CN218754498U - Pipeline - Google Patents

Pipeline Download PDF

Info

Publication number
CN218754498U
CN218754498U CN202222788387.4U CN202222788387U CN218754498U CN 218754498 U CN218754498 U CN 218754498U CN 202222788387 U CN202222788387 U CN 202222788387U CN 218754498 U CN218754498 U CN 218754498U
Authority
CN
China
Prior art keywords
main part
pipeline
pipeline main
connecting rod
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222788387.4U
Other languages
Chinese (zh)
Inventor
何猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222788387.4U priority Critical patent/CN218754498U/en
Application granted granted Critical
Publication of CN218754498U publication Critical patent/CN218754498U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of pipelines, and discloses a pipeline, including the pipeline main part, the ring channel has all been seted up outside pipeline main part both ends, the ring channel lateral wall has seted up the annular chamber, this pipeline, through sliding connection go-between in the ring channel of pipeline main part outside, set up the connecting rod in the mounting groove of the go-between outside, there is great clearance between connecting rod and the annular groove bottom, when needing to tie up the stay cord outside the pipeline main part, can tie up one end of stay cord on the connecting rod, then promote the go-between and rotate the round, make the stay cord encircle pipeline main part round, need not to lift up the pipeline main part, can tie up the stay cord cover outside the pipeline main part; the ring channel has all been seted up in the pipeline main part both ends outside, can tie up the other end of what rope of drawing at the other end of pipeline main part according to above-mentioned step cover, through the loop wheel machine hang draw stay cord the intermediate position can, can not make pipeline main part slope, do not need artificial assistance.

Description

Pipeline
Technical Field
The utility model relates to the technical field of pipelines, specifically a pipeline.
Background
In water conservancy projects, pipelines are used for conveying or distributing industrial feed water and domestic drinking water and for collecting, conveying and discharging industrial waste water, domestic sewage and rainwater.
At present, pipelines applied in the existing hydraulic engineering are round tubular bodies, thick and heavy, and when the pipelines are installed, pull ropes need to be tied on the outer sides of the pipelines, and then a crane can be used for moving the pipelines through the pull ropes. If chinese patent application No. 201820890805.1, the patent document of 23 in 2019, 4 months, the announcement date is "a PE pipeline for hydraulic engineering, including the pipeline body, the upper portion of the inner wall of pipeline body is equipped with induction coil, the lower part of inner wall is equipped with stainless steel vibration area and ultrasonic vibration unit, induction coil can to the ultrasonic vibration unit power supply, the ultrasonic vibration unit can drive the stainless steel vibration takes place the vibration, so that the mud of inner wall lower part with the inner wall separation. The utility model discloses the PE pipeline need not to set up extra dredging pipe equipment, can realize decontaminating under the condition of normal water delivery, has guaranteed water delivery efficiency effectively, and can not destroy the PE pipeline, has prolonged pipeline life. "the two ends of the pipe of this prior art are not provided with means for hoisting.
The pipeline of the hydraulic engineering has the following problems in the actual use process:
1. the existing pipeline for hydraulic engineering is thick and heavy, when a pull rope is bound on the outer side of the pipeline, one end of the pipeline is difficult to lift up by artificial external force, and the pull rope can be bound on the outer side of the pipeline only by lifting up the end part of the pipeline by using a crane in advance;
2. after the stay cord is bound, the middle part of the pipeline is bound to the stay cord artificially and inaccurately, and when the loop wheel machine hangs and draws, the condition that the pipeline inclines needs staff cooperation work to hold the pipeline both ends.
To this end, we propose a pipe for hydraulic engineering to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pipeline solves one of the problem that the background art provided at least for need not to lift up pipeline main part, can tie up the stay cord cover in its outside, when hanging the stay cord simultaneously, the problem of pipeline main part slope can not appear.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline, includes the pipeline main part, and the ring channel has all been seted up in the pipeline main part both ends outside, and the annular chamber has been seted up to the ring channel lateral wall, and sliding connection go-between in the ring channel, go-between lateral wall be provided with annular chamber sliding connection's spacing ring, the mounting groove has been seted up in the go-between outside, is provided with the connecting rod in the mounting groove, has great clearance between connecting rod and the annular chamber bottom.
Preferably, the mounting groove is multiunit, all is provided with the connecting rod in every mounting groove.
Preferably, the thickness of the connecting ring is less than the depth of the annular groove.
Preferably, the connecting rod is connected with a fixing ring in a sliding and rotating mode, and the fixing ring is connected with an inserting rod in a threaded connection mode.
Preferably, the upper end of the inserted rod is provided with a disc.
Preferably, the lower end of the inserted rod is provided with a pointed head.
Compared with the prior art, the utility model discloses possess following beneficial effect:
according to the pipeline, the connecting ring is connected in the annular groove in the outer side of the pipeline main body in a sliding mode, the connecting rod is arranged in the mounting groove in the outer side of the connecting ring, a large gap is formed between the connecting rod and the bottom of the annular groove, when the stay rope needs to be tied to the outer side of the pipeline main body, one end of the stay rope can be tied to the connecting rod, then the connecting ring is pushed to rotate for a circle, the stay rope can encircle the pipeline main body for a circle, and the stay rope can be tied to the outer side of the pipeline main body without lifting up the pipeline main body; the ring channel has all been seted up in the pipeline main part both ends outside, can tie up the other end of what rope of drawing at the other end of pipeline main part according to above-mentioned step cover, through the loop wheel machine hang draw stay cord the intermediate position can, can not make pipeline main part slope, do not need artificial assistance.
Drawings
FIG. 1 is a schematic view of the overall three-dimensional structure of the present invention;
FIG. 2 is an enlarged schematic view of A of FIG. 1;
FIG. 3 is an enlarged schematic view of B of FIG. 2;
FIG. 4 is a schematic view of the three-dimensional cross-sectional structure of the pipeline main body of the present invention;
fig. 5 is a schematic view of the connection three-dimensional structure of the pipe main body and the connection ring of the present invention.
In the drawings: 1. a pipe body; 2. an annular groove; 3. a connecting ring; 4. a disc; 5. mounting grooves; 6. a fixing ring; 7. inserting a rod; 8. a connecting rod; 9. an annular cavity; 10. a limit ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, a pipeline includes a pipeline main body 1, wherein the outer sides of two ends of the pipeline main body 1 are respectively provided with an annular groove 2, the side wall of the annular groove 2 is provided with an annular cavity 9, a connecting ring 3 is slidably connected in the annular groove 2, the side wall of the connecting ring 3 is provided with a limiting ring 10 slidably connected with the annular cavity 9, the limiting ring 10 and the connecting ring 3 can be welded into a whole, the connection mode is stable, the outer side of the connecting ring 3 is provided with a mounting groove 5, a connecting rod 8 is arranged in the mounting groove 5, the connecting rod 8 can be fixedly welded in the mounting groove 5, the connecting rod 8 can also be in threaded connection with the mounting groove 5, at this time, the connecting rod 8 is composed of two sleeves which slide and rotate mutually, so that the sleeves can be detached and replaced, a large gap is formed between the connecting rod 8 and the bottom of the annular groove 2, when a pull rope is required to be sleeved at the end of the pipeline main body 1, one end of the pull rope is firstly tied on the connecting rod 8, then the pull rope is pushed to rotate a circle, the outer side of the connecting ring 3 can be tied on the connecting ring 3, so that the outer side of the pipeline main body 1, and the pull rope can be pulled without being lifted up, and the connecting ring 1 can be pushed by workers can be pulled up; because the annular groove 2 has all been seted up in the pipeline main part 1 both ends outside, can tie up the other end of what rope of drawing at the other end of pipeline main part 1 according to above-mentioned step cover, then through the intermediate position that the loop wheel machine hung the stay cord can, when not needing artificial assistance, the condition of slope can not appear in pipeline main part 1 yet.
Further, as shown in fig. 2, mounting groove 5 is the multiunit, all is provided with connecting rod 8 in every mounting groove 5, when being connected the one end of stay cord with connecting rod 8, connecting rod 8 need not be located the one side that the staff faced this moment, need rotate go-between 3, set up a plurality of connecting rods 8 for the staff no matter stand in which side of go-between 3, all has corresponding connecting rod 8, and more connecting rod 8 is convenient for the staff to hand connecting rod 8 and promote go-between 3 and rotate simultaneously.
Further, as shown in fig. 2, 3 and 5, the thickness of the connection ring 3 is smaller than the depth of the annular groove 2, the pipe body 1 is grounded, and when the pull rope is tied, the connection ring 3 is not in contact with the ground, so that the ground is prevented from bringing large resistance when the connection ring 3 is rotated.
Further, as shown in fig. 3, the connecting rod 8 is connected with the fixing ring 6 in a sliding and rotating manner, the fixing ring 6 is connected with the inserted link 7 in a penetrating manner, when the pull rope is bound, one end of the pull rope can be tied on the fixing ring 6, then the inserted link 7 is rotated to enable the pull rope to penetrate through the pull rope, so that the pull rope is more stable in connection with the fixing ring 6, and the pull rope is prevented from falling off when the connecting ring 3 is rotated.
Further, as shown in fig. 3, the upper end of the inserting rod 7 is provided with the disc 4, the diameter of the disc 4 is far larger than that of the inserting rod 7, so that the worker can conveniently hold the rotating shaft, the anti-slip lines are clamped on the outer side of the disc 4, or the anti-slip rubber sleeve is sleeved on the outer side of the disc 4, the friction force is increased, and the slipping condition is avoided when the disc 4 is rotated.
Further, as shown in fig. 3, the lower end of the insertion rod 7 is pointed, so that the lower end of the insertion rod 7 can easily penetrate through the pull rope.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a pipeline, including pipeline main part (1), a serial communication port, ring channel (2) have all been seted up in pipeline main part (1) both ends outside, ring channel (9) have been seted up to ring channel (2) lateral wall, sliding connection go-between (3) in ring channel (2), go-between (3) lateral wall be provided with ring channel (9) sliding connection's spacing ring (10), mounting groove (5) have been seted up in the go-between (3) outside, be provided with connecting rod (8) in mounting groove (5), there is great clearance between connecting rod (8) and ring channel (2) bottom.
2. A pipeline according to claim 1, characterised in that the mounting slots (5) are in groups, each mounting slot (5) being provided with a connecting rod (8).
3. A pipe according to claim 1 or 2, characterized in that the thickness of the connecting ring (3) is smaller than the depth of the annular groove (2).
4. A pipe according to claim 1 or 2, characterized in that the connecting rod (8) is slidably and rotatably connected with a fixing ring (6), and the fixing ring (6) is through-screwed with the insert rod (7).
5. A duct according to claim 3, characterized in that the connecting rod (8) is slidably and rotatably connected with a fixed ring (6), and the fixed ring (6) is through-screwed with the inserted rod (7).
6. A pipe according to claim 4, characterized in that the upper end of the inserted rod (7) is provided with a disc (4).
7. A pipe according to claim 5, characterized in that the upper end of the inserted rod (7) is provided with a disc (4).
8. A pipe according to claim 4, characterized in that the lower end of the insertion rod (7) is pointed.
9. A pipe according to claim 5, 6 or 7, characterized in that the lower end of the insertion rod (7) is pointed.
CN202222788387.4U 2022-10-24 2022-10-24 Pipeline Active CN218754498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222788387.4U CN218754498U (en) 2022-10-24 2022-10-24 Pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222788387.4U CN218754498U (en) 2022-10-24 2022-10-24 Pipeline

Publications (1)

Publication Number Publication Date
CN218754498U true CN218754498U (en) 2023-03-28

Family

ID=85699548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222788387.4U Active CN218754498U (en) 2022-10-24 2022-10-24 Pipeline

Country Status (1)

Country Link
CN (1) CN218754498U (en)

Similar Documents

Publication Publication Date Title
CN206437767U (en) A kind of new lifting steel pipes device
CN218754498U (en) Pipeline
CN210286447U (en) Lifting hook device for lifting cement pipeline
CN210735989U (en) Hoisting device for installing vertical shaft pipeline with large vertical depth
CN201010428Y (en) Inverse plugged restoring steel cable tool
CN216715394U (en) Old pipe joint separating device
CN105621231A (en) Combined lifting appliance special for large-diameter reinforced concrete drainage pipe
CN205076740U (en) Lift by crane apparatus linkage
CN103850658B (en) Intelligent electric drifting device adopting and method
CN204060786U (en) Water pump suspension mobile device
CN215568410U (en) Pipeline concatenation auxiliary device
CN218479798U (en) Temporary pipeline fixing device for drilling construction based on root canal
CN2934192Y (en) Drawing type salvage apparatus
CN211113635U (en) Highway engineering pulls out stake and uses fixed component
CN204920875U (en) A drilling rod rescue device for revolving dig rig
CN218014755U (en) Traction wheel oil sludge cleaning device
CN214003852U (en) A gallows for oil field pipeline valve changes
CN217539850U (en) Urban rainwater and sewage pipe network is reformed transform and is buried device underground with pipeline
CN209940252U (en) Large-caliber reinforced concrete drainage pipe joint lifting appliance
CN210127046U (en) Vertical transportation device for demolishing building outer frame
CN213265342U (en) Support device for construction of geothermal well pipe
CN217419890U (en) Concrete socket joint rain sewage pipe's laying device
CN213977028U (en) Conveying pump station for sewage treatment
CN217323066U (en) Belt is laid with novel apparatus that lifts by crane
CN212656217U (en) Bored concrete pile head preliminary treatment structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant