CN218786857U - Electric power engineering prefabricated cable equipment foundation well structure - Google Patents

Electric power engineering prefabricated cable equipment foundation well structure Download PDF

Info

Publication number
CN218786857U
CN218786857U CN202223159235.4U CN202223159235U CN218786857U CN 218786857 U CN218786857 U CN 218786857U CN 202223159235 U CN202223159235 U CN 202223159235U CN 218786857 U CN218786857 U CN 218786857U
Authority
CN
China
Prior art keywords
well body
electric power
power engineering
install
bellows
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223159235.4U
Other languages
Chinese (zh)
Inventor
束小虎
张超
顾文栋
马妍
黄卫民
李杨
姚云龙
葛丹丹
周明昊
张健华
李金珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Chuangchuan Cement Pre Products Co ltd
Dafeng Longsheng Industrial Co ltd
Original Assignee
Jiangsu Chuangchuan Cement Pre Products Co ltd
Dafeng Longsheng Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Chuangchuan Cement Pre Products Co ltd, Dafeng Longsheng Industrial Co ltd filed Critical Jiangsu Chuangchuan Cement Pre Products Co ltd
Priority to CN202223159235.4U priority Critical patent/CN218786857U/en
Application granted granted Critical
Publication of CN218786857U publication Critical patent/CN218786857U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/14Extreme weather resilient electric power supply systems, e.g. strengthening power lines or underground power cables

Landscapes

  • Power-Operated Mechanisms For Wings (AREA)

Abstract

The utility model discloses a prefabricated cable plant foundation well structure of electric power engineering, including well body subassembly, door body subassembly, drainage subassembly and dampproofing subassembly, well body subassembly includes basic well body, installs at the supporting legs of basic well body bottom and installs the roof at basic well body top, dampproofing subassembly is including running through install at the bellows of basic well body both sides, install at the inside support of bellows, install the motor between the support, install in the pivot of motor output end, install the flabellum in the pivot outside, install at the inside heating wire of bellows and install at the inside dust screen of bellows, the utility model discloses in install motor, heating wire, the device can carry out inside stoving, has guaranteed that cable and distribution equipment can be in a suitable environment, has avoided cable and distribution equipment to be corroded, has prolonged cable and distribution equipment's life greatly, has eliminated the potential safety hazard.

Description

Electric power engineering prefabricated cable equipment foundation well structure
Technical Field
The utility model relates to a foundation well technical field specifically is electric power engineering prefabricated cable plant foundation well structure.
Background
Cable equipment foundation well is mainly used for installing cable and distribution equipment, its underground passage with the cable duct bank or the cable that set up communicates with each other, but because the foundation well sets up in external underground, the device is inside often to be intake easily and to lead to cable and distribution equipment to be in moist environment for a long time, this can seriously influence its operating condition undoubtedly, and still can corrode its surface, greatly reduced cable and distribution equipment's life, also buried huge potential safety hazard simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power engineering prefabricated cable plant foundation well structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: electric power engineering prefabrication cable plant foundation well structure, including well body subassembly, door body subassembly, drainage subassembly and dampproofing subassembly, well body subassembly includes basic well body, installs at the supporting legs of basic well body bottom and installs the roof at basic well body top, door body subassembly includes the sealing door of movable mounting at the roof top, drainage subassembly is including running through the drain pipe of installing in basic well body bottom, dampproofing subassembly is including running through bellows of installing in basic well body both sides, install at the inside support of bellows, install motor between the support, install in the pivot of motor output, install at the flabellum in the pivot outside, install at the inside heating wire of bellows and install at the inside dust screen of bellows.
Preferably, the drain pipe is located at the inner side of the supporting leg, the electric heating wire is located at one side of the fan blade, and the dust screen is located at one side of the electric heating wire.
Preferably, the visual window is installed at the top of roof, the visual window is located one side of sealing door, the both sides of basic well body are run through and have been seted up the preformed hole, the preformed hole is located the below of bellows, and the both sides of basic well body are run through and have been seted up the louver, the louver is for being located the top of bellows.
Preferably, the baffle is installed to the both sides of basis well body, the baffle is located the top of louver, the internally mounted of basis well body has the fagging, the guiding gutter has been seted up to the diapire of basis well body, the guiding gutter is located the below of fagging.
Preferably, a chimeric door is installed at the bottom of the sealing door, a sealing ring is installed at the outer side of the chimeric door, and the sealing ring is in contact with the top plate.
Preferably, a straight handle valve is installed at the top of the sealing door, a buckle is installed at the top of the top plate, and the buckle and the straight handle valve are in contact with each other.
Preferably, the internally mounted of drain pipe has the fretwork board, the telescopic shaft is installed at the top of fretwork board, the software spring is located the outside of telescopic shaft.
Preferably, the piston is installed at the top of telescopic shaft, the rubber sleeve is installed at the top of piston, the internally mounted of drain pipe has the shutoff board of symmetry, shutoff board and rubber sleeve contact each other.
By adopting the technical scheme, the utility model discloses the beneficial effect who gains does:
1. the utility model discloses in install the motor, the heating wire, the support is used for installing the motor, guarantee the stability of motor during operation, when needs are to device inside dampproofing the processing, open the motor, the motor drive pivot is rotatory, from this the flabellum produces wind-force, the heating wire circular telegram is generated heat and is heated the air current that the flabellum produced, from this dry to device inside, guaranteed that cable and distribution equipment can be in a suitable environment, cable and distribution equipment are avoided being corroded, the life of cable and distribution equipment has been prolonged greatly, the potential safety hazard has been eliminated.
2. The utility model discloses in install straight handle valve, the telescopic shaft, software spring and piston, the staff is when closing the door body, counter-clockwise turning straight handle valve, straight handle valve extrudees with the buckle each other, straight handle valve also can receive the power in an opposite direction, this power acts on the sealing door, extrude the sealing door inwards, the leakproofness of device has further been guaranteed, the drain pipe is used for the device drainage, a simple and easy check valve has been set up inside it, after the device is inside unexpected to intake, the pressure extrusion piston of water, telescopic shaft and software spring compress down, the breach of shutoff board is opened, begin the drainage, after the drainage, telescopic shaft and software spring reset and stop up the breach of shutoff board, need not to worry outside water backward flow and get into inside the device, the device has higher sealing performance and waterproof performance, staff's direct door body can when carrying out inside maintenance and clearance, time has been practiced thrift greatly, staff's pressure has been reduced, the device shares the degree of difficulty of worry that need not to flow backward when the drainage.
Drawings
Fig. 1 is a schematic perspective view of the whole device of the present invention.
Fig. 2 is a perspective view of the door according to the present invention.
Fig. 3 is a schematic sectional view of the whole device of the present invention.
Fig. 4 is a schematic view of the moisture-proof assembly of the present invention.
Fig. 5 is a schematic sectional view of the drainage assembly of the present invention.
In the figure: 100. a well body assembly; 101. a foundation well body; 102. supporting legs; 103. a top plate; 104. a visual window; 105. reserving a hole; 106. a ventilation window; 107. a baffle plate; 108. a supporting plate; 109. a diversion trench;
200. a door body assembly; 201. a sealing door; 202. a fitting door; 203. a seal ring; 204. a straight shank valve; 205. buckling;
300. a drainage assembly; 301. a drain pipe; 302. a hollowed-out plate; 303. a telescopic shaft; 304. a soft spring; 305. a piston; 306. a rubber sleeve; 307. a plugging plate;
400. a moisture barrier component; 401. an air box; 402. a support; 403. a motor; 404. a rotating shaft; 405. a fan blade; 406. an electric heating wire; 407. and (4) a dust screen.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1, 3 and 5, the electric power engineering prefabricated cable equipment foundation well structure;
including motor 403 and heating wire 406, supporting legs 102 are installed to the bottom of basic well body 101, roof 103 is installed at the top of basic well body 101, but visual window 104 is installed at the top of roof 103, visual window 104 is located one side of sealing door 201, the both sides of basic well body 101 are run through and are seted up preformed hole 105, preformed hole 105 is located the below of bellows 401, but ventilation window 106 is run through and is seted up to the both sides of basic well body 101, ventilation window 106 is for being located the top of bellows 401, baffle 107 is installed to the both sides of basic well body 101, baffle 107 is located the top of ventilation window 106, the internally mounted of basic well body 101 has fagging 108, guiding gutter 109 has been seted up to the diapire of basic well body 101, guiding gutter 109 is located the below of fagging 108, but the both sides of basic well body 101 are run through and are installed bellows 401, the internally mounted of bellows 401 has support 402, install motor 403 between the support 402, pivot 404 is installed to the output of motor 403, flabellum 405 is installed to the outside of pivot 404, the internally mounted of bellows 401 has the heating wire 406, heating wire 406 is located one side of flabellum 406, the internally mounted of dust screen 407, heating wire 406.
Concretely, visual window 104 makes things convenient for the staff to run through the internal conditions, preformed hole 105 is used for installing cable run, louver 106 is convenient for the circulation of gas in the device, play certain dampproofing effect, baffle 107 prevents that the rainwater from entering into the device inside by louver 106, fagging 108 is the fretwork steel sheet, be used for placing cable and distribution equipment, support 402 is used for installing motor 403, guarantee the stability of motor 403 during operation, when needs carry out dampproofing to the device inside, open motor 403, motor 403 drive pivot 404 is rotatory, therefore flabellum 405 produces wind-force, heating wire 406 circular telegram is generated heat the air current that flabellum 405 produced, from this dry the device inside, guaranteed that cable and distribution equipment can be in a suitable environment, cable and distribution equipment are avoided being corroded, the life of cable and distribution equipment has been prolonged greatly, the potential safety hazard has been eliminated.
The second embodiment:
referring to fig. 1, 2 and 5, the electric power engineering prefabrication of the basic well structure of the cable equipment;
including gomphosis door 202 and piston 305, sealing door 201 is installed at the top of activity roof 103, gomphosis door 202 is installed to the bottom of sealing door 201, sealing washer 203 is installed in the outside of gomphosis door 202, sealing washer 203 and roof 103 contact each other, straight shank valve 204 is installed at the top of sealing door 201, buckle 205 is installed at the top of roof 103, buckle 205 and straight shank valve 204 contact each other, drain pipe 301 is installed in the bottom of basic well body 101 run through, drain pipe 301 is located the inboard of supporting legs 102, the internally mounted of drain pipe 301 has fretwork board 302, telescopic shaft 303 is installed at the top of fretwork board 302, software spring 304 is located the outside of telescopic shaft 303, piston 305 is installed at the top of telescopic shaft 303, rubber sleeve 306 is installed at the top of piston 305, symmetrical shutoff board 307 is installed to the inside of drain pipe 301, shutoff board 307 and rubber sleeve 306 contact each other.
Specifically, on the basis of the first embodiment, the hinge and the sealing door 201 form a rotating mechanism, which facilitates the opening of a worker, the device is maintained and cleaned in an internal maintenance mode, the sealing door 201 is in contact with the outside, the area is large, the embedded door 202 is located inside the device, the area is small, the structure can ensure the tightness of the door body when the door body is closed, the sealing ring 203 is made of soft rubber, the sealing ring can be attached to a door seam to the maximum extent, the sealing performance when the door body is closed is ensured, when the worker closes the door body, the straight handle valve 204 is rotated anticlockwise and extrudes with the buckle 205, the straight handle valve 204 also receives a reverse force due to the mutual action of the force, the force acts on the sealing door 201, the sealing door 201 is extruded inwards, the sealing performance of the device is further ensured, the drain pipe 301 is used for draining the device, a simple one-way valve is arranged inside the device, after the water enters the device accidentally, the piston 305 is extruded by the pressure of the water, the telescopic shaft 303 and the spring 304 are compressed downwards, the sealing plate 307 is blocked, the water draining performance of the device is stopped, the water draining device can be prevented from entering the gap when the water leaking, and the water leaking back, the water leaking into the device is prevented, and the trouble caused by the water leaking into the device is avoided, and the water leaking back, and the trouble is avoided, and the trouble caused by the water leaking back flowing back of the device, and the people.
The working principle is as follows: the preformed hole 105 is used for installing a cable circuit, the supporting plate 108 is a hollow steel plate and used for placing cables and power distribution equipment, the hinge and the sealing door 201 form a rotating mechanism, the opening of a worker is facilitated, the maintenance and the cleaning of the interior of the device are carried out, when the worker closes a door body, the straight handle valve 204 is rotated anticlockwise, the straight handle valve 204 and the buckle 205 are mutually extruded, the straight handle valve 204 can be subjected to reverse force, the force is applied to the sealing door 201 to extrude the sealing door 201 inwards, the sealing performance of the device is further guaranteed, the drain pipe 301 is used for draining water of the device, a simple one-way valve is arranged in the device, when water accidentally enters the device, the piston 305 is extruded by the pressure of the water, the telescopic shaft 303 and the soft spring 304 are compressed downwards, the gap of the sealing plate 307 is opened to start draining, after the draining is finished, the telescopic shaft 303 and the soft spring 304 are reset to block the gap of the sealing plate 307, the water does not need to worry that external water enters the interior of the device, when the interior of the device is subjected to damp-proof treatment, the motor 403 is opened, the motor 403 drives the rotating shaft 404 to rotate, the rotating shaft 405, the air flow is heated, and the blades 405 is heated to heat and heat the interior of the heating device to heat the electric heating device, and dry the blades 406, and the electric heating wires 405 is carried out.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (8)

1. Electric power engineering prefabricated cable equipment foundation well structure, its characterized in that includes:
the well body assembly (100) comprises a basic well body (101), supporting legs (102) arranged at the bottom of the basic well body (101) and a top plate (103) arranged at the top of the basic well body (101);
the door body assembly (200) comprises a sealing door (201) movably mounted on the top of the top plate (103);
a drainage assembly (300) comprising a drainage pipe (301) penetratingly installed at the bottom of the basic well body (101);
the damp-proof assembly (400) comprises bellows (401) arranged on two sides of a basic well body (101) in a penetrating mode, supports (402) arranged inside the bellows (401), motors (403) arranged between the supports (402), rotating shafts (404) arranged at the output ends of the motors (403), fan blades (405) arranged on the outer sides of the rotating shafts (404), electric heating wires (406) arranged inside the bellows (401) and dust screens (407) arranged inside the bellows (401).
2. The electric power engineering prefabricated cable equipment foundation well structure as claimed in claim 1, wherein the drain pipe (301) is located inside the supporting foot (102), the heating wire (406) is located at one side of the fan blade (405), and the dust screen (407) is located at one side of the heating wire (406).
3. The electric power engineering prefabrication cable equipment foundation well structure according to claim 1, wherein a visible window (104) is installed at the top of the top plate (103), the visible window (104) is located on one side of the sealing door (201), two sides of the foundation well body (101) are provided with a reserved hole (105) in a penetrating mode, the reserved hole (105) is located below the air box (401), two sides of the foundation well body (101) are provided with a ventilation window (106) in a penetrating mode, and the ventilation window (106) is located above the air box (401).
4. The electric power engineering prefabricated cable equipment foundation well structure as claimed in claim 1, wherein baffles (107) are installed on two sides of the foundation well body (101), the baffles (107) are located above the ventilation window (106), a supporting plate (108) is installed inside the foundation well body (101), a diversion trench (109) is opened on the bottom wall of the foundation well body (101), and the diversion trench (109) is located below the supporting plate (108).
5. The electric power engineering prefabricated cable equipment foundation well structure as claimed in claim 1, wherein a fitting door (202) is installed at the bottom of the sealing door (201), a sealing ring (203) is installed at the outer side of the fitting door (202), and the sealing ring (203) and the top plate (103) are in contact with each other.
6. The electric power engineering prefabricated cable equipment foundation well structure according to claim 1, wherein a straight handle valve (204) is installed on the top of the sealing door (201), a buckle (205) is installed on the top of the top plate (103), and the buckle (205) and the straight handle valve (204) are in contact with each other.
7. The electric power engineering prefabricated cable equipment foundation well structure as claimed in claim 1, wherein a hollow plate (302) is installed inside the water drainage pipe (301), a telescopic shaft (303) is installed at the top of the hollow plate (302), a soft spring (304) is installed at the top of the hollow plate (302), and the soft spring (304) is located outside the telescopic shaft (303).
8. The electric power engineering prefabricated cable equipment foundation well structure as claimed in claim 7, wherein a piston (305) is installed on the top of the telescopic shaft (303), a rubber sleeve (306) is installed on the top of the piston (305), a symmetrical blocking plate (307) is installed inside the drain pipe (301), and the blocking plate (307) and the rubber sleeve (306) are in contact with each other.
CN202223159235.4U 2022-11-28 2022-11-28 Electric power engineering prefabricated cable equipment foundation well structure Active CN218786857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223159235.4U CN218786857U (en) 2022-11-28 2022-11-28 Electric power engineering prefabricated cable equipment foundation well structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223159235.4U CN218786857U (en) 2022-11-28 2022-11-28 Electric power engineering prefabricated cable equipment foundation well structure

Publications (1)

Publication Number Publication Date
CN218786857U true CN218786857U (en) 2023-04-04

Family

ID=86502414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223159235.4U Active CN218786857U (en) 2022-11-28 2022-11-28 Electric power engineering prefabricated cable equipment foundation well structure

Country Status (1)

Country Link
CN (1) CN218786857U (en)

Similar Documents

Publication Publication Date Title
CN218786857U (en) Electric power engineering prefabricated cable equipment foundation well structure
CN210888711U (en) Window with dehumidification cooling function
CN110943419B (en) Cable trench
CN207714856U (en) A kind of garage parking automobile anti-flooding apparatus
CN206495466U (en) A kind of Novel triple rain-proof water conservation air duct structure
CN213204738U (en) Go out roofing pipeline waterproof construction
CN113236098A (en) Water tightness structure at opening and closing position of door and window
CN219697066U (en) Ventilation structure for box-type transformer substation
CN211739410U (en) Ventilation structure of green building
CN221297675U (en) Pedestrian passageway gate quick-passing gate swing gate
CN101230749B (en) Indoor air conditioner installation, dissipating heat private channel
JP2008256274A (en) Energy-saving ventilating and deodorizing device for vacant house and vacant room in apartment house
CN220704739U (en) Pump house is with preventing base that floods
CN213234851U (en) Window frame with stealthy drainage and windproof and insect-proof functions
CN219549197U (en) Axial flow exhaust fan
CN212986418U (en) Pipeline air breather
CN217929101U (en) Waterproof roof ventilation structure
CN211480795U (en) Bridge with drainage function
CN211790107U (en) Waterproof power switch cabinet
CN216769686U (en) Green building energy-saving ventilating duct
CN216489250U (en) Prefabricated substation
CN220306928U (en) Automatic ventilation drainage device for cable pit
CN214280474U (en) Dampproofing dehumidification's outdoor distribution box
CN212376950U (en) Energy-saving aluminum roof fan
CN219674442U (en) Fresh air pipe assembly with rainproof structure and air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant