CN218929636U - Polyethylene pipe handling device - Google Patents

Polyethylene pipe handling device Download PDF

Info

Publication number
CN218929636U
CN218929636U CN202223108462.4U CN202223108462U CN218929636U CN 218929636 U CN218929636 U CN 218929636U CN 202223108462 U CN202223108462 U CN 202223108462U CN 218929636 U CN218929636 U CN 218929636U
Authority
CN
China
Prior art keywords
polyethylene pipe
bottom plate
plate
bracing piece
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223108462.4U
Other languages
Chinese (zh)
Inventor
叶平南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Quanzhong Industry Co ltd
Original Assignee
Zhejiang Quanzhong Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Quanzhong Industry Co ltd filed Critical Zhejiang Quanzhong Industry Co ltd
Priority to CN202223108462.4U priority Critical patent/CN218929636U/en
Application granted granted Critical
Publication of CN218929636U publication Critical patent/CN218929636U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/62Plastics recycling; Rubber recycling

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to the technical field of pipeline conveying devices, in particular to a polyethylene pipe conveying device. The utility model provides a polyethylene pipe handling device, including the bottom plate, the bottom of bottom plate is provided with a plurality of wheels, still include the year thing board, be provided with a plurality of first bracing pieces on the bottom plate, it is provided with the positioning seat to correspond first bracing piece on the lower surface of year thing board, be provided with in the positioning seat with first bracing piece matched with constant head tank, it is provided with a plurality of second bracing pieces to correspond the constant head tank on the upper surface of year thing board, the structure of first bracing piece and second bracing piece is the same, be provided with a plurality of track seats on the year thing board, be provided with the standing groove that is the U type on the track seat. The utility model not only can facilitate the workers to place the polyethylene pipes on the carrying device, saves time and labor, but also has more polyethylene pipes which can be placed on the carrying device, thereby improving the carrying efficiency of the workers.

Description

Polyethylene pipe handling device
Technical Field
The utility model relates to the technical field of pipeline conveying devices, in particular to a polyethylene pipe conveying device.
Background
The PE pipe is generally a PE pipe, and PE materials are widely applied to the field of water supply and drainage manufacturing due to the characteristics of the PE pipe, and the PE pipe is an ideal pipe for replacing a common iron water supply pipe because the PE pipe does not rust.
After the production of the polyethylene pipe is completed, the pipe is conveyed to a warehouse to be stored through a conveying device, and workers put the polyethylene pipe on the conveying device and then pull the polyethylene pipe through a trailer.
The existing conveying device is inconvenient to operate when polyethylene pipes are placed, time and labor are wasted, the number of the polyethylene pipes which can be placed on the conveying device is small, and the conveying efficiency of workers is greatly affected.
Disclosure of Invention
The utility model is mainly aimed at the problems, and provides a polyethylene pipe conveying device which not only can facilitate workers to place polyethylene pipes on the conveying device, saves time and labor, but also can be used for placing a large number of polyethylene pipes on the conveying device, thereby improving the conveying efficiency of the workers.
The aim of the utility model is mainly achieved by the following scheme: the utility model provides a polyethylene pipe handling device, includes the bottom plate, the bottom of bottom plate be provided with a plurality of wheels, still include the year thing board, the bottom plate on be provided with a plurality of first bracing pieces, the lower surface of year thing board on correspond first bracing piece and be provided with the positioning seat, the positioning seat in be provided with first bracing piece matched with constant head tank, the upper surface of year thing board on correspond the constant head tank and be provided with a plurality of second bracing pieces, the structure of first bracing piece and second bracing piece the same, year thing board on be provided with a plurality of track seats, the track seat on be provided with the standing groove that is the U type, the both sides of standing groove correspond and be provided with the holding tank, the holding tank in the interval be provided with a plurality of balls. The bottom of the bottom plate is provided with a plurality of wheels, the wheels are arranged to facilitate the movement of the whole device, the device further comprises a carrying plate, the bottom plate is provided with a plurality of first supporting rods, the number of the first supporting rods arranged on the bottom plate is 4, the four first supporting rods are respectively and correspondingly arranged on the four corners of the bottom plate, the lower surface of the carrying plate is provided with positioning seats corresponding to the first supporting rods, positioning grooves matched with the first supporting rods are arranged in the positioning seats, the upper surface of the carrying plate is provided with a plurality of second supporting rods corresponding to the positioning grooves, the structures of the first supporting rods and the second supporting rods are the same, the carrying plate is provided with a plurality of track seats, the track seats are provided with U-shaped placing grooves, the two sides of each placing groove are correspondingly provided with accommodating grooves, a plurality of balls are arranged in each accommodating groove at intervals, and particularly when carrying polyethylene pipes, workers place a carrying plate on the bottom plate firstly, namely, after the first support rod is correspondingly clamped into the positioning groove, the worker correspondingly places the polyethylene pipe into the positioning groove on the track seat after the stable installation of the first carrier plate is realized, the sliding friction between the polyethylene pipe and the positioning groove is changed into rolling friction due to the arrangement of the balls in the accommodating groove, so that the polyethylene pipe can be conveniently placed on the track seat, after the track seat on the first carrier plate is fully placed by the worker, the second carrier plate can be placed on the first carrier plate, namely, the second support rod on the first carrier plate is correspondingly clamped into the positioning groove on the second carrier plate, thereby realizing the stable installation of the second carrier plate, then the worker places the polyethylene pipe on the track seat of the second carrier plate, and the worker can sequentially stack a proper number of carrier plates according to actual requirements, thereby can once only carry the polyethylene pipe of a great deal of quantity, whole operation labour saving and time saving, the quantity of polyethylene pipe that can place on the handling device is more moreover to can improve staff's transport efficiency.
Preferably, a traction rod is arranged on one side of the bottom plate, and a traction ring is arranged at one end, far away from the bottom plate, of the traction rod. One side of bottom plate is provided with the traction lever, and the one end of keeping away from the bottom plate of traction lever is provided with the traction ring, and the traction lever can be convenient for the trailer to realize the traction movement to whole handling device with the setting of traction ring.
Preferably, the two ends of the track seat are correspondingly provided with clamping devices, the clamping devices comprise U-shaped hoops, one ends of the hoops are hinged to the track seat, the other ends of the hoops are provided with positioning plates, and the positioning plates are connected to the track seat through fastening bolts. The clamping device is provided with corresponding in both ends of track seat, clamping device is including being the clamp of U type, the one end of clamp articulates on the track seat, the other end of clamp is provided with the locating plate, the locating plate passes through fastening bolt to be connected on the track seat, when fastening bolt does not fix the locating plate on the track seat, the clamp can rotate round articulated department, place the standing groove on the track seat when the polyethylene pipe, after again with the locating plate fixed to the track seat through fastening bolt, cooperate can chucking polyethylene pipe through clamp and standing groove, thereby can prevent that the polyethylene pipe from droing when whole handling device removes.
Preferably, the cross sections of the first support rod and the second support rod are rectangular. The cross sections of the first support rod and the second support rod are rectangular, and the cross sections of the positioning grooves are also rectangular in a matched mode, so that stability between the carrying plates and when the carrying plates are connected with the bottom plate is high.
Preferably, the positioning seat and the second supporting rod are welded on the carrying plate. The positioning seat and the second supporting rod are welded on the carrying plate, so that the connection is very firm and the stability is good.
Therefore, the polyethylene pipe conveying device of the utility model has the following advantages: the utility model has simple operation and better stability in integral operation, is convenient for workers to place the polyethylene pipes on the carrying device, saves time and labor, and has more polyethylene pipes which can be placed on the carrying device, thereby improving the carrying efficiency of the workers.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a top view of the carrier plate of the present utility model;
FIG. 3 is a bottom view of the carrier plate of the present utility model;
fig. 4 is a cross-sectional view of a track bed in accordance with the present utility model.
Illustration of: the device comprises a 1-bottom plate, a 2-traction rod, a 3-traction ring, 4-wheels, a 5-first supporting rod, a 6-positioning seat, a 7-carrying plate, an 8-second supporting rod, a 9-track seat, a 10-clamp, an 11-fastening bolt, a 12-accommodating groove, 13-balls, a 14-positioning groove, a 15-placing groove and a 16-positioning plate.
Detailed Description
The technical scheme of the utility model is further specifically described below through examples and with reference to the accompanying drawings.
Examples:
as shown in fig. 1, 2, 3 and 4, a polyethylene pipe carrying device comprises a bottom plate 1, a plurality of wheels 4 are arranged at the bottom of the bottom plate 1, the wheels 4 are arranged to facilitate the movement of the whole device, a plurality of first support rods 5 are arranged on the bottom plate 1, the number of the first support rods 5 arranged on the bottom plate 1 is 4, the four first support rods 5 are respectively and correspondingly arranged on four corners of the bottom plate 1, a positioning seat 6 is arranged on the lower surface of the support plate 7 corresponding to the first support rods 5, a positioning groove 14 matched with the first support rods 5 is arranged in the positioning seat 6, a plurality of second support rods 8 are arranged on the upper surface of the support plate 7 corresponding to the positioning groove 14, the structures of the first support rods 5 and the second support rods 8 are the same, a plurality of track seats 9 are arranged on the support plate 7, a U-shaped placing groove 15 is arranged on the track seat 9, containing grooves 12 are correspondingly arranged on two sides of the placing groove 15, a plurality of balls 13 are arranged at intervals in the containing groove 12, and when a polyethylene pipe is carried, a worker firstly places the support plate 7 into the first support plate 7 into the corresponding to the first support plate 7, and then a second support plate 7 is placed into the second support plate 9 corresponding to the first support plate 7, and a second support plate 7 is placed into the first support plate 9, and a friction plate is placed into the first support plate 7, namely, and a plurality of balls are placed into the first support plates and a groove 9 is placed into the first support seat 9, and a friction plate is placed into the groove corresponding to the first support groove and a friction plate 9, and a friction plate and a second support plate 15. Thereby realize the stable installation of second piece year thing board 7, then the staff places the polyethylene pipe again on the track seat 9 of second piece year thing board 7, and the staff can superpose the thing board 7 of suitable quantity in proper order according to actual demand to can once only carry a large amount of polyethylene pipes, whole operation labour saving and time saving, the polyethylene pipe that can place on the handling device is more in quantity moreover, thereby can improve staff's handling efficiency.
One side of the bottom plate 1 is provided with a traction rod 2, one end, far away from the bottom plate 1, of the traction rod 2 is provided with a traction ring 3, and the traction rod 2 and the traction ring 3 are arranged so as to facilitate traction movement of the trailer to the whole carrying device.
The both ends of track seat 9 correspond and are provided with clamping device, clamping device is including being the clamp 10 of U type, the one end of clamp 10 articulates on track seat 9, the other end of clamp 10 is provided with locating plate 16, locating plate 16 passes through fastening bolt 11 to be connected on track seat 9, when fastening bolt 11 does not fix locating plate 16 on track seat 9, clamp 10 can rotate round articulated department, place the standing groove 15 on track seat 9 after the polyethylene pipe, be fixed to track seat 9 again through fastening bolt 11 with locating plate 16, cooperate through clamp 10 and standing groove 15 can chucking polyethylene pipe, thereby can prevent that the polyethylene pipe from droing when whole handling device removes.
The cross sections of the first support rod 5 and the second support rod 8 are rectangular, and the cross section of the positioning groove 14 is also rectangular in a matched mode, so that stability between the carrying plates 7 and when the carrying plates 7 are connected with the bottom plate 1 is high; the positioning seat 6 and the second supporting rod 8 are welded on the carrying plate 7, so that the connection is very firm and the stability is good.
It should be understood that this example is only illustrative of the utility model and is not intended to limit the scope of the utility model. Further, it is understood that various changes and modifications may be made by those skilled in the art after reading the teachings of the present utility model, and such equivalents are intended to fall within the scope of the claims appended hereto.

Claims (5)

1. The utility model provides a polyethylene pipe handling device, includes the bottom plate, the bottom of bottom plate be provided with a plurality of wheels, its characterized in that still includes the carrier board, the bottom plate on be provided with a plurality of first bracing pieces, the lower surface of carrier board on correspond first bracing piece and be provided with the positioning seat, the positioning seat in be provided with first bracing piece matched with constant head tank, the upper surface of carrier board on correspond the constant head tank and be provided with a plurality of second bracing pieces, first bracing piece and the same of structure of second bracing piece, the carrier board on be provided with a plurality of track seats, the track seat on be provided with the standing groove that is the U type, the both sides of standing groove correspond and be provided with the holding groove, the holding groove in-interval be provided with a plurality of balls.
2. The polyethylene pipe handling apparatus of claim 1, wherein one side of the base plate is provided with a drawbar, and one end of the drawbar remote from the base plate is provided with a drawbar ring.
3. The polyethylene pipe handling apparatus according to claim 1, wherein the two ends of the rail seat are correspondingly provided with clamping devices, the clamping devices comprise U-shaped clamps, one ends of the clamps are hinged to the rail seat, the other ends of the clamps are provided with positioning plates, and the positioning plates are connected to the rail seat through fastening bolts.
4. A polyethylene pipe handling apparatus according to claim 1, 2 or 3, wherein the first support bar and the second support bar are rectangular in cross section.
5. A polyethylene pipe handling apparatus according to claim 1, 2 or 3, wherein the positioning base and the second support bar are welded to the carrier plate.
CN202223108462.4U 2022-11-21 2022-11-21 Polyethylene pipe handling device Active CN218929636U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223108462.4U CN218929636U (en) 2022-11-21 2022-11-21 Polyethylene pipe handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223108462.4U CN218929636U (en) 2022-11-21 2022-11-21 Polyethylene pipe handling device

Publications (1)

Publication Number Publication Date
CN218929636U true CN218929636U (en) 2023-04-28

Family

ID=86087347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223108462.4U Active CN218929636U (en) 2022-11-21 2022-11-21 Polyethylene pipe handling device

Country Status (1)

Country Link
CN (1) CN218929636U (en)

Similar Documents

Publication Publication Date Title
CN218929636U (en) Polyethylene pipe handling device
CN213229057U (en) Wind power tower cylinder conveyer
CN203918865U (en) A kind of binding clasp for plate type heat exchanger
CN211670467U (en) Electrical cabinet with adjustable mounting structure
CN211731507U (en) Transfer device of electric power pipe
CN209739915U (en) Shuttle goods shelves
JP2002283152A (en) Pipe bundle module carrying in/out device and its method
CN203622295U (en) Wrench special for coal mine underground rail adjustment
CN208498724U (en) A kind of stabilizer support device
CN219406549U (en) Large-caliber pipeline transportation device
CN218023510U (en) Guide rail type goods shelf with adjustable placement area
CN213008454U (en) Air can water heater end cover and store transport frock car
CN218745844U (en) Pipeline is laid and is used device of keeping to mouthpart
CN112296586A (en) Portable large-diameter pipeline butt-joint platform of environmental protection
CN214164984U (en) Transport flat car
CN220864018U (en) Hanging belt storage vehicle for power station
CN111977209A (en) Building pipeline vehicle transportation anchor clamps
CN213534772U (en) High-strength double-wall corrugated pipe allocation and transportation device
CN214306513U (en) Novel integrated cryogenic liquids storage tank air feed device
CN205171762U (en) Unitized curtain wall assembles frame
CN214523992U (en) Waterproofing membrane transports frame
CN212338601U (en) Heat preservation device fixed at pipeline joint
CN216447892U (en) Parallel type galvanized square tube
CN203819277U (en) Single-handle trolley provided with rotary buckle
CN214931826U (en) Bracket frock is transported to steel-pipe pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant