CN218932888U - Ultrahigh conversion beam main reinforcement mounting jig frame - Google Patents

Ultrahigh conversion beam main reinforcement mounting jig frame Download PDF

Info

Publication number
CN218932888U
CN218932888U CN202222838971.6U CN202222838971U CN218932888U CN 218932888 U CN218932888 U CN 218932888U CN 202222838971 U CN202222838971 U CN 202222838971U CN 218932888 U CN218932888 U CN 218932888U
Authority
CN
China
Prior art keywords
shaped steel
steel frame
sliding sleeve
beam main
locating lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222838971.6U
Other languages
Chinese (zh)
Inventor
黄德熙
朱桢华
李钦臣
钟国庆
崔云坤
李星
赵德华
程晓琳
阳川
青渝嵇
周舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MASS TRANSIT ENGINEERING CONSULTANT CO LTD
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Shenzhen Engineering Co Ltd
Original Assignee
GUANGZHOU MASS TRANSIT ENGINEERING CONSULTANT CO LTD
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Shenzhen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MASS TRANSIT ENGINEERING CONSULTANT CO LTD, China Railway Guangzhou Engineering Group Co Ltd CRECGZ, CRECGZ Shenzhen Engineering Co Ltd filed Critical GUANGZHOU MASS TRANSIT ENGINEERING CONSULTANT CO LTD
Priority to CN202222838971.6U priority Critical patent/CN218932888U/en
Application granted granted Critical
Publication of CN218932888U publication Critical patent/CN218932888U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application discloses super high conversion roof beam main muscle installation bed-jig, it includes U type steelframe and a plurality of spinal branch post, a plurality of spinal branch posts all install in the U type steelframe, install many first locating lever on the U type steelframe, many first locating lever sets up at vertical upper interval, install many second locating lever on the stand, many the second locating lever sets up at vertical upper interval, the bottom of U type steelframe is connected with the stabilizer blade. This application has the ligature precision that improves conversion roof beam main muscle and the effect of convenience.

