CN218743735U - Waste gas treatment spray tower for galvanization - Google Patents

Waste gas treatment spray tower for galvanization Download PDF

Info

Publication number
CN218743735U
CN218743735U CN202222511936.3U CN202222511936U CN218743735U CN 218743735 U CN218743735 U CN 218743735U CN 202222511936 U CN202222511936 U CN 202222511936U CN 218743735 U CN218743735 U CN 218743735U
Authority
CN
China
Prior art keywords
fixedly connected
water
wall
gas treatment
air outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222511936.3U
Other languages
Chinese (zh)
Inventor
王静
王汶强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Jieweite Machinery Equipment Co ltd
Original Assignee
Weihai Jieweite Machinery Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weihai Jieweite Machinery Equipment Co ltd filed Critical Weihai Jieweite Machinery Equipment Co ltd
Priority to CN202222511936.3U priority Critical patent/CN218743735U/en
Application granted granted Critical
Publication of CN218743735U publication Critical patent/CN218743735U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a waste gas treatment spray column for galvanization belongs to exhaust-gas treatment technical field, include: spray mechanism, retaining mechanism and air-out mechanism, retaining mechanism sets up under spraying the mechanism, air-out mechanism sets up and is spraying mechanism one side. From this, the device not only can realize purifying the waste gas that the galvanizing process in produced, makes it to reach emission standard, can accomplish after exhaust-gas treatment in addition, scrub the cleanness to jar internal wall automatically, has effectively reduced jar interior clear degree of difficulty to the waste water that produces when the tank bottoms set up can be collected to filter and reuse, energy-concerving and environment-protective to the water tank.

Description

Waste gas treatment spray tower for galvanization
Technical Field
The utility model relates to a waste gas treatment tower especially relates to a waste gas treatment spray column for galvanization, belongs to exhaust-gas treatment technical field.
Background
The waste gas discharged from industrial production often has harmful influence on environment and human health, and before being discharged into the atmosphere, the waste gas is treated by adopting a purification measure so as to meet the requirements of waste gas discharge standards, and the process is called waste gas purification treatment.
The existing (publication number: CN 212680554U) patent discloses a spray tower for treating waste gas produced by galvanized pipe, which comprises a tower body, wherein the inside of the tower body is of a hollow structure, the bottom of the tower body is provided with a conical tower bottom, the bottom of the tower bottom is provided with a liquid return pipe, one side of the tower body is provided with a water tank, the tail end of the liquid return pipe is fixedly connected to the water tank and guides waste water at the tower bottom to the water tank, a vertically arranged first filter screen is arranged inside the water tank, the water tank is divided into a sewage area and a filtered water area by the first filter screen, the upper end of the water tank is fixedly connected with a water pump, the water inlet end of the water pump is fixedly connected with a water inlet pipe, the water inlet pipe extends to the bottom of the filtered water area, the water outlet end of the water pump is fixedly connected with a water outlet pipe, the upper end of the tower body penetrates through the fixedly connected with a spray pipe, the bottom of the spray pipe is fixedly connected with a plurality of spray nozzles, and the spray nozzles are positioned above a first rotational flow plate. The utility model discloses a thereby the water economy resource of cycling use of water.
The application discovers above-mentioned galvanized pipe production spray column for exhaust-gas treatment, accomplishes the back at exhaust-gas treatment and to jar interior clean washing effect not good or need artifical supplementary clean, wastes time and energy, based on this, we propose a waste-gas treatment spray column for galvanization and improve.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a waste gas treatment spray column for galvanization, this waste gas treatment spray column for galvanization can realize jar internal completion exhaust-gas treatment back, scrub jar internal wall through the brush, can also extract the clear water in addition, spray water to jar internal wall through annular spray thrower, the cooperation brush washes jar internal wall, it is inefficient to have solved through artifical clean for galvanization waste gas treatment spray column among the prior art, problem that intensity of labour is big.
In order to solve the problems, the following technical scheme is provided:
the utility model provides a waste gas treatment spray column for galvanization, is including spraying mechanism, retaining mechanism and air-out mechanism, retaining mechanism sets up under spraying the mechanism, air-out mechanism sets up and is spraying mechanism one side.
Further, the spraying mechanism comprises a tank body, a motor device is fixedly connected to one side of the upper end face of the tank body, a lead screw is fixedly connected to the output end of the motor device, a first limiting device is rotatably connected to the outer wall of the lead screw close to the upper end of the lead screw, a second limiting device is rotatably connected to the outer wall of the lead screw close to the lower end of the lead screw, a first sliding block and a second sliding block are respectively sleeved on the outer wall of the lead screw in a threaded manner, and connecting rods are fixedly connected to one sides of the first sliding block and the second sliding block; the utility model discloses a jar body, including jar body, connecting rod one end fixedly connected with annular frame, fixedly connected with brush on the annular frame outer wall, a plurality of dead levers of terminal surface fixedly connected with under the jar body roof, it is a plurality of dead lever lower extreme fixedly connected with annular spray thrower, the fixed air-supply line that has cup jointed in jar body one side lower part, air-supply line up end fixedly connected with valve, the jar body is close to fixedly connected with slide bar on the inner wall of air-supply line one side, be provided with first filter and second filter on jar body middle part and the bottom inner wall respectively, jar body up end fixedly connected with toper air outlet, be provided with the observation window on the external wall of jar.
Further, retaining mechanism includes the water tank, first pumping plant of water tank up end fixedly connected with and second pumping plant, the equal fixedly connected with drinking-water pipe in first pumping plant and second pumping plant one side, first pumping plant and second pumping plant opposite side are first inlet tube of fixedly connected with and second inlet tube respectively, terminal surface fixedly connected with filter screen under the drinking-water pipe, water tank one side is fixedly connected with bleeder and filler pipe respectively, the equal fixedly connected with valve of bleeder and filler pipe up end, the inside third filter that is provided with of water tank, second inlet tube output end fixedly connected with cross spray thrower, first inlet tube output end sets up with annular spray thrower fixed connection.
Further, air-out mechanism includes the chimney, chimney upper end fixedly connected with baffle, the first tuber pipe of fixedly connected with on the outer wall of chimney lower extreme one side, first tuber pipe one end fixedly connected with glass steel fan, glass steel fan one end fixedly connected with second goes out the tuber pipe, second goes out tuber pipe one end fixedly connected with third tuber pipe, third goes out tuber pipe one end fixedly connected with fourth tuber pipe, fourth tuber pipe and toper air outlet fixed connection set up.
Furthermore, the slide bar runs through the first filter setting, the annular frame slides and cup joints on the slide bar outer wall.
Furthermore, a plurality of first spray heads are uniformly arranged on the outer wall of the annular sprayer, and a plurality of second spray heads are uniformly arranged on the lower end face of the cross sprayer.
Furthermore, the first limiting device and the second limiting device are fixedly connected with the tank body, the first limiting device and the second limiting device are rotatably sleeved on the outer wall of the screw rod, and the first sliding block and the second sliding block are respectively arranged under the first limiting device and the second limiting device.
Compared with the prior art, the beneficial effects of the utility model reside in that: the device drives the screw rod to rotate by adopting the motor device, so that the screw rod drives the first sliding block and the second sliding block to vertically move, the annular frame and the hairbrush are further driven to vertically move to mechanically clean the inner wall of the tank body by the hairbrush, and the first limiter and the second limiter are arranged to limit the moving range of the sliding block and enable the hairbrush to scrub a specified area;
compared with the prior art, the beneficial effects of the utility model reside in that: through setting up second pumping plant, then through the water in the drinking-water pipe extraction water tank to carry annular spray thrower through first inlet tube, then spray water to jar internal wall through first shower nozzle, thereby realize the washing to the jar body, the cooperation brush is effectively clean to the jar body.
Specific embodiments of the present invention are disclosed in detail with reference to the following description and the accompanying drawings, which specify the manner in which the principles of the invention may be employed. It should be understood that the embodiments of the present invention are not so limited in scope. The embodiments of the invention include many variations, modifications and equivalents within the spirit and scope of the appended claims.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic perspective view of a preferred embodiment of a waste gas treatment spray tower for galvanization according to the present invention;
fig. 2 is a schematic front sectional view of a partial structure of a preferred embodiment of an exhaust gas treatment spray tower for galvanization according to the present invention;
fig. 3 is a schematic view of the internal structure of a spraying mechanism of a preferred embodiment of the waste gas treatment spray tower for galvanization according to the present invention;
fig. 4 is a schematic top view of the internal structure of a spraying mechanism according to a preferred embodiment of the exhaust gas treatment spray tower for galvanization of the present invention;
fig. 5 is a side view of a preferred embodiment of an exhaust gas treatment spray tower for galvanization according to the present invention.
In the figure: 1. a spraying mechanism; 101. a tank body; 102. a motor device; 103. a screw rod; 104. a first stopper; 105. a first slider; 106. a second stopper; 107. a second slider; 108. a connecting rod; 109. an annular frame; 110. a brush; 111. a fixing rod; 112. an annular sprayer; 113. a first nozzle; 114. a slide bar; 115. a first filter plate; 116. a second filter plate; 117. an air inlet pipe; 118. a valve; 119. a first water inlet pipe; 120. a conical air outlet; 121. an observation window; 2. a water storage mechanism; 201. a water tank; 202. a first water pump device; 203. a second water pump device; 204. a water pumping pipe; 205. a second water inlet pipe; 206. filtering with a screen; 207. a water discharge pipe; 208. a water feeding pipe; 209. a cross-shaped sprayer; 210. a third filter plate; 211. a second nozzle; 3. an air outlet mechanism; 301. a chimney; 302. a baffle plate; 303. a first air outlet pipe; 304. a glass fiber reinforced plastic fan; 305. a second air outlet pipe; 306. a third air outlet pipe; 307. and a fourth air outlet pipe.
Detailed Description
In order to make the utility model realize, the technical means, the creation characteristics, the achievement purpose and the efficacy are easy to understand and understand, the utility model is further explained by combining the specific implementation mode.
As shown in fig. 1 to 5, the exhaust gas treatment spray tower for galvanization provided in this embodiment includes a spray mechanism 1, a water storage mechanism 2 and an air outlet mechanism 3, the water storage mechanism 2 is disposed under the spray mechanism 1, and the air outlet mechanism 3 is disposed on one side of the spray mechanism 1.
Preferably, the spraying mechanism 1 comprises a tank body 101, a motor device 102 is fixedly connected to one side of the upper end face of the tank body 101, a lead screw 103 is fixedly connected to the output end of the motor device 102, a first stopper 104 is rotatably connected to the outer wall of the lead screw 103 near the upper end, a second stopper 106 is rotatably connected to the outer wall of the lead screw 103 near the lower end, a first slider 105 and a second slider 107 are respectively in threaded sleeve connection with the outer wall of the lead screw 103, and a connecting rod 108 is fixedly connected to one side of each of the first slider 105 and the second slider 107; connecting rod 108 one end fixedly connected with annular frame 109, fixedly connected with brush 110 on the annular frame 109 outer wall, a plurality of dead levers 111 of terminal surface fixedly connected with under the jar body 101 roof, a plurality of dead lever 111 lower extreme fixedly connected with annular spray thrower 112, jar body 101 one side lower part is fixed to be cup jointed has air-supply line 117, air-supply line 117 up end fixedly connected with valve 118, jar body 101 is close to fixedly connected with slide bar 114 on the inner wall of air-supply line 117 one side, be provided with first filter 115 and second filter 116 on jar body 101 middle part and the bottom inner wall respectively, jar body 101 up end fixedly connected with toper air outlet 120, be provided with observation window 121 on the jar body 101 outer wall, observation window 121 can the interior condition of real-time observation jar.
Preferably, the water storage mechanism 2 comprises a water tank 201, a first water pump device 202 and a second water pump device 203 are fixedly connected to the upper end face of the water tank 201, a water pumping pipe 204 is fixedly connected to one side of the first water pump device 202 and one side of the second water pump device 203, a first water inlet pipe 119 and a second water inlet pipe 205 are fixedly connected to the other side of the first water pump device 202 and the other side of the second water pump device 203 respectively, a filter screen 206 is fixedly connected to the lower end face of the water pumping pipe 204, a water discharging pipe 207 and a water adding pipe 208 are fixedly connected to one side of the water tank 201 respectively, a valve 118 is fixedly connected to the upper end faces of the water discharging pipe 207 and the water adding pipe 208 respectively, a third filter plate 210 is arranged inside the water tank 201, a cross-shaped sprayer 209 is fixedly connected to the output end of the second water inlet pipe 205, the output end of the first water inlet pipe 119 is fixedly connected with the annular sprayer 112, the filter screen 206 and the third filter plate 210 can effectively filter large impurities, and avoid damage to the water pump.
Preferably, air-out mechanism 3 includes chimney 301, chimney 301 upper end fixedly connected with baffle 302, the first play tuber pipe 303 of fixedly connected with on the outer wall of chimney 301 lower extreme one side, first play tuber pipe 303 one end fixedly connected with glass steel fan 304, glass steel fan 304 one end fixedly connected with second goes out tuber pipe 305, second goes out tuber pipe 305 one end fixedly connected with third play tuber pipe 306, third goes out tuber pipe 306 one end fixedly connected with fourth play tuber pipe 307, fourth play tuber pipe 307 sets up with toper air outlet 120 fixed connection, baffle 302 can prevent that impurity or rainwater from falling into chimney 301, avoid chimney 301 to block up the damage.
Preferably, the sliding rod 114 is disposed through the first filter plate 115, the annular frame 109 is slidably sleeved on the outer wall of the sliding rod 114, and the sliding rod 114 fixes the moving direction of the annular frame 109.
Preferably, a plurality of first nozzles 113 are uniformly arranged on the outer wall of the annular sprayer 112, and a plurality of second nozzles 211 are uniformly arranged on the lower end surface of the cross sprayer 209.
Preferably, the first position limiter 104 and the second position limiter 106 are fixedly connected with the tank body 101, the first position limiter 104 and the second position limiter 106 are rotatably sleeved on the outer wall of the screw rod 103, the first sliding block 105 and the second sliding block 107 are respectively arranged under the first position limiter 104 and the second position limiter 106, and the first position limiter 104 and the second position limiter 106 can also effectively limit the moving range of the first sliding block 105 and the second sliding block 107 when the rotation of the screw rod 103 is not influenced.
The utility model discloses an application principle and use flow:
the first water pump device 202 is started, the spraying medium is pumped to the cross sprayer 209 through the first water pump device 202 and sprayed out from the second spray head 211, the valve 118 on the air inlet pipe 117 and the glass fiber reinforced plastic fan 304 are further started, after waste gas to be treated enters the tank, the waste gas is in contact with the medium sprayed out from the second spray head 211 in the conveying process to the upper portion of the tank body 101, so that the waste gas is purified, the waste water naturally falls into the water tank 201 through the first filter plate 115 and the second filter plate 116, the purified waste gas is sucked and upwards output through the glass fiber reinforced plastic fan 304, the waste gas enters the fourth air outlet pipe 307, the third air outlet pipe 306, the second air outlet pipe 305 and the first air outlet pipe 303 through the conical air outlet 120 and is finally discharged through the chimney 301, after the waste gas treatment is completed, the motor device 102 is started, the motor device 102 drives the screw rod 103 to rotate, the screw rod 103 drives the first sliding block 105 and the second sliding block 107, the first sliding block 105 and the second sliding block 107 drive the annular frame 109 and the hairbrush 110 to scrub the second water pump device 203, the pump device 203 is started, the medium is sprayed out from the annular sprayer 112, the first water pump device 113, the tank, the spray head 113 is conveniently washed, and the tank can be conveniently washed.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be a fixed connection, a detachable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The present invention has been described in connection with specific embodiments, but it should be clear to a person skilled in the art that these descriptions are intended to be illustrative and not limiting to the scope of the invention. Various modifications and adaptations of the invention will become apparent to those skilled in the art in light of the spirit and principles of the invention and are intended to be included within the scope of the invention.

Claims (7)

1. The utility model provides a waste gas treatment spray column for galvanization, its characterized in that, including spraying mechanism (1), retaining mechanism (2) and air-out mechanism (3), retaining mechanism (2) set up and is spraying mechanism (1) under, air-out mechanism (3) set up and is spraying mechanism (1) one side.
2. The waste gas treatment spray tower for the galvanization according to claim 1, wherein the spray mechanism (1) comprises a tank body (101), a motor device (102) is fixedly connected to one side of the upper end face of the tank body (101), a lead screw (103) is fixedly connected to the output end of the motor device (102), a first stopper (104) is rotatably connected to the outer wall of the lead screw (103) close to the upper end, a second stopper (106) is rotatably connected to the outer wall of the lead screw (103) close to the lower end, a first sliding block (105) and a second sliding block (107) are respectively in threaded sleeve joint with the outer wall of the lead screw (103), and a connecting rod (108) is fixedly connected to one side of each of the first sliding block (105) and the second sliding block (107); connecting rod (108) one end fixedly connected with annular frame (109), fixedly connected with brush (110) on annular frame (109) outer wall, a plurality of dead lever (111) of terminal surface fixedly connected with under the jar body (101) roof, it is a plurality of dead lever (111) lower extreme fixedly connected with annular spray thrower (112), the fixed air-supply line (117) that has cup jointed in jar body (101) one side lower part, air-supply line (117) up end fixedly connected with valve (118), the jar body (101) are close to fixedly connected with slide bar (114) on air-supply line (117) one side inner wall, be provided with first filter (115) and second filter (116) on jar body (101) middle part and the bottom inner wall respectively, jar body (101) up end fixedly connected with toper air outlet (120), be provided with observation window (121) on jar body (101) outer wall.
3. The exhaust gas treatment spray tower for galvanization according to claim 1, wherein the water storage mechanism (2) comprises a water tank (201), a first water pump device (202) and a second water pump device (203) are fixedly connected to the upper end face of the water tank (201), a water pumping pipe (204) is fixedly connected to one side of each of the first water pump device (202) and the second water pump device (203), a first water inlet pipe (119) and a second water inlet pipe (205) are fixedly connected to the other side of each of the first water pump device (202) and the second water pump device (203), a filter screen (206) is fixedly connected to the lower end face of each of the water pumping pipes (204), a water discharging pipe (207) and a water feeding pipe (208) are fixedly connected to one side of the water tank (201), a valve (118) is fixedly connected to the upper end faces of each of the water discharging pipe (207) and the water feeding pipe (208), a third filter plate (210) is arranged inside the water tank (201), a cross-shaped spray thrower (209) is fixedly connected to the output end of the second water inlet pipe (205), and the output end of the first water inlet pipe (119) is fixedly connected to the annular spray thrower (112).
4. The exhaust gas treatment spray tower for galvanization of claim 1, characterized in that the air outlet mechanism (3) includes a chimney (301), a baffle (302) is fixedly connected to the upper end of the chimney (301), a first air outlet pipe (303) is fixedly connected to the outer wall of one side of the lower end of the chimney (301), a glass fiber reinforced plastic fan (304) is fixedly connected to one end of the first air outlet pipe (303), a second air outlet pipe (305) is fixedly connected to one end of the glass fiber reinforced plastic fan (304), a third air outlet pipe (306) is fixedly connected to one end of the second air outlet pipe (305), a fourth air outlet pipe (307) is fixedly connected to one end of the third air outlet pipe (306), and the fourth air outlet pipe (307) is fixedly connected to the tapered air outlet (120).
5. The exhaust gas treatment spray tower for galvanization of claim 2, wherein said sliding rod (114) is disposed through the first filter plate (115), and said annular frame (109) is slidably fitted over the outer wall of the sliding rod (114).
6. The exhaust gas treatment spray tower for galvanization of claim 3, wherein a plurality of first spray heads (113) are uniformly arranged on the outer wall of the annular sprayer (112), and a plurality of second spray heads (211) are uniformly arranged on the lower end surface of the cross-shaped sprayer (209).
7. The exhaust gas treatment spray tower for galvanization of claim 2, wherein the first stopper (104) and the second stopper (106) are fixedly connected with the tank body (101), the first stopper (104) and the second stopper (106) are rotatably sleeved on the outer wall of the screw rod (103), and the first slider (105) and the second slider (107) are respectively arranged under the first stopper (104) and the second stopper (106).
CN202222511936.3U 2022-09-22 2022-09-22 Waste gas treatment spray tower for galvanization Active CN218743735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222511936.3U CN218743735U (en) 2022-09-22 2022-09-22 Waste gas treatment spray tower for galvanization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222511936.3U CN218743735U (en) 2022-09-22 2022-09-22 Waste gas treatment spray tower for galvanization

Publications (1)

Publication Number Publication Date
CN218743735U true CN218743735U (en) 2023-03-28

Family

ID=85694741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222511936.3U Active CN218743735U (en) 2022-09-22 2022-09-22 Waste gas treatment spray tower for galvanization

Country Status (1)

Country Link
CN (1) CN218743735U (en)

Similar Documents

Publication Publication Date Title
CN109045902B (en) Electric automatization spray set
CN116637457A (en) Dust removal system and dust removal method for atmospheric pollution treatment
CN209035026U (en) A kind of PE can washing apparatus
CN218743735U (en) Waste gas treatment spray tower for galvanization
CN109621609A (en) A kind of coating cloud collection device
CN113521989A (en) Industrial flue gas desulfurization tower
CN206676082U (en) Drum-type intestines slag filter
CN208936233U (en) A kind of kitchen ventilator efficiently cleaned automatically
CN208356383U (en) A kind of tower type dust remover
CN207435078U (en) A kind of multi-effect water distillator convenient for adjusting
CN214399993U (en) Sewage treatment plant convenient to wash
CN209362093U (en) A kind of wet scrubber tower for waste gas purification
CN219943992U (en) Desulfurization washing tool under combined heat and power flue gas atmospheric wet process
CN220460230U (en) Furniture workshop dust clearing device
CN111974137A (en) Industrial tail gas purification, dust collection and slag discharge integrated system
CN218794827U (en) High tower NMP waste gas recovery device
CN218077243U (en) High-efficient biofiltration deodorization tower
CN214671688U (en) Building engineering cost presentation device
CN214581306U (en) Kitchen clarification plant shower nozzle structure
CN216498463U (en) Waste liquid collecting device of dealcoholized formaldehyde absorption tower
CN209662711U (en) Strainer built in a kind of sanitary sewage disposal tank clears up structure automatically
CN220257550U (en) Gas dust remover
CN217206547U (en) Mine ventilation dust collector
CN219091545U (en) Wet dust collector for sand blasting workshop
CN211753527U (en) Building construction cooling dust collector