CN218893397U - Large-scale material hoist device for construction - Google Patents
Large-scale material hoist device for construction Download PDFInfo
- Publication number
- CN218893397U CN218893397U CN202320141604.2U CN202320141604U CN218893397U CN 218893397 U CN218893397 U CN 218893397U CN 202320141604 U CN202320141604 U CN 202320141604U CN 218893397 U CN218893397 U CN 218893397U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- spout
- scale material
- frame
- center department
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 title claims abstract description 38
- 238000010276 construction Methods 0.000 title claims description 5
- 238000009435 building construction Methods 0.000 claims abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a large material hoisting device for building construction, which relates to the technical field of hoisting and comprises a bottom plate and a bearing plate, wherein a first column is fixedly connected to the top center of the bottom plate, a rotary disc is rotationally connected to the top center of the first column, a first frame is fixedly connected to the top center of the rotary disc, and twisting disc pieces are arranged on the front and rear inner surfaces of the first frame.
Description
Technical Field
The utility model relates to the technical field of hoisting, in particular to a large material hoisting device for building construction.
Background
The hoisting refers to the general term that a crane or a hoisting mechanism is used for installing and positioning equipment, the hoisting is generally carried out by matching a lifting appliance or a sling, the lifting appliance is manufactured by a professional manufacturer, and the hoisting technology is introduced, in particular to a professional website using the crane hoisting technology, such as a crane hoisting technology home, and the like.
Most of the existing hoisting devices can only hoist large materials with one shape, and if the hoisting operation is required to be performed on the large materials with different shapes, the hoisting devices can be realized only by replacing components in the hoisting devices by users, so that the hoisting devices are complicated, and the time of the whole hoisting operation is increased.
Disclosure of Invention
The utility model aims to solve the problems that in the prior art, most of hoisting devices only can hoist large materials with one shape, if the hoisting operation is required to be performed on the large materials with different shapes, the hoisting devices can be realized only by replacing components in the hoisting devices by users, the hoisting devices are complicated, and the time of the whole hoisting operation is increased.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a large-scale material hoist device for construction, includes the bottom plate and bears the board, the first cylinder of top center department fixedly connected with of bottom plate, the top center department of first cylinder changes and is connected with the rotation disc, the first frame of top center department fixedly connected with of rotation disc, the front and back internal surface of first frame is provided with the hank dish spare, the surface one side position fixedly connected with second post of hank dish spare, the surface fixedly connected with a plurality of evenly distributed's pulley of second post, the interior table wall center department sliding connection of pulley has wire rope, first spout has been seted up to the top both sides position of bearing the board, the top that bears the board is located the position of first spout is fixedly connected with second frame respectively, the second spout has been seted up to the top center department of second frame, the interior table wall sliding connection of second spout has the slider, the top fixedly connected with fixed block of second frame, the surface fixedly mounted of fixed block has first electric telescopic link, the bottom center department fixedly connected with second electric link of search for the slider, the second electric link has the position of stretching out and drawing forth the position of the second electric link, the position of the expansion link is close to the top half-limit position of expansion link.
Preferably, universal wheels are fixedly arranged at the bottom of the bottom plate near four corner positions.
Preferably, one end of the steel wire rope is fixedly connected with the outer surface of the winch piece.
Preferably, the other end of the steel wire rope is fixedly connected with the center of the top of the bearing plate.
Preferably, the extending end of the first electric telescopic rod is fixedly connected with the outer surface of the sliding block.
Preferably, the outer surface of the limiting piece is in sliding connection with the inner surface wall of the first sliding groove.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. according to the utility model, when the cylindrical large material is required to be lifted, the second electric telescopic rod starts to extend, so that the limiting piece can descend, when the limiting piece descends to a certain position, the semicircular groove is formed in the bottom of the limiting piece, and then the first electric telescopic rod starts to retract, the sliding block is driven to move in the second sliding groove together when the sliding block is retracted, the first electric telescopic rod and the limiting piece are driven to move together when the sliding block moves, when the limiting piece moves to a proper position, the inner surface wall of the semicircular groove can be attached to the outer surface of the cylindrical large material, clamping and limiting of the cylindrical large material can be achieved after the limiting piece is attached to the inner surface wall of the semicircular groove, and then when the cylindrical large material is lifted, the semicircular groove is not formed in the bottom of the limiting piece, and the surface of the bottom of the limiting piece is attached to the surface of the cylindrical large material only after the limiting piece descends to the proper position through the second electric telescopic rod, so that the cylindrical large material can be clamped, or the cylindrical large material can be clamped conveniently.
2. According to the utility model, the first frame can rotate due to the arrangement of the rotating disc, so that the large-scale materials at different positions can be hoisted, dead angles are avoided, and the counterweight is arranged, so that enough gravity can be provided for the bottom plate, and the heavier large-scale materials can be hoisted later.
Drawings
Fig. 1 is a schematic perspective view of a large material hoisting device for building construction;
fig. 2 is a schematic perspective view of the practical limiting member;
fig. 3 is an enlarged view at a in fig. 1.
Legend description: 1. a bottom plate; 2. a universal wheel; 3. a first column; 4. rotating the disc; 5. a first frame; 6. a winch member; 7. a wire rope; 8. a pulley; 9. a second column; 10. a receiving plate; 11. a fixed block; 12. a first electric telescopic rod; 13. a slide block; 14. a second chute; 15. a second electric telescopic rod; 16. a limiting piece; 17. a semicircular groove; 18. a second frame; 19. and a first chute.
Detailed Description
In order that the above objects, features and advantages of the utility model will be more clearly understood, a further description of the utility model will be rendered by reference to the appended drawings and examples. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, however, the present utility model may be practiced otherwise than as described herein, and therefore the present utility model is not limited to the specific embodiments of the disclosure that follow.
Embodiment 1, as shown in fig. 1-3, a large-scale material hoist device for construction, including bottom plate 1 and take board 10, the top center department fixedly connected with first cylinder 3 of bottom plate 1, the top center department of first cylinder 3 changes and connects with rotating disk 4, the top center department fixedly connected with first frame 5 of rotating disk 4, the front and back internal surface of first frame 5 is provided with capstan winch spare 6, the surface one side position fixedly connected with second post 9 of capstan spare 6, the surface fixedly connected with a plurality of evenly distributed pulley 8 of second post 9, the interior surface wall center department sliding connection of pulley 8 has wire rope 7, take board 10's top both sides position has seted up first spout 19, take board 10's top is located the position of first spout 19 and is fixedly connected with second frame 18 respectively, the top center department of second frame 18 has seted up second spout 14, the interior surface wall sliding connection of second spout 14 has slider 13, the top fixedly connected with fixed block 11 of second frame 18, the surface fixed block 11's surface fixedly installs first electric slide 12, the bottom electric slide 13's of search rod 13 is located the second electric slide 15 fixed position 15 of second electric slide 15, the top end expansion link 15 is seted up near the position of second electric slide 15, the top end expansion link 15 is located in the position of second expansion link 15.
The effect that its whole embodiment 1 reaches is, the bottom of locating part 16 is then does not offered half slot 17, so when spacing to the large-scale material of cylindricality, then the position of the half slot 17 that does not need locating part 16 to descend, then locating part 16 is retracting through first electric telescopic handle 12, drive slider 13 and second electric telescopic handle 15 and remove, make the bottom surface of locating part 16 can with the surface of the large-scale material of cylindricality contact, then just can realize spacing to the large-scale material of cylindricality after the contact, make the follow-up large-scale material of cylindricality for hoist and mount, pulley 8's setting, the realization can improve wire rope 7's stability, also can be spacing wherein wire rope 7 can prevent that wire rope 7 from following can have the condition of moving about.
In the embodiment 2, as shown in fig. 1-3, universal wheels 2 are fixedly installed at the bottom of the bottom plate 1 near four corners, one end of a steel wire rope 7 is fixedly connected with the outer surface of a winch member 6, the other end of the steel wire rope 7 is fixedly connected with the center of the top of the bearing plate 10, the extending end of a first electric telescopic rod 12 is fixedly connected with the outer surface of a sliding block 13, and the outer surface of a limiting member 16 is slidably connected with the inner surface of a first sliding groove 19.
The effect that its whole embodiment 2 reached is, the setting of universal wheel 2 realizes that convenient to use person removes this device to any place, realizes that hank dish spare 6 when the operation, wire rope 7 can give the hoist and mount board 10, has also guaranteed simultaneously that holistic hoist and mount operation can normally go on, realizes that when first electric telescopic handle 12 is making a round trip to stretch out and draw back, can drive slider 13 together can remove in second spout 14, realizes that when locating part 16 is ascending or descend through second electric telescopic handle 15, can normally pass through first spout 19.
Working principle: firstly, when the cylindrical large material needs to be lifted, the second electric telescopic rod 15 starts to descend, the limiting piece 16 can descend to a certain position at the same time, the semicircular groove 17 can descend to a position matched with the cylindrical large material, after the semicircular groove is matched, the first electric telescopic rod 12 starts to retract, the sliding block 13 can be driven to move in the second sliding groove 14 together during retraction, when the sliding block 13 moves, the second electric telescopic rod 15 can be driven to move together, the second electric telescopic rod 15 moves, the limiting piece 16 can be driven to move together, after the limiting piece 16 moves to a certain position, the inner surface wall of the semicircular groove 17 can be attached to the outer surface of the large material, after the clamping is finished, the winch piece 6 starts to operate, the cylindrical large material can be lifted, the same working principle can be installed, the semicircular groove 17 does not need to descend to the position of the cylindrical large material, the cylindrical large material can be lifted, and the cylindrical large material can be lifted only by the cylindrical large material can be lifted.
The present utility model is not limited to the above-mentioned embodiments, and any equivalent embodiments which can be changed or modified by the technical content disclosed above can be applied to other fields, but any simple modification, equivalent changes and modification made to the above-mentioned embodiments according to the technical substance of the present utility model without departing from the technical content of the present utility model still belong to the protection scope of the technical solution of the present utility model.
Claims (6)
1. The utility model provides a large-scale material hoist device for construction, includes bottom plate (1) and bears board (10), its characterized in that: the utility model discloses a search-and-rescue device, including bottom plate (1), first cylinder (3) of top center department fixedly connected with of bottom plate (1), top center department of first cylinder (3) changes and is connected with rotary disk (4), top center department fixedly connected with first frame (5) of rotary disk (4), the front and back internal surface of first frame (5) is provided with winch spare (6), surface one side position fixedly connected with second cylinder (9) of winch spare (6), the surface fixedly connected with a plurality of evenly distributed pulley (8) of second cylinder (9), the interior surface wall center department sliding connection of pulley (8) has wire rope (7), first spout (19) have been seted up at the top both sides position of bearing plate (10), the top of bearing plate (10) is located the position of first spout (19) and is fixedly connected with second frame (18) respectively, the top center department of second frame (18) is provided with second spout (14), the interior surface wall sliding connection of second spout (14) has slider (13), the interior surface sliding connection of second spout (18) has a plurality of evenly distributed pulley (8), the fixed mounting of electric rod (11) is fixed with the fixed mounting of second slider (11), the extending end of the second electric telescopic rod (15) is fixedly connected with a limiting piece (16), and a semicircular groove (17) is formed in the position, close to the top, of the inner surface of the limiting piece (16).
2. The large-scale material lifting device for building construction according to claim 1, wherein: the universal wheels (2) are fixedly arranged at the bottom of the bottom plate (1) near four corner positions.
3. The large-scale material lifting device for building construction according to claim 1, wherein: one end of the steel wire rope (7) is fixedly connected with the outer surface of the winch piece (6).
4. The large-scale material lifting device for building construction according to claim 1, wherein: the other end of the steel wire rope (7) is fixedly connected with the top center of the bearing plate (10).
5. The large-scale material lifting device for building construction according to claim 1, wherein: the extending end of the first electric telescopic rod (12) is fixedly connected with the outer surface of the sliding block (13).
6. The large-scale material lifting device for building construction according to claim 1, wherein: the outer surface of the limiting piece (16) is in sliding connection with the inner surface wall of the first sliding groove (19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320141604.2U CN218893397U (en) | 2023-01-18 | 2023-01-18 | Large-scale material hoist device for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320141604.2U CN218893397U (en) | 2023-01-18 | 2023-01-18 | Large-scale material hoist device for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218893397U true CN218893397U (en) | 2023-04-21 |
Family
ID=86001154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320141604.2U Active CN218893397U (en) | 2023-01-18 | 2023-01-18 | Large-scale material hoist device for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218893397U (en) |
-
2023
- 2023-01-18 CN CN202320141604.2U patent/CN218893397U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210230382U (en) | Bracket for wooden door paint spraying | |
CN112647697A (en) | Construction platform for housing construction engineering | |
CN218893397U (en) | Large-scale material hoist device for construction | |
CN213171337U (en) | Material lifting equipment for high-altitude operation | |
CN210393498U (en) | Simple crane convenient to use in workshop | |
CN210710564U (en) | Construction machinery material lift | |
CN209339550U (en) | A kind of decorative panel for building installation elevator | |
CN217596637U (en) | Curtain aluminum plate burnishing and polishing machine | |
CN215249212U (en) | Assembled building hoisting accessory | |
CN214570229U (en) | Rotatable crane for production and batching in chemical industry | |
CN209522499U (en) | A kind of novel construction and installation hanging apparatus | |
CN209098060U (en) | A kind of detachable civil air defense constructions and installations safeguard hanging apparatus | |
CN220845221U (en) | Lifting equipment for mounting constructional engineering equipment | |
CN210393392U (en) | Slewing bearing stone tongs | |
CN214570360U (en) | Portable hoisting machine | |
CN216426568U (en) | Workshop hoisting device for metal rack production | |
CN216403642U (en) | Lifting large-scale equipment lifting device | |
CN210162142U (en) | Feed additive material conveying device | |
CN211419389U (en) | Time board receiving arrangement for wall construction for architectural decoration | |
CN221027344U (en) | Tower crane davit mechanism | |
CN216269319U (en) | Municipal administration and building construction are with hanging material equipment of carrying | |
CN220866943U (en) | Crane with anti-swing device | |
CN215907329U (en) | Movable support convenient to adjust for construction | |
CN219031521U (en) | Portal frame for building construction | |
CN212475939U (en) | Building decoration is with convenient crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |