CN218756994U - Steel bushing box welding construction hanging basket - Google Patents

Steel bushing box welding construction hanging basket Download PDF

Info

Publication number
CN218756994U
CN218756994U CN202221357006.0U CN202221357006U CN218756994U CN 218756994 U CN218756994 U CN 218756994U CN 202221357006 U CN202221357006 U CN 202221357006U CN 218756994 U CN218756994 U CN 218756994U
Authority
CN
China
Prior art keywords
montant
jib
platform
festival section
poles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221357006.0U
Other languages
Chinese (zh)
Inventor
王安文
于策
黄振威
李晔
李亚群
薛飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202221357006.0U priority Critical patent/CN218756994U/en
Application granted granted Critical
Publication of CN218756994U publication Critical patent/CN218756994U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model relates to a steel bushing box welding construction hangs basket, which comprises a platform, the platform includes two sheer poles, many lower vertical poles of welding between two sheer poles, platform panel is laid to two sheer poles and each lower vertical pole top surface, a montant is welded respectively at two sheer pole both ends, weld two upper horizontal poles and two upper vertical poles between 4 montant upper ends, a montant longitudinal weld jib is followed respectively to two montant upper ends of platform one side, the jib includes lower festival section and last festival section, festival section lower extreme and montant welding under the jib, upper end and threaded sleeve lower extreme spiro union, jib upper segment lower extreme and threaded sleeve's upper end spiro union, a crooked couple down is buckled into to the upper end. The utility model discloses the structure is light, hangs on the steel pouring jacket festival section, hangs position and jib length and can adjust convenient to use according to welding position and high flexibility.

Description

Steel bushing box welding construction hanging basket
Technical Field
The utility model belongs to the technical field of the bridge construction, a steel bushing case processing of aquatic cushion cap construction is related to, concretely relates to steel bushing case welding construction hangs basket.
Background
The construction of the underwater bearing platform usually adopts the steel sleeve box as a water retaining structure, and provides a waterless environment for the construction of the bearing platform. The installation method of the steel sleeve box can be divided into two methods, wherein the steel sleeve box is integrally processed on the ground and lifted and lowered to the installation position through large-scale hoisting equipment, and the steel sleeve box is transported to the underwater assembling platform in blocks and lowered after being assembled on site. In the second method, a support is usually required to be erected for welding steel sleeve box block sections, but in a steel sleeve box with a complex structure, the support is inconvenient to erect and cannot move, the support needs to be erected independently at each construction position, particularly for a bottomless steel sleeve box, the erection of the support also requires an assembly platform with a large area, time and material are wasted, and the construction progress is influenced.
Disclosure of Invention
The utility model aims at the above problem, a steel bushing box welding construction hangs basket is provided, is convenient for remove and at steel bushing box welding operation to practice thrift construction cost.
The technical scheme of the utility model as follows:
the utility model provides a steel bushing box welding construction hangs basket which characterized in that: the device comprises a platform, wherein the platform comprises two lower cross rods, a plurality of lower longitudinal rods are welded between the two lower cross rods, and a platform panel is laid on the top surfaces of the two lower cross rods and the lower longitudinal rods; a montant is welded respectively at two sheer pole both ends, welds two last horizontal poles parallel with the sheer pole and two last vertical poles parallel with vertical pole down between 4 montant upper ends, and a jib is vertically welded along the montant respectively in two montant upper ends of platform one side, the jib includes lower festival section and last festival section, and festival section lower extreme and montant welding under the jib, upper end and a threaded sleeve lower extreme spiro union, jib upper festival section lower extreme with threaded sleeve's upper end spiro union, the couple of buckling into a downwarping in the upper end.
The utility model discloses the structure is light, hangs on the steel pouring jacket festival section, hangs position and jib length and can adjust according to welding position and highly flexible, and convenient to use need not set up the support, can practice thrift the cost and accelerate the construction progress.
Drawings
Fig. 1 is a schematic diagram of the platform structure of the present invention;
fig. 2 is a schematic side view of the present invention.
Detailed Description
As shown in fig. 1 and 2, the utility model comprises a platform, which comprises two lower cross bars 1, a plurality of lower vertical bars 2 welded between the two lower cross bars, and a platform panel laid on the top surfaces of the two lower cross bars and the lower vertical bars; a vertical rod 3 is welded at each of two ends of each lower cross rod, two upper cross rods 4 parallel to the lower cross rods and two upper longitudinal rods 5 parallel to the lower longitudinal rods are welded between the upper ends of the 4 vertical rods, a suspender is longitudinally welded to each upper end of each vertical rod on one side of the platform, the suspender comprises a lower section 6 and an upper section 7, the lower end of each lower section 6 of the suspender is welded to the corresponding vertical rod 3, the upper end of each lower section is in threaded connection with the lower end of a threaded sleeve 8, the lower end of each upper section 7 of the suspender is in threaded connection with the upper end of the threaded sleeve 8, and the upper end of each upper section is bent into a hook 9 which is bent downwards.
The utility model discloses during the concrete implementation, can weld bridging 10 respectively between two montants 3 of platform every side, the additional strengthening between the montant is regarded as to the bridging, plays the guardrail effect concurrently.
The utility model discloses during the implementation, two lower vertical poles 2 that are located the tip that sets up jib one side on two upper vertical poles 5 and two upper vertical poles under can outwards extend certain length, and the length that extends does not exceed the width of couple.
The utility model discloses during the concrete implementation, the jib can prepare the last festival section of multiple length, changes according to the height of welding part on the steel pouring jacket.
The utility model discloses when using, lift by crane through the loop wheel machine, hang the couple on two treat welded steel jacket case block sections, constructor carries out welding operation on the platform. The extending ends of the two upper longitudinal rods and the two lower longitudinal rods are supported on the side wall of the steel sleeve box, so that a certain space is formed between the hanging basket and the steel sleeve box, and the welding operation is convenient. And after welding of one construction point, hoisting the whole cradle to the next construction position by using a crane.

Claims (3)

1. The utility model provides a steel bushing box welding construction hangs basket which characterized in that: the device comprises a platform, wherein the platform comprises two lower cross rods, a plurality of lower longitudinal rods are welded between the two lower cross rods, and a platform panel is laid on the top surfaces of the two lower cross rods and the lower longitudinal rods; a montant is welded respectively at two sheer pole both ends, welds two last horizontal poles parallel with the sheer pole and two last vertical poles parallel with vertical pole down between 4 montant upper ends, and a jib is vertically welded along the montant respectively in two montant upper ends of platform one side, the jib includes lower festival section and last festival section, and festival section lower extreme and montant welding under the jib, upper end and a threaded sleeve lower extreme spiro union, jib upper festival section lower extreme with threaded sleeve's upper end spiro union, the couple of buckling into a downwarping in the upper end.
2. The steel jacket box welding construction hanging basket according to claim 1, characterized in that: and a scissor support is welded between the two vertical rods on each side of the platform.
3. The steel jacket box welding construction hanging basket according to claim 1, characterized in that: the end parts of the two upper longitudinal rods and the two lower longitudinal rods right below the two upper longitudinal rods, which are positioned at one side of the hanger rod, extend outwards for a certain length, and the extended length does not exceed the width of the hanger.
CN202221357006.0U 2022-05-30 2022-05-30 Steel bushing box welding construction hanging basket Active CN218756994U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221357006.0U CN218756994U (en) 2022-05-30 2022-05-30 Steel bushing box welding construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221357006.0U CN218756994U (en) 2022-05-30 2022-05-30 Steel bushing box welding construction hanging basket

Publications (1)

Publication Number Publication Date
CN218756994U true CN218756994U (en) 2023-03-28

Family

ID=85687587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221357006.0U Active CN218756994U (en) 2022-05-30 2022-05-30 Steel bushing box welding construction hanging basket

Country Status (1)

Country Link
CN (1) CN218756994U (en)

Similar Documents

Publication Publication Date Title
CN102230313B (en) Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof
CN105484164B (en) Spanning type bailey beam bracket and construction method thereof
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN109267493A (en) A kind of construction method installed across river steel lid beam
CN205224050U (en) Steel reinforcement cage is hung and is put device
CN201793330U (en) Gantry hanger frame device
CN211173007U (en) Novel tripod of encorbelmenting
CN218756994U (en) Steel bushing box welding construction hanging basket
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN108797380B (en) Suspension construction device and construction method for suspension irrigation continuous beam bracket
CN111335172A (en) Movable pier column cross beam prestress tensioning hanging frame construction platform and construction method
CN216515141U (en) Novel cantilever construction creeping formwork device
CN216516954U (en) Self-climbing concrete distributing device in super high-rise well way
CN107381376B (en) Device and method for hoisting by utilizing curtain wall embedded part
CN109944164A (en) Self-elevating hollow thin-wall pier roller die system and construction method thereof
CN214994020U (en) Combined tower crane foundation pre-embedded structure
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN214935303U (en) Hoisting device of steel reinforcement cage
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN211873772U (en) Externally-hung operating steel platform
CN210134442U (en) Steel cofferdam system of transferring in succession
CN112340596A (en) Hoisting device and hoisting method for reinforcement cage
CN210134349U (en) Hanging type platform for welding steel sleeve box side plate