Description

Ultrahigh conversion beam main reinforcement mounting jig frame
Technical Field
The utility model relates to the field of tie-up of steel bars of a conversion beam, in particular to an ultrahigh conversion beam main bar mounting jig frame.
Background
One of the keys of the ultra-high transfer beam construction is the construction of transfer beam steel bars. For the construction of the conversion beam with smaller section, the steel beam structure is hung into the construction site after being assembled offsite, while some conversion beams are large in height, the hoisting space is smaller, the mode of the construction of hoisting after assembly cannot be adopted, and reinforcement binding is needed at high altitude. However, when the steel bar binding is carried out at high altitude, the positioning of the main steel bar of the conversion beam is inconvenient, the main steel bar of the bound conversion beam is easy to misplace, the positioning precision is low, and the quality of the steel bar binding is reduced.
With respect to the related art in the above, the applicant believes that the following drawbacks exist: the main rib of the high-altitude binding conversion beam is inconvenient to position, and the main rib binding precision is low.
Disclosure of Invention
In order to improve ligature precision and the convenience of conversion roof beam main muscle, this application provides an ultra-high conversion roof beam main muscle installation bed-jig.
The application provides an ultrahigh transfer beam main muscle installation bed-jig adopts following technical scheme:
the utility model provides an ultrahigh conversion roof beam owner muscle installation bed-jig, includes U type steelframe and a plurality of spinal branch post, a plurality of spinal branch posts all install in the U type steelframe, install many first locating lever on the U type steelframe, many first locating lever sets up at vertical upper interval, install many second locating lever on the stand, many second locating lever sets up at vertical upper interval, the bottom of U type steelframe is connected with the stabilizer blade.
Through adopting the technical scheme, during installation, a plurality of jig frames are distributed in sequence along the beam span direction of the conversion beam, the jig frames are transversely arranged at the position of the conversion beam and serve as a supporting and positioning structure of the main rib of the conversion beam, wherein supporting legs are supported on concrete cushion blocks on a bottom formwork to keep the support of the U-shaped steel frames stable and bear the stress of the main rib of the conversion beam, the U-shaped steel frames and the upright columns position the transverse position of the main rib of the conversion beam, the U-shaped steel frames provide support for the first positioning rod, the upright columns provide support for the second positioning rod, the first positioning rod and the second positioning rod position the vertical position of the main rib of the conversion beam, and the main rib of the conversion beam can be accurately positioned after being mounted on the first positioning rod and the second positioning rod, so that the binding precision and convenience of the main rib of the conversion beam are improved; and this application's bed-jig simple structure, after the changeover beam main muscle was fixed a position first locating lever and second locating lever, with changeover beam main muscle ligature to U type steelframe and stand on, connect changeover beam main muscle, stand, U shaped steel frame into a whole, pour in the changeover beam together, the bed-jig can be as the partly of changeover beam reinforcing bar, need not to dismantle convenient and fast.
Preferably, the support legs are inverted Y-shaped, two support legs are arranged, the two support legs are respectively arranged on two sides of the bottom of the U-shaped steel frame, and the support legs are in threaded connection with the U-shaped steel frame.
Through adopting above-mentioned technical scheme, the stabilizer blade of falling Y style of calligraphy supports stably, and when rotatory stabilizer blade, can adjust the height and the inclination of U type steelframe to improve the accuracy of the position of U type steelframe.
Preferably, a rack for placing the level is arranged at the bottom of the U-shaped steel frame, and the rack is perpendicular to the upright post.
Through adopting above-mentioned technical scheme, when installing the bed-jig, place the spirit level on the rack, then rotatory stabilizer blade adjusts the angle of U type steelframe, can judge through the spirit level that the angle of bed-jig is in the horizontality.
Preferably, the first locating lever is connected with the U-shaped steel frame through a first sliding sleeve, the first sliding sleeve is sleeved outside the U-shaped steel frame in a sliding manner, a first limit bolt is installed outside the first sliding sleeve, the first limit bolt can be abutted against and separated from the U-shaped steel frame, the second locating lever is connected with the upright post through a second sliding sleeve, the second sliding sleeve is sleeved outside the upright post, a second limit bolt is installed outside the second sliding sleeve, and the second limit bolt can be abutted against and separated from the upright post.
By adopting the technical scheme, the first limit bolt is loosened, the first sliding sleeve is adjusted to the required height, and then the first limit bolt is screwed, so that the first positioning rod is adjusted to the accurate height; similarly, the second limiting bolt is loosened, the second sliding sleeve is adjusted to the required height, and then the second limiting bolt is screwed, so that the second positioning rod can be adjusted to the accurate height.
Preferably, the first sliding sleeve and the second sliding sleeve are respectively provided with an indication arrow, two sides of the U-shaped steel frame and the upright posts are respectively provided with a vertical identification line, and when the indication arrows are aligned with the identification lines, the first sliding sleeve and the second sliding sleeve are in place in horizontal angle.
Through adopting above-mentioned technical scheme, because first sliding sleeve and second sliding sleeve homoenergetic rotate, so when adjusting the height of first locating lever and second locating lever, first locating lever and second locating lever rotate easily and deviate the exact position, and the angle that can be convenient through instruction arrow and sign line judgement first locating lever and second locating lever is correct to improve the accuracy of the position of first locating lever and second locating lever, can keep the structure of stand and U type steelframe simultaneously, convenient manufacture.
Preferably, the stand column is provided with scales, the scales are vertically distributed, and the scales are arranged on two sides of the identification line.
Through adopting above-mentioned technical scheme, through the scale can be convenient the height of each first sliding sleeve of visual and second sliding sleeve, the height of convenient regulation first locating lever and second locating lever, and the both sides of mark line can be adjusted together with the height to the scale is located to the scale.
Preferably, the lower extreme of stand is connected with the stiffening rib, stiffening rib fixed connection stand and U type steelframe.
Through adopting above-mentioned technical scheme, the stiffening rib improves the stability of stand and U type steelframe, locates the stiffening rib the lower extreme of stand and can reduce the stiffening rib and to the interference of conversion roof beam main muscle installation, reduces the adverse effect of conversion roof beam main muscle installation.
Preferably, the device further comprises a push rod, wherein the push rod is fixedly connected with a plurality of sleeves, the sleeves are respectively sleeved on the upper parts of the upright posts and the U-shaped steel frames, and the sleeves are detachably connected with the upright posts and the U-shaped steel frames.
Through adopting above-mentioned technical scheme, because the upper end of stand does not have fixed connection structure, receive the effort influence of the conversion roof beam owner muscle easily and take place the skew, when the conversion roof beam owner muscle of ligature bed-jig department, use the ejector pin to connect the upper end of stand and the upper end of U shaped steel frame earlier, correct the position of stand, carry out the ligature of conversion roof beam owner muscle again to improve the ligature precision of conversion roof beam owner muscle, with the ejector pin again pull down the conversion roof beam owner muscle ligature of next bed-jig department after the ligature is accomplished.
In summary, the present application includes at least one of the following beneficial technical effects:
1. during installation, a plurality of jig frames are distributed in sequence along the beam span direction of the conversion beam, the jig frames are transversely arranged at the position of the conversion beam and serve as a supporting and positioning structure of the main rib of the conversion beam, the supporting feet are supported on concrete cushion blocks on the bottom templates, the supporting stability of the U-shaped steel frames is kept, the stress of the main rib of the conversion beam can be born, the U-shaped steel frames and the upright columns position the transverse position of the main rib of the conversion beam, the U-shaped steel frames provide support for the first positioning rod, the upright columns provide support for the second positioning rod, the first positioning rod and the second positioning rod position the vertical position of the main rib of the conversion beam, and the main rib of the conversion beam can be accurately positioned after being installed on the first positioning rod and the second positioning rod, so that the binding precision and convenience of the main rib of the conversion beam are improved; the jig frame is simple in structure, after the main bars of the conversion beam are positioned to the first positioning rods and the second positioning rods, the main bars of the conversion beam are bound to the U-shaped steel frames and the upright columns, the main bars of the conversion beam, the upright columns and the U-shaped steel frames are connected into a whole, the whole is poured into the conversion beam together, and the jig frame can be used as a part of the steel bars of the conversion beam without being detached, so that the jig frame is convenient and quick;
2. because the first sliding sleeve and the second sliding sleeve can rotate, when the heights of the first positioning rod and the second positioning rod are adjusted, the first positioning rod and the second positioning rod can easily rotate to deviate from the correct positions, and whether the angles of the first positioning rod and the second positioning rod are correct or not can be conveniently judged through the indication arrow and the identification line, so that the accuracy of the positions of the first positioning rod and the second positioning rod is improved, the structure of the upright post and the U-shaped steel frame can be maintained, and the manufacturing is convenient; the heights of the first sliding sleeve and the second sliding sleeve can be conveniently visually observed through scales, and the heights of the first positioning rod and the second positioning rod can be conveniently adjusted.
Drawings
Fig. 1 is a schematic structural view of an ultrahigh conversion beam main rib mounting jig according to an embodiment of the application.
Fig. 2 is a schematic structural view of an ultrahigh conversion beam main rib mounting jig according to a second embodiment of the present application.
Reference numerals illustrate:
1. u-shaped steel frame; 2. a column; 3. a first positioning rod; 4. a second positioning rod; 5. a support leg; 6. a first sliding sleeve; 7. the second sliding sleeve; 8. a first limit bolt; 9. the second limit bolt; 10. a placing rack; 11. an indication arrow; 12. a marking line; 13. a scale; 14. reinforcing ribs; 15. a sleeve; 16. and (5) a push rod.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-2.
The embodiment of the application discloses an ultrahigh conversion beam main reinforcement mounting jig frame.
Example 1
Referring to fig. 1, an ultrahigh conversion beam main reinforcement installation jig comprises a U-shaped steel frame 1 and a plurality of upright posts 2, wherein the U-shaped steel frame 1 is vertically arranged and is provided with an upward opening, the upright posts 2 are vertically arranged in the U-shaped steel frame 1 and are arranged at intervals, the lower ends of the upright posts 2 are fixedly connected with the bottom rods of the U-shaped steel frame 1, the U-shaped steel frame 1 and the upright posts 2 are positioned in the same plane, and the space in the U-shaped steel frame 1 is equally divided by the upright posts 2. The lower extreme of stand 2 is connected with stiffening rib 14, and stiffening rib 14 fixed connection stand 2 and the bottom of U shaped steel frame 1 improve the stability of stand 2 through stiffening rib 14. A plurality of first locating rods 3 are respectively installed on two sides of the U-shaped steel frame 1, the first locating rods 3 are arranged at intervals in the vertical direction, a plurality of second locating rods 4 are installed on each upright post 2, the second locating rods 4 are arranged at intervals in the vertical direction, and the first locating rods 3 and the second locating rods 4 are used for supporting and locating the conversion beam steel bars. Two ends of the bottom rod of the U-shaped steel frame 1 are respectively provided with two vertically arranged threaded cylinders, the two threaded cylinders are arranged below the bottom rod of the U-shaped steel frame 1, each threaded cylinder is in threaded connection with one supporting leg 5, the supporting legs 5 are inverted Y-shaped, and the height and the inclination angle of the U-shaped steel frame 1 can be adjusted by rotating the supporting legs 5. The U-shaped steel frame 1, the upright posts 2 and the positioning rods are all made of steel bars with the same model as the main steel bars of the conversion beam, after the main steel bars of the conversion beam are installed, the jig frame and the main steel bars of the conversion beam are used as the steel bars of the conversion beam together for pouring, and the jig frame does not need to be disassembled.
A rack 10 for placing the level is arranged on the bottom rod of the U-shaped steel frame 1, the rack 10 is made of a plurality of steel wire meshes in a crisscross mode, and the rack 10 is horizontally arranged. When the jig is installed, the level gauge is placed on the placing frame 10, then the support legs 5 are rotated, the angle of the U-shaped steel frame 1 is adjusted, and whether the angle of the jig is in a horizontal state can be judged through the level gauge.
The U-shaped steel frame 1 is connected through first sliding sleeve 6 to first locating lever 3, and outside the side lever of U-shaped steel frame 1 was located to first sliding sleeve 6 sliding sleeve, first stop bolt 8 was installed outward to first sliding sleeve 6, and first stop bolt 8 can support tightly and break away from U-shaped steel frame 1. The second locating rod 4 is connected with the upright post 2 through the second sliding sleeve 7, the second sliding sleeve 7 is sleeved outside the upright post 2 in a sliding manner, a second limit bolt 9 is installed outside the second sliding sleeve 7, and the second limit bolt 9 can be abutted against and separated from the upright post 2. The positions of the first sliding sleeve 6 and the second sliding sleeve 7 are adjusted by controlling the tightness of the first limit bolt 8 and the second limit bolt 9, so that the height adjustment of the first positioning rod 3 and the second positioning rod 4 is realized. The first sliding sleeve 6 and the second sliding sleeve 7 are respectively provided with an indication arrow 11, two sides of the U-shaped steel frame 1 and the upright posts 2 are respectively provided with a vertical identification line 12, when the indication arrow 11 is aligned with the identification line 12, the first sliding sleeve 6 and the second sliding sleeve 7 are in place in horizontal angle, and whether the angle of the first positioning rod 3 and the second positioning rod 4 is correct can be conveniently judged through the indication arrow 11 and the identification line 12. Be equipped with scale 13 on the stand 2, scale 13 is along vertical distribution, and the both sides of mark line 12 are located to scale 13, and the height of each first sliding sleeve 6 of visual each and second sliding sleeve 7 that can be convenient through scale 13 conveniently adjusts the height of first locating lever 3 and second locating lever 4 to angle and height can be adjusted together.
The implementation principle of the ultrahigh conversion beam main rib installation jig frame provided by the embodiment of the application is as follows: during installation, a plurality of bed-jig distribute in proper order along the roof beam span direction of transfer roof beam, the horizontal vertical setting of bed-jig is in the position department of transfer roof beam, as the support and the location structure of transfer roof beam owner muscle, wherein stabilizer blade 5 supports on the concrete pad on the die block board, adjust stabilizer blade 5 and make the height and the angle of U type frame meet the requirements, height and the angle of readjusting first sliding sleeve 6 and second sliding sleeve 7, make the height of first locating lever 3 and second locating lever 4 meet the requirements, can carry out the installation of transfer roof beam owner muscle, the transfer roof beam owner muscle is installed and can be realized the accurate positioning on first locating lever 3 and second locating lever 4, thereby improve the ligature precision and the convenience of transfer roof beam owner muscle.
Example two
Referring to fig. 2, the tire frame is different from the embodiment in that the tire frame further comprises a push rod 16, the push rod 16 is fixedly connected with a plurality of sleeves 15, the sleeves 15 are respectively sleeved on the upper parts of the set-up column 2 and the U-shaped steel frame 1, and the sleeves 15 are detachably connected with the upright column 2 and the U-shaped steel frame 1. Because the upper end of the upright post 2 is not provided with a fixed connection structure, the upper end is easily affected by the acting force of the main rib of the conversion beam to generate deflection, when the main rib of the conversion beam at the position of a jig frame is bound, the upper end of the upright post 2 is connected with the upper end of the U-shaped steel frame 1 by using the ejector rod 16, the position of the upright post 2 is corrected, and then the main rib of the conversion beam is bound, so that the binding precision of the main rib of the conversion beam is improved, and after the binding is finished, the ejector rod 16 is detached to bind the main rib of the conversion beam at the position of the next jig frame.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (8)

1. The utility model provides an ultrahigh conversion roof beam main muscle installation bed-jig which characterized in that: including U shaped steel frame (1) and a plurality of stand (2), a plurality of stand (2) all install in U shaped steel frame (1), install many first locating lever (3) on U shaped steel frame (1), many first locating lever (3) are vertical in the interval setting, install many second locating lever (4) on stand (2), many second locating lever (4) are vertical in the interval setting, the bottom of U shaped steelframe (1) is connected with stabilizer blade (5).
2. The ultra-high transfer beam main tendon mounting jig of claim 1, wherein: the support legs (5) are inverted Y-shaped, two support legs (5) are arranged, the two support legs (5) are respectively arranged on two sides of the bottom of the U-shaped steel frame (1), and the support legs (5) are in threaded connection with the U-shaped steel frame (1).
3. The ultra-high transfer beam main tendon mounting jig of claim 2, wherein: the bottom of U shaped steel frame (1) is equipped with rack (10) that are used for placing the spirit level, rack (10) is perpendicular stand (2).
4. The ultra-high transfer beam main tendon mounting jig of claim 1, wherein: the U-shaped steel frame is characterized in that the first positioning rod (3) is connected with the U-shaped steel frame (1) through a first sliding sleeve (6), the first sliding sleeve (6) is sleeved outside the U-shaped steel frame (1) in a sliding mode, a first limit bolt (8) is installed outside the first sliding sleeve (6), the first limit bolt (8) can be abutted to and separated from the U-shaped steel frame (1), the second positioning rod (4) is connected with the upright post (2) through a second sliding sleeve (7), the second sliding sleeve (7) is sleeved outside the upright post (2) in a sliding mode, a second limit bolt (9) is installed outside the second sliding sleeve (7), and the second limit bolt (9) can be abutted to and separated from the upright post (2).
5. The ultra-high transfer beam main tendon mounting jig of claim 4, wherein: the novel steel frame is characterized in that indication arrows (11) are respectively arranged on the first sliding sleeve (6) and the second sliding sleeve (7), vertical identification lines (12) are respectively arranged on two sides of the U-shaped steel frame (1) and the upright posts (2), and when the indication arrows (11) are aligned with the identification lines (12), the first sliding sleeve (6) and the second sliding sleeve (7) are in place in a horizontal angle.
6. The ultra-high transfer beam main tendon mounting jig of claim 5, wherein: the vertical column (2) is provided with scales (13), the scales (13) are vertically distributed, and the scales (13) are arranged on two sides of the identification line (12).
7. The ultra-high transfer beam main tendon mounting jig of claim 1, wherein: the lower extreme of stand (2) is connected with stiffening rib (14), stiffening rib (14) fixed connection stand (2) and U shaped steel frame (1).
8. The ultra-high transfer beam main tendon mounting jig of claim 1, wherein: the novel steel support is characterized by further comprising an ejector rod (16), wherein the ejector rod (16) is fixedly connected with a plurality of sleeves (15), the sleeves (15) are respectively sleeved on the upper parts of the upright post (2) and the U-shaped steel frame (1), and the sleeves (15) are detachably connected with the upright post (2) and the U-shaped steel frame (1).
CN202222838971.6U 2022-10-25 2022-10-25 Ultrahigh conversion beam main reinforcement mounting jig frame Active CN218932888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222838971.6U CN218932888U (en) 2022-10-25 2022-10-25 Ultrahigh conversion beam main reinforcement mounting jig frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222838971.6U CN218932888U (en) 2022-10-25 2022-10-25 Ultrahigh conversion beam main reinforcement mounting jig frame

Publications (1)

Publication Number Publication Date
CN218932888U true CN218932888U (en) 2023-04-28

Family

ID=86061703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222838971.6U Active CN218932888U (en) 2022-10-25 2022-10-25 Ultrahigh conversion beam main reinforcement mounting jig frame

Country Status (1)

Country Link
CN (1) CN218932888U (en)

Similar Documents

Publication Publication Date Title
CN102561712B (en) Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN201752827U (en) Assembly jig for assembling pipe trusses
CN109629833B (en) Rapid construction method for binding high-precision high-quality steel bar space net rack
CN106087744A (en) Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device and method
CN212715972U (en) Prefabricated bed-jig suitable for multiple specification pier stud reinforcing bar
CN214737333U (en) Detachable adjustable type embedded main reinforcement positioning device for prefabricated pier stud bridge bearing platform
CN218932888U (en) Ultrahigh conversion beam main reinforcement mounting jig frame
CN214696972U (en) Embedded part leveling and positioning fixing frame
CN212224683U (en) Positioning device for pre-buried foundation bolt
CN205999789U (en) Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device
CN212384891U (en) Accurate adjustable steel truss assembles bed-jig
CN206408969U (en) A kind of support meanss for being used to adjust bent cap vertical and horizontal gradient
CN201933791U (en) Integral bar reinforcement binding and positioning device for simple-box double-cell full span box girder
CN207847086U (en) A kind of tall and big beam form support frame
CN215443120U (en) Cast-in-place concrete stair template system that modularization was assembled
CN102022001A (en) Integrated binding and locating device of single-box double-chamber full span box girder reinforcing steel bar
CN114737756A (en) Construction method of disc buckle early-dismantling support real-time monitoring system
CN210820171U (en) Prefabricated T-beam steel bar binding tire film frame
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN211200103U (en) Bridge floor anticollision barrier reinforcing bar positioner
CN211689918U (en) Positioning device for capping beam framework
CN210360045U (en) Steel support built-in fitting location frock subassembly
CN210369357U (en) Rag bolt suspends accurate positioning device in midair
CN218375114U (en) Concrete structure supporting groove forming die positioning device
CN212072387U (en) T roof beam panel reinforcement positioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant