CN218842235U - Converter is built by laying bricks or stones swiftly and is set up platform device - Google Patents

Converter is built by laying bricks or stones swiftly and is set up platform device Download PDF

Info

Publication number
CN218842235U
CN218842235U CN202223002417.0U CN202223002417U CN218842235U CN 218842235 U CN218842235 U CN 218842235U CN 202223002417 U CN202223002417 U CN 202223002417U CN 218842235 U CN218842235 U CN 218842235U
Authority
CN
China
Prior art keywords
platform
converter
swift
track
fixed bolster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223002417.0U
Other languages
Chinese (zh)
Inventor
许旭东
邓法年
曾海良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel Co Ltd
Original Assignee
Nanjing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel Co Ltd filed Critical Nanjing Iron and Steel Co Ltd
Priority to CN202223002417.0U priority Critical patent/CN218842235U/en
Application granted granted Critical
Publication of CN218842235U publication Critical patent/CN218842235U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The utility model relates to a converter masonry quick-set platform device, which is arranged outside a converter shell and comprises a quick platform, a track slider and a platform fixing support, wherein the quick platform is arranged on a converter front platform outside the converter shell; the device is simple to set up, safe and reliable, and the setting time of a masonry platform is reduced.

Description

Converter is built by laying bricks or stones swiftly and is set up platform device
Technical Field
The utility model relates to a set up platform device, concretely relates to converter is built by laying bricks or stones and is swiftly set up platform device belongs to metallurgical industry converter furnace lining maintenance of equipment technical field.
Background
The converter masonry platform is a necessary device for transferring converter bricks into the converter. Before the refractory material of the converter is built, a stable and safe building platform needs to be built, heavy refractory materials such as high-density magnesia carbon bricks and the like are transferred into the converter for building, but the platform cannot be moved and is inconvenient to transfer and high in labor intensity, so that the CN201099690Y provides steel converter repairing equipment, a channel of an outer construction platform is a horizontal transportation raceway, the refractory material transfer is facilitated, but the platform building mode is that a steel pipe structure is manually used for building, and the problems that time is long, building intensity is high, and the working intensity of operating personnel is increased exist in the mode.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that, overcome prior art's shortcoming, provide a converter and build swift platform device by laying bricks or stones, the device sets up simply, and safe and reliable reduces and builds platform setting time by laying bricks or stones.
In order to solve the technical problem, the utility model provides a converter is built by laying bricks or stones swiftly and is set up platform device, sets up outside the converter stove outer covering, including swift platform, track slider and platform fixed bolster, swift platform sets up on the outer converter stokehold platform of converter stove outer covering, and the surface activity of swift platform is equipped with the track slider, and the track slider slides to converter stove outer covering direction, and the one end that swift platform closes on the converter stove outer covering is equipped with the platform fixed bolster, and the platform fixed bolster sets up on the converter stove outer covering.
The utility model discloses the technical scheme who further injects is:
further, in the converter masonry quick erection platform device, the platform fixing support comprises a left platform fixing support, a middle platform fixing support and a right platform fixing support, and the left platform fixing support, the middle platform fixing support and the right platform fixing support are arranged on one side of the quick platform side by side.
In the converter building quick platform setting device, the left platform fixing support, the middle platform fixing support and the right platform fixing support are distributed along the diameter of the converter shell in an arc shape.
The technical effect, three platform fixed bolster arc distributes, guarantees the steadiness of swift platform, makes it can not take place not hard up when transporting resistant material phenomenons such as not hard up, guarantees the normal operating of work.
Among the aforementioned converter is built by laying bricks or stones swiftly and is set up platform device, the track slider includes first track slider and second track slider, and first track slider and second track slider bilateral symmetry set up in the surface of swift platform, and first track slider and second track slider structure are the same to include track, pulley and slider respectively, and the track sets up in the surface of swift platform, and the slider passes through the pulley activity and sets up in the track.
The technical effect slides and sets up, is convenient for transport resistant material, and convenient to use removes simply, reduces intensity of labour, has set up first track slider and second track slider about simultaneously, can go on simultaneously on both sides, has improved work efficiency.
In the converter building quick platform-erecting device, the platform fixing support is arranged on the backing ring of the converter shell.
The technical effect, when the platform was set up to the converter body, preceding platform shank probably had unsettledly, set up the platform fixed bolster on the trunnion ring of converter stove outer covering, can laminate on the converter body trunnion ring, convenient operation, also be convenient for stabilize fixedly, guarantee the normal operating of work, raise the efficiency.
Among the aforementioned converter built by laying bricks or stones swiftly and set up platform device, swift platform includes workstation and supporting leg, and the supporting leg sets up in the bottom four corners of workstation, and the bottom of swift platform is equipped with the strengthening rib, and the one end of strengthening rib sets up in the bottom of workstation, and the other end sets up on the supporting leg.
The technical effect sets up the strengthening rib and forms the triangle form and consolidate, further strengthens the stability of swift platform, and the work of being convenient for improves work efficiency.
The beneficial effects of the utility model are that:
the utility model discloses a swift platform does not need the manual work to use steel pipe structure to set up, safe and reliable, and it is also convenient to use, does not need the manual work to demolish after building by laying bricks or stones the end, but device repeatedly usable reduces intensity of labour.
The utility model discloses effectively reduce and build the platform by laying bricks or stones and set up the time cost, according to shortening and set up 4 hours, the per stove steel smelting cycle of converter 30 minutes, the benefit of 5 ten thousand yuan of stove steel calculates. The time cost is saved, and the synergy of 4 × 60/30 × 5=40 (ten thousand yuan/time) can be realized
The utility model discloses improved the security that builds by laying bricks or stones platform and set up and the operation simultaneously, realized platform used repeatedly.
Drawings
FIG. 1 is a schematic structural view of a device for quickly building a platform for converter masonry according to an embodiment of the present invention;
FIG. 2 is a side view of FIG. 1;
FIG. 3 is a schematic structural diagram of the shortcut platform in FIG. 1;
in the figure: 1-a rapid platform, 11-a workbench, 12-supporting legs, 2-track sliding blocks, 21-first track sliding blocks, 22-second track sliding blocks, 3-a platform fixing support, 31-a left platform fixing support, 32-a middle platform fixing support, 33-a right platform fixing support, 4-a converter shell, 5-a converter front platform, 6-reinforcing ribs and 7-a converter brick inlet.
Detailed Description
Example 1
The utility model provides a converter is built by laying bricks or stones and is swiftly set up platform device, the structure is shown in fig. 1-3, the setting is outside the converter stove outer covering, including swift platform 1, track slider 2 and platform fixed bolster 3, swift platform 1 sets up on the outer converter stokehold platform 5 of converter stove outer covering 4, the surface activity of swift platform 1 is equipped with track slider 2, track slider 2 slides to converter stove outer covering 4 direction, swift platform 1 closes on the one end of converter stove outer covering 4 and is equipped with platform fixed bolster 3, platform fixed bolster 3 sets up on converter stove outer covering 4.
In this embodiment, platform fixed bolster 3 includes left platform fixed bolster 31, well platform fixed bolster 32 and right platform fixed bolster 33, left side platform fixed bolster 31, well platform fixed bolster 32 and right platform fixed bolster 33 set up side by side in one side of swift platform 1, left side platform fixed bolster 31, well platform fixed bolster 32 and right platform fixed bolster 33's structure is the same, one end is connected with swift platform 1, the other end is equipped with the horizontal segment and directly sets up on the ring, installation convenient operation.
In this embodiment, the left platform fixing bracket 31, the middle platform fixing bracket 32 and the right platform fixing bracket 33 are distributed along the diameter of the converter shell 1 in an arc shape, the lower height edge is flush with the upper part of the trunnion ring of the converter body, and the forward extending part can be placed on the upper part of the trunnion ring of the converter shell in a contact manner.
In this embodiment, the track sliding block 2 includes a first track sliding block 21 and a second track sliding block 22, the first track sliding block 21 and the second track sliding block 22 are symmetrically arranged on the surface of the shortcut platform 1, the first track sliding block 21 and the second track sliding block 22 respectively include a track, a pulley and a sliding block with the same structure, the track is arranged on the surface of the shortcut platform 1, and the sliding block is movably arranged in the track through the pulley.
In the present embodiment, the platform fixing bracket 3 is provided on a trunnion ring of the converter shell 4.
In this embodiment, the shortcut platform 1 comprises a workbench 11 and supporting legs 12, the supporting legs 12 are arranged at four corners of the bottom end of the workbench 11, the bottom of the shortcut platform 1 is provided with reinforcing ribs 6, one ends of the reinforcing ribs 6 are arranged at the bottom of the workbench 11, and the other ends of the reinforcing ribs are arranged on the supporting legs 12.
In this embodiment, the size of the shortcut platform 1 is 3000 mm × 2000mm × 1200mm (length × width × height), and is located right in front of the converter shell 4 on the converter front platform 5, and is about 300mm away from the edge of the converter front platform 5, so as not to be suspended.
In this embodiment, the slide block has a size of 2600 mm × 800mm (length × width), is used for placing lining bricks of a furnace, can be quickly moved to a position close to a furnace shell, and is manually transported into a brick inlet 7 of a converter for building.
When specifically implementing, after the furnace lining is empty, use fork truck or crane will the utility model discloses transport the position that the stokehold platform is close to the converter stove outer covering, the platform fixed bolster is decided on the converter stove outer covering, requires the contact of the platform fixed bolster prohibitions horizontal segment to place on converter stove outer covering backing ring upper portion to weld and consolidate, transport the track slider with whole case furnace lining brick with fork truck on, advance by the manual work to the converter and build by laying bricks or stones in brick mouth 7.
Use the utility model discloses effectively reduce and build the platform and set up time 4 hours, every stove steel smelting cycle 30 minutes, calculate according to the benefit of 5 ten thousand yuan/stove steel, then the month saves time cost and can realize that increase 4 x 60/30 x 5=40 (ten thousand yuan/time)
In addition to the above embodiments, the present invention may have other embodiments. All technical solutions formed by adopting equivalent replacement or equivalent transformation fall within the protection scope required by the utility model.

Claims (6)

1. The utility model provides a platform device is swiftly set up in converter masonry, sets up outside the converter stove outer covering, its characterized in that: including swift platform (1), track slider (2) and platform fixed bolster (3), swift platform (1) sets up on converter stokehold platform (5) outside converter stove outer covering (4), the surface activity of swift platform (1) is equipped with track slider (2), track slider (2) slides to converter stove covering (4) direction, the one end that swift platform (1) closes on converter stove covering (4) is equipped with platform fixed bolster (3), platform fixed bolster (3) set up in on converter stove covering (4).
2. The converter masonry shortcut erection platform device according to claim 1, characterized in that: platform fixed bolster (3) include left platform fixed bolster (31), well platform fixed bolster (32) and right platform fixed bolster (33), left side platform fixed bolster (31), well platform fixed bolster (32) and right platform fixed bolster (33) set up side by side in one side of swift platform (1).
3. The converter masonry shortcut erection platform device according to claim 2, characterized in that: the left platform fixing support (31), the middle platform fixing support (32) and the right platform fixing support (33) are distributed along the diameter of the converter shell (4) in an arc shape.
4. The converter masonry rapid set-up platform device according to claim 1, characterized in that: track slider (2) include first track slider (21) and second track slider (22), first track slider (21) and second track slider (22) bilateral symmetry set up in the surface of swift platform (1), first track slider (21) and second track slider (22) structure is the same to include track, pulley and slider respectively, the track set up in the surface of swift platform (1), the slider pass through the pulley activity set up in the track.
5. The converter masonry rapid set-up platform device according to claim 1, characterized in that: the platform fixing support (3) is arranged on a backing ring of the converter shell (4).
6. The converter masonry shortcut erection platform device according to claim 1, characterized in that: swift platform (1) includes workstation (11) and supporting leg (12), supporting leg (12) set up in the bottom four corners of workstation (11), the bottom of swift platform (1) is equipped with strengthening rib (6), the one end of strengthening rib (6) set up in the bottom of workstation (11), the other end set up in on supporting leg (12).
CN202223002417.0U 2022-11-11 2022-11-11 Converter is built by laying bricks or stones swiftly and is set up platform device Active CN218842235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223002417.0U CN218842235U (en) 2022-11-11 2022-11-11 Converter is built by laying bricks or stones swiftly and is set up platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223002417.0U CN218842235U (en) 2022-11-11 2022-11-11 Converter is built by laying bricks or stones swiftly and is set up platform device

Publications (1)

Publication Number Publication Date
CN218842235U true CN218842235U (en) 2023-04-11

Family

ID=87306528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223002417.0U Active CN218842235U (en) 2022-11-11 2022-11-11 Converter is built by laying bricks or stones swiftly and is set up platform device

Country Status (1)

Country Link
CN (1) CN218842235U (en)

Similar Documents

Publication Publication Date Title
US3458396A (en) Demolition machine
JPH11223474A (en) Steel scrap preheater for melting metallurgical furnace employing parallel flow of scrap and high temperature waste gas and process system thereof
CN109210274A (en) Push pipe pipeline docking facilities and interconnection method
CN102997686B (en) Automatic discharge device of calcium carbide furnace
CN218842235U (en) Converter is built by laying bricks or stones swiftly and is set up platform device
JPWO2007135916A1 (en) Method of dismantling the bottom of the blast furnace furnace
CN214701726U (en) Electric charging vehicle for smelting furnace
CN205275628U (en) Change formula blast furnace casting ditch
CN215439492U (en) Steel ladle and iron ladle lining masonry lifting platform
CN212561612U (en) Supporting structure system in piping lane
US3487957A (en) Charging apparatus
CN211169761U (en) Working platform device for modifying crown block beam at top of blast furnace
CN207795270U (en) A kind of portable cart
CN205980789U (en) Auxiliary device of installation heating furnace brickwork burner block
CN206297586U (en) A kind of kiln transport trolley
CN214830459U (en) Special steel smelting and transferring mechanism
CN213687878U (en) Skip car for fuel type melting furnace
CN218052404U (en) Auxiliary device is changed to scarfing cinder ware supporting wheel
CN211545774U (en) Simple hoisting device
CN206799678U (en) One kind is heat-treated dual-purpose fire door
CN216011755U (en) Automatic feeding machine of zinc oxide production smelting roasting furnace
CN213115541U (en) Portable mortar material fill
CN215544885U (en) Integrated transfer ladle prefabricated part for smelting
CN214720536U (en) Telescopic dust suction device
CN106476868A (en) A kind of kiln transport trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant