CN218814962U - Heavy-load ground structure for large-scale exhibitions - Google Patents

Heavy-load ground structure for large-scale exhibitions Download PDF

Info

Publication number
CN218814962U
CN218814962U CN202222250952.1U CN202222250952U CN218814962U CN 218814962 U CN218814962 U CN 218814962U CN 202222250952 U CN202222250952 U CN 202222250952U CN 218814962 U CN218814962 U CN 218814962U
Authority
CN
China
Prior art keywords
concrete
layer
heavy
exhibitions
wear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222250952.1U
Other languages
Chinese (zh)
Inventor
陈景镇
吕凯芳
黄楚煌
林凤英
刘华长
戴敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Engineering Bureau Construction and Development Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202222250952.1U priority Critical patent/CN218814962U/en
Application granted granted Critical
Publication of CN218814962U publication Critical patent/CN218814962U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a heavy-duty ground structure of large-scale exhibitions project sets up in the foundation ditch, and supreme reinforced concrete structure bottom plate, waterproof layer, pea gravel concrete protective layer, metalling, concrete cushion, wear-resisting concrete layer and the alloy aggregate wearing surface layer of including in proper order are down followed. Compare traditional heavy load ground structure, the utility model provides a heavy load ground structure has better wearability resistance to compression impact resistance, more is fit for being applied to the heavy load ground structure of exhibitions project.

Description

Heavy-load ground structure for large-scale exhibitions
Technical Field
The utility model relates to a heavily carry ground structure technical field, especially relate to a heavy-duty ground structure of large-scale exhibitions project.
Background
In recent years, with the continuous development of economy in China, the requirements of people on large-scale exhibitions are continuously improved, and the work load and the use frequency of the ground of an exhibition hall are continuously increased. However, compare the heavy load ground in other places, the earth's surface of exhibitions project can stand more crowds trample/stop, the process of freight dolly, the goods falls down when friction that light-duty goods pulled and unload, the impact that the participant produced the earth's surface when showing for the exhibition personnel, consequently can appear the earth's surface too smoothly after shorter live time, clean personnel clear up the earth's surface after or the rainy day exhibition personnel bring the rainwater into the circumstances that makes the personnel of process appear slipping and falling injury after the exhibitions place, or the pit appears in the earth's surface, sunken, make whole unaesthetic and influence the exhibitions image. In addition, the exhibitions project can be subjected to long-term pressure in regions and different regions where people/goods pass through due to different exhibitor enterprises and exhibition types, so that the whole heavy-load ground needs to have better pressure bearing and pressure bearing capacity, and the ground surface is prevented from sinking.
SUMMERY OF THE UTILITY MODEL
In order to solve the above problem, the utility model provides a large-scale exhibitions project heavy load ground structure, the utility model discloses a realize like this:
the utility model provides a heavy-duty ground structure of large-scale exhibitions project, sets up in the foundation ditch, from supreme reinforced concrete structure bottom plate, waterproof layer, fine aggregate concrete protective layer, metalling, concrete cushion, wear-resisting concrete layer and the wear-resisting surface course of alloy aggregate of including in proper order down.
Preferably, the reinforced concrete structure bottom plate is a self-waterproof structure bottom plate with an anti-permeability grade of P10, and the reinforced concrete layer is doped with the composite reinforced concrete rust inhibitor.
Preferably, the waterproof layer is formed by vertically and horizontally brushing cement-based capillary crystalline waterproof paint with the thickness of 1.0, and the thickness of the waterproof layer is 0.3-0.5 mm.
Preferably, the fine aggregate concrete protective layer has a concrete grade of C20 and a thickness of 50mm.
Preferably, the thickness of the gravel layer is 400mm, the gravel layer is formed by paving gravel with the particle size of 5-32 mm, and the gravel layer also comprises cement mortar with the particle size of M5.0.
Preferably, the concrete grade of the concrete cushion layer is C20, and the thickness is 200mm.
Preferably, the concrete grade on wear-resisting concrete layer is C30, and thickness is 200mm, set phi 8@200 two-way reinforcing bar net in the wear-resisting concrete layer, just be provided with in the wear-resisting concrete layer and be no less than 4 @100 two-way reinforcing bar nets.
Preferably, the alloy aggregate wear-resistant surface layer is formed by construction of a special liquid hardening agent for a carborundum wear-resistant floor.
The beneficial effects of the utility model reside in that:
1. through setting up wear-resisting concrete layer and alloy aggregate wearing layer at the superiors of heavily loaded ground structure, improved resistance to compression, the ability of shocking resistance and stand wear and tear of the earth's surface on exhibitions project heavy load ground, the while ground top layer that the alloy aggregate wearing layer formed more is favorable to the cleanup crew to clean and maintain.
2. Prevent the ground settlement through set up reinforced concrete structure bottom plate on basic soil layer, set up the waterproof layer on reinforced concrete layer, avoid groundwater infiltration to influence the heavy load ground wholly, set gradually fine aggregate concrete protective layer, metalling, concrete cushion, wear-resisting concrete layer and alloy aggregate wear-resisting surface layer on the waterproof layer again, improved the holistic compressive capacity of heavy load ground and ability of resistance to wears.
Drawings
Fig. 1 is a schematic sectional view of the present invention.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
In the description of the present invention, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.
The utility model provides a heavy-duty ground structure of large-scale exhibitions project sets up in the foundation ditch, and supreme reinforced concrete structure bottom plate 1, waterproof layer 2, fine aggregate concrete protective layer 3, metalling 4, concrete cushion 5, wear-resisting concrete layer 6 and the wear-resisting surface course of alloy aggregate of including in proper order are down followed.
Preferably, the reinforced concrete structure bottom plate 1 is a self-waterproof structure bottom plate with an anti-permeability grade of P10, and the reinforced concrete layer is doped with the composite reinforced concrete rust inhibitor.
Further, after the reinforced concrete structure bottom plate 1 is processed to meet the construction requirements, vertically and horizontally brushing a cement-based capillary crystalline waterproof coating with the thickness of 1.0 thick on the surface of the reinforced concrete structure bottom plate to form a waterproof layer 2, wherein the thickness of each brushing is controlled within the range of 0.3-0.5 mm, and preferably, one brushing is not sticky before the interval time of each brushing.
Furthermore, a lateral waterproof layer 2 formed by 1.0 thick cement-based capillary crystalline waterproof paint is coated on the surface of the inner side wall of the foundation pit, and the coating thickness is controlled within the range of 0.3-0.5 mm.
Furthermore, the upper surface of the waterproof layer 2 is poured with a fine aggregate concrete protective layer 3, the fine aggregate concrete protective layer is compacted by vibration of a plane vibrator during pouring, the fine aggregate concrete protective layer is leveled and covered with a plastic film after pouring, and the concrete is timely watered and maintained after final setting. The thickness of the fine aggregate concrete protective layer 3 is 50mm.
Further, after the fine aggregate concrete protection layer 3 reaches the strength, gravel backfilling is carried out on the upper surface of the fine aggregate concrete protection layer 3 to form a gravel layer 4 with the height of 400mm, and gravel with the particle size of 5-32 mm is preferably selected for the gravel layer 4.
Furthermore, in order to ensure that the gravel is densely filled, filling is carried out in two layers, each layer is 200mm, and in the filling process, the filling is laid from the outer side to the inner side in sequence. And backfilling each crushed stone layer 4 until the specific elevation is 1.5-2.5 cm higher than the ground elevation during filling, and then rolling and flattening by using a crawler-type excavator, wherein wheel tracks are overlapped. Pouring M5.0 cement mortar after the pressure is stabilized, and vibrating and compacting. When grouting, gaps among the broken stones need to be filled, the surface of the mortar is flush with the broken stones, and edges and corners of the broken stones are exposed on the mortar. And (3) immediately after grouting is finished, fully vibrating by using a flat plate vibrator, overlapping 10-20 cm during vibration, and forming a cement mortar layer 41 on the upper end surface of the gravel layer 4 within a vibration time of not less than 30S during vibration at the same position.
Further, a concrete cushion 5 with the thickness of 200mm is poured on the gravel layer 4, the pouring of the concrete cushion 5 is carried out from one end to the other end, and a flat plate vibrator is adopted for vibrating. The concrete should be poured continuously at one time, and if the concrete is intermittent, construction joints should be reserved according to regulations. After the concrete is vibrated to be compact, the surface is rubbed to be flat by applying a wooden trowel. And after the cushion layer is poured, timely maintaining. The concrete grade of the concrete cushion 5 is C20.
Further, after the concrete cushion layer 5 is cured, firstly, the cement slurry is used, and a wear-resistant concrete layer 6 of 200mm is poured on the concrete cushion layer 5. Before pouring, phi 8@200 bidirectional reinforcing mesh is internally matched, the periphery of a pipe ditch needs to be encrypted, 4 channels are not less than @100 bidirectional reinforcing mesh, reinforcing steel bars are bound according to specifications, and certain flatness and elevation are guaranteed during construction to ensure the thickness of a wear-resistant concrete surface layer. Paving the surface layer must be carried out before the transition layer is in initial setting, and the surface layer is strickled off by a scraper and the elevation and the flatness are measured. After the leveling, a disc mechanical smoothing machine is adopted for rolling and slurry extraction, and the first smoothing is carried out before initial setting. Surface layer is smeared after initial setting and before final setting, iron is adopted for smearing and pressing for 2-3 times, and the directions of smearing and pressing for each time are mutually vertical. And after survival for 24h, covering, watering and curing for 7d. The concrete grade of the wear-resistant concrete cushion layer 5 is C30.
And finally, forming a warm gray alloy aggregate wear-resistant surface layer on the surface of the wear-resistant concrete by using a special liquid hardening agent for the carborundum wear-resistant floor. The surface layer construction is divided into two parts: when the initial setting time of the base concrete is controlled for the first time and a 3 mm footprint can be left when people get on the base concrete, uniformly spreading carborundum on the surface of the concrete according to a certain fixed direction by about half of the total amount, and after the carborundum surface spread for the first time becomes dark, using a polishing machine with a grinding disc to trowel and ensure that the corners are all compacted. After the first compaction, the rest carborundum is spread on the ground in the direction perpendicular to the first spreading direction, and is smoothed and polished by electric steel. The extended area is scored 1 × 1 every 3m × 3 m.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a heavy-duty ground structure of large-scale exhibitions project, sets up in the foundation ditch, its characterized in that, supreme reinforced concrete structure bottom plate, waterproof layer, fine aggregate concrete protective layer, metalling, concrete cushion, wear-resisting concrete layer and the wear-resisting surface course of alloy aggregate of including in proper order down.
2. The heavy-duty ground structure for a large-scale exhibitions of claim 1,
the reinforced concrete structure bottom plate is a self-waterproof structure bottom plate with impervious grade P10.
3. The heavy-duty ground structure for a large-scale exhibitions of claim 1,
the waterproof layer is formed by vertically and horizontally brushing cement-based capillary crystalline waterproof paint with the thickness of 1.0, and the thickness of the waterproof layer is 0.3-0.5 mm.
4. The heavy-duty floor structure for large exhibitions as claimed in claim 1,
the concrete grade of the fine aggregate concrete protective layer is C20, and the thickness is 50mm.
5. The heavy-duty floor structure for large exhibitions as claimed in claim 1,
the thickness of the gravel layer is 400mm, the gravel layer is formed by paving gravel with the particle size of 5-32 mm, and the gravel layer also comprises M5.0 cement mortar.
6. The heavy-duty floor structure for large exhibitions as claimed in claim 1,
the concrete grade of the concrete cushion is C20, and the thickness is 200mm.
7. The heavy-duty floor structure for large exhibitions as claimed in claim 1,
the concrete grade on wear-resisting concrete layer is C30, and thickness is 200mm, set phi 8@200 two-way reinforcing bar net in the wear-resisting concrete layer, just be provided with in the wear-resisting concrete layer and be no less than 4 at 100 two-way reinforcing bar nets.
CN202222250952.1U 2022-08-25 2022-08-25 Heavy-load ground structure for large-scale exhibitions Active CN218814962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222250952.1U CN218814962U (en) 2022-08-25 2022-08-25 Heavy-load ground structure for large-scale exhibitions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222250952.1U CN218814962U (en) 2022-08-25 2022-08-25 Heavy-load ground structure for large-scale exhibitions

Publications (1)

Publication Number Publication Date
CN218814962U true CN218814962U (en) 2023-04-07

Family

ID=87258697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222250952.1U Active CN218814962U (en) 2022-08-25 2022-08-25 Heavy-load ground structure for large-scale exhibitions

Country Status (1)

Country Link
CN (1) CN218814962U (en)

Similar Documents

Publication Publication Date Title
CN101153475B (en) Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN201095717Y (en) Red beds filled high-speed railway roadbed
CN105040554A (en) Garden path structure and paving construction technology thereof
CN106894442A (en) A kind of reinforced sand soil barricade and construction method
CN106283944A (en) Method for reinforcing shallow soft foundation by pressing and filling rubbles and/or blocks
CN108677638A (en) Express highway roadbed dam filling construction based on building waste
CN109680586A (en) A kind of pavement asphalt laying method
CN110820456A (en) Anti-settling and replacement-filling alternate airport runway and construction method thereof
CN107137913B (en) The construction technology in tennis court and tennis court
CN218814962U (en) Heavy-load ground structure for large-scale exhibitions
CN109024123A (en) A kind of roadbed construction method
CN109853313B (en) Pile foundation side soft soil foundation road friction resistance eliminating structure and construction method
CN111549603A (en) Pavement considering water load coupling and construction method thereof
CN105155387A (en) Garden road structure
CN113026473B (en) Road widening construction method
CN213115347U (en) Dampproof ground
CN221168515U (en) Heavy ground structure of large-scale equipment exhibition room
CN109440572B (en) Construction method for laying temporary road in coal mine pit by prefabricated slab
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
JPH02157304A (en) Construction for pavement of bed in play-ground
Sharp Concrete in Highway Engineering: International Series of Monographs in Civil Engineering
CN1584209A (en) Block pavement constructing method
CN208965334U (en) Handle the compression soil plate of railway bridges and culverts changeover portion
CN111979865A (en) Composite asphalt pavement construction method
US20060213146A1 (en) Method of making a flat foundation for a floor without substantial excavation and foundation made by said method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant