mechanical energy storage, e.g. flywheels or pressurised fluids
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The utility model provides a quick-mounting through-wall joint assembly for an energy storage system pipeline, which comprises a through-wall main body assembly, wherein the through-wall main body assembly comprises a through-wall main body, the left side and the right side of the through-wall main body are respectively connected with a first pipeline installation assembly and a second pipeline installation assembly in a threaded manner, and the bottoms of internal threads on the two sides of the through-wall main body are respectively provided with a first sealing ring and a second sealing ring; the first pipeline installation assembly comprises a first sanitary chuck and a first external thread quick-mounting chuck, the first sanitary chuck and the first external thread quick-mounting chuck are fixed through a first quick-mounting clamping hoop, a first chuck quick-mounting gasket is arranged at the joint of the first sanitary chuck and the first external thread quick-mounting chuck, the first external thread quick-mounting chuck is connected with the left side of the wall penetrating main body, and the first external thread quick-mounting chuck abuts against the first sealing ring; the second pipeline installation assembly comprises a second sanitary chuck and a second external thread quick-mounting chuck, and the second sanitary chuck and the second external thread quick-mounting chuck are fixed through a second quick-mounting clamping hoop.
Description
Technical Field
The utility model relates to the field of energy storage systems, in particular to a quick-mounting through-wall joint assembly for an energy storage system pipeline.
Background
With the continuous development of energy storage technology, the battery box is used as a core device of an energy storage system, the thermal characteristics and uniformity of the internal environment of the battery box directly determine the energy storage effect of a battery cell group, the thermal management of the energy storage system is particularly important, at present, a large hole is required to be reserved in the form that a liquid cooling pipeline mostly needs to be drilled and then penetrates through a wall body to another cabin body, a sleeve is required to be fixed with a filler after installation, vibration is generated after cooling liquid flows in the pipeline or in container energy storage transportation, and the battery box is unstable after installation, so that the service life is influenced.
Disclosure of Invention
The utility model provides a quick-mounting through-wall joint assembly for an energy storage system pipeline, aiming at the problems in the prior art, so as to solve at least one technical problem.
The technical scheme of the utility model is as follows: the quick-mounting through-wall joint assembly for the energy storage system pipeline comprises a through-wall main body assembly and is characterized in that the through-wall main body assembly comprises a through-wall main body, the left side and the right side of the through-wall main body are respectively connected with a first pipeline installation assembly and a second pipeline installation assembly in a threaded manner, and the bottoms of internal threads on the two sides of the through-wall main body are respectively provided with a first sealing ring and a second sealing ring;
the first pipeline installation assembly comprises a first sanitary chuck and a first external thread quick-mounting chuck, the first sanitary chuck and the first external thread quick-mounting chuck are fixed through a first quick-mounting clamping hoop, a first chuck quick-mounting gasket is arranged at the joint of the first sanitary chuck and the first external thread quick-mounting chuck, the first external thread quick-mounting chuck is connected with the left side of the wall penetrating main body, and the first external thread quick-mounting chuck is propped against the first sealing ring;
the second pipeline installation assembly comprises a second sanitary chuck and a second external thread quick-mounting chuck, the second sanitary chuck and the second external thread quick-mounting chuck are fixed through a second quick-mounting clamping hoop, a second chuck quick-mounting gasket is arranged at the joint of the second sanitary chuck and the second external thread quick-mounting chuck, the second external thread quick-mounting chuck is connected with the right side of the through-wall main body, and the second external thread quick-mounting chuck is propped against the second sealing ring.
The utility model has simple and convenient installation, high reliability after installation and high degree of fit with the wall body, perfectly solves the problems that the old through-wall structure needs to be fixed by a sleeve and a filler after installation, and the cooling liquid in a pipeline flows or vibrates in the container energy storage transportation, and is unstable after installation, thereby influencing the service life. The main body of the utility model adopts a thread structure, so that the length can be freely adjusted, and the utility model is not limited by the thickness of a wall body. According to the utility model, the two sides of the device are connected with the main body to realize the detachable connection, the quick-mounting structures on the two sides can be replaced, the connection with different quick-mounting structures is realized, and the limitation of the types of the quick-mounting structures is reduced.
Further preferably, the first pipe installation component and the second pipe installation component are both provided with clamping grooves with conical structures.
Further preferably, the outer wall of the through-wall main body is provided with an external thread, a locking nut is installed on the external thread, the locking nut is close to the first pipeline installation component, a first flat gasket is further arranged on the external thread, and the first flat gasket is attached to the locking nut.
The lock nut can be freely adjusted according to the thickness of the wall body, so that the installation of the fast-assembling through-wall joint assembly is free from limitation on the thickness of the wall body, and the installation is more convenient. The flat gasket can increase the contact area with the wall body, reduce pressure and prevent the locking nut of the through-wall main body assembly from loosening, so that the through-wall joint assembly is more stably arranged on the wall body.
Further preferably, the outer wall of the through-wall main body is further provided with a limiting ring, the limiting ring is close to the second pipeline installation assembly, the edge of the limiting ring is attached with a second flat gasket, and the first flat gasket and the second flat gasket are arranged between the locking nut and the limiting ring.
The limiting ring can play a limiting effect on the wall body, and the flat gasket can increase the contact area with the wall body and reduce the pressure.
Drawings
FIG. 1 is a schematic view of the overall structure of the present utility model;
FIG. 2 is an overall exploded view of the present utility model;
FIG. 3 is a schematic view of the assembly installation of the present utility model;
FIG. 4 is an exploded view of a first conduit installation assembly of the present utility model;
reference numerals in the drawings: a first pipe installation assembly; a second conduit mounting assembly 20; a wall penetrating body assembly 30; 101 a first sanitary chuck; a second sanitary chuck 201; 102 a first quick-fit clip; 202, fixing a second quick-mounting clamping hoop; 103 a first chuck quick-fit gasket; 203 a second chuck quick-fit washer; 104 a first external thread quick-fit chuck; 204 a second external thread quick-fit chuck; 305 locking nuts; 3061 first flat washer; 3062 a second flat gasket; 3071 a first seal ring; 3072 a second seal ring; 308 a stop collar; 309 wall-penetrating main body
Detailed Description
The utility model is further described below with reference to the accompanying drawings.
Referring to fig. 1-4, a fast-assembling through-wall joint assembly for an energy storage system pipeline comprises a through-wall main body assembly 30, wherein the through-wall main body assembly comprises a through-wall main body 309, the left side and the right side of the through-wall main body are respectively connected with a first pipeline installation assembly 10 and a second pipeline installation assembly 20 in a threaded manner, and the bottoms of internal threads on the two sides of the through-wall main body are respectively provided with a first sealing ring 3071 and a second sealing ring 3072; the first pipeline installation assembly comprises a first sanitary chuck 101 and a first external thread quick-mounting chuck 104, the first sanitary chuck and the first external thread quick-mounting chuck are fixed through a first quick-mounting clamp 102, a first chuck quick-mounting gasket 103 is arranged at the joint of the first sanitary chuck and the first external thread quick-mounting chuck, the first external thread quick-mounting chuck is connected with the left side of the wall penetrating main body, and the first external thread quick-mounting chuck is propped against the first sealing ring; the second pipeline installation component includes second health chuck 201 and second external screw thread fast-assembling chuck 204, and second health chuck and second external screw thread fast-assembling chuck pass through second fast-assembling clamp and fix 202, and the junction of second health chuck and second external screw thread fast-assembling chuck is equipped with second chuck fast-assembling packing ring 203, and second external screw thread fast-assembling chuck is connected with the right side of wearing the wall main part, and second external screw thread fast-assembling chuck offsets with the second sealing washer.
The utility model has simple and convenient installation, high reliability after installation and high degree of fit with the wall body, perfectly solves the problems that the old through-wall structure needs to be fixed by a sleeve and a filler after installation, and the cooling liquid in a pipeline flows or vibrates in the container energy storage transportation, and is unstable after installation, thereby influencing the service life. The main body of the utility model adopts a thread structure, so that the length can be freely adjusted, and the utility model is not limited by the thickness of a wall body. According to the utility model, the two sides of the device are connected with the main body to realize the detachable connection, the quick-mounting structures on the two sides can be replaced, the connection with different quick-mounting structures is realized, and the limitation of the types of the quick-mounting structures is reduced.
Further preferably, the first pipe installation component and the second pipe installation component are both provided with clamping grooves with conical structures.
Further preferably, the outer wall of the wall penetrating main body is provided with an external thread, a locking nut 305 is installed on the external thread, the locking nut is close to the first pipeline installation component, a first flat gasket 3061 is further arranged on the external thread, and the first flat gasket is attached to the locking nut. The lock nut can be freely adjusted according to the thickness of the wall body, so that the installation of the fast-assembling through-wall joint assembly is free from limitation on the thickness of the wall body, and the installation is more convenient. The flat gasket can increase the contact area with the wall body, reduce pressure and prevent the locking nut of the through-wall main body assembly from loosening, so that the through-wall joint assembly is more stably arranged on the wall body.
Further preferably, the outer wall of the wall penetrating body is further provided with a limiting ring 308, the limiting ring is close to the second pipeline installation assembly, the edge of the limiting ring is attached with a second flat gasket 3062, and the first flat gasket and the second flat gasket are arranged between the locking nut and the limiting ring. The limiting ring can play a limiting effect on the wall body, and the flat gasket can increase the contact area with the wall body and reduce the pressure.
The foregoing is merely a preferred embodiment of the present utility model and it should be noted that modifications and adaptations to those skilled in the art may be made without departing from the principles of the present utility model, which are intended to be comprehended within the scope of the present utility model.
Claims (4)
1. The quick-mounting through-wall joint assembly for the energy storage system pipeline comprises a through-wall main body assembly and is characterized in that the through-wall main body assembly comprises a through-wall main body, the left side and the right side of the through-wall main body are respectively connected with a first pipeline installation assembly and a second pipeline installation assembly in a threaded manner, and the bottoms of internal threads on the two sides of the through-wall main body are respectively provided with a first sealing ring and a second sealing ring;
the first pipeline installation assembly comprises a first sanitary chuck and a first external thread quick-mounting chuck, the first sanitary chuck and the first external thread quick-mounting chuck are fixed through a first quick-mounting clamping hoop, a first chuck quick-mounting gasket is arranged at the joint of the first sanitary chuck and the first external thread quick-mounting chuck, the first external thread quick-mounting chuck is connected with the left side of the wall penetrating main body, and the first external thread quick-mounting chuck is propped against the first sealing ring;
the second pipeline installation assembly comprises a second sanitary chuck and a second external thread quick-mounting chuck, the second sanitary chuck and the second external thread quick-mounting chuck are fixed through a second quick-mounting clamping hoop, a second chuck quick-mounting gasket is arranged at the joint of the second sanitary chuck and the second external thread quick-mounting chuck, the second external thread quick-mounting chuck is connected with the right side of the through-wall main body, and the second external thread quick-mounting chuck is propped against the second sealing ring.
2. The quick connect coupling assembly of claim 1, wherein said first and second conduit mounting assemblies each have a tapered configuration of slots.
3. The quick-mounting through-wall joint assembly for an energy storage system pipeline according to claim 1, wherein an external thread is arranged on the outer wall of the through-wall main body, a locking nut is mounted on the external thread, the locking nut is close to the first pipeline mounting assembly, a first flat gasket is further arranged on the external thread, and the first flat gasket is attached to the locking nut.
4. The quick-mounting through-wall joint assembly for an energy storage system pipeline according to claim 3, wherein a limiting ring is further arranged on the outer wall of the through-wall main body, the limiting ring is close to the second pipeline installation assembly, a second flat gasket is attached to the edge of the limiting ring, and the first flat gasket and the second flat gasket are arranged between the locking nut and the limiting ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222362330.8U CN218954231U (en) | 2022-09-06 | 2022-09-06 | Energy storage system is fast-assembling wall joint Assembly is worn to ready-package for pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222362330.8U CN218954231U (en) | 2022-09-06 | 2022-09-06 | Energy storage system is fast-assembling wall joint Assembly is worn to ready-package for pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218954231U true CN218954231U (en) | 2023-05-02 |
Family
ID=86134128
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222362330.8U Active CN218954231U (en) | 2022-09-06 | 2022-09-06 | Energy storage system is fast-assembling wall joint Assembly is worn to ready-package for pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218954231U (en) |
-
2022
- 2022-09-06 CN CN202222362330.8U patent/CN218954231U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111594674A (en) | Corrugated pipe mounting device | |
CN210770778U (en) | Connecting joint for connecting pipe | |
CN218954231U (en) | Energy storage system is fast-assembling wall joint Assembly is worn to ready-package for pipeline | |
CN213982381U (en) | Flexible tight hoop type drainage cast iron pipe fitting connecting device | |
CN103133783A (en) | Pipeline double-thread connection structure penetrating through cartridge receiver | |
CN201190856Y (en) | Compensation type high sealed pipe connection | |
US10371296B2 (en) | No contact connectors | |
CN202769077U (en) | Continuous penetrating tank structure of stainless steel tube | |
CN210830865U (en) | Flexible clamp type centrifugal drain pipe mounting structure | |
CN220540557U (en) | Plastic-lined three-way pipe | |
CN201661782U (en) | Conversion joint for connecting metal pipe and nonmetal pipe | |
CN217355988U (en) | Flange capable of bearing high pressure | |
KR100837666B1 (en) | Assembled sealing gasket body of manhole structure for power transmission | |
CN215635596U (en) | Gasket and engine | |
CN214466770U (en) | Copper-plastic composite pipeline socket welding double-seal connecting structure | |
CN220016460U (en) | High-temperature high-pressure pump bolt connecting flange | |
CN205745739U (en) | A kind of pipe fitting carrying sealing device | |
CN217714023U (en) | Novel partition plate type flange low-pressure pipe combined joint | |
CN221034565U (en) | Steel-plastic adapter with good sealing performance | |
CN219327883U (en) | Detachable interface | |
CN220600791U (en) | Tap water network management installation structure | |
CN220851215U (en) | Connecting elbow for pipeline transformation | |
CN211344341U (en) | Pull type inner support flange seat | |
CN220337773U (en) | High-sealing leadless bronze alloy tee joint quick-connection pipe fitting structure | |
CN218818802U (en) | Air inlet rubber tube with limiting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A quick installation wall joint component for energy storage system pipelines Granted publication date: 20230502 Pledgee: China Construction Bank Corporation Shanghai Fourth Branch Pledgor: SHANGHAI FOUND AUTOMATIC EQUIPMENT Co.,Ltd. Registration number: Y2024310000229 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |