CN218952452U - Building wall body reserves entrance to a cave and blocks up structure - Google Patents
Building wall body reserves entrance to a cave and blocks up structure Download PDFInfo
- Publication number
- CN218952452U CN218952452U CN202222034868.6U CN202222034868U CN218952452U CN 218952452 U CN218952452 U CN 218952452U CN 202222034868 U CN202222034868 U CN 202222034868U CN 218952452 U CN218952452 U CN 218952452U
- Authority
- CN
- China
- Prior art keywords
- mounting panel
- mounting plate
- mounting
- baffle
- building wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to the technical field of building equipment, in particular to a building wall reserved hole plugging structure, which comprises a first mounting plate, wherein a second mounting plate is arranged on one side of the first mounting plate, a locking mechanism for fixing the second mounting plate is arranged on one side of the first mounting plate, a side groove is formed in one side of the first mounting plate, a baffle is connected in a sliding manner in the side groove, a limiting mechanism for fixing the baffle is arranged on the second mounting plate, the first mounting plate and the second mounting plate are arranged at the position of a reserved hole of a wall surface through a willow nail, concrete is injected into the reserved hole through a material injection hole, and after the concrete is injected, a U-shaped bolt is pulled out from the first clamping hole and the second clamping hole, and at the moment, the second mounting plate can be detached from one side of the first mounting plate, so that the second mounting plate and the material injection hole can be used next time.
Description
Technical Field
The utility model relates to the technical field of building equipment, in particular to a reserved hole plugging structure of a building wall.
Background
In building construction, the setting of reserved hole is very popular, and the variety of reserved hole is various in addition, like measurement unwrapping wire hole, concrete pump pipe hole, scaffold frame hole of encorbelmenting, fixed outer scaffold frame hole etc. these holes all need the shutoff closely knit in subsequent construction, if these reserved hole shutoff is not closely knit, can bring very big hidden danger for engineering quality afterwards.
When the existing reserved hole is plugged, the wooden mold is adopted for opposite pulling reinforcement, and the thickness of the wooden mold is thicker when concrete is poured, so that the concrete is protruded, the wall surface is uneven, manual picking and beating are required to be arranged at the later stage, and therefore, the reserved hole plugging structure for the building wall is provided.
Disclosure of Invention
The utility model aims to provide a reserved hole plugging structure of a building wall, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a building wall reserves hole opening and seals structure, includes first mounting panel, one side of first mounting panel is provided with the second mounting panel, one side of first mounting panel is provided with the locking mechanism who is used for fixed second mounting panel, the side tank has been seted up to one side of first mounting panel, sliding connection has the baffle in the side tank, be provided with the stop gear who is used for fixed stop on the second mounting panel, the blown down tank has been seted up to one side of second mounting panel, the blown down tank is linked together with the side tank, one side fixed mounting of second mounting panel has the notes material mouth, the notes material mouth is linked together with the blown down tank.
Preferably, the locking mechanism comprises a plurality of first clamping holes, a plurality of first clamping holes are formed in the outer side wall of the first mounting plate, a plurality of second clamping holes are formed in the outer side wall of the second mounting plate, and the first clamping holes and the second clamping holes are movably sleeved with the same U-shaped plug pin.
Preferably, the limiting mechanism comprises a connecting sleeve, the connecting sleeve is fixedly arranged on the top surface of the second mounting plate, a jack is formed in one side of the baffle, and the jack and the connecting sleeve are movably sleeved with the same inserting rod.
Preferably, a plurality of mounting holes are formed in one side of the first mounting plate, and a plurality of the mounting holes are internally provided with the willow nails.
Preferably, a plurality of side holes are formed in one side of the second mounting plate, and the side holes are movably sleeved with one ends of the plurality of nails respectively.
Preferably, a handle is fixedly arranged at the top end of the baffle.
Preferably, a sealing ring is arranged on the outer side wall of the first mounting plate.
Preferably, one side of the baffle is in the same horizontal plane as one side of the first mounting plate.
Compared with the prior art, the utility model has the beneficial effects that:
1. this wall body is reserved hole and is blocked up structure for construction installs first mounting panel and second mounting panel in the position of wall preformed hole through the willow nail, pours into the preformed hole with concrete through annotating the material mouth, after the concrete injection is accomplished, pulls out U type bolt in first card hole and the second card hole, can dismantle the second mounting panel from one side of first mounting panel this moment, and the second mounting panel of being convenient for uses with annotating the material mouth next time.
2. This wall body is reserved hole and is blocked up structure for construction, after second mounting panel concrete fills up the preformed hole, outwards pulls the jack, pushes down the baffle this moment, and the baffle can clear away the concrete that overflows on the preformed hole, makes the position and the face wall that the preformed hole shutoff kept level, has strengthened the aesthetic property.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a first mounting plate structure according to the present utility model;
FIG. 3 is a schematic view of a spout according to the present utility model;
fig. 4 is an enlarged view of the portion a of fig. 1 according to the present utility model.
In the figure: 1. a first mounting plate; 2. a second mounting plate; 3. a seal ring; 4. a side groove; 5. a baffle; 6. a discharge chute; 7. a material injection port; 8. a first clamping hole; 9. a second clamping hole; 10. a U-shaped bolt; 11. a mounting hole; 12. a willow nail; 13. a side hole; 14. connecting sleeves; 15. a jack; 16. a rod; 17. a handle.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution:
the utility model provides a building wall reserves hole opening and seals structure, including first mounting panel 1, one side of first mounting panel 1 is provided with second mounting panel 2, one side of first mounting panel 1 is provided with the locking mechanism who is used for fixed second mounting panel 2, side tank 4 has been seted up to one side of first mounting panel 1, sliding connection has baffle 5 in side tank 4, be provided with the stop gear who is used for fixed baffle 5 on the second mounting panel 2, blown down tank 6 has been seted up to one side of second mounting panel 2, blown down tank 6 is linked together with side tank 4, one side fixed mounting of second mounting panel 2 has annotate material mouth 7, annotate material mouth 7 and blown down tank 6 and be linked together.
Specifically, the locking mechanism comprises a plurality of first clamping holes 8, the plurality of first clamping holes 8 are formed in the outer side wall of the first mounting plate 1, the plurality of second clamping holes 9 are formed in the outer side wall of the second mounting plate 2, and the first clamping holes 8 and the second clamping holes 9 are movably sleeved with the same U-shaped bolt 10.
Based on the following structure: the U-shaped bolt 10 is pulled out from the first clamping hole 8 and the second clamping hole 9, and the second mounting plate 2 can be detached from one side of the first mounting plate 1 at the moment, so that the second mounting plate 2 and the material injection hole 7 can be used next time.
Specifically, the limiting mechanism comprises a connecting sleeve 14, the connecting sleeve 14 is fixedly arranged on the top surface of the second mounting plate 2, a jack 15 is formed in one side of the baffle 5, and the jack 15 and the connecting sleeve 14 are movably sleeved with the same inserting rod 16.
Based on the following structure: when the concrete is injected, the inserted link 16 is inserted into the insertion hole 15 and the connecting sleeve 14, so that the baffle 5 can be limited at a fixed position and cannot move, and the baffle 5 is prevented from influencing the injection of the concrete.
Specifically, a plurality of mounting holes 11 are formed in one side of the first mounting plate 1, and the inside of each mounting hole 11 is provided with a nail 12.
Based on the following structure: the first mounting plate 1 and the second mounting plate 2 are mounted at the position of the reserved hole of the wall surface through the willow nails 12
Specifically, a plurality of side holes 13 are formed in one side of the second mounting plate 2, and the side holes 13 are movably sleeved with one ends of the plurality of nails 12 respectively.
Based on the following structure: the side holes 13 are sleeved with the nails 12, so that the fixity between the second mounting plate 2 and the first mounting plate 1 is enhanced, and the first mounting plate 1 and the second mounting plate 2 are attached more tightly.
Specifically, the top end of the baffle 5 is fixedly provided with a handle 17,
based on the following structure: the baffle 5 is conveniently driven to move by pulling the handle 17.
Specifically, the outer side wall of the first mounting plate 1 is provided with a sealing ring 3.
Based on the following structure: the sealing ring 3 enhances the tightness of the first mounting plate 1 and the wall body during mounting, and avoids the excessive concrete overflowing from the gap between the wall surface and the first mounting plate 1.
Specifically, one side of the baffle 5 is in the same horizontal plane as one side of the first mounting plate 1.
Based on the following structure: at this time, the baffle plate 5 is pressed downwards, and the baffle plate 5 can clear away the concrete overflowed from the reserved opening, so that the position of the reserved opening for plugging is kept flat with the face wall, and the attractiveness is enhanced.
When the wall body reserved hole plugging structure for building construction of the embodiment is used, the first mounting plate 1 and the second mounting plate 2 are mounted at the position of a reserved hole of the wall surface through the willow nails 12, concrete is injected into the reserved hole through the material injection hole 7, after the concrete injection is finished, the U-shaped bolt 10 is pulled out of the first clamping hole 8 and the second clamping hole 9, at the moment, the second mounting plate 2 can be detached from one side of the first mounting plate 1, and the second mounting plate 2 and the material injection hole 7 are convenient to use next time. After the second mounting plate 2 concrete fills up the preformed hole, outwards pulling jack 15, pushing down baffle 5 this moment, baffle 5 can clear away the concrete that overflows on the preformed hole, makes preformed hole shutoff's position and face wall keep level, has strengthened the aesthetic property.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the above-described embodiments, and that the above-described embodiments and descriptions are only preferred embodiments of the present utility model, and are not intended to limit the utility model, and that various changes and modifications may be made therein without departing from the spirit and scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a building wall reserves entrance to a cave and seals structure, includes first mounting panel (1), its characterized in that: one side of first mounting panel (1) is provided with second mounting panel (2), one side of first mounting panel (1) is provided with the locking mechanism who is used for fixed second mounting panel (2), side tank (4) have been seted up to one side of first mounting panel (1), sliding connection has baffle (5) in side tank (4), be provided with the stop gear who is used for fixed baffle (5) on second mounting panel (2), blown down tank (6) have been seted up to one side of second mounting panel (2), blown down tank (6) are linked together with side tank (4), one side fixed mounting of second mounting panel (2) has annotate material mouth (7), annotate material mouth (7) are linked together with blown down tank (6).
2. The building wall reserved hole plugging structure according to claim 1, wherein: the locking mechanism comprises a plurality of first clamping holes (8), the plurality of first clamping holes (8) are formed in the outer side wall of the first mounting plate (1), a plurality of second clamping holes (9) are formed in the outer side wall of the second mounting plate (2), and the first clamping holes (8) and the second clamping holes (9) are movably sleeved with the same U-shaped plug pin (10).
3. The building wall reserved hole plugging structure according to claim 1, wherein: the limiting mechanism comprises a connecting sleeve (14), the connecting sleeve (14) is fixedly arranged on the top surface of the second mounting plate (2), a jack (15) is formed in one side of the baffle (5), and the jack (15) and the connecting sleeve (14) are movably sleeved with the same inserting rod (16).
4. The building wall reserved hole plugging structure according to claim 1, wherein: a plurality of mounting holes (11) are formed in one side of the first mounting plate (1), and a plurality of nails (12) are arranged in the mounting holes (11).
5. The building wall reserved hole plugging structure according to claim 1, wherein: a plurality of side openings (13) have been seted up to one side of second mounting panel (2), and a plurality of side openings (13) cup joint with the activity of the one end of a plurality of willow nails (12) respectively, cup joint together through side opening (13) and willow nail (12), strengthened the fixity between second mounting panel (2) and first mounting panel (1), make the inseparabler of laminating of first mounting panel (1) and second mounting panel (2).
6. The building wall reserved hole plugging structure according to claim 1, wherein: the top of the baffle plate (5) is fixedly provided with a handle (17), and the baffle plate (5) is conveniently driven to move by pulling the handle (17).
7. The building wall reserved hole plugging structure according to claim 1, wherein: the outer side wall of the first mounting plate (1) is provided with a sealing ring (3); one side of the baffle plate (5) is positioned on the same horizontal plane with one side of the first mounting plate (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222034868.6U CN218952452U (en) | 2022-08-03 | 2022-08-03 | Building wall body reserves entrance to a cave and blocks up structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222034868.6U CN218952452U (en) | 2022-08-03 | 2022-08-03 | Building wall body reserves entrance to a cave and blocks up structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218952452U true CN218952452U (en) | 2023-05-02 |
Family
ID=86108749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222034868.6U Active CN218952452U (en) | 2022-08-03 | 2022-08-03 | Building wall body reserves entrance to a cave and blocks up structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218952452U (en) |
-
2022
- 2022-08-03 CN CN202222034868.6U patent/CN218952452U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111705950A (en) | High-strength assembly type shear wall structure | |
CN113047457B (en) | Assembled energy-conserving building based on BIM | |
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN218952452U (en) | Building wall body reserves entrance to a cave and blocks up structure | |
CN216360918U (en) | Exempt from to pick chisel quick detach pin-connected panel wall body hole shutoff mould | |
CN210421512U (en) | Positioning, mounting and connecting structure of PC prefabricated wall board | |
CN109676756A (en) | A kind of wall triangle dome brick prefabricated section mold and its production and application method | |
CN209211771U (en) | A kind of screw-thread steel intelligent connector | |
CN210289130U (en) | Wall opening formwork supporting tool | |
CN212507353U (en) | Side template structure of building cast-in-place structure body | |
CN207259944U (en) | CFST Arch Bridge arch springing fixed structure | |
CN208202353U (en) | A kind of rhizoma nelumbinis grout sleeve that stability is strong | |
CN211923241U (en) | Vertical steel bar grouting sleeve of assembled shear wall structure | |
CN219909935U (en) | Upper formwork grouting equipment of filling wall | |
CN219138049U (en) | Assembly component of prefabricated building wallboard | |
CN111719861A (en) | Construction device and construction method for grouting plugging of fabricated building | |
CN211899641U (en) | Totally closed exterior window template of aluminum alloy | |
CN220133255U (en) | Simple interface of precast concrete structure wall | |
CN218779713U (en) | Casting constructional column is with exempting from hollow building block of formwork | |
CN218091637U (en) | Decorative composite board convenient to install | |
CN217949372U (en) | Beam bottom gap filling device | |
CN212026717U (en) | Assembled fiber fireproof insulation board building block | |
CN210104933U (en) | Floor drain plugging device | |
CN219808589U (en) | Steel bar sleeve with stable internal structure | |
CN213654234U (en) | A mold device for building wall line box binding off |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |