CN218771141U - Special construction of interim power consumption in hotel is with electrical connection box - Google Patents

Special construction of interim power consumption in hotel is with electrical connection box Download PDF

Info

Publication number
CN218771141U
CN218771141U CN202223168069.4U CN202223168069U CN218771141U CN 218771141 U CN218771141 U CN 218771141U CN 202223168069 U CN202223168069 U CN 202223168069U CN 218771141 U CN218771141 U CN 218771141U
Authority
CN
China
Prior art keywords
sealing
connection box
shell
hotel
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223168069.4U
Other languages
Chinese (zh)
Inventor
孙凯
王腊
夏亮
齐浩
闫文龙
何康
周鹏飞
李航
杨弘鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202223168069.4U priority Critical patent/CN218771141U/en
Application granted granted Critical
Publication of CN218771141U publication Critical patent/CN218771141U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Casings For Electric Apparatus (AREA)

Abstract

The utility model relates to a power connection box technical field, in particular to a power connection box for special construction of temporary electricity utilization of a hotel, which comprises a shell for cable connection, wherein both sides of the shell are provided with threading holes, the upper end and the lower end of the shell are both provided with sealing ports, and matched sealing plates are arranged in the sealing ports; the utility model discloses well casing constitutes a box sealed relatively with sealing door under the effect of closing plate jointly, can effectively avoid external steam to enter into the electronic box through seal port department inside to cause harmful effects's phenomenon to its inside spare part, solved prior art promptly, electronic box is because the radiating hole department does not have seal part and leads to external steam can dock the defect that electronic box inside spare part caused harmful effects such as corrosion.

Description

Special construction of interim power consumption in hotel is with electrical connection box
Technical Field
The utility model relates to an electricity connection box technical field especially relates to a special construction of interim power consumption of hotel is with electricity connection box.
Background
The junction box can be called as a junction box and is mainly used for box bodies for line transition connection, line jump connection and bridging, and a wiring terminal is installed in the junction box.
When the existing electric box is used, in order to quickly dissipate heat in the electric box, a plurality of heat dissipation holes are generally formed in a box body, so that external air flows through the electric box through the heat dissipation holes, and finally heat dissipation treatment is completed through the flowing air, but because the heat dissipation holes are not provided with sealing parts, when the electric box is used under the condition that the use environment such as temporary electricity consumption of a hotel is incomplete, water vapor generated in the external rain easily enters the electric box through the heat dissipation holes, and further, adverse effects such as corrosion are caused on internal parts of the electric box; therefore, in order to solve the technical problems, the power connection box special for temporary power utilization construction of the hotel is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the special construction of the interim power consumption of a hotel that proposes is with electrical connection box.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a hotel uses electricity special project construction temporarily with connecting electric box, including the casing that is used for cable junction, the both sides of casing are equipped with the through wires hole, and the upper and lower both ends of casing all are equipped with the seal opening and are equipped with matched with closing plate in the seal opening, the face that is close to mutually of two closing plates all is fixed with the linkage frame and is equipped with the dust screen at each wall of linkage frame, the four corners that the tip of casing corresponds the closing plate is fixed with matched with guide post, one side of casing is rotated and is installed the regulation pole, the both ends of adjusting the pole are equipped with and revolve to opposite thread, one side of closing plate corresponds the threaded end of adjusting the pole and is fixed with matched with elevator.
Preferably, the four corners of the sealing plate are slidably sleeved on the guide post rod body, and an annular limiting bulge is arranged at one end, away from the shell, of the guide post.
Preferably, the front side of casing is equipped with matched with sealing door, and the both sides of casing correspond the through wires hole and are fixed with the threading pipe, the elastic sealing tube of internally mounted of threading pipe.
Preferably, both sides of the bottom in the shell are fixed with placing frames, and a moisture absorption bag is placed in the placing frames.
Preferably, a force application barrel is fixed in the middle of the adjusting rod, an anti-slip strip is arranged on the outer ring surface of the force application barrel, and the adjusting rod is located on the rod bodies at the two ends of the force application barrel and is connected with the side face of the shell through a bearing and a bearing mounting seat.
Preferably, the dust filtering nets arranged on the walls of the linkage frame are arranged in multiple layers, the outermost dust filtering net is flush with the outer annular surface of the linkage frame, and the outer annular surface of the linkage frame is attached to the inner wall of the sealing port.
Preferably, the close surfaces of the two sealing plates are provided with sealing gaskets corresponding to the sealing openings, and the sealing gaskets have elasticity.
The utility model provides a special construction of interim power consumption of hotel is with electrical connection box, beneficial effect lies in:
1: the utility model discloses well personnel can rotate the regulating stem, and adjust the pole and rotate the in-process through the screw thread at both ends and drive the synchronous each other of elevator and be close to, and at this in-process, the elevator drives the closing plate and is close to relatively, along with being close to each other of closing plate, make the closing plate progressively cover in sealed mouth department, final closing plate seals sealed mouth department, make the casing form a relative sealed box with the sealing door jointly under the effect of closing plate, can effectively avoid external steam to enter into the power connection box through sealed mouth department inside, thereby cause the phenomenon of harmful effects to its inside spare part, in the prior art has been solved promptly, power connection box leads to external steam to lead to the fact the defect of harmful effects such as corrosion to the inside spare part of power connection box because radiating hole department does not have seal part.
2: in the utility model, the linkage frame is fixed on the side surface of the sealing plate, and each wall of the linkage frame is provided with the dust filter net, namely when the sealing plate is separated from the sealing port, the sealing plate is connected with the sealing port of the shell through the linkage frame and the dust filter net, so that when external wind enters the inside of the power connection box through the sealing port, pollutants such as dust and the like mixed in the wind are filtered by the dust filter net, thereby ensuring that the wind entering the inside of the power connection box is cleaner, namely avoiding the phenomenon that the dust is accumulated on the internal parts when the external wind dissipates heat to the inside of the power connection box; and because personnel's accessible is adjusted the distance between closing plate and the casing and is adjusted, when connecting the use of electric box promptly, personnel can carry out position control to the closing plate through adjusting the pole according to specific heat dissipation demand to the amount of wind of entering from the seal opening of adjusting.
Drawings
FIG. 1 is an axonometric view of an electric connection box for special construction of temporary electricity utilization of hotels, which is provided by the utility model;
FIG. 2 is an axonometric view of an electric connection box for special construction of temporary electricity utilization of the hotel, which is provided by the utility model;
fig. 3 is a schematic structural view of the power connection box for special construction of temporary power utilization of the hotel provided by the utility model;
fig. 4 is an enlarged schematic view of a power connection box for special construction of temporary power utilization of the hotel provided by the utility model at the position A;
figure 5 is the utility model provides a special construction of interim power consumption of hotel is with structure schematic diagram of connecting electrical box.
In the figure: 1. a housing; 2. a sealing plate; 3. a linkage frame; 4. a dust filter screen; 5. a guide post; 6. adjusting a rod; 7. a lifting block; 8. a threading tube; 9. a sealing tube; 10. placing the frame; 11. a force application cylinder; 12. a gasket is provided.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-5, a special construction of interim power consumption of hotel is with electrical connection box, including the casing 1 that is used for cable junction, the dorsal part of casing 1 is equipped with the mounting bracket, the mounting bracket passes through the bolt fastening at external mounting surface, the both sides of casing 1 are equipped with the through wires hole, and the upper and lower both ends of casing 1 all are equipped with the seal port and are equipped with matched with closing plate 2 in the seal port, the face of being close to mutually of two closing plate 2 all is fixed with linkage frame 3 and is equipped with dust filter 4 at each wall of linkage frame 3, the tip of casing 1 corresponds the four corners of closing plate 2 and is fixed with matched with guide post 5, one side of casing 1 is rotated and is installed and is adjusted pole 6, the both ends of adjusting pole 6 are equipped with the opposite thread line of turning to, the threaded end that one side of closing plate 2 corresponds adjusting pole 6 is fixed with matched with elevator 7.
As a technical optimization scheme of the utility model, four corners of the sealing plate 2 are slidably sleeved on the rod body of the guide post 5, and one end of the guide post 5 far away from the shell 1 is provided with an annular limiting bulge; the arrangement of the guide posts 5 is beneficial to the stability of the sealing plate 2 during moving.
As a technical optimization scheme of the utility model, a sealing door is arranged at the front side of the shell 1, threading pipes 8 are fixed at the two sides of the shell 1 corresponding to threading holes, and an elastic sealing pipe 9 is arranged in each threading pipe 8; the arrangement of sealing tube 9 is convenient for seal the cable that casing 1 wore to establish to keep the inside cleanliness of casing 1.
As a technical optimization scheme of the utility model, both sides of the bottom in the shell 1 are fixed with a placing frame 10, and a moisture absorption bag is placed in the placing frame 10; the moisture absorption pad is provided to absorb moisture inside the housing 1.
As a technical optimization scheme of the utility model, a force application barrel 11 is fixed in the middle of an adjusting rod 6, an anti-slip strip is arranged on the outer ring surface of the force application barrel 11, and the rod bodies of the adjusting rod 6 positioned at two ends of the force application barrel 11 are connected with the side surface of a shell 1 through a bearing and a bearing mounting seat; the force application barrel 11 is arranged to facilitate a person to apply force to the adjusting rod 6.
As a technical optimization scheme of the utility model, the dust filtering nets 4 arranged on each wall of the linkage frame 3 are arranged in a multilayer way, the dust filtering net 4 on the outermost side is flush with the outer annular surface of the linkage frame 3, and the outer annular surface of the linkage frame 3 is attached to the inner wall of the sealing port; the outer annular surface of the linkage frame 3 is attached to the inner wall of the sealing opening, so that external wind can only enter the shell 1 from the dust filtering net 4, and the amount of external dust entering the shell 1 through the wind is further reduced.
As a technical optimization scheme of the utility model, sealing gaskets 12 are respectively arranged on the corresponding sealing ports of the adjacent surfaces of the two sealing plates 2, and the sealing gaskets 12 have elasticity; the sealing gasket 12 is provided to make the sealing between the sealing plate 2 and the sealing port tighter.
The use principle and the advantages are as follows: the utility model discloses in the use, 1 dorsal part welding of casing has the mounting bracket, and then when the electronic box needs to use, personnel's accessible mounting bracket installs casing 1 in the external world, and personnel wear to establish the inside to casing 1 to each cable afterwards, through the terminal of casing 1 inside alright carry out cable connection afterwards, after cable connection personnel alright close sealing door, this moment electronic box just installs the completion.
And then in this scheme use, because the side of casing 1 is equipped with regulation pole 6, and the sealing opening department at casing 1 upper and lower both ends is equipped with closing plate 2, thereby when the external world is in sunny weather, personnel can rotate regulation pole 6, and adjust pole 6 and drive elevator 7 and keep away from each other through the whorl at both ends in the rotation process, elevator 7 synchronous drive closing plate 2 is kept away from relatively promptly, and the in-process that closing plate 2 kept away from each other, make the sealing opening exposed the department, external wind accessible two inside flows in and flows out of sealing opening casing 1 promptly, and at the gaseous inflow outflow in-process, the inside heat of its casing 1 is taken away by the gas of flowing through, just accomplished the inside heat of butt joint electronic box at this moment and carried out radiating processing.
Meanwhile, the linkage frame 3 is fixed on the side surface of the sealing plate 2, and the dust filter nets 4 are arranged on the walls of the linkage frame 3, namely when the sealing plate 2 is separated from the sealing port, the sealing plate 2 is connected with the sealing port of the shell 1 through the linkage frame 3 and the dust filter nets 4, so that when external wind enters the electric connection box through the sealing port, pollutants such as dust and the like mixed in the wind are filtered by the dust filter nets 4, the wind entering the electric connection box is cleaner, and the phenomenon that dust is accumulated on internal parts when the external wind dissipates heat to the inside of the electric connection box is avoided; and because personnel's accessible is adjusted the pole 6 and is adjusted the distance between closing plate 2 and the casing 1, when the electric box uses promptly, personnel can carry out position control to closing plate 2 through adjusting pole 6 according to specific heat dissipation demand to the amount of wind that the regulation was got into from the sealing opening.
Further, in the use process of the scheme, when the outside is in a rainy day, because the power connection box is used for temporary power utilization construction of an outside hotel, namely, complete protection facilities cannot be usually arranged outside the power connection box, when a constructor stops construction when the outside is in the rainy day, external water vapor can enter the inside of the shell 1 through the sealing port, namely, adverse effects are caused on parts inside the shell 1; at this moment, because 1 side of casing in this scheme is equipped with adjusts pole 6, and the seal opening department at both ends is equipped with closing plate 2 about casing 1, namely personnel can rotate adjusting pole 6, and adjust pole 6 and drive the synchronous mutual approaching of elevator 7 through the whorl line at both ends in the rotation process, and at this in-process, elevator 7 drives closing plate 2 and is close to relatively, along with closing plate 2 is close to each other, make closing plate 2 progressively cover in seal opening department, finally closing plate 2 seals seal opening department, make casing 1 form a sealed box with sealing door jointly under closing plate 2's effect, can effectively avoid external steam to enter inside the power connection box through seal opening department, thereby cause the phenomenon of harmful effects to its inside spare part, in the prior art has been solved promptly, the power connection box leads to external steam can cause the defect of harmful effects such as corrosion to power connection box inside spare part because heat dissipation hole department does not have seal part.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a special construction of interim power consumption of hotel is with connection box, including casing (1) that is used for cable junction, a serial communication port, the both sides of casing (1) are equipped with the through wires hole, and the upper and lower both ends of casing (1) all are equipped with the seal port and are equipped with matched with closing plate (2) in the seal port, the face that is close to mutually of two closing plate (2) all is fixed with linkage frame (3) and is equipped with dust filter net (4) at each wall of linkage frame (3), the tip of casing (1) corresponds the four corners of closing plate (2) and is fixed with matched with guide post (5), one side of casing (1) is rotated and is installed regulation pole (6), the both ends of adjusting pole (6) are equipped with the opposite thread line of turning to, the threaded end that one side of closing plate (2) corresponds regulation pole (6) is fixed with matched with lift piece (7).
2. The special construction power connection box for temporary electricity utilization of the hotel according to claim 1, wherein four corners of the sealing plate (2) are slidably sleeved on a rod body of the guide column (5), and one end, far away from the shell (1), of the guide column (5) is provided with an annular limiting protrusion.
3. The special power connection box for the temporary power utilization construction of the hotel according to claim 1, wherein a sealing door matched with the shell (1) is arranged on the front side of the shell (1), a threading pipe (8) is fixed on two sides of the shell (1) corresponding to the threading hole, and an elastic sealing pipe (9) is arranged inside the threading pipe (8).
4. The special construction power connection box for temporary electricity utilization of hotels according to claim 1, characterized in that a placing frame (10) is fixed on each of two sides of the bottom in the shell (1), and a moisture absorption bag is placed inside the placing frame (10).
5. The special power connection box for the temporary power utilization construction of the hotel as claimed in claim 1, wherein a force application barrel (11) is fixed in the middle of the adjusting rod (6), an anti-slip strip is arranged on the outer annular surface of the force application barrel (11), and the adjusting rod (6) is positioned on the rod bodies at two ends of the force application barrel (11) and is connected with the side surface of the shell (1) through a bearing and a bearing mounting seat.
6. The power connection box special for hotel temporary electricity utilization construction according to claim 1, wherein the dust filter nets (4) arranged on the walls of the linkage frame (3) are arranged in multiple layers, the outermost dust filter net (4) is flush with the outer annular surface of the linkage frame (3), and the outer annular surface of the linkage frame (3) is attached to the inner wall of the sealing port.
7. The special construction power connection box for temporary electricity utilization of the hotel according to claim 1, wherein sealing gaskets (12) are mounted on the corresponding sealing openings of the adjacent surfaces of the two sealing plates (2), and the sealing gaskets (12) have elasticity.
CN202223168069.4U 2022-11-29 2022-11-29 Special construction of interim power consumption in hotel is with electrical connection box Active CN218771141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223168069.4U CN218771141U (en) 2022-11-29 2022-11-29 Special construction of interim power consumption in hotel is with electrical connection box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223168069.4U CN218771141U (en) 2022-11-29 2022-11-29 Special construction of interim power consumption in hotel is with electrical connection box

Publications (1)

Publication Number Publication Date
CN218771141U true CN218771141U (en) 2023-03-28

Family

ID=85676484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223168069.4U Active CN218771141U (en) 2022-11-29 2022-11-29 Special construction of interim power consumption in hotel is with electrical connection box

Country Status (1)

Country Link
CN (1) CN218771141U (en)

Similar Documents

Publication Publication Date Title
CN218771141U (en) Special construction of interim power consumption in hotel is with electrical connection box
CN213457732U (en) Irrigation district gate automated control device
CN207098282U (en) A kind of power distribution cabinet for waterproof immersion of keeping off the rain
CN206272116U (en) A kind of green ecological power distribution cabinet heat insulation and heat control system
CN210092714U (en) High-efficient waterproof formula case that buries becomes casing
CN212441818U (en) Landscape fountain
CN210728835U (en) Special filter equipment of salicylamide
CN210898208U (en) Energy-saving heat dissipation type high-low voltage complete set power distribution cabinet
CN207296096U (en) Energy saving building curtain wall
CN210670990U (en) Waterproof device of wind-power complementary controller
CN209124424U (en) A kind of brush board mechanism in solar panel cleaning device
CN207625452U (en) A kind of power supply box protecgulum of collection waterproof and cooling one
CN207572804U (en) A kind of outdoor electrical control cabinet based on Internet of Things
CN206668528U (en) A kind of electricity box for being easily installed pump house monitoring terminal
CN206401785U (en) A kind of photovoltaic type transformer substation high-voltage room arrester fixing device
CN206861451U (en) A kind of lighting equipment of 360 degree of lock seamings
CN205975801U (en) A sealed ware for water supply pipe well
CN218007442U (en) Agricultural water-saving irrigation equipment based on water resource management
CN214948618U (en) Novel 5G wisdom street lamp of water-proof effects preferred
CN215772106U (en) High-low voltage wiring separating mechanism of high-voltage vacuum power distribution device
CN219760305U (en) Combined power distribution cabinet with rainproof structure
CN212162876U (en) Photovoltaic rechargeable battery with power-off function
CN216774001U (en) Distribution box equipped with active rainproof mechanism
CN215562979U (en) House with rainwater collection function
CN215404598U (en) Electrophoresis sealed tubular anode cover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant