CN218905801U - Movable concrete pouring operation platform - Google Patents

Movable concrete pouring operation platform Download PDF

Info

Publication number
CN218905801U
CN218905801U CN202221880291.4U CN202221880291U CN218905801U CN 218905801 U CN218905801 U CN 218905801U CN 202221880291 U CN202221880291 U CN 202221880291U CN 218905801 U CN218905801 U CN 218905801U
Authority
CN
China
Prior art keywords
fixedly connected
fixing
supporting
concrete placement
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221880291.4U
Other languages
Chinese (zh)
Inventor
顾海东
何化栋
李桐
朱瑶瑶
陈旭阳
张艳鹏
胡欣
丰硕
王延钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202221880291.4U priority Critical patent/CN218905801U/en
Application granted granted Critical
Publication of CN218905801U publication Critical patent/CN218905801U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a movable concrete pouring operation platform, which comprises a supporting frame, an operation table top and two socket sleeves, wherein the supporting frame comprises four supporting legs, the upper ends of the four supporting legs are fixedly connected with a supporting frame together, two fixing screw holes are formed in the outer sides of the four supporting legs, the operation table top comprises a steel fence piece, connecting pieces are fixedly connected to the four sides of the steel fence piece, the two socket sleeves comprise fixing sleeves, one sides of the two fixing sleeves are fixedly connected with connecting sleeves, and the front sides of the two fixing sleeves are provided with connecting screw holes. In the utility model, when concrete is poured, pouring personnel are positioned on the movable platform, the treading collapse of the steel bars on the plate surface and the deflection of the embedded part are avoided, the support legs are welded by the steel bars on the platform, the steel fence pieces are used as the platform surface, and all the platforms can be spliced and combined, so that the manufacturing is simple and the application range is wide.

Description

Movable concrete pouring operation platform
Technical Field
The utility model relates to the technical field of concrete structure construction, in particular to a movable concrete pouring operation platform.
Background
When the front concrete slab is poured, pouring personnel need to stand on the upper layer steel bars of the slab, collapse of the upper layer steel bars of the slab and position deviation of the embedded part are easily caused in the pouring process, and the concrete solid structure quality and the use of the embedded part are affected.
Therefore, the movable concrete pouring operation platform provided by the utility model can realize that concrete pouring personnel stand on the platform to pour, and the tread of plate-surface steel bars and embedded parts is avoided.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides a movable concrete pouring operation platform, wherein pouring personnel are positioned on the movable platform in the concrete pouring process, so that the trampling of bound steel bars and embedded parts can be effectively avoided, the trampling collapse of plate steel bars and the deviation of the embedded parts are avoided, and the concrete pouring quality is improved.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the movable concrete pouring operation platform comprises a support frame, an operation table top and two socket sleeves, wherein the support frame comprises four support legs, the upper ends of the four support legs are fixedly connected with a support frame together, and two fixing screw holes are formed in the outer sides of the four support legs;
the operation table top comprises a steel fence piece, and connecting pieces are fixedly connected to four sides of the steel fence piece;
the socket sleeve comprises a fixing sleeve, one side of the fixing sleeve is fixedly connected with a connecting sleeve, the front sides of the fixing sleeve are provided with connecting screw holes, and fixing bolts are sleeved in the connecting screw holes through threads;
through the technical scheme, the platform formed by the supporting frame, the operating table surface and the socket sleeve is arranged on the movable platform by pouring personnel when in use, so that the treading of bound steel bars and embedded parts can be effectively avoided, and the concrete pouring quality is improved.
Further, the lower ends of the four supporting legs are fixedly connected with rubber anti-skid pads;
through above-mentioned technical scheme, setting up the rubber slipmat can improve supporting leg stability when supporting.
Further, the operation table top is arranged on the upper end face of the supporting frame, and the four connecting sheets are fixedly connected with the supporting frame through screws;
through above-mentioned technical scheme, operation mesa is connected firmly, and it is convenient to dismantle.
Further, a supporting beam is fixedly connected to the middle part of the inner side of the supporting frame;
through above-mentioned technical scheme, the stability of support frame can be improved to the supporting beam, and the staff of being convenient for walks on the operation mesa.
Further, the two fixing sleeves are respectively sleeved at the outer ends of the two supporting legs in a sliding manner, and the two fixing bolts penetrate through the connecting screw holes and are connected with the fixing screw holes through threads;
through above-mentioned technical scheme, be connected fixed sleeve with the supporting leg through fixing bolt.
Further, the inner diameters of the connecting sleeve and the fixing sleeve are the same, and are slightly larger than the diameters of the supporting legs;
through above-mentioned technical scheme, aperture complex supporting leg and connecting sleeve and fixed sleeve's cooperation that can be inseparable are connected, and is more stable during the spigot-and-socket.
Further, the four supporting legs are formed by welding reinforcing steel bars with diameters not smaller than 22 mm;
through above-mentioned technical scheme, the supporting leg obtains conveniently, and structural strength is reliable.
Further, the support frame is made of steel square tubes, and the length of the four sides of the support frame is not more than 1 meter;
through above-mentioned technical scheme, form the support frame intensity by the preparation of steel side pipe high, the welding is convenient.
The utility model has the following beneficial effects:
1. the movable concrete pouring operation platform provided by the utility model has the advantages that the movable platform adopts the framework and the steel fence piece welded by the steel bars as the platform surface, the material is common in construction sites, special customization is not needed, the site processing is realized, and the manufacturing is simple.
2. The movable concrete pouring operation platform provided by the utility model has the advantages that the size of the movable platform is small, the movable platform can move along with concrete pouring, and the movable platform can be randomly combined through the socket sleeve, so that the movable platform is convenient to connect, has strong applicability and can be recycled.
3. According to the movable concrete pouring operation platform, the movable platform provides an operation space for pouring personnel, trampling of steel bars and embedded parts in the pouring process is avoided, and the quality of a concrete structure and the position accuracy of the embedded parts are greatly improved.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a schematic view of the structure of the support frame of the present utility model;
FIG. 3 is a schematic view of a socket sleeve according to the present utility model;
FIG. 4 is a schematic view of the structure of the operation table of the present utility model;
FIG. 5 is a socket connection diagram of the present utility model.
Legend description:
1. a support frame; 101. support legs; 102. fixing the screw holes; 103. a rubber anti-slip pad; 104. a support frame; 105. a support beam; 2. an operating table; 201. a steel fence piece; 202. a connecting sheet; 3. a socket sleeve; 301. a fixed sleeve; 302. a connecting sleeve; 303. a connecting screw hole; 304. and (5) fixing bolts.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, one embodiment provided by the present utility model is: the utility model provides a portable concrete placement operation platform, includes braced frame 1, operation mesa 2, two socket joint sleeve 3, braced frame 1 includes four supporting legs 101, the common fixedly connected with support frame 104 of upper end of four supporting legs 101, two fixed screw 102 have all been seted up in the outside of four supporting legs 101, and two fixed screw 102 positions are different for change socket joint sleeve 3's direction of connection.
The operating table top 2 comprises a steel fence piece 201, connecting pieces 202 are fixedly connected with four sides of the steel fence piece 201,
the two socket sleeves 3 comprise fixing sleeves 301, one sides of the two fixing sleeves 301 are fixedly connected with connecting sleeves 302, connecting screw holes 303 are formed in the front sides of the two fixing sleeves 301, and fixing bolts 304 are sleeved in the two connecting screw holes 303 through threads.
The lower extreme of four supporting legs 101 is all fixedly connected with rubber slipmat 103, set up the stability of supporting legs 101 when supporting rubber slipmat 103, operating table face 2 sets up the up end at braced frame 1, four connection pieces 202 are all through screw and support frame 104 fixed connection, operating table face 2 connects firmly, it is convenient to dismantle, the inboard middle part department fixedly connected with supporting beam 105 of support frame 104, supporting beam 105 can improve the stability of support frame 104, the staff walks on operating table face 2 of being convenient for, two fixed sleeve 301 slip cap establishes the outer end at two supporting legs 101 respectively, two fixing bolt 304 all pass connecting screw 303 and pass through threaded connection with fixed screw 102, be connected fixed sleeve 301 and supporting legs 101 through fixed bolt 304, the internal diameter of connecting sleeve 302 and fixed sleeve 301 is the same, and all be greater than the diameter of supporting legs 101, aperture complex supporting legs 101 and connecting sleeve 302 and fixed sleeve's 301 can be connected through the cooperation, it is more stable when inserting, four supporting legs 101 are formed by the diameter is not less than 22mm welding, supporting legs 101 acquire the convenience, structural strength is reliable, the support frame 104 is formed by the square pipe of steel square pipe 104, the square pipe is made by the square pipe of steel 104, the square pipe is made by the length is high and the square pipe 104 is made by the steel, the square pipe is convenient, the manufacturing is made.
Working principle: this moving platform adopts the reinforcing bar to weld into supporting leg 101, steel basketry piece 201 as the platform surface, the material is the common material of job site, need not special customization, but site operation, simple manufacture, moving platform is small, according to the convenient mobile position of concrete placement position, fixed sleeve 301 that sets up is connected with supporting leg 101 through fixing bolt 304, accessible change fixing bolt 304's connection fixed screw 102 comes the direction of change socket joint sleeve 3, thereby be convenient for carry out the socket joint with other platforms from each direction, it is convenient to connect, the suitability is strong, moving platform after the installation is accomplished provides the operation space for pouring personnel, trample reinforcing bar and built-in fitting has been avoided pouring in-process, concrete structure quality and built-in fitting position accuracy have been greatly improved.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (8)

1. The utility model provides a portable concrete placement operation platform, includes braced frame (1), operation mesa (2), two socket joint sleeves (3), its characterized in that: the support frame (1) comprises four support legs (101), the upper ends of the four support legs (101) are fixedly connected with a support frame (104) together, and two fixing screw holes (102) are formed in the outer sides of the four support legs (101);
the operation table top (2) comprises a steel fence piece (201), and connecting pieces (202) are fixedly connected to four sides of the steel fence piece (201);
two socket sleeve (3) all include fixed sleeve (301), two one side of fixed sleeve (301) is all fixedly connected with connecting sleeve (302), two connecting screw (303) have all been seted up to the front side of fixed sleeve (301), two the inside of connecting screw (303) has all cup jointed fixing bolt (304) through the screw thread.
2. A movable concrete placement operating platform as defined in claim 1 wherein: the lower ends of the four supporting legs (101) are fixedly connected with rubber anti-skid pads (103).
3. A movable concrete placement operating platform as defined in claim 1 wherein: the operating table top (2) is arranged on the upper end face of the supporting frame (1), and the four connecting sheets (202) are fixedly connected with the supporting frame (104) through screws.
4. A movable concrete placement operating platform as defined in claim 1 wherein: the middle part of the inner side of the supporting frame (104) is fixedly connected with a supporting beam (105).
5. A movable concrete placement operating platform as defined in claim 1 wherein: the two fixing sleeves (301) are respectively sleeved at the outer ends of the two supporting legs (101) in a sliding mode, and the two fixing bolts (304) penetrate through the connecting screw holes (303) and are connected with the fixing screw holes (102) through threads.
6. A movable concrete placement operating platform as defined in claim 1 wherein: the inner diameters of the connecting sleeve (302) and the fixing sleeve (301) are the same, and are slightly larger than the diameters of the supporting legs (101).
7. A movable concrete placement operating platform as defined in claim 1 wherein: the four supporting legs (101) are formed by welding reinforcing steel bars with diameters not smaller than 22 mm.
8. A movable concrete placement operating platform as defined in claim 1 wherein: the support frame (104) is made of steel square tubes, and the length of the four sides of the support frame (104) is not more than 1 meter.
CN202221880291.4U 2022-07-21 2022-07-21 Movable concrete pouring operation platform Active CN218905801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221880291.4U CN218905801U (en) 2022-07-21 2022-07-21 Movable concrete pouring operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221880291.4U CN218905801U (en) 2022-07-21 2022-07-21 Movable concrete pouring operation platform

Publications (1)

Publication Number Publication Date
CN218905801U true CN218905801U (en) 2023-04-25

Family

ID=86017591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221880291.4U Active CN218905801U (en) 2022-07-21 2022-07-21 Movable concrete pouring operation platform

Country Status (1)

Country Link
CN (1) CN218905801U (en)

Similar Documents

Publication Publication Date Title
CN210597799U (en) Assembly steel bar truss building carrier plate with location structure
CN109162450B (en) Adjustable stair laying mold convenient to carry and install
CN218905801U (en) Movable concrete pouring operation platform
CN212802482U (en) Adjustable overhanging of general type cable-stayed external corner
CN204626966U (en) A kind of deformation joint formwork erection device
CN210887278U (en) Fixing device for cup mouth type concrete foundation pit stand column
CN210288117U (en) Angle-adjustable support jacking
CN210067436U (en) Formwork support for steel structure floor slab construction
CN211440459U (en) Template anchor clamps for construction
CN212052342U (en) Construction auxiliary tool is transversely widened to prestressed concrete T roof beam of scalable regulation
CN207934203U (en) Modularization pre-embedded steel slab
CN218821987U (en) Auxiliary device for measuring tape
CN203626154U (en) Truss reinforcing bar stair
CN213772971U (en) Abutment template is with fixing device convenient to installation
CN202625670U (en) Adjustable wall-attached support device of tower crane of building
CN206752513U (en) Inspection shaft template
CN220133472U (en) Height-adjustable movable frame supporting leg
CN218873342U (en) Correcting device suitable for out-of-round pipeline
CN221073460U (en) Template supporting structure
CN219691090U (en) Auxiliary tool for formwork support of stairway on construction site
CN215406011U (en) Wall template support frame is led to adjustable ground even wall
CN217316693U (en) Flange steel bending aligning device for welding flange and steel elbow
CN218951983U (en) Bridge pier shaft reinforcing bar installation bench device
CN219887511U (en) Elevator shaft steel platform
CN218438288U (en) Conveniently-adjusted aluminum die inclined supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant