CN218838211U - Roof perforating device for construction - Google Patents
Roof perforating device for construction Download PDFInfo
- Publication number
- CN218838211U CN218838211U CN202222843945.2U CN202222843945U CN218838211U CN 218838211 U CN218838211 U CN 218838211U CN 202222843945 U CN202222843945 U CN 202222843945U CN 218838211 U CN218838211 U CN 218838211U
- Authority
- CN
- China
- Prior art keywords
- electric drill
- rod
- roof
- supporting plate
- lifting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The utility model relates to the technical field of building construction equipment, and discloses a roof punching device for building construction, which comprises an electric drill, a supporting mechanism and a control mechanism for controlling the electric drill; the supporting mechanism comprises a supporting plate, the top end of the supporting plate is provided with a sliding groove, a lifting rod is connected in the sliding groove in a sliding mode, and fastening screws for clamping the lifting rod are connected to two sides of the supporting plate in a threaded mode; the control mechanism comprises a vertical rod, a U-shaped clamp and a control switch for controlling the start and stop of the electric drill, the electric drill is installed at the top of the vertical rod through the U-shaped clamp, the bottom of the vertical rod is hinged with an adjusting rod, the middle of the adjusting rod is hinged with a lifting rod, and the electric drill and the adjusting rod are respectively located on two sides of the vertical rod. The utility model discloses simple structure through the regulation and control degree of depth of punching, effectively promotes the efficiency of punching to effectively reduced the potential safety hazard of roof operation of punching, the practicality is stronger.
Description
Technical Field
The utility model relates to a construction equipment technical field, concretely relates to roof perforating device for construction.
Background
Along with the continuous improvement of the national standard of living, people have higher and higher requirements on facilities and use functions in buildings, and the requirements are embodied in the higher and higher heights of public building layers, ventilation pipelines, cable bridges of indoor central air conditioners, ceilings of decoration and fitment and the like.
In the prior art, when the roof of a multi-storey, high-rise building and public building needs to be punched, a building worker generally climbs onto a herringbone ladder, then holds an electric drill to punch the roof, and after the hole is punched, the roof goes up and down from the herringbone ladder, then the herringbone ladder is moved to another place to continue punching, so that the operation work is complicated, the construction efficiency is low, and meanwhile, the risk that an operator falls off from the herringbone ladder exists; more dust and ash are generated during drilling.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a roof perforating device for construction to when solving prior art station and utilizing the electric drill to punch the roof on the double ladder, punch the inefficiency and the poor problem of security.
In order to solve the above problem, the utility model provides a basic scheme does: a roof perforating device for building construction comprises an electric drill, a supporting mechanism and a control mechanism for controlling the electric drill; the supporting mechanism comprises a supporting plate, the top end of the supporting plate is provided with a sliding groove, a lifting rod is connected in the sliding groove in a sliding mode, and fastening screw rods used for clamping the lifting rod are connected to two sides of the supporting plate in a threaded mode; the control mechanism comprises a vertical rod, a U-shaped clamp and a control switch for controlling the start and stop of the electric drill, the electric drill is mounted at the top of the vertical rod through the U-shaped clamp, an adjusting rod is hinged to the bottom of the vertical rod, the middle of the adjusting rod is hinged to the lifting rod, and the electric drill and the adjusting rod are respectively located on two sides of the vertical rod.
The utility model discloses theory of operation and beneficial effect: when the electric drill is used, the electric drill is fixed to the top of the vertical rod through the U-shaped clamp, then a drill bit of the electric drill is aligned to a punching operation area, the lifting rod is adjusted to move towards the roof direction along the sliding groove according to construction requirements, the heights of the supporting plate and the lifting rod are adjusted at will, and the height is limited through the fastening screw rod; the drill bit is abutted against the roof, an operator holds the adjusting rod, the electric drill is started, and according to the drilling depth of construction, the lever principle is applied through the adjusting rod, so that the drilling depth is controlled; compared with the prior art, the device is applicable to more roof operation of punching, according to the construction altitude mixture control backup pad with the lifter highly can, convenient operation, work efficiency height, safe risk are low, install the electric drill in the montant both sides with adjusting the pole simultaneously, the lime-ash drops and the injury of raise dust to operating personnel when effectively having avoided punching.
Scheme two, this is the preferred of basic scheme, still includes the connecting rod, the one end and the montant of connecting rod are articulated, the other end and the lifter of connecting rod are articulated. The drill bit of the electric drill is always propped against the roof by driving the adjusting rod through the easily deformable far away of the four sides.
Scheme three, this is the preferred of scheme two, it is connected with the pivot to rotate in the backup pad, be equipped with the gear in the pivot, be equipped with logical groove in the lifter, be equipped with the rack on leading to the groove, gear and rack toothing. Through the drive pivot, drive gear revolve by the pivot to by the gear drive rack removal, thereby realize adjusting the height of backup pad and lifter.
And a fourth scheme is preferable to the third scheme, and a rocker arm is arranged at one end of the rotating shaft. The rotating shaft is rotated by rotating the rocker arm, so that the rotating shaft drives the gear to rotate to adjust the heights of the lifting rod and the supporting plate.
And a fifth scheme is preferable to the fourth scheme, wherein the free end of the adjusting rod is provided with a handle, and the handle is provided with an anti-skidding sleeve. The free end of the adjusting rod is fixedly connected with a handle, an operator holds the handle to conveniently operate the adjusting rod, and the anti-skidding sleeve is arranged on the handle to reduce the risk of hand skidding.
Scheme six, this is the preferred of scheme five, electric drill cover is equipped with the collecting vat. The ash slag knocked by the drill bit is collected in time by the collecting groove, so that dust pollution is reduced.
Drawings
The invention is further explained below with reference to the drawings and the description.
FIG. 1 is a perspective view of the roof perforating device for building construction of the present invention;
FIG. 2 is a partial cross-sectional view of the roof perforating device for building construction of the present invention;
fig. 3 is the utility model relates to a roof perforating device's for construction front view.
In the figure: an electric drill 101; a drill bit 102; a support plate 201; a lifter 202; a fastening screw 203; a rotating shaft 204; a gear 205; a rack 206; a rocker arm 207; a vertical rod 301; a clevis 302; an adjustment lever 303; a connecting rod 304; a handle 305; the tank 306 is collected.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Please refer to fig. 1 to 3: a roof perforating device for building construction comprises an electric drill 101, a supporting mechanism and a control mechanism; the supporting mechanism includes the backup pad 201, the spout has been seted up on the top of backup pad 201, sliding connection has lifter 202 in the spout, logical groove has been seted up on the lifter 202, it has rack 206 to lead to the rigid coupling on the groove, it is connected with pivot 204 to rotate on the backup pad 201, pivot 204 activity runs through in backup pad 201, pivot 204 one end rigid coupling has rocking arm 207, the rigid coupling has gear 205 on the pivot 204, gear 205 and rack 206 intermeshing, the equal threaded connection in both sides of backup pad 201 has fastening screw 203, fastening screw 203's free end supports on the lateral wall of lifter 202.
The control mechanism comprises a vertical rod 301, a U-shaped clamp 302, a connecting rod 304 and a control switch for controlling the starting and stopping of the electric drill 101, the model of the control switch is AKON-K-125L, a through hole is formed in the vertical rod 301, the U-shaped clamp 302 clamps the electric drill 101, penetrates through the through hole and is screwed by a nut, the bottom of the vertical rod 301 is hinged with an adjusting rod 303, the middle part of the adjusting rod 303 is hinged with the lifting rod 202, the free end of the adjusting rod 303 is fixedly connected with a handle 305, an anti-skidding sleeve is fixedly connected to the handle 305, and the handle 305 and the electric drill 101 are respectively arranged on two sides of the vertical rod 302; one end of the connecting rod 304 is hinged with the vertical rod 301, the other end of the connecting rod 304 is hinged with the lifting rod 202, and the vertical rod 301, the connecting rod 304, the adjusting rod 303 and the lifting rod 202 form a quadrangle; a collecting groove 306 is sleeved on the electric drill 101, and the opening end of the collecting groove 306 is located in the direction of the roof.
The implementation manner of the embodiment is as follows: when the device is used, according to the requirement of site punching, an operator rotates the rocker arm 207, so that the rocker arm 207 drives the rotating shaft 204 to rotate, the gear 205 drives the rack 206 to move, and the lifting rod 202 is adjusted to move towards the roof along the sliding chute; when the drill 102 of the hole puncher 101 is pressed against the roof punching area, the fastening screw 203 is rotated to enable the free end of the fastening screw 203 to be pressed against the side wall of the lifting rod 202, so that the lifting rod 202 is fixed in the sliding groove of the supporting plate 201; starting the electric drill 101 through a control switch to start drilling, then holding the handle 305 by an operator, and slowly pressing the handle 305 downwards by applying the lever principle and the drilling depth requirement, so that the drill bit 102 of the electric drill 101 is always kept against the roof; after the drilling is finished, the electric drill 101 is turned off through the control switch to stop running, then the handle 305 is pressed upwards, so that the drill bit 102 is pulled out of the hole, ash in the collecting groove 306 is cleaned in time, and the drilling device is moved to the next drilling area to drill again.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top", "end", "one side" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Also, unless expressly stated or limited otherwise, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, adjustably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
It is to be understood that the above description is only one embodiment of the invention, and not all embodiments. Other modifications or equivalent substitutions made by those skilled in the art based on the embodiments of the present invention should be included in the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.
Claims (6)
1. The utility model provides a roof perforating device for construction which characterized in that: the electric drill comprises an electric drill (101), a supporting mechanism and a control mechanism for controlling the electric drill (101); the supporting mechanism comprises a supporting plate (201), a sliding groove is formed in the top end of the supporting plate (201), a lifting rod (202) is connected in the sliding groove in a sliding mode, and fastening screws (203) used for clamping the lifting rod are connected to the two sides of the supporting plate (201) in a threaded mode; control mechanism includes montant (301), U-shaped clamp (302) and is used for controlling electric drill (101) to open the control switch who stops, electric drill (101) are installed at the top of montant (301) through U-shaped clamp (302), montant (301) bottom articulates there is regulation pole (303), it is articulated with lifter (202) to adjust pole (303) middle part, electric drill (101) and regulation pole (303) are located the both sides of montant (301) respectively.
2. The roof boring device for construction according to claim 1, wherein: the lifting rod is characterized by further comprising a connecting rod (304), one end of the connecting rod (304) is hinged to the vertical rod (301), and the other end of the connecting rod (304) is hinged to the lifting rod (202).
3. The roof perforating device for building construction according to claim 2, characterized in that: the supporting plate (201) is connected with a rotating shaft (204) in a rotating mode, a gear (205) is arranged on the rotating shaft (204), a through groove is formed in the lifting rod (202), a rack (206) is arranged on the through groove, and the gear (205) is meshed with the rack (206).
4. The roof boring device for building construction according to claim 3, wherein: one end of the rotating shaft (204) is provided with a rocker arm (207).
5. The roof boring device for building construction according to claim 4, wherein: the free end of the adjusting rod (303) is provided with a handle (305), and the handle (305) is provided with an anti-skidding sleeve.
6. The roof boring device for building construction according to claim 5, wherein: the electric drill (101) is sleeved with a collecting groove (306).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222843945.2U CN218838211U (en) | 2022-10-27 | 2022-10-27 | Roof perforating device for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222843945.2U CN218838211U (en) | 2022-10-27 | 2022-10-27 | Roof perforating device for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218838211U true CN218838211U (en) | 2023-04-11 |
Family
ID=87308369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222843945.2U Active CN218838211U (en) | 2022-10-27 | 2022-10-27 | Roof perforating device for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218838211U (en) |
-
2022
- 2022-10-27 CN CN202222843945.2U patent/CN218838211U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207508350U (en) | A kind of dust-proof perforating device of lift metope | |
CN112593674A (en) | Auxiliary equipment for wooden door installation | |
CN218838211U (en) | Roof perforating device for construction | |
CN112360164A (en) | Assembled auxiliary supporting device for installation of building wallboard | |
CN206899527U (en) | A kind of perforating device for being easy to heighten | |
CN213919024U (en) | High-efficiency water drilling unit suitable for milling hole in vertical pipe of staircase | |
CN219411768U (en) | Protective hanging basket for tower crane | |
CN110436394A (en) | A kind of outdoor machine of air-conditioner installation equipment | |
CN213950508U (en) | Convenient-to-operate elevator operating platform | |
CN213352544U (en) | Building decorative panel cutting device | |
CN213107523U (en) | High-rise outdoor wall perforating device for building | |
CN211249100U (en) | Steel plate processing equipment for light steel assembly house | |
CN210828210U (en) | Plastering machine for building construction | |
CN208214404U (en) | A kind of construction building top plate vertical drilling device | |
CN219563717U (en) | Grooving device for building curtain wall | |
CN111173303A (en) | Wall surface flatness planing device for building engineering | |
CN218748614U (en) | Drilling device for building engineering technical service | |
CN221222055U (en) | Building monitoring device convenient to altitude mixture control | |
CN211917303U (en) | Energy-conserving wallboard cutting device with assistance-localization real-time function | |
CN220080654U (en) | Auxiliary plastering device for building construction | |
CN217434691U (en) | Engineering roof drilling equipment is built in room | |
CN216099743U (en) | Be applied to dustless device of seting up of architectural decoration's water and electricity groove | |
CN216768813U (en) | Elevator monitoring device convenient to install | |
CN216230145U (en) | Auxiliary device for air conditioner installation punching | |
CN211842621U (en) | Wall body drilling equipment for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |