CN218815319U - Be used for factory building post center positioning device - Google Patents

Be used for factory building post center positioning device Download PDF

Info

Publication number
CN218815319U
CN218815319U CN202222615076.8U CN202222615076U CN218815319U CN 218815319 U CN218815319 U CN 218815319U CN 202222615076 U CN202222615076 U CN 202222615076U CN 218815319 U CN218815319 U CN 218815319U
Authority
CN
China
Prior art keywords
nut
factory building
column
bolt
positioning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222615076.8U
Other languages
Chinese (zh)
Inventor
许鑫
杨雄英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang International Engineering Technology Co Ltd
Original Assignee
Beijing Shougang International Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang International Engineering Technology Co Ltd filed Critical Beijing Shougang International Engineering Technology Co Ltd
Priority to CN202222615076.8U priority Critical patent/CN218815319U/en
Application granted granted Critical
Publication of CN218815319U publication Critical patent/CN218815319U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a be used for factory building post center positioner, belongs to building installation field. The utility model provides a steel column problem that the precision is not high in the installation. The utility model comprises a hoop 1 and a fixing plate 4; the fixing plate 4 is fixed on the hoop 1 through the nut 2 and the nut 3 at a right angle to form two integral half bodies, and the two half bodies are fixed through the nut 5, the spring washer 6 and the bolt 7 to form an integral device. The device has the advantages of simple structure, light weight, easy processing and manufacturing, simple operation and high positioning precision.

Description

Be used for factory building post center positioning device
Technical Field
The utility model belongs to building installation field especially relates to a central positioner of accurate installation of factory building post.
Background
The installation of the factory building column is used as an important component of factory building construction of an industrial production line, and the positioning and installation of the first factory building column are often used as important nodes of a project to attract attention. Because the industrial production line has the characteristics of high complexity and extremely high relevance, the positioning accuracy of the plant pillar is related to the installation of the crown beam and the roof beam, and the installation of the crown block, mechanical equipment and electrical equipment is further influenced.
The steel pipe plant room column is welded into an outer wall by the spiral welded pipe, is filled with self-compacting concrete into a whole, has the characteristic of low cost compared with the steel pipe plant room column, and is widely adopted by various design units so as to reduce the construction cost.
At the present stage, a column center line and a cup mouth center line are drawn in advance before a steel column is installed, a sizing block with a proper height is padded at the bottom of the cup mouth to reach a designed elevation, and then a crane is used for hoisting the column into the poured cup mouth. At the moment, the steel column is suspended in the cup opening, after the steel column is stabilized, the center line of the walking steel column adjusting steel column is aligned to the center line of the cup opening, and the steel column is placed on the sizing block in the cup opening. And (4) accurately positioning in two directions by using a hydraulic jack to align the cross lines, and finally fixing and welding by using a wedge iron. The installation mode has long installation period because the installation mode needs secondary alignment, and the jack needs to be screwed in two directions simultaneously when the installation mode is accurately aligned, so that the installation mode has the defects of more manpower resources, inconvenient operation, easy excessive adjustment and multiple adjustments, and difficult achievement of the relevant regulation that the deviation of the steel column is within 3mm in the steel structure engineering construction quality acceptance standard (GB 50205-2020) of the national specification.
Therefore, in order to reduce unnecessary trouble in the subsequent installation process, the use amount of operators and tools is reduced, and the safety is improved. There is a high necessity to develop an easily operated, easily used and safe auxiliary device for accurate positioning of a column of a factory building.
Disclosure of Invention
The utility model aims at providing a device for factory building post center location has solved the not high problem of steel column precision in the installation, improves installation adjustment speed, improves operating personnel security.
A device for factory building post center location constitute by identical two parts, use bolt, spring washer, nut to fix an organic whole, the steel ring that the center formed is embraced on the factory building post, the steel sheet top of four directions is on the wall on rim of a cup four sides on every side.
A center positioning device for a factory building column comprises a hoop 1 and a fixing plate 4; the fixing plate 4 is fixed on the hoop 1 through the first nut 2 and the second nut 3, the two hoops 1 form two complete half bodies, and two sides of the two half bodies are fixed through the third nut 5, the spring washer 6 and the fourth bolt 7 respectively to form a complete device.
Staple bolt 1 include an arc steel sheet, four gussets and two foraminiferous steel sheets, four gussets of the outer even welding of an arc steel sheet, the other end welding of two adjacent gussets has a foraminiferous steel sheet, two staple bolts 1's arc steel sheet forms a circle that can hold the post tightly after connecting.
The fixing plate 4 is formed by welding a bolt perpendicular to the steel plate, and the bolt penetrates through a preformed hole of the steel plate with the hole on the hoop 1.
The utility model has the advantages of simple structure, light weight, low investment and easy processing and manufacturing. Each set of device can be repeatedly utilized for many times, the operation is simple, and one person can carry out installation and positioning operation. And the device greatly improves the positioning precision of the factory building column, avoids the problems possibly occurring in the subsequent installation process to a certain extent, avoids the work and rework, and indirectly improves the labor productivity.
Drawings
Fig. 1 is a schematic structural view of the plant column center positioning device provided by the present invention. Wherein, staple bolt 1, nut 2, nut 3, fixed plate 4, nut 5, spring washer 6, bolt 7.
Fig. 2 is the utility model provides a be used for factory building post center positioning device installation sketch map. Wherein, the factory building column 8 and the cup mouth 9.
Detailed Description
In order to make the technical field better understand the solution of the present invention, the following detailed description of the present invention is provided with reference to the accompanying drawings and the detailed description.
The utility model discloses a staple bolt 1, nut 2, nut 3, fixed plate 4, nut 5, spring washer 6, bolt 7 are fixed as an organic whole.
The hoop 1 is composed of two identical parts, and is formed by welding an arc-shaped steel plate, four rib plates and a steel plate with holes.
The fixing plate 4 is composed of four identical parts, and is welded with a steel plate into a whole by bolts which pass through holes of the steel plate with holes to be connected into a whole.
Nut 2, nut 3 are the same completely, and nut 2, nut 3 are connected fixed plate 4 on staple bolt 1, and nut 3 is used for adjusting the extension length of fixed plate 4 and then adjusts the factory building post position, and nut 2 is used for spacing and prevents that fixed plate 4 from breaking away from staple bolt 1.
The hoop 1 is butted together by the nut 5, the spring washer 6 and the bolt 7, and a circular shape is formed in the center to hold a steel column of a factory building.
Preferably, four fixing plates are arranged in the circumferential direction and used for propping against the inner wall of the cup mouth, so that the adjustment is facilitated.
Preferably, the hoop fitting surface and the central line of the fixing plate are arranged at a certain angle, and enough wrench space is reserved. The hoop arc plate and the fixed plate bolt are staggered from top to bottom by a certain distance, so that interference with the anchoring nail at the bottom of the plant column is avoided.
Preferably, the positioning device can accurately position the factory building column by fixing the device at a proper position on the factory building column to be installed and screwing the nut 3 by using a wrench.
As shown in fig. 1, the fixing plate 4 is fixed on the hoop 1 through the nut 2 and the nut 3 at a right angle to form two integral half bodies, and the two half bodies are fixed on the plant-house column by using the nut 5, the spring washer 6 and the bolt 7 before the plant-house column is hoisted. The factory building column is hung into the cup mouth, the bottom of the factory building column is aligned to the pre-adjusted sizing block and hovers, and the position of the device is adjusted to enable the upper surface of the fixing plate to be lower than the upper surface of the cup mouth. The position of the limiting nut 2 is adjusted to ensure enough adjusting distance, and the planes of the four fixing plates are tightly attached to the inner wall of the cup opening.
And fastening the nuts 3 according to the center line of the cup opening and the center line of the steel column drawn in advance, loosening the nuts 3 on the opposite sides at the same time, aligning the center lines of the steel column in one direction, and adjusting the position in the other direction in such a way. After the central line is completely aligned, the steel column falls to the sizing block by means of gravity, the device is taken out from the cup opening after all the nuts 3 are loosened, the wedge is symmetrically plugged into the welding die, and the positioning accuracy of the plant room column is guaranteed. After the installation process of the plant column is completed, the nut 5, the spring washer 6 and the bolt 7 are loosened, the device is divided into two bodies to be taken down, and the next installation is waited.

Claims (3)

1. The utility model provides a be used for factory building post center positioning device which characterized in that: the device comprises a hoop (1) and a fixing plate (4); the fixing plate (4) is fixed on the hoop (1) through the first nut (2) and the second nut (3), the two hoops (1) form two complete half bodies, and the two sides of the two half bodies are fixed through the third nut (5), the spring washer (6) and the fourth bolt (7) respectively to form a complete device.
2. The positioning device according to claim 1, wherein the anchor ear (1) comprises an arc-shaped steel plate, four rib plates and two perforated steel plates, the four rib plates are evenly welded outside the arc-shaped steel plate, the perforated steel plate is welded at the other end of the two adjacent rib plates, and the arc-shaped steel plates of the two anchor ears (1) are connected to form a circle capable of holding a column tightly.
3. The positioning device according to claim 2, characterized in that the fixing plate (4) is formed by welding a bolt perpendicular to the steel plate, and the bolt passes through a prepared hole of the steel plate with holes on the anchor ear (1).
CN202222615076.8U 2022-10-01 2022-10-01 Be used for factory building post center positioning device Active CN218815319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222615076.8U CN218815319U (en) 2022-10-01 2022-10-01 Be used for factory building post center positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222615076.8U CN218815319U (en) 2022-10-01 2022-10-01 Be used for factory building post center positioning device

Publications (1)

Publication Number Publication Date
CN218815319U true CN218815319U (en) 2023-04-07

Family

ID=87252896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222615076.8U Active CN218815319U (en) 2022-10-01 2022-10-01 Be used for factory building post center positioning device

Country Status (1)

Country Link
CN (1) CN218815319U (en)

Similar Documents

Publication Publication Date Title
CN102493471B (en) Suspending installation construction process method of structural foot margin anchor bolt
CN111254968A (en) Installation device and installation method for large-diameter embedded bolt of large-scale equipment foundation
CN218815319U (en) Be used for factory building post center positioning device
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN212027084U (en) Adjustable combined steel formwork with supporting rod
CN102605960A (en) Method for finely adjusting, locating and lifting hollow warehouse roof platform
CN210122814U (en) Laminated slab support frame
CN214834907U (en) Prefabricated assembled post hoist and mount counterpoint installing the system
CN212176500U (en) Adjustable reducing type open caisson safety operation platform
CN212612632U (en) Novel working well template device
CN210421911U (en) Early-dismantling supporting device for building engineering
CN113882697B (en) Positioning adjusting rod for assembling of assembled cavity structure
CN203247718U (en) Steel column butt-joint mounting device
CN111485887A (en) Novel working well template device and construction method thereof
CN105438940B (en) Hoisting construction method for large indoor water tank of nuclear power station
CN210031510U (en) Device for preventing inner membrane of box girder from floating upwards
CN220467316U (en) Cast-in-place pile reinforcement cage hoisting device
CN219587189U (en) Pi-shaped steel support of tool-type outer anchor cantilever scaffold
CN220909184U (en) Can have enough to meet need post-positioning steel sheet of supplementary PC wall body installation
CN217998917U (en) Big wall template connection structure who uses installs fast
CN219379466U (en) Frock of adjustment transformer tank wall group welds gap
CN215047949U (en) Hoisting tool for metallurgical equipment
CN220862630U (en) Hanging hammer convenient for high-altitude hammering
CN215564621U (en) Steel pipe upright post upper beam falling safety device
CN219823408U (en) Quick accurate hoisting structure of buckling restrained brace component in limited height

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant