CN218935527U - Double-layer anti-corrosion pipeline erection device for building construction - Google Patents

Double-layer anti-corrosion pipeline erection device for building construction Download PDF

Info

Publication number
CN218935527U
CN218935527U CN202320037043.1U CN202320037043U CN218935527U CN 218935527 U CN218935527 U CN 218935527U CN 202320037043 U CN202320037043 U CN 202320037043U CN 218935527 U CN218935527 U CN 218935527U
Authority
CN
China
Prior art keywords
pipeline
fixedly connected
double
building construction
erection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320037043.1U
Other languages
Chinese (zh)
Inventor
朱丹丹
朱小雪
张风鸣
邓献波
朱庆飞
赵德胜
刘瑜
邓永彬
路小雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Longyun Construction Engineering Co ltd
Original Assignee
Henan Longyun Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Longyun Construction Engineering Co ltd filed Critical Henan Longyun Construction Engineering Co ltd
Priority to CN202320037043.1U priority Critical patent/CN218935527U/en
Application granted granted Critical
Publication of CN218935527U publication Critical patent/CN218935527U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a double-layer anti-corrosion pipeline erection device for building construction, which relates to the technical field of pipeline erection and comprises pipeline erection mechanisms, wherein the number of the pipeline erection mechanisms is two, the two pipeline erection mechanisms are symmetrically arranged, a double-layer anti-corrosion pipeline is clamped above the two pipeline erection mechanisms, each pipeline erection mechanism comprises a stand column, the upper part of the stand column is sleeved with a sleeve, the upper surface of the sleeve is fixedly connected with a flat plate, the upper surface of the flat plate is fixedly connected with three mounting plates, and a bidirectional screw rod is rotationally connected between the three mounting plates. According to the double-layer anti-corrosion pipeline erection device for building construction, the flat plate, the mounting plate, the bidirectional screw rod, the sliding block, the first clamping plate, the second clamping plate and the adjusting handle are arranged, so that the double-layer anti-corrosion pipeline erection device for building construction has the function of firmly clamping the anti-corrosion pipeline, the anti-corrosion pipeline is clamped face to face from two sides of the anti-corrosion pipeline, the clamping is more stable, the operation is more rapid, the construction risk is greatly reduced, and the time is saved.

Description

Double-layer anti-corrosion pipeline erection device for building construction
Technical Field
The utility model relates to the technical field of pipeline erection, in particular to a double-layer anti-corrosion pipeline erection device for building construction.
Background
The corrosion-resistant pipe is also commonly called as a corrosion-resistant steel pipe, and is a steel pipe which is processed by a corrosion-resistant process and can effectively prevent or slow down corrosion caused by chemical or electrochemical reaction in the transportation and use processes. According to the statistical data of China, the direct economic loss of steel pipe corrosion in China per year is 2800 hundred million, and the global loss of steel pipe corrosion per year is up to 5000 hundred million dollars at present. The corrosion protection tube is effective in preventing or slowing down corrosion. On building construction site, use to a pipeline erection device to install anticorrosive pipeline
The double-layer anti-corrosion pipeline erection device for building construction disclosed in the Chinese patent application publication No. CN 216382859U comprises two symmetrically arranged pipeline erection mechanisms, wherein the two pipeline erection mechanisms are fixedly connected through a connecting cross rod, and an anti-corrosion pipeline is clamped above each pipeline erection mechanism. According to the utility model, one surface of the limit bolt is separated from one surface of the vertical support plate by screwing the limit bolt, the strip-shaped slide plate can be downwards moved at the moment, the bottom end of the rotating rod can downwards move by downwards moving the strip-shaped slide plate, the top end of the rotating rod can inwards move at the moment until the two rectangular guide rods can tightly clamp the anti-corrosion pipeline, then the limit bolt is screwed, so that one surface of the limit bolt is tightly extruded with the front surface of the vertical support plate, the strip-shaped slide plate is fixed, the strip-shaped slide plate is prevented from moving again, clamping can be simply and conveniently completed, and therefore, the working efficiency is greatly improved.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a double-layer anti-corrosion pipeline erection device for building construction, which solves the problems in the prior art.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a double-deck anticorrosive pipeline erects device that construction was used, includes pipeline erects the mechanism, the quantity of pipeline erects the mechanism is two, two pipeline erects the mechanism and is the symmetry setting, two the top of pipeline erects the mechanism all presss from both sides and has held a double-deck anticorrosive pipeline, pipeline erects the mechanism and includes the stand, the sleeve has been cup jointed on the upper portion of stand, telescopic upper surface fixedly connected with is dull and stereotyped, dull and stereotyped upper surface fixedly connected with three mounting panel, three rotate between the mounting panel and be connected with two-way lead screw, two-way lead screw's surface threaded connection has the slider, the quantity of slider is two the slider is the symmetric distribution, two the upper surface of slider is fixedly connected with first grip block and second grip block respectively.
Optionally, the upper surface fixedly connected with installation screw rod of dull and stereotyped, the externally mounted of installation screw rod has the connecting rod, two through connecting rod fixed connection between the pipeline erects the mechanism.
Optionally, the two-way lead screw rotates to set up in the upper portion of dull and stereotyped, the left end of two-way lead screw extends to the outside of mounting panel, and fixedly connected with adjusts the handle.
Optionally, the slider slides along two-way lead screw direction and sets up between the mounting panel, the lower surface of slider and the upper surface sliding connection of dull and stereotyped.
Optionally, the upper end fixedly connected with two gripper claws of first grip block, the upper end fixedly connected with three gripper claws of second grip block, the gripper claw of first grip block is the alternate opposition setting with the gripper claw of second grip block.
Optionally, rectangular sliding grooves are formed in the middle of the upright post, rectangular sliding blocks are connected to the inner portions of the rectangular sliding grooves in a sliding mode, screw rods are fixedly connected to the two ends of the rectangular sliding blocks, nut sleeves are connected to the outer surfaces of the screw rods in a threaded mode, the nut sleeves are arranged on the outer portions of the upright post in a rotating mode, and one side face, close to the upright post, of each nut sleeve is in butt joint with the outer surface of the upright post.
Optionally, one end fixedly connected with installation pole of stand is kept away from to the nut cover, the outside of installation pole cup joints and installs the rotation connecting block, the last fixed surface who rotates the connecting block is connected with the bracing piece, the upper surface and the telescopic lower fixed surface of bracing piece are connected.
Optionally, the lower surface fixedly connected with fixed bottom plate of stand, fixed bottom plate's lower surface fixedly connected with fixed ground awl.
(III) beneficial effects
The utility model provides a double-layer anti-corrosion pipeline erection device for building construction, which has the following beneficial effects:
1. according to the double-layer anti-corrosion pipeline erection device for building construction, the double-layer anti-corrosion pipeline erection device for building construction has the function of firmly clamping the anti-corrosion pipeline by arranging the flat plate, the mounting plate, the bidirectional screw rod, the sliding block, the first clamping plate, the second clamping plate and the adjusting handle, so that the anti-corrosion pipeline is clamped face to face from two sides of the anti-corrosion pipeline, the clamping is more stable, the operation is more rapid, the construction risk is greatly reduced, and the time is saved;
2. this double-deck anticorrosive pipeline of construction usefulness erects device, through setting up fixed ground awl, stand, sleeve, rectangle spout, rectangle slider, screw rod, nut cover, installation pole, rotation connecting block and bracing piece, make this double-deck anticorrosive pipeline of construction usefulness erect device possess the function of adjusting the centre gripping height, can adjust the height that anticorrosive pipeline erect according to real-time topography needs, and is more convenient, more practical.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic perspective view of a pipe erection mechanism according to the present utility model;
FIG. 3 is a schematic diagram of the front view of the pipe erection mechanism of the present utility model;
FIG. 4 is a schematic view of a partial A amplifying structure of the present utility model;
fig. 5 is an enlarged view of the structure of the part B of the present utility model.
In the figure: 1. a pipe erection mechanism; 101. fixing the ground cone; 102. a column; 103. a sleeve; 104. a flat plate; 105. a mounting plate; 106. a two-way screw rod; 107. a slide block; 108. a first clamping plate; 109. a second clamping plate; 110. adjusting the handle; 111. rectangular sliding grooves; 112. a rectangular slide block; 113. a screw; 114. a nut sleeve; 115. a mounting rod; 116. rotating the connecting block; 117. a support rod; 118. a fixed bottom plate; 2. a connecting rod; 201. installing a screw; 3. double-layer anti-corrosion pipeline.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Example 1
Referring to fig. 1 to 3, the present utility model provides the following technical solutions: the utility model provides a double-deck anticorrosive pipeline erects device that construction was used, including pipeline erects mechanism 1, pipeline erects the quantity of mechanism 1 and is two, two pipeline erects mechanism 1 and is the symmetry setting, two pipeline erects the top of mechanism 1 and all presss from both sides and hold a double-deck anticorrosive pipeline 3, pipeline erects mechanism 1 includes stand 102, sleeve 103 has been cup jointed on the upper portion of stand 102, sleeve 103's upper surface fixedly connected with dull and stereotyped 104, dull and stereotyped 104's upper surface fixedly connected with mounting screw 201, mounting screw 201's externally mounted has connecting rod 2, pass through connecting rod 2 fixed connection between two pipeline erects mechanism 1, dull and stereotyped 104's upper surface fixedly connected with three mounting plate 105, rotate between the three mounting plate 105 and be connected with two-way lead screw 106, two-way lead screw 106 rotate the upper portion that sets up in dull and stereotyped 104, the left end of two-way lead screw 106 extends to the outside of mounting plate 105, and fixedly connected with adjustment handle 110, two outer surface threaded connection of two-way lead screw 106 has slider 107, the quantity of slider 107 has two, two slider 107 are the symmetric distribution, two slider 107's upper surface fixedly connected with first grip block 108 and second grip block 109 respectively, slider 107 is provided with two opposite upper surface fixedly connected with first grip block 108 and second grip block 109, slider 107 is provided with two opposite upper surface fixedly connected with two grip block 108.
During the use, through setting up dull and stereotyped 104, mounting panel 105, two-way lead screw 106, slider 107, first grip block 108, second grip block 109 and regulation handle 110, make the double-deck anticorrosive pipeline of this construction usefulness erect the device and possess the function of firm centre gripping anticorrosive pipeline, pass double-deck anticorrosive pipeline 3 from between first grip block 108 and the second grip block 109 at first, then rotate regulation handle 110, regulation handle 110 drives two-way lead screw 106 and rotates, thereby drive the slider 107 of both sides and remove to the middle part in step, thereby make first grip block 108 and second grip block 109 remove to double-deck anticorrosive pipeline 3 simultaneously, until first grip block 108 and second grip block 109 firmly grip double-deck anticorrosive pipeline 3, the gripper is crisscross to set up each other, can grip double-deck anticorrosive pipeline 3 of different diameters, extensive adaptability, carry out face-to-face centre gripping from anticorrosive pipeline's both sides, the centre gripping is more firm, the operation is more swift, greatly reduced the construction risk, and time has been saved.
Example 2
Referring to fig. 1 to 5, the present utility model provides the following technical solutions: the double-layer anti-corrosion pipeline erection device for building construction is characterized in that the upper parts of two pipeline erection mechanisms 1 are respectively provided with a double-layer anti-corrosion pipeline 3 in a clamping mode, each pipeline erection mechanism 1 comprises a vertical column 102, a sleeve 103 is sleeved on the upper part of each vertical column 102, a rectangular sliding groove 111 is formed in the middle of each vertical column 102, a rectangular sliding block 112 is connected to the inside of each rectangular sliding groove 111 in a sliding mode, screws 113 are fixedly connected to the two ends of each rectangular sliding block 112, nut sleeves 114 are connected to the outer surfaces of the screws 113 in a threaded mode, the nut sleeves 114 are rotatably arranged on the outer parts of the vertical columns 102, one side, close to the vertical columns 102, of each nut sleeve 114 is in butt joint with the outer surfaces of the vertical columns 102, one end, far from the vertical columns 102, of each nut sleeve 114 is fixedly connected with a mounting rod 115, a rotary connecting block 116 is sleeved on the outer part of each mounting rod 115, a supporting rod 117 is fixedly connected to the upper surface of each rotary connecting block 116, the upper surface of each supporting rod 117 is fixedly connected with the lower surface of each sleeve 103, a fixed bottom plate 118 is fixedly connected to the lower surface of each vertical column 102, and a fixed bottom plate 118 is fixedly connected to a cone 101.
When the double-layer anti-corrosion pipeline erection device for building construction is used, through the arrangement of the fixed ground cone 101, the upright post 102, the sleeve 103, the rectangular sliding groove 111, the rectangular sliding block 112, the screw 113, the nut sleeve 114, the mounting rod 115, the rotary connecting block 116 and the supporting rod 117, the double-layer anti-corrosion pipeline erection device for building construction has the function of adjusting the clamping height, the anti-corrosion pipeline erection height is adjusted according to the topography and construction requirements of a building construction site, firstly, the fixed ground cone 101 is inserted into the bottom surface, the lower surface of the fixed bottom plate 118 is in contact with the bottom surface, the upright post 102 is kept vertical, then the nut sleeve 114 is loosened by hands, the nut sleeve 114 is separated from the surface of the upright post 102, the rectangular sliding block 112 at the moment can move up and down in the rectangular sliding groove 111, after the proper height is found, the nut sleeve 114 is rotated, the nut sleeve 114 is abutted with the outer surface of the upright post 102, the position of the rectangular sliding block 112 is fixed, and the corresponding sleeve 103 is changed accordingly, the erection height is changed, and the convenience and practicability are improved.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (8)

1. Double-deck anticorrosive pipeline of construction usefulness erects device, including pipeline erection mechanism (1), its characterized in that: the utility model provides a pipeline erects quantity of mechanism (1) and is two, two pipeline erects mechanism (1) and is the symmetry setting, two the top of mechanism (1) is erect to the pipeline all has held a double-deck anticorrosive pipeline (3), pipeline erects mechanism (1) including stand (102), sleeve (103) have been cup jointed on the upper portion of stand (102), the upper surface fixedly connected with flat board (104) of sleeve (103), the upper surface fixedly connected with three mounting panel (105) of flat board (104), three rotate between mounting panel (105) and be connected with two-way lead screw (106), the surface threaded connection of two-way lead screw (106) has slider (107), the quantity of slider (107) is two, two slider (107) are the symmetric distribution, two the upper surface of slider (107) is fixedly connected with first grip block (108) and second grip block (109) respectively.
2. The double-deck anti-corrosion pipe erection device for building construction according to claim 1, wherein: the upper surface of dull and stereotyped (104) fixedly connected with installation screw rod (201), the externally mounted of installation screw rod (201) has connecting rod (2), two through connecting rod (2) fixed connection between pipeline erection mechanism (1).
3. The double-deck anti-corrosion pipe erection device for building construction according to claim 2, wherein: the bidirectional screw rod (106) is rotatably arranged on the upper portion of the flat plate (104), and the left end of the bidirectional screw rod (106) extends to the outside of the mounting plate (105) and is fixedly connected with an adjusting handle (110).
4. The double-deck anti-corrosion pipe erection device for building construction according to claim 1, wherein: the sliding block (107) is arranged between the mounting plates (105) in a sliding manner along the direction of the bidirectional screw rod (106), and the lower surface of the sliding block (107) is connected with the upper surface of the flat plate (104) in a sliding manner.
5. The double-deck anticorrosive pipeline erection device for building construction according to claim 4, wherein: the upper end fixedly connected with two gripper claws of first grip block (108), the upper end fixedly connected with three gripper claws of second grip block (109), the gripper claws of first grip block (108) are the crisscross opposite setting with the gripper claws of second grip block (109).
6. The double-deck anti-corrosion pipe erection device for building construction according to claim 5, wherein: rectangular sliding grooves (111) are formed in the middle of the upright post (102), rectangular sliding blocks (112) are connected to the inner portions of the rectangular sliding grooves (111) in a sliding mode, screw rods (113) are fixedly connected to the two ends of the rectangular sliding blocks (112), nut sleeves (114) are connected to the outer surfaces of the screw rods (113) in a threaded mode, the nut sleeves (114) are arranged outside the upright post (102) in a rotating mode, and one side face, close to the upright post (102), of each nut sleeve (114) is in butt joint with the outer surfaces of the upright post (102).
7. The double-deck anti-corrosion pipe erection device for building construction according to claim 6, wherein: one end that stand (102) was kept away from to nut cover (114) is fixedly connected with installation pole (115), the outside of installation pole (115) cup joints installs and rotates connecting block (116), the upper surface fixedly connected with bracing piece (117) of rotating connecting block (116), the upper surface of bracing piece (117) is fixedly connected with the lower surface of sleeve (103).
8. The double-deck anti-corrosion pipe erection device for building construction according to claim 7, wherein: the lower surface of stand (102) is fixedly connected with fixed bottom plate (118), the lower surface of fixed bottom plate (118) is fixedly connected with fixed ground awl (101).
CN202320037043.1U 2023-01-07 2023-01-07 Double-layer anti-corrosion pipeline erection device for building construction Active CN218935527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320037043.1U CN218935527U (en) 2023-01-07 2023-01-07 Double-layer anti-corrosion pipeline erection device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320037043.1U CN218935527U (en) 2023-01-07 2023-01-07 Double-layer anti-corrosion pipeline erection device for building construction

Publications (1)

Publication Number Publication Date
CN218935527U true CN218935527U (en) 2023-04-28

Family

ID=86067368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320037043.1U Active CN218935527U (en) 2023-01-07 2023-01-07 Double-layer anti-corrosion pipeline erection device for building construction

Country Status (1)

Country Link
CN (1) CN218935527U (en)

Similar Documents

Publication Publication Date Title
CN210398179U (en) Mapping equipment fixing frame for engineering cost major
CN211541002U (en) Assembly jig is used in processing of large-scale steel construction
CN218935527U (en) Double-layer anti-corrosion pipeline erection device for building construction
CN209151429U (en) A kind of fixed holder of adjustable circuit board
CN113909795A (en) Welding auxiliary device and method for assembly type prefabricated steel structure
CN210160415U (en) Auxiliary feeding device for lathe
CN213898055U (en) Convenient tunnel construction who adjusts scaffold frame
CN206047426U (en) Pipe welding clamp
CN214144866U (en) House top beam supporting device
CN213087461U (en) Brickwork wall construction fixing device
CN211360191U (en) Bending device for sheet metal processing
CN211099735U (en) Multifunctional hanging tool for steel structure coating system
CN206047479U (en) Butting joint fixture
CN212583310U (en) Protection plate for building construction
CN219335742U (en) Steel bar bending device for building construction
CN213997589U (en) Steel bar bending device for water conservancy project
CN219113466U (en) Clamp for cutting
CN221054430U (en) Support frame convenient to pipeline quick positioning
CN214771656U (en) Device convenient to box girder installation location
CN215331404U (en) Set up dish knot formula scaffold frame bottom adjustable angle's dragging seat device on slope basis
CN219726169U (en) Clamp for machining steel structure beam
CN217834221U (en) Portable high-speed curb rapid cutting device
CN218581159U (en) Scaffold stand connecting pipe
CN215092120U (en) A cutting auxiliary assembly for building steel construction engineering
CN221001666U (en) Assembled structural conversion layer reinforcing bar locating rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant