CN218815158U - Building scaffold interfacing apparatus convenient to installation - Google Patents

Building scaffold interfacing apparatus convenient to installation Download PDF

Info

Publication number
CN218815158U
CN218815158U CN202222697103.0U CN202222697103U CN218815158U CN 218815158 U CN218815158 U CN 218815158U CN 202222697103 U CN202222697103 U CN 202222697103U CN 218815158 U CN218815158 U CN 218815158U
Authority
CN
China
Prior art keywords
scaffold
fixing
fixing pipe
main
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222697103.0U
Other languages
Chinese (zh)
Inventor
郑祖军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haimen Shuangcheng Construction And Installation Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222697103.0U priority Critical patent/CN218815158U/en
Application granted granted Critical
Publication of CN218815158U publication Critical patent/CN218815158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to the technical field of building, and a building scaffold interfacing apparatus convenient to installation is disclosed, including scaffold frame king post, scaffold frame pillar and be used for the fixed mounting of fixed scaffold frame king post and scaffold frame pillar and be used for the joint spare of joint mounting, A owner fixed tube and B owner fixed tube parcel are in the both sides of scaffold frame king post, A props up fixed tube and B fixed tube parcel in the both sides of scaffold frame pillar, A connecting plate and B connecting plate are fixed at the both ends of A fixed tube and B fixed tube, fixed ring installs the surface at A owner fixed tube and B owner fixed tube, go up preforming and lower preforming parcel in the both sides of scaffold frame king post; the outer fixed surface of scaffold pillar is connected with the connecting plate, prescribes a limit to A owner's fixed pipe and B owner's fixed pipe through the retaining ring, is convenient for dismantle convenient and fast to owner's fixed pipe.

Description

Building scaffold interfacing apparatus convenient to installation
Technical Field
The utility model relates to a building technical field specifically is a construction scaffolding interfacing apparatus convenient to installation.
Background
With the development of times, the tool requirements of the building industry are continuously improved, china encourages 'replacing wood with steel', metal scaffolds are widely applied, the butt joint device plays a vital role in the use of the scaffolds, certain potential safety hazards can appear after the butt joint device of the scaffolds is used for a long time, and the butt joint device of the scaffolds still needs to be improved continuously.
As disclosed in the chinese patent: the utility model provides a building scaffold interfacing apparatus convenient to installation, publication no: 202121922810.4, the utility model discloses scaffold for building convenient to installation is provided with the connection pad that need not dismantle repeatedly, through fastening bolt and spread groove and fixed slot threaded connection, accomplish the installation to the connection pad, again with branch and connection pad butt joint, and then only need demolish branch from the connection pad after using, avoid the repeated dismouting of connection pad, thereby solve the easy problem that smooth silk pine takes off that appears of dismouting, be provided with the connecting rod of rotatory block, through inserting branch in the first recess, insert logical groove with the connecting rod in the second recess again, thereby make gag lever post and spacing groove block fixed accomplish the installation to branch through rotatory connecting rod, solve the not convenient enough problem of installation, but the fixed effect of pillar is poor, lead to the pillar bearing capacity weak, there is the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction scaffolding interfacing apparatus convenient to installation to solve the problem that proposes in the above-mentioned background art.
The embodiment of the application adopts the following technical scheme:
a building scaffold docking device convenient to install comprises a scaffold main column, a scaffold support column, a fixing piece and a clamping piece, wherein the fixing piece is used for fixing the scaffold main column and the scaffold support column, the clamping piece is used for clamping the fixing piece, the fixing piece is arranged on the outer surfaces of the scaffold main column and the scaffold support column, and the clamping piece is clamped on the outer surface of the fixing piece; the fixing piece comprises a main fixing pipe A, a main fixing pipe B, a branch fixing pipe A, a branch fixing pipe B, a connecting plate A and a connecting plate B, the main fixing pipe A and the main fixing pipe B are wrapped on two sides of a main column of the scaffold, the branch fixing pipe A and the branch fixing pipe B are wrapped on two sides of a strut of the scaffold, and the connecting plate A and the connecting plate B are fixed at two ends of the branch fixing pipe A and the branch fixing pipe B;
the clamping piece comprises a fixing ring, a threaded hole A, a through hole B, a pull ring, a pull rod, a limiting column, a limiting groove, a connecting sleeve, a baffle plate, an upper pressing sheet and a lower pressing sheet, the fixing ring is installed on the outer surfaces of the main fixing pipe A and the main fixing pipe B, the through hole B is formed in one side of the fixing ring, the through holes A corresponding to the through holes B are formed in the two sides of the main fixing pipe B, and the upper pressing sheet and the lower pressing sheet are wrapped on the two sides of the main column of the scaffold;
the outer surface of the scaffold pillar is fixedly connected with a connecting plate;
the outer surfaces of the fixing ring, the A main fixing pipe, the B main fixing pipe, the A branch fixing pipe and the B branch fixing pipe are coated with anti-corrosion coatings;
the baffle is connected at the bottom of pull rod, and the baffle sets up in the clearance between adapter sleeve and last preforming.
Preferably, four limit grooves matched with the limit columns are formed in the contact positions of the fixing rings and the main fixing pipe B.
Preferably, one side of the upper pressing sheet is connected with the connecting sleeve through a bolt, and the lower pressing sheet is connected to the inner side wall of the main fixing pipe A.
The embodiment of the application adopts at least one technical scheme which can achieve the following beneficial effects:
one of which, when using, prescribe a limit to the fixed pipe of A owner and the fixed pipe of B owner through the fixed ring, be convenient for dismantle main fixed pipe, convenient and fast, through the pull ring, a series of structures such as pull rod extrude the top board, go up the preforming and prescribe a limit to the scaffold king post with the cooperation of lower preforming mutually, after the reverse operation, go up the preforming and prescribe a limit to the scaffold king post no longer with the disappearance of lower preforming atress, be convenient for prescribe a limit to the scaffold king post fast and dismantle, convenient and fast, a connecting plate, A connecting plate and B connecting plate are through a plurality of bolted connection, further prescribe a limit to the position of scaffold king post, make scaffold post during operation more stable, and the potential safety hazard is reduced.
And the outer surfaces of the fixing ring, the A main fixing pipe, the B main fixing pipe, the A branch fixing pipe and the B branch fixing pipe are coated with anti-corrosion coatings, so that the anti-corrosion property of the scaffold butting device can be improved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a first front view structural schematic diagram of the fixing ring of the present invention;
fig. 3 is a first front view structural diagram of the fixing member of the present invention;
fig. 4 is a first front view structural schematic diagram of the scaffold strut of the present invention;
FIG. 5 is a schematic view of a partial sectional structure of a main fixing tube B of the present invention;
FIG. 6 is an enlarged schematic view of a portion A of the structure of the present invention shown in FIG. 5;
FIG. 7 is a schematic view of the profiling structure of the limiting hole of the present invention;
fig. 8 is a second front view structural diagram of the fixing ring of the present invention;
fig. 9 is a second front view of the fixing member of the present invention;
fig. 10 is a second front view structural diagram of the scaffold strut of the present invention.
In the figure: the scaffold main column 1, a main fixing pipe 201, b main fixing pipe 202, a through hole 203,
e threaded hole 204, fixing ring 3, A threaded hole 301, B through hole 302, F threaded hole 303, pull ring 4, pull rod 401, limiting column 402, limiting hole 403, connecting sleeve 404, baffle 405, upper pressing sheet 406, lower pressing sheet 407, A fixing tube 501, B fixing tube 502, B threaded hole 503, scaffold support 6, connecting plate 701, C through hole 702, A connecting plate 801, B connecting plate 802, D through hole 803, E through hole 804, external thread 9, C threaded hole 10 and D threaded hole 11.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the technical solutions of the present application will be described in detail and completely with reference to the following specific embodiments of the present application and the accompanying drawings. It should be apparent that the described embodiments are only some of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The technical solutions provided by the embodiments of the present application are described in detail below with reference to the accompanying drawings.
Example 1: referring to fig. 1 to 6, a construction scaffold docking device convenient to mount includes a scaffold main column 1, a scaffold support 6, a fixing member for fixing the scaffold main column 1 and the scaffold support 6, and a clamping member for clamping the fixing member, wherein the fixing member is disposed on the outer surfaces of the scaffold main column 1 and the scaffold support 6, and the clamping member is clamped on the outer surface of the fixing member; the fixing piece comprises a main fixing pipe 201A, a main fixing pipe 202B, a fixing pipe 501A, a fixing pipe 502B, a connecting plate 801A and a connecting plate 802B, wherein the main fixing pipe 201A and the main fixing pipe 202B are wrapped on two sides of a scaffold main column 1, the fixing pipe 501A and the fixing pipe 502B are wrapped on two sides of a scaffold support 6, an external thread 9 is arranged on one side of the scaffold support 6, the fixing pipe 501A and the fixing pipe 502B are in threaded connection with the scaffold support 6, the fixing pipe 501A and the fixing pipe 502B are respectively and fixedly connected on two sides of the main fixing pipe 201A and the fixing pipe 202B, the fixing pipe 501A and the fixing pipe 502B are provided with at least four threaded holes 503B for bolt connection, the connecting plate 801A and the connecting plate 802B are fixed on two ends of the fixing pipe 801A and the fixing pipe 802B, the connecting plate 801A and the connecting plate 802 are connected by bolts, and the connecting plate 801A and the connecting plate 802 are provided with a plurality of through holes 803D and E through holes 804;
the clamping piece comprises a fixing ring 3, a threaded hole A301, a through hole B302, a pull ring 4, a pull rod 401, a limiting column 402, a limiting groove 403, a connecting sleeve 404, a baffle plate 405, an upper pressing plate 406 and a lower pressing plate 407, wherein a plurality of threaded holes A301 for bolt connection are formed in one side of the fixing ring 3, the fixing ring 3 is installed on the outer surfaces of a main fixing pipe 201A and a main fixing pipe 202B, the through hole B302 is formed in one side of the fixing ring 3, the through hole A203 corresponding to the through hole B302 is formed in both sides of the main fixing pipe 202B, one side of the upper pressing plate 406 is in bolted connection with the connecting sleeve 404, the lower pressing plate 407 is connected to the inner side wall of the main fixing pipe 201A, the upper pressing plate 406 and the lower pressing plate 407 are wrapped on both sides of a main scaffold column 1, the baffle plate 405 is connected to the bottom of the pull rod 401, the baffle plate 405 is arranged in a gap between the connecting sleeve 404 and the upper pressing plate 406, the pull rod 401 penetrates through the through hole B302 and the through hole A203, the two limiting columns 402 are symmetrically and fixedly connected to the middle position of the outer surface of the pull rod 401, the fixing ring 3 and the fixing pipe 202B, four limiting grooves are formed in the positions where the contact part of the limiting column 402 and the fixing ring 403, the fixing ring 3 and the fixing ring 401, and the one end of the fixing pipe 401;
the outer surface of the scaffold support 6 is fixedly connected with a connecting plate 701, a plurality of C through holes 702 corresponding to the D through holes 803 and the E through holes 804 are sequentially formed in the connecting plate 701 in a circumferential array, a plurality of threaded rods penetrate between the C through holes 702 and the D through holes 803 and between the C through holes 804 and the E through holes 804, and nuts used for fixing the connecting plate 701 and the A connecting plate 801 and the B connecting plate 802 are arranged at two ends of each threaded rod.
When the device is used, a connecting sleeve 404 is penetrated into the bottom of a pull rod 401, a baffle plate 405 is connected with the bottom of the pull rod 401, the connecting sleeve 404 is connected with an upper pressing sheet 406 through a bolt, a fixing ring 3 is sleeved with an A main fixing tube 201 and a B main fixing tube 202, a limiting column 402 is swung to a proper direction by rotating a pull ring 401 and sequentially penetrates through an A through hole 203 and a B through hole 302, one side of the pull rod 401 and the pull ring 4 are connected through a bolt, the positions of the A main fixing tube 201 and the B main fixing tube 202 are limited by screwing the bolt on one side of the fixing ring 3, a plurality of B threaded holes 503 on two sides of the A branch fixing tube 501 and the B branch fixing tube 502 are connected through a bolt, and the positions of the A branch fixing tube 501 and the B branch fixing tube 502 are limited, the method comprises the steps of connecting a connecting plate 801 and a connecting plate 802 through bolts, further limiting a fixed pipe 501 and a fixed pipe 502, placing a scaffold main column 1 into the main fixed pipe 201 and the main fixed pipe 202, pressing down a pull ring 4 and rotating the pull ring 4, enabling a limiting column 402 on the surface of a pull rod 401 to enter a limiting groove 403, enabling an upper pressing sheet 406 to press down and press down a pressing sheet 407 to jointly act through a series of structures, limiting the position of the scaffold main column 1, connecting a scaffold support 6 with the fixed pipe 501 and the fixed pipe 502 through threads, limiting the position of the scaffold support 6, connecting the connecting plate 701, the connecting plate 801 and the connecting plate 802 through a plurality of bolts, and further limiting the scaffold support 6.
Example 2: referring to fig. 1, 2, 8, 9, and 10, based on embodiment 1, the clamping member includes a fixing ring 3, a threaded hole a 301, a threaded hole F303, a pull ring 4, a pull rod 401, a connecting sleeve 404, a baffle 405, an upper pressing plate 406, and a lower pressing plate 407, one side of the fixing ring 3 is provided with a plurality of threaded holes a 301 for bolt connection, the fixing ring 3 is installed on the outer surfaces of a main fixing tube a 201 and a main fixing tube B202, one side of the fixing ring 3 is provided with a threaded hole F303, both sides of the main fixing tube B202 are provided with threaded holes E204 corresponding to the threaded hole F303, the upper pressing plate 406 is wrapped on one side of the outer surface of the main scaffolding column 1, the lower pressing plate 407 is connected to the inner sidewall of the main fixing tube a 201, the upper pressing plate 406 and the lower pressing plate 407 are wrapped on both sides of the main scaffolding column 1, one side of the upper pressing plate 406 is connected to the connecting sleeve 404 by a bolt, the baffle 405 is disposed in a gap between the connecting sleeve 404 and the upper pressing plate 406, the pull rod 401 is connected to the threaded hole F303, the threaded hole E204, and one end of the pull rod 401;
two C threaded holes 10 are formed in one side of a scaffold strut 6, two D threaded holes 11 corresponding to the C threaded holes 10 are formed in two sides of an A-branch fixed pipe 501 and a B-branch fixed pipe 502, the A-branch fixed pipe 501 and the B-branch fixed pipe 502 are connected with the scaffold strut 6 through bolts, a connecting plate 701 is fixedly connected to the outer surface of the scaffold strut 6, a plurality of C through holes 702 corresponding to the D through holes 803 and the E through holes 804 are sequentially formed in the connecting plate 701 in a circumferential array mode, a plurality of threaded rods penetrate between the C through holes 702 and the D through holes 803 and between the C through holes 804 and the E through holes 804, and nuts used for fixing the connecting plate 701 and the A connecting plate and the B connecting plate 802 are arranged at two ends of the threaded rods.
When in use: the method comprises the steps of penetrating the bottom of a pull rod 401 into a connecting sleeve 404, connecting a baffle 405 with the bottom of the pull rod 401, bolting the connecting sleeve 404 with an upper pressing sheet 406, sleeving a fixing ring 3 with an A main fixing pipe 201 and a B main fixing pipe 202, sequentially penetrating the pull rod 401 through an E threaded hole 204 and an F threaded hole 303 by rotating the pull rod 401, bolting one side of the pull rod 401 with a pull ring 4, limiting the positions of the A main fixing pipe 201 and the B main fixing pipe 202 by tightening a bolt on one side of the fixing ring 3, bolting the A main fixing pipe 501 and the B main fixing pipe 202 through a plurality of B threaded holes 503 on both sides of the A fixing pipe 501 and the B fixing pipe 502, positioning the A fixing pipe 501 and the B main fixing pipe 502, bolting the A connecting plate 801 with a B connecting plate 802, further limiting the A fixing pipe 501 and the B fixing pipe 502, putting a scaffold main column 1 into the interiors of the A main fixing pipe 201 and the B main fixing pipe 202, rotating the pull rod 401 downwards by threaded engagement, passing through a series of structures, pressing the upper pressing structure 701 and the bottom of a pressing structure with a pressing sheet 701, further limiting the scaffold 4, and the scaffold connecting plate 501, and the scaffold connecting plate 2, and the scaffold connecting plate 501, and the scaffold connecting plate 10.
The above description is only an example of the present application and is not intended to limit the present application. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims (5)

1. A construction scaffold butting device convenient to install comprises a scaffold main column (1), a scaffold support column (6), a fixing piece for fixing the scaffold main column (1) and the scaffold support column (6) and a clamping piece for clamping the fixing piece, and is characterized in that the fixing piece is arranged on the outer surfaces of the scaffold main column (1) and the scaffold support column (6), and the clamping piece is clamped on the outer surface of the fixing piece; the fixing piece comprises a main fixing pipe A (201), a main fixing pipe B (202), a fixing pipe A (501), a fixing pipe B (502), an A connecting plate (801) and a B connecting plate (802), wherein the main fixing pipe A (201) and the main fixing pipe B (202) are wrapped on two sides of a main scaffold column (1), the fixing pipe A (501) and the fixing pipe B (502) are wrapped on two sides of a scaffold support column (6), and the connecting plate A (801) and the connecting plate B (802) are fixed at two ends of the fixing pipe A (501) and the fixing pipe B (502);
the clamping piece comprises a fixing ring (3), a threaded hole A (301), a through hole B (302), a pull ring (4), a pull rod (401), a limiting column (402), a limiting groove (403), a connecting sleeve (404), a baffle (405), an upper pressing sheet (406) and a lower pressing sheet (407), the fixing ring (3) is installed on the outer surfaces of a main fixing pipe A (201) and a main fixing pipe B (202), the through hole B (302) is formed in one side of the fixing ring (3), through holes A (203) corresponding to the through holes B (302) are formed in the two sides of the main fixing pipe B (202), and the upper pressing sheet (406) and the lower pressing sheet (407) are wrapped on the two sides of the scaffold main column (1);
the outer surface of the scaffold strut (6) is fixedly connected with a connecting plate (701).
2. The scaffold docking device of a building for easy installation according to claim 1, wherein the outer surfaces of the fixing ring (3), the A main fixing pipe (201) and the B main fixing pipe (202), the A-branch fixing pipe (501) and the B-branch fixing pipe (502) are coated with an anti-corrosion coating.
3. An installation-facilitating docking device for a building scaffold according to claim 1, characterized in that the baffle (405) is attached to the bottom of the tie rod (401), the baffle (405) being placed in the gap between the adapter sleeve (404) and the upper press plate (406).
4. The building scaffold docking device convenient for installation according to claim 1, wherein the contact part of the fixing ring (3) and the B main fixing pipe (202) is provided with four limiting grooves (403) matched with the limiting columns (402).
5. The scaffold docking device for construction convenient for installation according to claim 1, wherein one side of the upper pressing plate (406) is bolted to the connection sleeve (404), and the lower pressing plate (407) is connected to the inner sidewall of the A main fixing tube (201).
CN202222697103.0U 2022-10-13 2022-10-13 Building scaffold interfacing apparatus convenient to installation Active CN218815158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222697103.0U CN218815158U (en) 2022-10-13 2022-10-13 Building scaffold interfacing apparatus convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222697103.0U CN218815158U (en) 2022-10-13 2022-10-13 Building scaffold interfacing apparatus convenient to installation

Publications (1)

Publication Number Publication Date
CN218815158U true CN218815158U (en) 2023-04-07

Family

ID=87270321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222697103.0U Active CN218815158U (en) 2022-10-13 2022-10-13 Building scaffold interfacing apparatus convenient to installation

Country Status (1)

Country Link
CN (1) CN218815158U (en)

Similar Documents

Publication Publication Date Title
CN218815158U (en) Building scaffold interfacing apparatus convenient to installation
CN216553005U (en) A novel attach wall device for creeping formwork support body
CN201224954Y (en) Bar reinforcement sleeve connection structure
CN213013962U (en) Template support frame is used in public road bridge roof beam construction
CN212613009U (en) Novel net rack rod piece
CN214329869U (en) Bracket device for truss support of silo wall
CN108979122B (en) Scaffold frame that circulated used links wall spare
CN213084602U (en) Steel pipe transportation fixing device
CN214723358U (en) Crossbeam locking mechanism
CN219299746U (en) High-strength fastening screw
CN210597612U (en) Assembled I-steel beam clamp connecting piece
CN211899513U (en) Construction frame reinforcing apparatus
CN215858926U (en) Combined scaffold
CN212897605U (en) Formwork support for constructional engineering
CN219297950U (en) Continuous box girder with corrugated steel web steel-concrete combined structure
KR200352474Y1 (en) Cable tension introduction unit that used temporary steel bars
CN212003890U (en) Novel positioning bayonet lock
CN218958468U (en) Cable telescopic bracket in bridge
CN221031371U (en) Clamping steel pipe for scaffold
CN212836619U (en) Light fixture type scaffold mounted on box type steel upright post
CN215563292U (en) Multipoint support steel structure reinforcing device
CN219826087U (en) Wall scaffold connecting assembly easy to splice
CN214462462U (en) Adopt outer frame of bracing resistance to deformation to link wall spare
CN216476294U (en) Scaffold frame for constructional engineering steel pipe
CN219633636U (en) Tank body and reinforcing ring assembling tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230605

Address after: No. 50, Beihai Road, Haimen Street, Haimen City, Nantong City, Jiangsu Province 226100

Patentee after: Haimen Shuangcheng Construction and Installation Co.,Ltd.

Address before: No. 15, Group 8, Hongshaxi Village, Guandian Town, Jianshi County, Enshi Tujia and Miao Autonomous Prefecture, Hubei Province, 445300

Patentee before: Zheng Zujun