CN218843755U - Building construction template anchor clamps - Google Patents

Building construction template anchor clamps Download PDF

Info

Publication number
CN218843755U
CN218843755U CN202320255352.6U CN202320255352U CN218843755U CN 218843755 U CN218843755 U CN 218843755U CN 202320255352 U CN202320255352 U CN 202320255352U CN 218843755 U CN218843755 U CN 218843755U
Authority
CN
China
Prior art keywords
fixing frame
rod
fixed frame
fixing
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320255352.6U
Other languages
Chinese (zh)
Inventor
徐原辉
王菁
赵仁璧
黄浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320255352.6U priority Critical patent/CN218843755U/en
Application granted granted Critical
Publication of CN218843755U publication Critical patent/CN218843755U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building construction template clamp, which comprises a first fixing frame and a second fixing frame which are arranged oppositely, wherein the rod ends of the two sides of the first fixing frame are internally provided with a first connecting rod in an inserted manner, the rod ends of the two sides of the second fixing frame are internally provided with a second connecting rod in an inserted manner, and an adjusting rod is connected between the first connecting rod and the second connecting rod in a threaded manner; the inner sides of the middle rod sections of the first fixing frame and the second fixing frame are respectively provided with a clamp plate which is arranged oppositely, the side surfaces, far away from each other, of the two clamp plates are respectively in threaded connection with a plurality of screw rods which are movably inserted into the first fixing frame/the second fixing frame, and springs are sleeved outside the screw rods; the upper portions of the first fixing frame and the second fixing frame are in threaded connection with a plurality of inserting ground fixing rods. The utility model discloses a can realize connecting rod and fixed frame relative position's quick adjustment and fine setting to satisfy the centre gripping needs of the concrete of different dimensions, buffer structure simple structure, the clearance with change easy operation is convenient, the easy operation convenience of disassembling of anchor clamps.

Description

Building construction template anchor clamps
Technical Field
The utility model relates to a construction anchor clamps technical field especially relates to a construction form anchor clamps.
Background
The construction template is a temporary supporting structure, is manufactured according to design requirements, enables a concrete structure and a member to be formed according to specified positions and geometric dimensions, keeps the correct positions of the concrete structure and the member, bears the self weight of the construction template and external loads acting on the construction template, and aims to ensure the quality and the construction safety of a concrete engineering, accelerate the construction progress and reduce the engineering cost.
Can make anchor clamps collapse problem when leading to concrete solid volume to change for solving the toughness difference that building construction template exists in the use, the chinese utility model patent that announces for CN216109726U discloses a building construction template anchor clamps, can press from both sides tight fixedly to circular shape concrete structure through setting up semi-circular double-layered groove among its technical scheme, it pushes up the upper cover piece through the concrete setting inflation, thereby cover piece extrusion spring and second backup pad are gone up in the drive, then it can effectually decompose the power that the concrete setting inflation produced to drive the slide in the spout in the slide in the second backup pad.
However, in the process of implementing the technical scheme, the pen user finds that the technical scheme still has the following defects: firstly, a fixed rod is inserted between a first fixed frame and a second fixed frame, two ends of the fixed rod are respectively connected with the first fixed frame and the second fixed frame through bolts, and the positions of threaded holes are preset, so that the inserting positions (the adjustment of the relative positions of the two fixed frames) between the fixed rod and the first fixed frame or the second fixed frame are fixed position points, and the position between the position points can not be adjusted and positioned; secondly, when the clamp is used, the clamp needs to be sleeved on the outer side of a concrete column, and the two fixing frames are pushed to proper positions (the surfaces of the clamping plates are in contact with the surface of the concrete), so that the concrete column is reliably clamped and fixed by the clamping plates, the extrusion springs are inevitably compressed to a certain extent, and certain pre-tightening force is reversely provided for the clamping plates; thirdly, the supporting rods are fixedly arranged at the rear ends of the two fixing frames, after the supporting rods are inserted into soil to complete the fixation of the template clamp, the acting force between the clamping plates and the surface of the concrete column is increased by the compression force generated in the concrete solidification and expansion process, so that the supporting rods are not easy to pull out from the soil, the first bolts are not easy to remove from the fixing rods, and after the first bolts are removed from the fixing rods, the clamping plates cannot be horizontally removed from the concrete column due to the fact that the supporting rods are inserted into the soil, and therefore the template is very inconvenient to disassemble; finally, the buffer structure formed by the spring, the second support plate and the like is arranged on the inner sides of the two fixed frames, the structure is complex, the spring cannot work normally due to the fact that the spring falls into concrete easily, and cleaning and replacement are inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a building construction template clamp is provided, the position-adjustable connecting rods inserted by bolts are respectively arranged on two fixing frames, so that the relative position of the connecting rods and the fixing frames can be quickly adjusted, and the relative position of the two connecting rods can be finely adjusted by arranging an adjusting rod with double-thread between the two connecting rods, thereby realizing the arbitrary adjustment and positioning of the relative position between the two fixing frames within a certain distance range, and meeting the clamping requirements of concrete with different sizes and specifications; meanwhile, the concrete column can be clamped by the clamp in a state that the clamp is sleeved by the bolt through coarse positioning and then fine positioning through threaded connection, and the concrete column can be clamped by one person; the screw rods in threaded connection are arranged on the clamping plates, the springs are sleeved on the screw rods and are arranged on the outer sides of the two fixing frames, so that the buffer structure is simple in structure, concrete is not prone to falling on the springs, and the buffer structure is simple and convenient to clean and replace; through set up threaded connection's the dead lever of inserting on two fixed frames, can satisfy the fixed demand of anchor clamps, the operation of disassembling of the anchor clamps of being convenient for.
In order to solve the technical problem, the utility model discloses a technical scheme be:
a building construction template clamp comprises a first fixing frame and a second fixing frame which are oppositely arranged, wherein the first fixing frame and the second fixing frame are both U-shaped rod pieces, first connecting rods are inserted into rod ends on two sides of the first fixing frame, second connecting rods are inserted into rod ends on two sides of the second fixing frame, the end parts of the first connecting rods can be adjusted and positioned in the first fixing frame and/or the end parts of the second connecting rods can be adjusted and positioned in the second fixing frame, adjusting rods are in threaded connection between the first connecting rods and the second connecting rods on the same side, and the spiral directions of threaded sections at two ends of the adjusting rods are opposite;
the inner sides of the middle rod sections of the first fixing frame and the second fixing frame are respectively provided with a clamp plate which is arranged oppositely, the side surfaces, far away from each other, of the two clamp plates are respectively in threaded connection with a plurality of screw rods which are movably inserted into the first fixing frame/the second fixing frame, and springs are sleeved outside one ends, located on the outer sides of the first fixing frame/the second fixing frame, of the screw rods;
equal threaded connection has the ground dead lever of inserting of a plurality of vertical settings on the middle part pole section of first fixed frame and the fixed frame of second.
Furthermore, be hollow structure in the both sides rod end of the fixed frame of first fixed frame and/or second, on the one end top surface that the head rod and the fixed frame of first frame pegged graft and/or set up the location pinhole that a plurality of equidistance distribute on the one end top surface that the fixed frame of second connecting rod and second pegged graft, the activity is inserted on the both sides tip of the fixed frame of first fixed frame and/or second and is equipped with the bolt with location pinhole complex.
Furthermore, the middle part of the adjusting rod is fixedly provided with an adjusting nut, and the lengths of the thread sections on the two sides of the adjusting nut are unequal.
Further, the outside end of screw rod an organic whole is provided with the nut head, the inboard of nut head is provided with rotates the snap ring that the cover was established on the screw rod, the lateral surface fixed connection of the one end of spring and the fixed frame of first fixed frame/second, the other end and snap ring fixed connection.
Furthermore, a hanging ring is fixedly arranged at the top end of each ground inserting fixing rod.
Furthermore, the ground inserting fixing rod is composed of a thread section at the top, a polished rod section at the middle and a pointed cone section at the bottom.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model realizes the rapid adjustment of the relative position of the connecting rod and the fixed frames by respectively arranging the connecting rods with adjustable positions spliced by the bolts on the two fixed frames, and realizes the fine adjustment of the relative position of the two connecting rods by arranging the adjusting rods with double-thread threads between the two connecting rods, thereby realizing the arbitrary adjustment and positioning of the relative position between the two fixed frames within a certain distance range, and meeting the clamping requirements of the concrete with different sizes and specifications;
2. the position adjusting mode that the bolt is used for coarse positioning and then the bolt is used for threaded connection and fine positioning is adopted, the clamp can be firstly sleeved on the concrete column through the bolt connection, and then the two fixing frames are driven to be relatively close through threads under the state that the clamp is sleeved, so that the clamping of the clamp on the concrete column is realized, the clamp can be operated by one person, and the labor input is saved;
3. the screw rods in threaded connection are arranged on the clamping plates, the springs are sleeved on the screw rods and are arranged on the outer sides of the two fixing frames, so that the buffer structure is simple in structure, concrete is not prone to falling on the springs, and the buffer structure is simple and convenient to clean and replace;
4. through the dead lever of inserting ground that sets up threaded connection on two fixed frames, when inserting ground dead lever threaded connection on fixed frame, the accessible will be poor ground dead lever and insert the fixed of realization anchor clamps in soil, the dead lever of pegging graft removes the back from fixed frame, fixed frame suspension in the ground top, the reverse rotation regulation pole can make two fixed frames keep away from until one of them connecting rod and regulation pole separation relatively gradually in the horizontal direction to realize the removal of anchor clamps on concrete column, the disassembling easy operation of anchor clamps is convenient.
Drawings
FIG. 1 is a schematic perspective view of a formwork clamp for construction according to a first embodiment;
fig. 2 is a second schematic perspective view of the formwork clamp for building construction according to the first embodiment;
FIG. 3 is a schematic top view of the formwork clamp for construction according to the first embodiment;
FIG. 4 is a side view of the formwork clamp for construction according to the first embodiment;
FIG. 5 isbase:Sub>A schematic cross-sectional view taken along line A-A of FIG. 3;
FIG. 6 is a perspective view illustrating a first connecting rod according to a first embodiment;
fig. 7 is a schematic perspective view of the ground-inserting fixing rod according to the first embodiment;
FIG. 8 is a schematic perspective view of the adjustment lever according to the first embodiment;
fig. 9 is a schematic perspective view of the construction form clamp according to the second embodiment.
In the figure: the device comprises a first fixing frame 1, a second fixing frame 2, a first connecting rod 3, a positioning pin hole 301, a threaded hole 302, a second connecting rod 4, an adjusting rod 5, a clamping plate 6, a screw rod 7, a spring 8, a ground fixing rod 9, a lifting ring 901 and a plug pin 10.
Detailed Description
The following detailed description of the preferred embodiments of the present invention will be provided in conjunction with the accompanying drawings, so as to enable those skilled in the art to more easily understand the advantages and features of the present invention, and thereby define the scope of the invention more clearly and clearly.
The first embodiment is as follows:
referring to fig. 1 to 8, a formwork fixture for building construction includes a first fixing frame 1 and a second fixing frame 2 which are oppositely disposed, the first fixing frame 1 and the second fixing frame 2 are both U-shaped rods, and the ends of the two side rods of the first fixing frame 1 and the second fixing frame 2 are hollow, in this embodiment, the first fixing frame 1 and the second fixing frame 2 are both formed by welding three sections of square steel pipes end to end, so that the overall weight of the fixture can be reduced.
The two side rod ends of the first fixed frame 1 are internally and respectively connected with a first connecting rod 3 in an inserting manner, the two side rod ends of the second fixed frame 2 are internally and respectively connected with a second connecting rod 4 in an inserting manner, the end part of the first connecting rod 3 can be adjusted and positioned in the position of the first fixed frame 1, and the end part of the second connecting rod 4 can be adjusted and positioned in the position of the second fixed frame 2. Specifically, as shown in fig. 6, the first connecting rod 3 has a two-section structure, and the cross-sectional profile of the left section thereof matches the profile of the inner cross-section of the rod ends of the two sides of the first fixing frame 1, and the length thereof also matches the length of the side rod of the first fixing frame 1, so that the left section of the first connecting rod 3 can be inserted into the first connecting rod 3 (as shown in fig. 5). A plurality of (5 as shown in fig. 6) positioning pin holes 301 distributed at equal intervals are formed on the top surface of one end (left side section) of the first connecting rod 3 inserted into the first fixing frame 1, and pins 10 matched with the positioning pin holes 301 are movably inserted into the end parts of the side bars at two sides of the first fixing frame 1. After extracting bolt 10 from first fixed frame 1, accessible pull head rod 3 realizes the position quick adjustment of head rod 3 in first fixed frame 1, through the cooperation of bolt 10 with different location pinhole 301, realizes the position fixation of head rod 3 on first fixed frame 1 after the adjustment position. Obviously, a plurality of plug pin insertion ports arranged at equal intervals or at unequal intervals can be formed on the side lever of the first fixing frame 1, and the plug pin 10 is inserted into the position of the alignment fit through the alignment fit of the positioning pin hole 301 and the plug pin insertion ports, so that various positioning positions can be adjusted.
The right side section cross section profile of the first connecting rod 3 is matched with the side rod outer interface profile of the first fixing frame 1, so that after the first connecting rod 3 is completely inserted into the side rod of the first fixing frame 1, the end surface of the right side section of the first connecting rod just leans against the end surface of the side rod. At this time, the pin insertion port located at the outermost side is just aligned with the positioning pin hole 301 located at the innermost side, and after the pin 10 is inserted into the positioning pin hole 301 located at the innermost side, the first connecting rod 3 is fixedly connected to the first fixing frame 1, and the total length of the side edges of the first connecting rod 3 and the first fixing frame 1 is the minimum.
In the embodiment, the second fixed frame 2 and the first fixed frame 1 are symmetrically arranged, and the structure of the second fixed frame 2 is completely the same as that of the first fixed frame 1 because the first fixed frame 1 is also of a symmetrical structure; the structure of the second connecting rod 4 is symmetrical to that of the first connecting rod 3 and is completely the same as that of the first connecting rod 3; therefore, the coupling and position adjustment between the second connecting rod 4 and the second fixed frame 2 are the same as those between the first connecting rod 3 and the first fixed frame 1.
An adjusting rod 5 is in threaded connection between the first connecting rod 3 and the second connecting rod 4 which are positioned on the same side, the spiral directions of the thread sections at the two ends of the adjusting rod 5 are opposite, and the thread pitches are equal. The middle part of the adjusting rod 5 is fixedly provided with an adjusting nut (as shown in fig. 7), the center of the end surface of the right section of the first connecting rod 3 is provided with a threaded hole 302 (as shown in fig. 6), and the threaded connection and the adjustment of the relative position between the adjusting rod 5 and the first connecting rod 3 can be realized through the threaded fit between the threaded section on the left side of the adjusting rod 5 and the threaded hole 302 of the first connecting rod 3. The second connecting rod 4 is in threaded connection with the right-hand threaded section of the adjusting rod 5. Because the screw directions of the screw thread sections at the two ends of the adjusting rod 5 are opposite, when a wrench and other tools act on the adjusting nut, the adjusting rod 5 can be rotated forward or reversely to enable the first connecting rod 3 and the second connecting rod 4 to be close to or far away from each other synchronously under the effect of screw transmission, so that the relative position between the first connecting frame 1 and the second connecting frame 2 is adjusted, namely the whole width of the template clamp is adjusted.
Preferably, the thread segments on both sides of the adjusting nut are not equal in length, and in this embodiment, the length L of the thread segment on the left side of the adjusting nut is greater than the length L of the thread segment on the right side thereof, as shown in fig. 5. So, in the in-process of template anchor clamps disassembling, when rotating the regulation pole 5 in succession, second connecting rod 4 can separate with adjusting pole 5 earlier, and the left end still has a segment and keeps the threaded connection state with head rod 3, under the state of accomplishing the fixed frame 2 of second and the separation of first fixed frame 1, adjust pole 5 and keep on head rod 3, avoid adjusting pole 5 to drop and the loss appears easily, also avoid next time need carry out threaded connection with adjusting pole 5 and head rod 3 once more when using this template anchor clamps.
The middle part pole section inboard of the fixed frame of first fixed frame 1 and second 2 all is provided with splint 6 of relative setting, and the side that splint 6 is relative is the arcwall face to the surface of concrete column cooperates. The sides of the two clamping plates 6 which are far away from each other are in threaded connection with a plurality of (3 as shown in fig. 1 to 3) screw rods 7 which are movably inserted in the first fixing frame 1/the second fixing frame 2. Specifically, the main body of the screw 7 is a polished rod, shaft holes are formed in the middle rod sections of the first fixed frame 1 and the second fixed frame 2, and the screw 7 penetrates through the shaft holes, so that the screw 7 can axially move and circumferentially rotate in the shaft holes; a nut head is integrally arranged at the outer side end of the screw rod 7, so that an operator can act on the nut head through a tool such as a wrench to rotate the screw rod 7; the outer thread section is seted up to the medial extremity of screw rod 7, offers the screw hole with screw rod 7 assorted on the lateral surface of splint 6, and the medial extremity of screw rod 7 and the threaded connection of splint 6 can adjust the distance between the terminal surface of nut head and the lateral surface of splint 6 through rotating screw rod 7.
And a spring 8 is sleeved outside one end of the screw 7 positioned on the outer side of the first fixed frame 1/the second fixed frame 2. The assembly and operation of the spring 8 will be described by taking the side of the first fixed frame 1 as an example. A snap ring (not shown in the figure) which is rotatably sleeved on the screw 7 is arranged on the inner side of the nut head, one end of the spring 8 is fixedly connected with the outer side surface of the first fixed frame 1, and the other end of the spring is fixedly connected with the snap ring. Therefore, when the spring 8 is in a natural state, a neutral distance can be kept between the outer side surface of the clamping plate 6 and the inner side surface of the middle rod section of the first fixing frame 1, when the template clamp is sleeved on the concrete column, the clamping plates 6 on the two sides can be close to each other and contact with the surface of the concrete column through adjustment of the adjusting rod 5, the spring 8 is slightly stretched, the stretching force of the spring 8 applies pre-pressure to the clamping plates 6, and the template clamp can be reliably clamped and fixed on the concrete column; when splint 6 receives the solidification inflation of concrete column and the oppression power that produces does the time spent, splint 6 is further close to the middle part pole section of first fixed frame 1, and spring 8 is further stretched this moment, alleviates the oppression power that the inflation produced, avoids causing the damage to the template anchor clamps. The arrangement of the screw 7 and the spring 8 on the second fixed frame 2 is similar to the arrangement of the screw 7 and the spring 8 on the first fixed frame 1 and is arranged symmetrically.
Through threaded connection length of adjusting screw 7 on splint 6, it is adjustable when spring 8 is in natural state, the distance of the neutral gear between the lateral surface of splint 6 and the medial surface of the middle part pole section of first fixed frame 1 to adapt to the centre gripping demand of unidimensional concrete column, guarantee that the clamp force of exerting is roughly the same in advance, this in advance the size of clamp force in order to guarantee the reliable centre gripping of template anchor clamps on concrete column, avoid producing the extrusion damage again to concrete column's surface and be suitable. The springs 8 are arranged on the outer sides of the two fixed frames, so that the buffer structure is simple in structure, concrete is not easy to fall on the springs 8, and the buffer structure is simple and convenient to clean; the screw 7 is detached from the clamping plate 6 and is pulled out from the first fixing frame 1 or the second fixing frame 2, so that the screw 7, the spring 8 or the clamping plate 6 can be replaced, and the replacement operation is simple and convenient.
A plurality of (4 as shown in fig. 1 to 3) vertically-arranged ground-inserting fixing rods 9 are in threaded connection with the middle rod sections of the first fixing frame 1 and the second fixing frame 2. As shown in fig. 8, the ground-engaging securing lever 9 is composed of a threaded section at the top, a polished rod section at the middle and a tapered section at the bottom. The nominal diameter of the threaded section is larger than that of the polished rod section, the top surfaces and the bottom surfaces of the middle rod sections of the first fixing frame 1 and the second fixing frame 2 are provided with through threaded holes, the bottom ends of the ground inserting fixing rods 9 are inserted from the upper parts of the threaded holes until the threaded section at the top of the ground inserting fixing rods is in threaded connection with the threaded holes, so that the ground inserting fixing rods 9 are fixedly connected to the first fixing frame 1 and the second fixing frame 2, and the template clamp can be fixed after the ground inserting fixing rods 9 are inserted into soil; and the fixed rod 9 is inserted into the ground in a reverse rotation way, so that the fixed rod vertically rises under the action of thread transmission and is pulled out from soil, the fixing action of the soil on the first fixed frame 1 and the second fixed frame 2 can be eliminated, and the template clamp can be conveniently detached from the concrete column.
Preferably, a hanging ring 901 is fixedly arranged at the top end of each ground-inserting fixing rod 9, so that the ground-inserting fixing rods 9 can be conveniently connected with the first fixing frame 1 and the second fixing rod 2 through threads, or after the two clamping plates 6 are separated from the surface of the concrete column through the adjusting rods 5, the template clamp can be integrally pulled out of the soil by an external lifting tool or equipment acting on the hanging ring 901, and meanwhile, the template clamp can be conveniently grabbed and transferred in a non-working state.
The template clamp is used as follows:
(1) Sleeving a first fixing frame 1 with a first connecting rod 3, adjusting rods 5, a clamping plate 6, a screw 7, a spring 8 and a ground inserting fixing rod 9 on one side of a concrete column, sleeving a second fixing frame 2 with a second connecting rod 4, a clamping plate 6, a screw 7, a spring 8 and a ground inserting fixing rod 9 on the other side of the concrete column, and enabling the two second connecting rods 4 and the two adjusting rods 5 to be in threaded butt joint respectively, so that the second connecting rod 4 and the adjusting rods 5 reserve certain threaded connection adjusting length, and at the moment, the first fixing frame 1 and the second fixing frame 2 are primarily connected and sleeved on the outer side of the concrete column;
(2) The bolt 10 on the first fixing frame 1 or the second fixing frame 2 is pulled out, the connecting position of the first connecting rod 3 on the first fixing frame 1 or the connecting position of the second connecting rod 4 on the second fixing frame 2 are adjusted, and the whole width of the template clamp is adjusted to enable the two clamping plates 6 to be approximately contacted with the surface of the concrete column;
(3) The first fixed top frame 1 and the second fixed frame 2 are pressed downwards through external force, so that the ground inserting fixing rods 9 are inserted into soil, and the first fixed frame 1 and the second fixed frame 2 are fixed;
(4) Adjusting the adjusting rods 5 at the two sides to enable the inner side surface of the clamping plate 6 to be in contact with the surface of the concrete column;
(5) The screws 7 on both sides are adjusted, so that the stretching length of the spring 8 is adjusted, and the clamp plate 6 applies a preset pretightening force to the surface of the concrete column.
The template clamp is disassembled as follows:
(1) The ground inserting fixing rod 9 is rotated reversely, so that the ground inserting fixing rod rises vertically, the bottom of the ground inserting fixing rod is pulled out of the soil, and the ground inserting fixing rod contacts the soil to fix the first fixing frame 1 and the second fixing frame 2;
(2) Pulling out the bolts 10 on the two sides of the first fixed frame 1 or the second fixed frame 2 to separate the first connecting rod 3 from the first fixed frame 1 or separate the second connecting rod 4 from the second fixed frame 2;
(3) And horizontally moving the first fixing frame 1 and the second fixing frame 2 to one side far away from the concrete column respectively to finish the dismantling work of the template clamp.
The disassembly process of the template clamp can also be completed by adopting the following modes:
(1) The ground inserting fixing rod 9 is rotated reversely, so that the ground inserting fixing rod rises vertically, the bottom of the ground inserting fixing rod is pulled out of the soil, and the ground inserting fixing rod contacts the soil to fix the first fixing frame 1 and the second fixing frame 2;
(2) The adjusting rods 5 on the two sides are rotated reversely until the second connecting rod 4 is separated from the adjusting rods 5;
(3) And horizontally moving the first fixing frame 1 and the second fixing frame 2 to one side far away from the concrete column respectively to finish the dismantling work of the template clamp.
The template clamp can be disassembled in the following mode:
(1) The screw rods 7 on the two sides are rotated reversely, so that the two clamping plates 6 move towards the two sides respectively and are far away from the two sides, and the inner side surfaces of the clamping plates 6 and the surface of the concrete column are in a non-contact state;
(2) The template clamp is lifted up to be removed from the soil by acting on a hanging ring 901 of the ground inserting fixing rod 9 manually or by external tools or equipment;
(3) Pulling out the bolts 10 on the two sides of the first fixed frame 1 or the second fixed frame 2 to separate the first connecting rod 3 from the first fixed frame 1 or separate the second connecting rod 4 from the second fixed frame 2; or the adjusting rods 5 on the two sides are rotated reversely until the second connecting rod 4 is separated from the adjusting rods 5;
(4) And horizontally moving the first fixing frame 1 and the second fixing frame 2 to one side far away from the concrete column respectively to finish the dismantling work of the template clamp.
Example two:
referring to fig. 9, the difference between the first embodiment and the second embodiment is that the first connecting rod 3 is fixedly connected to the first fixing frame 1, for example, by bolts 11, that is, the position between the first connecting rod 3 and the first fixing frame 1 is not adjustable, and the structure, the connection manner, and the working process of the other components are the same as those in the first embodiment. Obviously, the first connecting rod 3 can also be welded, integrally formed and the like to form an integral structure with the first fixed frame 1.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (6)

1. The utility model provides a construction formwork clamp, includes the fixed frame (2) of first fixed frame (1) and second that set up relatively, the fixed frame (2) of first fixed frame (1) and second are the member of "U" shape, its characterized in that: the two side rod ends of the first fixing frame (1) are internally provided with first connecting rods (3) in an inserted mode, the two side rod ends of the second fixing frame (2) are internally provided with second connecting rods (4) in an inserted mode, the end portions of the first connecting rods (3) can be adjusted and positioned in the first fixing frame (1) and/or the end portions of the second connecting rods (4) can be adjusted and positioned in the second fixing frame (2), adjusting rods (5) are in threaded connection between the first connecting rods (3) and the second connecting rods (4) on the same side, and the thread sections at the two ends of each adjusting rod (5) are opposite in spiral direction;
the inner sides of the middle rod sections of the first fixing frame (1) and the second fixing frame (2) are respectively provided with a clamping plate (6) which are arranged oppositely, the side surfaces, far away from each other, of the two clamping plates (6) are in threaded connection with a plurality of screw rods (7) which are movably inserted into the first fixing frame (1) and the second fixing frame (2), and the outer part of one end, located on the outer side of the first fixing frame (1) and the second fixing frame (2), of each screw rod (7) is sleeved with a spring (8);
equal threaded connection has ground dead lever (9) of inserting of a plurality of vertical settings on the middle part pole section of the fixed frame of first (1) and second (2).
2. The building construction formwork clamp of claim 1, wherein: be hollow structure in the both sides rod end of the fixed frame of first fixed frame (1) and/or second (2), on the one end top surface of pegging graft mutually of head rod (3) and first fixed frame (1) and/or set up location pinhole (301) that a plurality of equidistance distribute on the one end top surface of pegging graft mutually of second connecting rod (4) and second fixed frame (2), activity is inserted on the both sides tip of the fixed frame of first fixed frame (1) and/or second (2) and is equipped with and fixes location pinhole (301) matched with bolt (10).
3. The construction form work clamp of claim 1 or 2, wherein: the middle part of the adjusting rod (5) is fixedly provided with an adjusting nut, and the lengths of the thread sections on the two sides of the adjusting nut are unequal.
4. The building construction formwork clamp of claim 1, wherein: the utility model discloses a screw rod (7) of fixing frame, including screw rod (7), the outside end of screw rod (7) an organic whole is provided with the nut head, the inboard of nut head is provided with rotates the cover and establishes the snap ring on screw rod (7), the lateral surface fixed connection, the other end and the snap ring fixed connection of the one end of spring (8) and the fixed frame of first (1)/second (2).
5. The building construction formwork clamp of claim 1, wherein: the top end of each ground inserting fixing rod (9) is fixedly provided with a hanging ring (901).
6. The construction form work clamp of claim 1 or 5, wherein: the ground inserting fixing rod (9) is composed of a thread section at the top, a polished rod section at the middle and a pointed cone section at the bottom.
CN202320255352.6U 2023-02-10 2023-02-10 Building construction template anchor clamps Active CN218843755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320255352.6U CN218843755U (en) 2023-02-10 2023-02-10 Building construction template anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320255352.6U CN218843755U (en) 2023-02-10 2023-02-10 Building construction template anchor clamps

Publications (1)

Publication Number Publication Date
CN218843755U true CN218843755U (en) 2023-04-11

Family

ID=87301133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320255352.6U Active CN218843755U (en) 2023-02-10 2023-02-10 Building construction template anchor clamps

Country Status (1)

Country Link
CN (1) CN218843755U (en)

Similar Documents

Publication Publication Date Title
CN112275963B (en) Rapid positioning, installing and constructing method for prefabricated frame column reinforcement cage
CN218843755U (en) Building construction template anchor clamps
CN208276792U (en) A kind of portable type spanner
CN109736328B (en) Loose head and using method thereof
CN208592334U (en) A kind of fixed cutter device of high-voltage line
CN114197486B (en) Deep basal pit assembled shaped steel bearing structure
CN215748745U (en) Automatic upset location frock
CN209954574U (en) Valve spring compressor
CN214805553U (en) Oral cavity improved tooth extraction instrument
CN113756208A (en) Support bracket for bridge engineering and construction method thereof
CN211081035U (en) Tool for disassembling aluminum template
CN211680837U (en) Inclined support dismounting device
CN211541019U (en) Adjustable dismounting device for square clamp of polished rod of oil pumping unit
CN108145641A (en) A kind of spring pipe vice
CN216504790U (en) Be applied to chain of horizontal plug-in components machine and dismantle appurtenance
CN221053233U (en) Built-in fitting positioner
CN212496178U (en) Wheel excavator frock fixing device
CN215674392U (en) Electric power layout planning simulation device
CN213054552U (en) Operation tool of bypass valve locking device
CN219887566U (en) Template clamp with adjustable width
CN221314019U (en) Adjustable wrench
CN219931635U (en) Tool for dismantling bottom die of steel bar truss floor support plate
CN215256031U (en) Directional well trajectory control drilling tool anticreep device
CN218110664U (en) Rusted bolt dismounting device for equipment repair
CN216240491U (en) Drilling and grinding pipe column clamping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant