CN218862167U - Concrete spraying and curing device for house construction - Google Patents

Concrete spraying and curing device for house construction Download PDF

Info

Publication number
CN218862167U
CN218862167U CN202223600648.1U CN202223600648U CN218862167U CN 218862167 U CN218862167 U CN 218862167U CN 202223600648 U CN202223600648 U CN 202223600648U CN 218862167 U CN218862167 U CN 218862167U
Authority
CN
China
Prior art keywords
box
slide
base
fixed connection
bull stick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223600648.1U
Other languages
Chinese (zh)
Inventor
谢一斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Mutual Construction Engineering Co ltd
Original Assignee
Fujian Mutual Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Mutual Construction Engineering Co ltd filed Critical Fujian Mutual Construction Engineering Co ltd
Priority to CN202223600648.1U priority Critical patent/CN218862167U/en
Application granted granted Critical
Publication of CN218862167U publication Critical patent/CN218862167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete sprays curing means for construction is built in room relates to concrete curing technical field, the on-line screen storage device comprises a base, the top of base is provided with the slide, be provided with between base and the slide and collect the box, collect one side fixedly connected with sliding frame at box top, slider sliding connection is in sliding frame, the one end of bull stick is rotated and is connected on the lateral wall of slide, the other end fixed connection of bull stick is on the slider, brush fixed connection is in the one side of bull stick dorsad sliding frame. This concrete sprays curing means for construction is built in room collects the box laminating at the wall body surface, sprays rivers at the wall body surface and flows down along the wall body to in flowing into and collecting the box, the flexible end of hydraulic stem flexible simultaneously can drive bull stick and brush swing, both can prevent to spray the in-process normal water and splash by both sides, can also clear away the superficial sand and the dust of wall body surface at the swing back and forth in-process, improve the viscidity of follow-up construction.

Description

Concrete spraying and curing device for house construction
Technical Field
The utility model relates to a concrete curing technology field, in particular to concrete sprays curing means for building construction.
Background
Concrete is a generic term for a process of integrating cement into a whole. The term concrete is used as a cementing material, sand and stone are used as aggregates; mixing with water (containing additive and admixture) according to a certain proportion, and stirring to obtain the invented product.
After the concrete structure is cast and formed, the concrete structure needs to be sprayed and maintained to ensure that the cement hydration process is smoothly carried out, so that certain structural strength is ensured after the concrete structure is formed. When current spraying concrete wall body vertical structure, the water that sprays can be fast along wall body flow direction ground, lacks recovery unit, causes the waste of water resource.
Meanwhile, the position of a spray head of the existing automatic spraying device is inconvenient to adjust, and the spraying efficiency of the vertical structure of the concrete wall is reduced.
Therefore, it is necessary to provide a concrete spraying maintenance device for building construction to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction is built in room sprays curing means with concrete to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction is built in room and is sprayed curing means with concrete, includes the base, the top of base is provided with the slide, be provided with between base and the slide and collect the box, collect one side fixedly connected with sliding frame at box top, sliding frame's both ends all are provided with the splashproof subassembly, and two sets of splashproof subassemblies are the symmetric distribution, the splashproof subassembly includes bull stick, slider and brush, slider sliding connection is in sliding frame, the one end of bull stick is rotated and is connected on the lateral wall of slide, the other end fixed connection of bull stick is on the slider, brush fixed connection is in the one side of bull stick slip frame dorsad, the brush is located the top of collecting the box.
Preferably, a support plate is fixedly connected to the middle of the sliding frame, a hydraulic rod is arranged between the sliding frame and the sliding plate, one end of the hydraulic rod is fixedly connected to the upper surface of the support plate, and the other end of the hydraulic rod is fixedly connected to the lower surface of the sliding plate.
Preferably, both ends of slide one side all are provided with the rotation fixed subassembly, and two sets of rotation fixed subassemblies all are located the top of collecting the box.
Preferably, rotatory fixed subassembly includes card box, first motor and elasticity cassette, the card box is U style of calligraphy structure, the opening of card box is downward, card box fixed connection is on the lateral wall of slide, first motor fixed connection is in the inside of card box, the top of card box is run through to the drive shaft of first motor, elasticity cassette fixed connection is at the top of first motor drive shaft.
Preferably, the inside of base sets up to the cavity, the inside fixed mounting of base has the second motor, the middle part of base upper surface is provided with the lead screw, lead screw fixed connection is in the drive shaft of second motor, slide threaded connection is in the outside of lead screw, the equal fixedly connected with guide arm in both ends of base upper surface, the round hole that supplies the guide arm to pass is all seted up at the both ends of slide, the top of lead screw is rotated and is connected with the limiting plate, fixed connection is at the guide arm top that corresponds respectively at the both ends of limiting plate.
Preferably, one surface of the collection box back to the screw rod is fixedly connected with a sponge strip.
The utility model discloses a technological effect and advantage:
1. the collecting box is attached to the surface of a wall body, water sprayed on the surface of the wall body flows downwards along the wall body and flows into the collecting box, and meanwhile, the telescopic end of the hydraulic rod stretches and retracts to drive the rotating rod and the brush to swing, so that water can be prevented from splashing from two sides in the spraying process, floating sand and dust on the surface of the wall body can be removed in the back-and-forth swinging process, and the viscosity of subsequent construction is improved;
2. the rotating fixing assembly consisting of the clamping box, the first motor and the elastic clamping seat can drive the spray head of the water pipe to swing left and right, and then the screw rod is matched to rotate to drive the sliding plate to reciprocate up and down, so that the spraying coverage area is enlarged, and the spraying effect is improved.
Drawings
Fig. 1 is the utility model discloses concrete spray curing means for building construction schematic diagram.
Fig. 2 is an enlarged schematic structural diagram of a point a in fig. 1 according to the present invention.
Figure 3 is the utility model discloses collect box, hydraulic stem and splashproof subassembly schematic structure.
Fig. 4 is a schematic view of the structure of the rotating rod, the brush and the sliding block of the present invention.
In the figure: 1. a base; 2. a slide plate; 3. a collection box; 4. a sliding frame; 5. a sponge strip; 6. a rotating rod; 7. a brush; 8. a hydraulic lever; 9. a support plate; 10. a card box; 11. a first motor; 12. an elastic card holder; 13. a screw rod; 14. a guide bar; 15. a second motor; 16. a slide block.
Detailed Description
The technical solution in the embodiment of the present invention will be made clear below with reference to the drawings in the embodiment of the present invention; the present invention has been described in considerable detail with reference to certain preferred versions thereof. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a concrete spray curing means for building construction as shown in fig. 1-4, including base 1, base 1's top is provided with slide 2, and slide 2 can be through the displacement about lead screw 13, and then sprays from top to bottom to the wall. Be provided with between base 1 and the slide 2 and collect box 3, collect box 3 and be used for laminating the wall and collect and spray the water that flows down along the wall after, avoid the waste of water resource, improve the availability factor of water resource. The bottom of the collecting box 3 can be provided with a filter screen and a water outlet pipe, and the filter screen and the water outlet pipe are used for recycling after floating sand impurities are filtered. Collect one side fixedly connected with sliding frame 4 at box 3 top, sliding frame 4's both ends all are provided with the splashproof subassembly, and two sets of splashproof subassemblies are the V style of calligraphy and distribute, both can prevent to spray the in-process, and water splashes by both sides, can also clear away the superficial sand and the dust on wall body surface at the swing back and forth in-process worker, improves the viscidity of follow-up construction, and two sets of splashproof subassemblies are the symmetric distribution. The splash-proof assembly comprises a rotating rod 6, a sliding block 16 and a brush 7, wherein the width of the brush 7 exceeds that of the collecting box 3, so that the splash-proof assembly can be better attached to the surface of a wall. 16 sliding connection of slider is in sliding frame 4, and the one end of bull stick 6 is rotated and is connected on the lateral wall of slide 2, and the other end fixed connection of bull stick 6 is on slider 16, and brush 7 fixed connection is on the one side of bull stick 6 slip frame 4 dorsad, and brush 7 is located the top of collecting box 3, and bull stick 6 rotates the in-process and drives brush 7 and rotate.
The middle part fixedly connected with extension board 9 of slide frame 4 is provided with hydraulic stem 8 between slide frame 4 and the slide 2, and the one end fixed connection of hydraulic stem 8 is on extension board 9 upper surface, and the other end fixed connection of hydraulic stem 8 is on slide 2 lower surface.
It is specific, collect the laminating of box 3 on the wall body surface, rotatory fixed subassembly and the cooperation of lead screw 13, spray about going on to the wall surface, improve the coverage area who sprays, the rivers that spray on the wall body surface flow down along the wall body, and flow into and collect in the box 3, the flexible of the flexible end of hydraulic stem 8 simultaneously, can drive the swing of bull stick 6, both can prevent to spray the in-process, water splashes by both sides, can also clear away the superficial husky and dust of wall body surface at the swing back and forth in-process, improve the viscidity of follow-up construction.
The utility model provides a construct and use concrete spray curing means as shown in fig. 1-fig. 2 in room, the both ends of 2 one sides of slide all are provided with rotatory fixed subassembly, and two sets of rotatory fixed subassemblies all are located the top of collecting box 3, and rotatory fixed subassembly can drive the water pipe shower head horizontal hunting, enlarges and sprays the coverage area. The rotary fixing component comprises a clamping box 10, a first motor 11 and an elastic clamping seat 12, wherein the first motor 11 is a servo motor and drives the water pipe spray header to swing left and right. The card box 10 is in a U-shaped structure, the opening of the card box 10 faces downwards, and the card box 10 is fixedly connected to the side wall of the sliding plate 2. The first motor 11 is fixedly connected to the inside of the cartridge 10, a driving shaft of the first motor 11 penetrates the top of the cartridge 10, and the elastic holder 12 is fixedly connected to the top of the driving shaft of the first motor 11. When the water pipe spraying head is used, the water pipe spraying head is clamped in the elastic clamping seat 12, and the first motor 11 drives the elastic clamping seat 12 to rotate in a reciprocating mode.
The utility model provides a concrete sprays curing means for construction is built in room as shown in figure 1, base 1's inside sets up to the cavity, and base 1's inside fixed mounting has second motor 15, and the middle part of base 1 upper surface is provided with lead screw 13, and second motor 15 rotates and drives lead screw 13 and rotate, and lead screw 13 rotates and drives slide 2 up-and-down reciprocating motion. The screw rod 13 is fixedly connected to a driving shaft of the second motor 15, and the sliding plate 2 is in threaded connection with the outer part of the screw rod 13. The equal fixedly connected with guide arm 14 in both ends of base 1 upper surface, the round hole that supplies guide arm 14 to pass is all seted up at the both ends of slide 2, and guide arm 14 is used for preventing that slide 2 from reciprocating rocking of in-process, improves stability. The top of lead screw 13 is rotated and is connected with the limiting plate, and fixed connection is at the guide arm 14 top that corresponds respectively at the both ends of limiting plate, and the limiting plate is used for following the position of top restriction slide 2, can also improve the stability of device.
The utility model provides a as shown in figure 1, figure 3 a concrete spray curing means for building construction collects one side fixed connection sponge strip 5 of box 3 lead screw 13 dorsad, and sponge strip 5 avoids collecting box 3 laminating and reciprocates the in-process at the wall body surface, causes the damage to wall body and collection box 3.

Claims (6)

1. The utility model provides a construction is built in room is with concrete spraying curing means, includes base (1), its characterized in that: the top of base (1) is provided with slide (2), be provided with between base (1) and slide (2) and collect box (3), collect one side fixedly connected with sliding frame (4) at box (3) top, the both ends of sliding frame (4) all are provided with the splashproof subassembly, and two sets of splashproof subassemblies are the symmetric distribution, the splashproof subassembly includes bull stick (6), slider (16) and brush (7), slider (16) sliding connection is in sliding frame (4), the one end of bull stick (6) is rotated and is connected on the lateral wall of slide (2), the other end fixed connection of bull stick (6) is on slider (16), brush (7) fixed connection is in bull stick (6) the one side of sliding frame (4) dorsad, brush (7) are located the top of collecting box (3).
2. The concrete spraying and curing device for house building construction according to claim 1, characterized in that: the middle of the sliding frame (4) is fixedly connected with a support plate (9), a hydraulic rod (8) is arranged between the sliding frame (4) and the sliding plate (2), one end of the hydraulic rod (8) is fixedly connected to the upper surface of the support plate (9), and the other end of the hydraulic rod (8) is fixedly connected to the lower surface of the sliding plate (2).
3. The concrete spraying and curing device for house building construction according to claim 2, characterized in that: both ends of slide (2) one side all are provided with the rotation fixed subassembly, and two sets of rotation fixed subassemblies all are located the top of collecting box (3).
4. The concrete spraying and curing device for house building construction according to claim 3, characterized in that: rotatory fixed subassembly includes card box (10), first motor (11) and elasticity cassette (12), card box (10) is U style of calligraphy structure, the opening of card box (10) is downward, card box (10) fixed connection is on the lateral wall of slide (2), first motor (11) fixed connection is in the inside of card box (10), the top of card box (10) is run through to the drive shaft of first motor (11), elasticity cassette (12) fixed connection is at the top of first motor (11) drive shaft.
5. The concrete spraying and curing device for house building construction according to claim 4, characterized in that: the inside of base (1) sets up to the cavity, the inside fixed mounting of base (1) has second motor (15), the middle part of base (1) upper surface is provided with lead screw (13), lead screw (13) fixed connection is in the drive shaft of second motor (15), slide (2) threaded connection is in the outside of lead screw (13), the equal fixedly connected with guide arm (14) in both ends of base (1) upper surface, the round hole that supplies guide arm (14) to pass is all seted up at the both ends of slide (2), the top of lead screw (13) is rotated and is connected with the limiting plate, the both ends difference fixed connection of limiting plate is at guide arm (14) top that corresponds.
6. The concrete spraying and curing device for house building construction according to claim 5, characterized in that: one surface of the collection box (3) back to the screw rod (13) is fixedly connected with a sponge strip (5).
CN202223600648.1U 2022-12-30 2022-12-30 Concrete spraying and curing device for house construction Active CN218862167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223600648.1U CN218862167U (en) 2022-12-30 2022-12-30 Concrete spraying and curing device for house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223600648.1U CN218862167U (en) 2022-12-30 2022-12-30 Concrete spraying and curing device for house construction

Publications (1)

Publication Number Publication Date
CN218862167U true CN218862167U (en) 2023-04-14

Family

ID=87371360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223600648.1U Active CN218862167U (en) 2022-12-30 2022-12-30 Concrete spraying and curing device for house construction

Country Status (1)

Country Link
CN (1) CN218862167U (en)

Similar Documents

Publication Publication Date Title
CN209020652U (en) A kind of prefabricated component processing is prefabricated to use polyethylene decorative panel release agent application device
CN211074180U (en) Dust removal device of stirrer
CN218862167U (en) Concrete spraying and curing device for house construction
CN217746355U (en) Stone material burnishing machine waste water recovery device
CN216399172U (en) Granite plate surface polishing device
CN214783150U (en) Road and bridge maintenance structure
CN214075167U (en) Extraction box convenient to adjust
CN212161769U (en) Chip bar cutting and flash removing all-in-one machine
CN215212399U (en) Concrete placement equipment for construction
CN113524384A (en) Building board pouring equipment
CN215150533U (en) Unloader is used in recycled concrete preparation
CN112452884A (en) Machine parts belt cleaning device for machining
CN217668288U (en) CBN blade PVD coating washs polishing equipment
CN213005896U (en) Concrete mixer
CN216679163U (en) Building engineering environmental monitoring device convenient to maintain
CN217324895U (en) Concrete curing means that highway engineering construction was used
CN219234909U (en) High-precision polishing device
CN221433909U (en) Sand and stone separation device of concrete
CN218365743U (en) Chip removal workstation of cutting usefulness of zirconia corundum electrically fused brick
CN220561895U (en) Self-propelled curbstone make-up machine
CN221089519U (en) Concrete proportioning machine with clean structure
CN218668375U (en) Whitewash mortar that interior wall was decorated shifts diversion equipment
CN217998975U (en) Automatic concrete pouring device for building construction
CN221681582U (en) Roughening machine for road and bridge construction
CN219219686U (en) Plastering machine for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant