CN218863428U - Pipeline construction auxiliary fixtures - Google Patents

Pipeline construction auxiliary fixtures Download PDF

Info

Publication number
CN218863428U
CN218863428U CN202223183552.XU CN202223183552U CN218863428U CN 218863428 U CN218863428 U CN 218863428U CN 202223183552 U CN202223183552 U CN 202223183552U CN 218863428 U CN218863428 U CN 218863428U
Authority
CN
China
Prior art keywords
bearing
pipeline
grip block
board
pipeline construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223183552.XU
Other languages
Chinese (zh)
Inventor
梁火勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Jinde Communication Equipment Co ltd
Original Assignee
Zhuhai Jinde Communication Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Jinde Communication Equipment Co ltd filed Critical Zhuhai Jinde Communication Equipment Co ltd
Priority to CN202223183552.XU priority Critical patent/CN218863428U/en
Application granted granted Critical
Publication of CN218863428U publication Critical patent/CN218863428U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model relates to the technical field of pipeline construction, in particular to a pipeline construction auxiliary tool, which comprises a bearing frame, wherein pipeline clamping components are arranged at two ends of the bearing frame through bearing grooves, and bearing seats are arranged on the bearing frame through the bearing grooves and positioned at the inner sides of the pipeline clamping components; through being connected between spacing couple and the spacing post, realize strutting spacing between first grip block and the second grip block, after first grip block and second grip block correspond with the pipeline, separate spacing couple and spacing post between, connect the hoist and mount rope through accepting the seat, stimulate bearing the dress frame, under the effect of pulling force, first grip block, the second grip block, first accepting the board, the second is accepted and is realized the linkage shrink between the board, the centre gripping stability that makes the pipeline is higher, and under the effect of protection joint plate, stability when making the supplementary centre gripping of pipeline construction remove is high, make the high safety in use when whole is under the construction.

Description

Pipeline construction auxiliary fixtures
Technical Field
The utility model relates to a pipeline construction technical field specifically is a pipeline construction auxiliary fixtures.
Background
In urban construction, water discharge and natural gas transportation are basically realized by interconnecting pipelines, the pipelines at a gathering position and the like have large volume and size, and are usually operated by some auxiliary tools during construction and installation, and are mainly used for auxiliary placement of the pipelines.
The grant publication number CN211312765U3 discloses a pipeline construction auxiliary tool, the patent technology can realize the adjustment of the pipeline position, when the electric telescopic rod retracts, the clamping block is just above the ground, the pipeline is conveniently and stably placed, and the use convenience of the device is improved; be provided with stopper and spread groove, the connection pad can slide in the spread groove under the effect of stopper, thereby realize the rotation of connection pad, can directly promote the pipeline to adjust its angle of putting after spacing to the pipeline, the convenience carries out certain rotation to the pipeline, improve the efficiency of construction of pipeline, but during the hoist and mount centre gripping to the pipeline in this scheme, convenience and the stability to the pipeline centre gripping are not good enough, thereby influence convenience and the security of pipeline construction auxiliary fixtures when using, thereby influence the availability factor, consequently, need a pipeline construction auxiliary fixtures to make the improvement to above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline construction auxiliary fixtures to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a pipeline construction auxiliary tool comprises a bearing frame, wherein bearing grooves are transversely formed in the bearing frame, pipeline clamping assemblies are mounted at two ends of the bearing frame through the bearing grooves, and bearing seats are arranged on the bearing frame through the bearing grooves and located on the inner sides of the pipeline clamping assemblies;
pipeline centre gripping subassembly is including installing the positioning seat on bearing the dress frame, department installs the bearing axle in the middle of the lower extreme of positioning seat, the middle department of bearing the dress axle installs first board of accepting, the bearing is epaxial and accept the board and be provided with the second for central front and back symmetry based on first board of accepting, first other end of accepting the board rotates installs first grip block, the second is accepted the other end of board and is rotated and install the second grip block, first commentaries on classics joint shaft front end of accepting board and first grip block junction is provided with spacing couple, the right front side of second grip block is provided with spacing post, protection joint board is installed to the lower extreme inboard of first grip block, second grip block.
As the utility model discloses preferred scheme, accept the seat and hold the sliding connection that can regulate and control of dress groove, the upside of accepting the seat is provided with switching rings.
As the utility model discloses preferred scheme, the transversal I type structure setting of personally submitting of positioning seat.
As the utility model discloses preferred scheme, the upside both ends of holding the dress frame all set up with the spacing groove of position fixing base looks adaptation.
As the utility model discloses preferred scheme, adopt switching circle hub connection between first grip block, the second grip block.
As the utility model discloses preferred scheme, the lower extreme of first grip block, second grip block is "J" column structure setting, the transversal setting of personally submitting "L" type structure of protection joint board.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, regulate and control the pipeline centre gripping subassembly at bearing frame both ends according to the length of pipeline in pipeline construction auxiliary fixtures, make the suitability of pipeline centre gripping subassembly higher, and when pipeline centre gripping subassembly carries out the centre gripping to the pipeline, be connected through between spacing couple and the spacing post, realize strutting spacingly between first grip block and the second grip block, after first grip block and second grip block correspond with the pipeline, separate between spacing couple and the spacing post, connect the hoist and mount rope through accepting the seat, spur bearing frame, under the effect of pulling force, first grip block, the second grip block, first accept the board, realize the linkage shrink between the board, make the centre gripping stability of pipeline higher, and under the effect of protection joint board, stability when making the supplementary centre gripping of pipeline construction remove is high, make the whole safety in utilization when being under construction high.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a part of the structure of the present invention;
fig. 3 is a schematic diagram of a part of the structure of the present invention.
In the figure: 1. a bearing frame; 101. a bearing groove; 102. a bearing seat; 103. switching a hanging ring; 104. a limiting groove; 2. a tube gripping assembly; 201. positioning seats; 202. bearing and mounting a shaft; 203. a first bearing plate; 204. a second bearing plate; 205. a first clamping plate; 206. a second clamping plate; 207. a limiting hook; 208. a limiting column; 209. a protective clamping and connecting plate; 210. the circular shaft is connected.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
In order to facilitate understanding of the invention, the invention will be described more fully hereinafter with reference to the accompanying drawings, in which several embodiments of the invention are shown, but which can be embodied in many different forms and are not limited to the embodiments described herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like are used herein for purposes of illustration only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used herein in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
The embodiment is as follows: referring to fig. 1-3, an auxiliary tool for pipeline construction includes a bearing frame 1, a bearing groove 101 is transversely formed on the bearing frame 1, a pipeline clamping assembly 2 is installed at two ends of the bearing frame 1 through the bearing groove 101, and a bearing seat 102 is arranged on the bearing frame 1 through the bearing groove 101 and at the inner side of the pipeline clamping assembly 2;
the pipeline clamping assembly 2 comprises a positioning seat 201 installed on a bearing frame 1, a bearing shaft 202 is installed in the middle of the lower end of the positioning seat 201, a first bearing plate 203 is installed in the middle of the bearing shaft 202, a second bearing plate 204 is symmetrically arranged on the bearing shaft 202 in the front-back direction based on the first bearing plate 203 as the center, a first clamping plate 205 is installed at the other end of the first bearing plate 203 in a rotating mode, a second clamping plate 206 is installed at the other end of the second bearing plate 204 in a rotating mode, a limiting hook 207 is arranged at the front end of a transfer shaft at the connection position of the first bearing plate 203 and the first clamping plate 205, a limiting column 208 is arranged on the front right side of the second clamping plate 206, and a protective clamping plate 209 is installed on the inner side of the lower ends of the first clamping plate 205 and the second clamping plate 206;
the pipeline clamping components 2 at two ends of the bearing frame 1 are regulated according to the length of a pipeline, so that the applicability of the pipeline clamping components 2 is high, when the pipeline is clamped by the pipeline clamping components 2, the first clamping plate 205 and the second clamping plate 206 are separated through connection between the limiting hook 207 and the limiting column 208, when the first clamping plate 205 and the second clamping plate 206 correspond to the pipeline, the limiting hook 207 and the limiting column 208 are separated, the bearing seat 102 is connected with a hoisting rope, the bearing frame 1 is pulled, under the action of pulling force, the first clamping plate 205, the second clamping plate 206, the first bearing plate 203 and the second bearing plate 204 are in linkage contraction, so that the clamping stability of the pipeline is high, under the action of the protective clamping plate 209, the stability of the pipeline during auxiliary clamping movement during construction is high, and the use safety of the whole body during construction is high;
in the embodiment, the bearing seat 102 is in adjustable sliding connection with the bearing groove 101, the adapting hanging ring 103 is arranged on the upper side of the bearing seat 102, and the connecting effect of the bearing seat 102 between a lifting rope and an external lifting machine can be good through the adapting hanging ring 103;
the cross section of the positioning seat 201 is arranged in an I-shaped structure, the two ends of the upper side of the bearing frame 1 are respectively provided with a limiting groove 104 matched with the positioning seat 201, and the two ends of the upper side of the bearing frame 1 are respectively provided with a limiting groove 104 matched with the positioning seat 201, so that the positioning stability of the positioning seat 201 during regulation and control can be high, and the auxiliary clamping moving effect of the pipeline clamping assembly 2 during pipeline construction is good;
wherein first grip block 205, adopt switching circle axle 210 to connect between the second grip block 206, first grip block 205, the lower extreme of second grip block 206 is "J" column structure setting, the transversal "L" type structure setting of personally submitting of protection joint board 209, through first grip block 205, the lower extreme of second grip block 206 is "J" column structure setting, and the transversal "L" type structure setting of personally submitting of protection joint board 209, the steadiness when can making the pipeline construction centre gripping is high, thereby make whole excellent in use effect when the pipeline construction.
The working principle is as follows: when the auxiliary tool for pipeline construction is used, the connection effect of the bearing seat 102 between a lifting rope and an external lifting machine can be good through the transfer lifting ring 103; the pipeline clamping components 2 at two ends of the bearing frame 1 are regulated according to the length of a pipeline, so that the applicability of the pipeline clamping components 2 is high, when the pipeline is clamped by the pipeline clamping components 2, the first clamping plate 205 and the second clamping plate 206 are separated through connection between the limiting hook 207 and the limiting column 208, when the first clamping plate 205 and the second clamping plate 206 correspond to the pipeline, the limiting hook 207 and the limiting column 208 are separated, the bearing seat 102 is connected with a hoisting rope, the bearing frame 1 is pulled, under the action of pulling force, the first clamping plate 205, the second clamping plate 206, the first bearing plate 203 and the second bearing plate 204 are in linkage contraction, so that the clamping stability of the pipeline is high, under the action of the protective clamping plate 209, the stability of the pipeline during auxiliary clamping movement during construction is high, and the use safety of the whole body during construction is high; the limiting grooves 104 matched with the positioning seats 201 are formed in the two ends of the upper side of the bearing frame 1, so that the positioning stability of the positioning seats 201 during regulation and control is high, and the auxiliary clamping moving effect of the pipeline clamping assembly 2 during pipeline construction is good; the lower extreme through first grip block 205, second grip block 206 is "J" column structure setting to the transversal personally submitting "L" type structure setting of protection joint board 209 can make the steadiness when the pipeline construction centre gripping high, thereby makes the whole excellent in use effect when being under construction the pipeline.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pipeline construction auxiliary fixtures, includes and holds dress frame (1), its characterized in that: a bearing groove (101) is transversely formed in the bearing frame (1), the two ends of the bearing frame (1) are provided with the pipeline clamping assembly (2) through the bearing groove (101), and a bearing seat (102) is arranged on the bearing frame (1) through the bearing groove (101) and positioned on the inner side of the pipeline clamping assembly (2);
pipeline centre gripping subassembly (2) is including installing positioning seat (201) on bearing frame (1), department installs bearing axle (202) in the middle of the lower extreme of positioning seat (201), the middle department of bearing axle (202) installs first board (203) of accepting, bearing axle (202) is gone up and be provided with the second for central front and back symmetry based on first board (203) of accepting and accept board (204), first other end of accepting board (203) rotates installs first grip block (205), the second accepts the other end of board (204) and rotates and install second grip block (206), first the switching axle front end of accepting board (203) and first grip block (205) junction is provided with spacing couple (207), the right front side of second grip block (206) is provided with spacing post (208), protection joint board (209) are installed to the lower extreme inboard of first grip block (205), second grip block (206).
2. The auxiliary tool for pipeline construction according to claim 1, wherein: the bearing seat (102) is connected with the bearing groove (101) in an adjustable sliding mode, and a transfer hanging ring (103) is arranged on the upper side of the bearing seat (102).
3. The auxiliary tool for pipeline construction according to claim 1, wherein: the cross section of the positioning seat (201) is arranged in an I-shaped structure.
4. The auxiliary tool for pipeline construction according to claim 1, wherein: the upper side both ends of the bearing frame (1) are provided with limit grooves (104) matched with the positioning seats (201).
5. The auxiliary tool for pipeline construction according to claim 1, wherein: the first clamping plate (205) and the second clamping plate (206) are connected by a transfer circular shaft (210).
6. The auxiliary tool for pipeline construction according to claim 1, wherein: the lower extreme of first grip block (205), second grip block (206) is "J" column structure setting, the cross section of protection joint board (209) is "L" type structure setting.
CN202223183552.XU 2022-11-28 2022-11-28 Pipeline construction auxiliary fixtures Active CN218863428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223183552.XU CN218863428U (en) 2022-11-28 2022-11-28 Pipeline construction auxiliary fixtures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223183552.XU CN218863428U (en) 2022-11-28 2022-11-28 Pipeline construction auxiliary fixtures

Publications (1)

Publication Number Publication Date
CN218863428U true CN218863428U (en) 2023-04-14

Family

ID=87355233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223183552.XU Active CN218863428U (en) 2022-11-28 2022-11-28 Pipeline construction auxiliary fixtures

Country Status (1)

Country Link
CN (1) CN218863428U (en)

Similar Documents

Publication Publication Date Title
CN218161717U (en) Strain clamp
CN211589484U (en) Decorate panel grinding device for engineering
CN218863428U (en) Pipeline construction auxiliary fixtures
CN219314388U (en) Suspension device for steel structure installation
CN208071180U (en) Single-phase multi-purpose pulley
CN212049867U (en) Corner pulley for cable paying-off
CN213738185U (en) Hoisting rigging with anti-skidding function
CN211396641U (en) Formwork diagonal bracing for building construction
CN212098680U (en) Vehicle-mounted mobile terminal clamping support
CN212366643U (en) Portable electric power distribution network construction tool
CN214141243U (en) Large-scale tonnage is anchor clamps for hoist and mount
CN210105314U (en) Multifunctional high and large inclined wall formwork supporting device
CN214996550U (en) Adjustable telegraph pole correction device
CN213802562U (en) Assembled steel construction is convenient for combination base of adjusting
CN216306951U (en) Convenient hydraulic engineering pipeline of adjusting stabilizes connecting device
CN216477503U (en) Steam turbine base
CN218738019U (en) Light seat chassis with bushing
CN210195242U (en) Fixing piece around cylindrical template
CN212805032U (en) Splitting machine support structure
CN112623930B (en) Hoisting device for rotor core and rotating wheel set of full tubular pump
CN216699344U (en) Lifting device for replacing porcelain insulator of distribution network
CN220533363U (en) Steel structure welding jig
CN210636907U (en) Communication tower fixing base for electronic information engineering
CN215212664U (en) Embrace pole counter weight steel sheet for support convenient to adjustment
CN217603526U (en) Support hanger with adjusting function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant