CN218875731U - Construction drilling equipment - Google Patents

Construction drilling equipment Download PDF

Info

Publication number
CN218875731U
CN218875731U CN202222836402.8U CN202222836402U CN218875731U CN 218875731 U CN218875731 U CN 218875731U CN 202222836402 U CN202222836402 U CN 202222836402U CN 218875731 U CN218875731 U CN 218875731U
Authority
CN
China
Prior art keywords
top surface
sliding block
workstation
threaded
driving motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222836402.8U
Other languages
Chinese (zh)
Inventor
付坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Zhiyue Construction Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222836402.8U priority Critical patent/CN218875731U/en
Application granted granted Critical
Publication of CN218875731U publication Critical patent/CN218875731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Abstract

The utility model discloses a construction drilling equipment, its technical scheme main points are: the device comprises a workbench, wherein two fixed plates are fixedly arranged on the top surface of the workbench, and two threaded rods are fixedly arranged between the two fixed plates; drilling subassembly, the drilling subassembly sets up the top surface of workstation for drill to the plank, the drilling subassembly includes: the sliding block, the sliding block sets up the top surface of workstation, two sliding holes have been seted up to one side of sliding block, the sliding hole with the threaded rod activity is cup jointed, first screw hole has been seted up to the top surface of sliding block, the inside threaded connection of first screw hole has the screw thread post, uses through the sliding block, sliding hole, threaded rod, screw ring, handle, screw thread post, drill bit and the driving motor that set up mutually supporting down, can remove drilling to the plank, is convenient for punch other positions of plank, and is more practical.

Description

Construction drilling equipment
Technical Field
The utility model relates to a plank drilling technical field, concretely relates to construction drilling equipment.
Background
Hydraulic engineering is the surface water and the groundwater that are used for controlling and allotting the nature, reaches the earth's surface water and the groundwater of harmfully having the benefit purpose and construct, also is called water engineering, and water is the essential valuable resource of human production and life, and current hydraulic engineering when the construction, can use various panel, for example plank etc. all need to drill the plank, also is convenient for use later stage.
For example, chinese patent No. CN214772629U discloses a sheet drilling device for hydraulic engineering construction, which is matched with a threaded rod and a threaded sleeve to adjust the height of the drilling device, and the second electric telescopic rod is matched with a fixed plate to adjust the left and right direction of the sheet, so as to solve the problem of low efficiency caused by the fact that an operator needs to move the sheet in the conventional sheet drilling device.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a construction drilling equipment has solved when driling to panel, still need remove panel about through second electric telescopic handle and fixed plate cooperation, but because the drill bit is in second electric telescopic handle's top, consequently remove behind the panel, also can't drill to other positions of panel, is unfavorable for the problem of punching to panel.
The above technical purpose of the present invention can be achieved by the following technical solutions:
a construction drilling device comprises a workbench, wherein two fixing plates are fixedly mounted on the top surface of the workbench, and two threaded rods are fixedly mounted between the two fixing plates; drilling subassembly, the drilling subassembly sets up the top surface of workstation for drill to the plank, the drilling subassembly includes: the sliding block, the sliding block sets up the top surface of workstation, two sliding holes have been seted up to one side of sliding block, the sliding hole with the threaded rod activity cup joints, first screw hole has been seted up to the top surface of sliding block, the internal thread of first screw hole is connected with the screw thread post, the fixed slot has been seted up to the bottom surface of screw thread post, the fixed cover in inside of fixed slot has cup jointed driving motor, is located the left side one side fixed mounting of fixed plate has the PLC controller, the PLC controller with driving motor electric connection, the one end fixed mounting of driving motor drive shaft has the drill bit.
In order to carry on spacingly to the sliding block, as the utility model discloses a construction drilling equipment, the preferred, the drilling subassembly still includes: and the threaded ring is in threaded connection with the outer circle wall surface of the threaded rod.
In order to rotate the screw thread post, as the utility model discloses a construction drilling equipment, the preferred, the top surface fixed mounting of screw thread post has the handle.
In order to carry out the centre gripping to the plank, as the utility model discloses a construction drilling equipment, the preferred, the top surface fixed mounting of workstation has a plurality of connecting plate, the second screw hole has been seted up to one side of connecting plate, the inside threaded connection of second screw hole has the centre gripping post.
In order to support the battery, as the utility model discloses a construction drilling equipment, the preferred, the bottom surface fixed mounting of workstation has the support frame, the inside bottom surface fixed mounting of support frame has the battery, the battery with driving motor electric connection.
In order to dispel the heat to the battery, as the utility model discloses a construction drilling equipment, the preferred, a plurality of thermovent has been seted up to the inside bottom surface of support frame.
In order to improve the stability of workstation, as the utility model discloses a construction drilling equipment, the preferred, the bottom surface fixed mounting of workstation has a plurality of bracing piece.
To sum up, the utility model discloses mainly have following beneficial effect:
through the workstation that sets up, the staff can put the plank at the top surface of workstation, through rotating connecting plate, centre gripping post and the second screw hole that sets up under mutually supporting the use, can carry out the centre gripping to the plank, through sliding block, sliding hole, threaded rod, screw ring, handle, screw post, drill bit and the driving motor that sets up under mutually supporting the use, can remove drilling to the plank, be convenient for punch to other positions of plank when the construction, it is more practical.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic structural view of the threaded post of the present invention;
FIG. 3 is a partial schematic view of A in FIG. 1;
FIG. 4 is a schematic view of the connection plate structure of the present invention;
fig. 5 is a schematic view of the supporting frame of the present invention.
Reference numerals are as follows: 1. a work table; 2. a fixing plate; 3. a threaded rod; 4. a slider; 5. a first threaded hole; 6. a threaded post; 7. a handle; 8. a fixing groove; 9. a slide hole; 10. a drive motor; 11. a drill bit; 12. a threaded ring; 13. a connecting plate; 14. a second threaded hole; 15. a clamping post; 16. a support frame; 17. a storage battery; 18. a heat dissipation port; 19. a support rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Example one
Referring to fig. 1, 2 and 3, a construction drilling device comprises a workbench 1, wherein two fixed plates 2 are fixedly installed on the top surface of the workbench 1, two threaded rods 3 are fixedly installed between the two fixed plates 2, a drilling assembly is arranged on the top surface of the workbench 1 and used for drilling a wood board, the drilling assembly comprises a sliding block 4, the sliding block 4 is arranged on the top surface of the workbench 1, two sliding holes 9 are formed in one side of the sliding block 4, the sliding holes 9 are movably sleeved with the threaded rods 3, a first threaded hole 5 is formed in the top surface of the sliding block 4, a threaded column 6 is connected to the internal thread of the first threaded hole 5, a fixed groove 8 is formed in the bottom surface of the threaded column 6, a driving motor 10 is fixedly sleeved inside the fixed groove 8, a PLC controller is fixedly installed on one side of the left fixed plate 2 and electrically connected with the driving motor 10, a drill bit 11 is fixedly installed at one end of the driving shaft of the driving motor 10, the drilling component also comprises a threaded ring 12, the threaded ring 12 is in threaded connection with the outer circle wall surface of the threaded rod 3, a worker can pull the arranged sliding block 4, the sliding block 4 can be moved by sliding on the outer circle wall surface of the threaded rod 3 through the arranged sliding hole 9, the sliding block 4 can be limited by rotating the arranged threaded ring 12 to be attached to the sliding block 4, the worker can rotate the arranged threaded column 6 to enable the drill bit 11 to be in contact with the wood board, the arranged driving motor 10 is started at the moment, the drill bit 11 can be driven to drill the wood board by rotating the driving shaft of the driving motor 10, the worker can rotate the threaded column 6 downwards to improve the drilling depth, the arranged sliding block 4 can be moved at the later stage to drill the wood board, and other positions of the wood board can be conveniently drilled, is more practical.
Example two
Referring to fig. 1 and 4, the top surface fixed mounting of screw post 6 has handle 7, the top surface fixed mounting of workstation 1 has a plurality of connecting plate 13, second screw hole 14 has been seted up to one side of connecting plate 13, the internal thread of second screw hole 14 is connected with centre gripping post 15, through the workstation 1 that sets up, the staff can put the plank on the top surface of workstation 1, through rotating the centre gripping post 15 that sets up, centre gripping post 15 can rotate and carry out the centre gripping to the plank in the inside of second screw hole 14 this moment.
EXAMPLE III
Referring to fig. 1 and 5, the bottom surface fixed mounting of workstation 1 has support frame 16, the inside bottom surface fixed mounting of support frame 16 has battery 17, battery 17 and driving motor 10 electric connection, a plurality of thermovent 18 has been seted up to the inside bottom surface of support frame 16, battery 17 through the setting, battery 17 can supply power to driving motor 10 in driving motor 10 uses, and in the use of battery 17, the heat that battery 17 gived off can discharge out through thermovent 18, reach certain radiating effect, the bottom surface fixed mounting of workstation 1 has a plurality of bracing piece 19.
The working principle is as follows: referring to fig. 1-5, through the workstation 1 that sets up, the staff can put the plank on the top surface of workstation 1, through the centre gripping post 15 that rotates the setting, centre gripping post 15 can rotate and carry out the centre gripping to the plank in the inside of second screw hole 14 this moment, the staff can stimulate the sliding block 4 that sets up, slide at the excircle wall of threaded rod 3 through the slip hole 9 that sets up and can let sliding block 4 remove, rotate the screw ring 12 that sets up and laminate with sliding block 4 after again, can carry out spacing to sliding block 4, the staff can hold handle 7 and rotate the screw post 6 that sets up this moment, can let drill bit 11 and plank contact, start the driving motor 10 that sets up this moment, the drive shaft rotation of driving motor 10 can drive drill bit 11 and bore the plank, and the staff can rotate screw post 6 downwards, can improve the degree of depth of drilling, the later stage can remove the sliding block 4 that sets up, can remove the drilling to the plank, be convenient for punch to other positions of plank when the construction, and is more practical.
Through the battery 17 that sets up, battery 17 can supply power to driving motor 10 in driving motor 10 uses to in battery 17 uses, the heat that battery 17 gived off can discharge out through thermovent 18, reaches certain radiating effect.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A construction drilling device, comprising:
the device comprises a workbench (1), wherein two fixed plates (2) are fixedly mounted on the top surface of the workbench (1), and two threaded rods (3) are fixedly mounted between the two fixed plates (2);
the drilling subassembly, the drilling subassembly sets up the top surface of workstation (1) for drill hole to the plank, the drilling subassembly includes: sliding block (4), sliding block (4) set up the top surface of workstation (1), two slip holes (9) have been seted up to one side of sliding block (4), slip hole (9) with threaded rod (3) activity cup joints, first screw hole (5) have been seted up to the top surface of sliding block (4), the internal thread connection of first screw hole (5) has screw thread post (6), fixed slot (8) have been seted up to the bottom surface of screw thread post (6), driving motor (10) have been cup jointed to the inside of fixed slot (8), are located the left side one side fixed mounting of fixed plate (2) has the PLC controller, the PLC controller with driving motor (10) electric connection, the one end fixed mounting of driving motor (10) drive shaft has drill bit (11).
2. The construction drilling device of claim 1, wherein the drilling assembly further comprises: the threaded ring (12) is in threaded connection with the outer circle wall surface of the threaded rod (3).
3. The construction drilling device according to claim 1, wherein: and a handle (7) is fixedly arranged on the top surface of the threaded column (6).
4. The construction drilling device according to claim 1, wherein: the top surface fixed mounting of workstation (1) has a plurality of connecting plate (13), second screw hole (14) have been seted up to one side of connecting plate (13), the internal thread connection of second screw hole (14) has centre gripping post (15).
5. The construction drilling device according to claim 1, wherein: the bottom surface fixed mounting of workstation (1) has support frame (16), the inside bottom surface fixed mounting of support frame (16) has battery (17), battery (17) with driving motor (10) electric connection.
6. The construction drilling device according to claim 5, wherein: a plurality of heat dissipation ports (18) are formed in the inner bottom surface of the support frame (16).
7. The construction drilling device according to claim 1, wherein: the bottom surface of the workbench (1) is fixedly provided with a plurality of supporting rods (19).
CN202222836402.8U 2022-10-27 2022-10-27 Construction drilling equipment Active CN218875731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222836402.8U CN218875731U (en) 2022-10-27 2022-10-27 Construction drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222836402.8U CN218875731U (en) 2022-10-27 2022-10-27 Construction drilling equipment

Publications (1)

Publication Number Publication Date
CN218875731U true CN218875731U (en) 2023-04-18

Family

ID=85945538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222836402.8U Active CN218875731U (en) 2022-10-27 2022-10-27 Construction drilling equipment

Country Status (1)

Country Link
CN (1) CN218875731U (en)

Similar Documents

Publication Publication Date Title
WO2023134794A2 (en) Positioning and drilling apparatus for electronic component production and processing
CN218875731U (en) Construction drilling equipment
CN211306959U (en) Building construction wall perforating device
CN209886723U (en) Device for drilling waste soft package lithium ion battery
CN218598201U (en) Coal mine drilling machine stabilizing and angle adjusting device
CN211842373U (en) Gang drill device for furniture production
CN210732706U (en) Construction equipment is used in construction of high accuracy wood system furniture installation
CN210208941U (en) Tapping device for mounting computer shell
CN210589960U (en) Ceiling drilling assistor is used to fitment
CN210280760U (en) Excavator bucket tooth pin slot perforating device
CN215033814U (en) Flange rotary machining platform
CN111633234A (en) Perforating device is used in electrical accessories processing
CN220482144U (en) Processing device for glass cover plate production
CN220283395U (en) Lifting device of reverse well drilling machine
CN213496625U (en) Drilling device for machining welding tower
CN110948002A (en) Quick punching equipment of curved link
CN212554491U (en) Decoration is with high-efficient perforating device
CN213919019U (en) Quick positioning and punching device for building water and electricity installation
CN218224755U (en) Drilling equipment is used in motor housing processing
CN217799085U (en) Internal combustion steel rail drilling machine
CN213674514U (en) Efficient drilling equipment for furniture boards
CN218503411U (en) High-efficient drilling equipment of sheet metal working
CN212527602U (en) Jacking quick assembly device
CN215469775U (en) Boring cutter for rough machining of parts
CN216181724U (en) Drilling machine for stone processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230606

Address after: No. 241 Shengli West Road, Jianchang Town, Nancheng County, Fuzhou City, Jiangxi Province, 344000

Patentee after: Jiangxi Jinjia Construction Engineering Co.,Ltd.

Address before: Machang Town Machang Village, Quanjiao County, Chuzhou City, Anhui Province, 239000

Patentee before: Fu Kun

TR01 Transfer of patent right

Effective date of registration: 20240409

Address after: Room 502, Unit 1, Building 36, Jinxiu Yuan, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region, 750002 (self declared)

Patentee after: Ningxia Zhiyue Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 241 Shengli West Road, Jianchang Town, Nancheng County, Fuzhou City, Jiangxi Province, 344000

Patentee before: Jiangxi Jinjia Construction Engineering Co.,Ltd.

Country or region before: China