CN218726115U - Building engineering reinforcing bar check out test set - Google Patents

Building engineering reinforcing bar check out test set Download PDF

Info

Publication number
CN218726115U
CN218726115U CN202222969866.6U CN202222969866U CN218726115U CN 218726115 U CN218726115 U CN 218726115U CN 202222969866 U CN202222969866 U CN 202222969866U CN 218726115 U CN218726115 U CN 218726115U
Authority
CN
China
Prior art keywords
base
push rod
steel bar
fixing mechanism
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222969866.6U
Other languages
Chinese (zh)
Inventor
杨在罡
曲亚男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222969866.6U priority Critical patent/CN218726115U/en
Application granted granted Critical
Publication of CN218726115U publication Critical patent/CN218726115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Abstract

The utility model discloses a construction engineering steel bar detection device, which comprises a base and a fixing mechanism; base: the upper ends of the supporting columns are respectively provided with a supporting column, the upper ends of the supporting columns are fixedly connected with the lower end of the connecting plate, the lower end of the connecting plate is provided with an electric push rod, the lower end of the telescopic end of the electric push rod is provided with a pressing plate, the left side and the right side of the upper end of the base are respectively provided with a connecting column, the lower ends of the connecting columns respectively penetrate through the mounting holes formed in the upper end of the base and are fixedly connected with the bottom wall of the base, and the upper ends of the connecting columns are fixedly connected with the lower ends of the vertically adjacent mounting plates; a fixing mechanism: the upper end of the fixing mechanism is fixedly connected with the lower end of the mounting plate respectively; this building engineering reinforcing bar check out test set, can be quick carry out effectual clamp to the building engineering reinforcing bar and fix, alleviate personnel's work burden when easy operation, solved because of the problem that the engineering building engineering reinforcing bar body is popped out after the extrusion and is wounded the people from sleeve or splint.

Description

Building engineering reinforcing bar check out test set
Technical Field
The utility model relates to a building engineering reinforcing bar check out test set technical field specifically is a building engineering reinforcing bar check out test set.
Background
The steel bar is steel for reinforced concrete and prestressed reinforced concrete, the cross section of the steel bar is round, sometimes square with round corners, and the steel bar comprises smooth steel bars, ribbed steel bars and twisted steel bars, the steel bar for reinforced concrete is straight bar or wire rod-shaped steel for reinforced concrete reinforcement, and the shapes of the steel bar are smooth steel bars and deformed steel bars;
the construction engineering steel bar mainly bears tension in concrete, so the quality of the construction engineering steel bar needs to be sampled and detected after the construction engineering steel bar is produced, for example, the tensile strength or the deformation resistance of the construction engineering steel bar is detected;
when detecting the construction engineering reinforcing steel bar, the construction engineering reinforcing steel bar is usually clamped and fixed through a manual mode, then the construction engineering reinforcing steel bar is extruded through an electric push rod or a hydraulic rod, so that the construction engineering reinforcing steel bar is bent, and then the strength quality of the construction engineering reinforcing steel bar is judged according to the pressure applied by the electric push rod or the hydraulic rod.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, a building engineering reinforcing bar check out test set is provided, cooperation through splint and spacing splint sets up, can be quick carry out effectual clamp to the building engineering reinforcing bar and fix, has alleviateed personnel's work burden in the time of easy operation, has solved because of the problem of the injury people of popping out from sleeve or splint after the extrusion of engineering building engineering reinforcing bar this integument, has improved the security of this equipment, can effectively solve the problem in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a kind of constructional engineering steel bar detection equipment, including base and fixed establishment;
base: the upper ends of the supporting columns are respectively provided with a supporting column, the upper ends of the supporting columns are fixedly connected with the lower end of the connecting plate, the lower end of the connecting plate is provided with an electric push rod, the lower end of the telescopic end of the electric push rod is provided with a pressing plate, the left side and the right side of the upper end of the base are respectively provided with a connecting column, the lower ends of the connecting columns respectively penetrate through mounting holes formed in the upper end of the base and are respectively and fixedly connected with the bottom wall of the base, and the upper ends of the connecting columns are respectively and fixedly connected with the lower ends of vertically adjacent mounting plates;
a fixing mechanism: the upper end of the fixing mechanism is respectively and fixedly connected with the lower end of the mounting plate, and the connecting columns are respectively and slidably connected with sliding holes correspondingly arranged at the lower end of the fixing mechanism;
wherein: still include the singlechip, the singlechip is located the outside of base, and the input and the external power supply electricity of singlechip are connected, and electric putter's input is connected with single chip microcomputer output electricity, sets up through the cooperation of splint and spacing splint, and it is fixed to carry out effectual clamp to the building engineering reinforcing bar that can be quick, and easy operation has alleviateed personnel's work burden simultaneously, has solved because of the problem that the people was hindered in following sleeve or splint to pop out after this integument extrusion of engineering building engineering reinforcing bar, has improved the security of this equipment.
Further, fixed establishment includes elevating platform, push rod, splint and spacing splint, the upper end of spacing splint respectively with the lower extreme fixed connection of mounting panel, the spliced pole corresponds the slide opening sliding connection who sets up with the elevating platform lower extreme respectively, the upper end of elevating platform all is provided with the push rod, the upper end of push rod all is provided with splint, splint respectively with vertical adjacent spacing splint upper and lower position correspond, can press from both sides tightly fixedly to the building engineering reinforcing bar.
Further, fixed establishment still includes screw rod, slider, mount pad and connecting rod, the screw rod rotates respectively through the bearing to be connected in the inside left and right sides of base, the screw rod respectively with the screw hole threaded connection that the slider lower extreme set up, the slider all with the diapire sliding connection of base, it is connected with the connecting rod to rotate through the round pin axle in the mounting groove that the slider upper end set up, the mount pad all sets up in the lower extreme of elevating platform, the upper end of connecting rod is rotated through the lower extreme of round pin axle with vertical adjacent mount pad respectively and is connected, be convenient for adjust the interval between splint and the spacing splint.
Further, fixed establishment still includes the belt pulley, the belt pulley all sets up in the front end of screw rod, connects through belt transmission between two belt pulleys, can be quick carry out effectual clamp to the building engineering reinforcing bar fixedly, has alleviateed personnel's work burden.
The motor is arranged on the right side of the front end of the base, the rear end of a motor output shaft is fixedly connected with the front end of a screw rod on the right side, the input end of the motor is electrically connected with the output end of the single chip microcomputer, the distance between the clamping plate and the limiting clamping plate can be adjusted, and the working efficiency is improved.
Furthermore, the steel bar detection device further comprises a sliding column and a spring, wherein the sliding column is respectively in sliding connection with a sliding opening formed in the upper end of the base, a baffle is arranged at the lower end of the sliding column, the upper end of the sliding column is fixedly connected with the lower end of the supporting plate, the spring is respectively arranged between the upper end of the base and the lower end of the supporting plate, and the spring is sleeved outside the upper side of the sliding column, so that detection work on the steel bars in the construction engineering is facilitated.
Further, still include pressure measurement appearance, pressure measurement appearance sets up in the middle part of base upper end, and pressure measurement appearance is located the downside of backup pad, detects the pressure that the backup pad received.
Compared with the prior art, the beneficial effects of the utility model are that: this building engineering reinforcing bar check out test set has following benefit:
the during operation staff puts the building engineering reinforcing bar in the upper end of two splint, this moment, regulation and control through the singlechip, the motor begins to operate, the output shaft drives the screw rod on right side rotatory, the screw rod on right side drives left belt pulley through the belt pulley on right side rotatory, thereby it is rotatory to drive left screw rod, make two sliders move backward, can give ascending thrust of mount pad through the connecting rod when two sliders move backward, thereby drive the elevating platform rebound through the mount pad, make the interval between splint and the spacing splint constantly reduce, realize the tight fixed of clamp to the building engineering reinforcing bar at last, cooperation through splint and spacing splint sets up, can be quick carry out effectual clamp to the building engineering reinforcing bar and fix, personnel's work burden has been alleviateed in the time of easy operation, the problem of hindering the people because of the engineering building engineering reinforcing bar is played from sleeve or splint after this integument extrusion has been solved, the security of this equipment has been improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the fixing mechanism of the present invention;
fig. 3 is a schematic side sectional plan view of the present invention.
In the figure: the device comprises a base 1, a singlechip 2, a support column 3, a connecting plate 4, a pressing plate 5, a connecting column 6, a mounting plate 7, an electric push rod 8, a fixing mechanism 9, a screw 91, a belt pulley 92, a sliding block 93, a mounting seat 94, a lifting table 95, a push rod 96, a clamping plate 97, a limiting clamping plate 98, a connecting rod 99, a sliding column 10, a support plate 11, a pressure detector 12, a spring 13 and a motor 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present embodiment provides a technical solution: a kind of constructional engineering steel bar detection equipment, including base 1 and fixed establishment 9;
base 1: the upper ends of the supporting columns 3 are respectively provided with a supporting column 3, the upper ends of the supporting columns 3 are fixedly connected with the lower end of a connecting plate 4, the lower end of the connecting plate 4 is provided with an electric push rod 8, the lower end of the telescopic end of the electric push rod 8 is provided with a pressing plate 5, the left side and the right side of the upper end of the base 1 are respectively provided with a connecting column 6, the lower end of each connecting column 6 respectively penetrates through a mounting hole formed in the upper end of the base 1 and is fixedly connected with the bottom wall of the base 1, the upper end of each connecting column 6 is fixedly connected with the lower end of a vertically adjacent mounting plate 7, before the building engineering steel bar detection equipment is used, the building engineering steel bar detection equipment is moved to a specified working place through external traction equipment, the base 1 is installed and butted with a corresponding station, and the supporting and fixing of the base 1 and internal equipment are realized;
the fixing mechanism 9: the fixing mechanism is arranged inside a base 1, the upper end of a fixing mechanism 9 is respectively fixedly connected with the lower end of an installation plate 7, connecting columns 6 are respectively in sliding connection with sliding holes which are arranged corresponding to the lower end of the fixing mechanism 9, the fixing mechanism 9 comprises an elevating platform 95, push rods 96, clamping plates 97 and limiting clamping plates 98, the upper ends of the limiting clamping plates 98 are respectively fixedly connected with the lower end of the installation plate 7, the connecting columns 6 are respectively in sliding connection with the sliding holes which are arranged corresponding to the lower end of the elevating platform 95, the upper ends of the elevating platform 95 are respectively provided with the push rods 96, the upper ends of the push rods 96 are respectively provided with the clamping plates 97, the clamping plates 97 respectively correspond to the vertically adjacent limiting clamping plates 98 in an up-down position, the fixing mechanism 9 further comprises screw rods 91, sliding blocks 93, installation seats 94 and connecting rods 99, the screw rods 91 are respectively rotatably connected to the left side and the right side inside the base 1 through bearings, the screw rods 91 are respectively in threaded connection with threaded holes which are arranged at the lower ends of the sliding blocks 93, the sliding blocks 93 are respectively, the sliding blocks 93 are connected with the bottom walls of the base 1, the upper end of the slide block 93 is rotatably connected with a connecting rod 99 through a pin shaft in a mounting groove arranged at the upper end of the slide block 93, the mounting seats 94 are all arranged at the lower end of the lifting platform 95, the upper end of the connecting rod 99 is rotatably connected with the lower end of the vertically adjacent mounting seat 94 through a pin shaft respectively, the fixing mechanism 9 further comprises a belt pulley 92, the belt pulley 92 is arranged at the front end of the screw rod 91, the two belt pulleys 92 are connected through belt transmission, a worker puts the construction engineering steel bar at the upper end of the two clamping plates 97 during working, at the moment, through the regulation and control of the single chip microcomputer 2, the motor 14 starts to operate, the output shaft drives the screw rod 91 at the right side to rotate, the screw rod 91 at the right side drives the belt pulley 92 at the left side to rotate through the belt pulley 92 at the right side, so as to drive the screw rod 91 at the left side to rotate, the two slide blocks 93 to move backwards, and simultaneously can provide upward thrust for the mounting seats 94 through the connecting rod 99, the lifting platform 95 is driven to move upwards through the mounting seat 94, so that the distance between the clamping plate 97 and the limiting clamping plate 98 is continuously reduced, and finally, the constructional engineering steel bar is clamped and fixed;
wherein: still include singlechip 2, singlechip 2 is located the outside of base 1, and singlechip 2's input is connected with external power source electricity, and electric putter 8's input is connected with singlechip 2 output electricity, can regulate and control the electrical components of equipment inside.
Wherein: still include motor 14, motor 14 sets up in the right side of base 1 front end, the rear end of the output shaft of motor 14 and the front end fixed connection of the screw rod 91 on right side, the input of motor 14 is connected with singlechip 2's output electricity, regulation and control through singlechip 2, motor 14 begins to operate, the output shaft drives the screw rod 91 on right side rotatory, the screw rod 91 on right side drives left belt pulley 92 through belt pulley 92 on right side rotatory, thereby it is rotatory to drive left screw rod 91, thereby interval between adjustment splint 97 and the spacing splint 98.
Wherein: still include traveller 10 and spring 13, traveller 10 respectively with the sliding opening sliding connection that base 1 upper end set up, the lower extreme of traveller 10 all is provided with the baffle, the upper end of traveller 10 all with the lower extreme fixed connection of backup pad 11, spring 13 sets up respectively between the lower extreme of base 1's upper end and backup pad 11, the outside of traveller 10 upside is all located to spring 13, then can extrude backup pad 11 when the building engineering reinforcing bar is crooked, thereby drive backup pad 11 downstream, spring 13 contracts, when backup pad 11 and pressure measurement appearance 12's probe contact, pressure measurement appearance 12 can be sent to the pressure that receives to backup pad 11, be convenient for detect work to the building engineering reinforcing bar.
Wherein: still include pressure detector 12, pressure detector 12 sets up in the middle part of base 1 upper end, and pressure detector 12 is located the downside of backup pad 11, and pressure detector 12 can real-time detection backup pad 11 receive the pressure, and pressure detector 12 can convey the data that detect to singlechip 2 in real time.
The utility model provides a pair of building engineering reinforcing bar check out test set's theory of operation as follows: before use, the construction engineering reinforcing steel bar detection equipment is moved to a specified working place through external traction equipment, the base 1 is in installation butt joint with a corresponding station, supporting and fixing of the base 1 and internal equipment are realized, a worker places the construction engineering reinforcing steel bar at the upper ends of the two clamping plates 97 during working, at the moment, through regulation and control of the single chip microcomputer 2, the motor 14 starts to operate, an output shaft drives the right screw 91 to rotate, the right screw 91 drives the left belt pulley 92 to rotate through the right belt pulley 92, so as to drive the left screw 91 to rotate, so as to enable the two sliding blocks 93 to move backwards, an upward thrust can be given to the mounting seat 94 through the connecting rod 99 while the two sliding blocks 93 move backwards, so that the lifting platform 95 is driven to move upwards through the mounting seat 94, the distance between the clamping plates 97 and the limiting clamping and fixing of the construction engineering reinforcing steel bar is finally realized, at the moment, through regulation and control of the single chip microcomputer 2, the electric push rod 8 starts to operate, the pressing plate 5 is pushed to extrude the construction engineering reinforcing steel bar to be detected, as the electric push rod 8 is continuously increased in pressure, the pressure detector 11 can be capable of conveying the supporting plate 11 to the supporting plate 11, the supporting plate 11 can be contacted with the pressure detector 12, and the pressure detector 12, so as the construction engineering reinforcing steel bar can be detected in real-time, the pressure detector can be detected, the pressure of the construction engineering reinforcing bar can be detected, the construction engineering detector 12, and the construction pressure detector can be detected in real-time, the construction quality detector can be detected, the construction quality detector 12, and the construction quality detector can be detected, the construction quality detector can be detected in real-time, the construction quality detector 12, and the construction detector can be detected, the strength of the construction detector can be detected, and the construction bar can be detected, the pressure detector 12 can be detected in real-time, the construction detector can be detected in real-time, the construction detector can be detected by the construction detector 12, the greater the pressure exerted by the electric push rod 8, and conversely the lower the strength and quality of the construction steel bars, the less the pressure exerted by the electric push rod 8.
It is worth noting that the single chip microcomputer 2 disclosed in the above embodiments may use STM8S207S8T6C, the electric push rod 8 may use YRJ0905, the pressure detector 12 may use OHR-M2, the motor 14 may use 5IK200A-AF, and the single chip microcomputer 2 controls the electric push rod 8, the pressure detector 12 and the motor 14 to operate by a method commonly used in the prior art.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a building engineering reinforcing bar check out test set which characterized in that: comprises a base (1) and a fixing mechanism (9);
base (1): the upper ends of the supporting columns (3) are respectively provided with a supporting column, the upper ends of the supporting columns (3) are fixedly connected with the lower end of a connecting plate (4), the lower end of the connecting plate (4) is provided with an electric push rod (8), the lower end of the telescopic end of the electric push rod (8) is provided with a pressing plate (5), the left side and the right side of the upper end of the base (1) are respectively provided with a connecting column (6), the lower end of the connecting column (6) respectively penetrates through a mounting hole formed in the upper end of the base (1) and is respectively and fixedly connected with the bottom wall of the base (1), and the upper ends of the connecting columns (6) are respectively and fixedly connected with the lower ends of vertically adjacent mounting plates (7);
fixing mechanism (9): the device is arranged in a base (1), the upper end of a fixing mechanism (9) is respectively and fixedly connected with the lower end of an installation plate (7), and a connecting column (6) is respectively and slidably connected with a sliding hole correspondingly arranged at the lower end of the fixing mechanism (9);
wherein: the novel multifunctional pedestal is characterized by further comprising a single chip microcomputer (2), wherein the single chip microcomputer (2) is located outside the pedestal (1), the input end of the single chip microcomputer (2) is electrically connected with an external power supply, and the input end of the electric push rod (8) is electrically connected with the output end of the single chip microcomputer (2).
2. The constructional engineering steel bar detection device of claim 1, wherein: fixed establishment (9) are including elevating platform (95), push rod (96), splint (97) and spacing splint (98), the upper end of spacing splint (98) respectively with the lower extreme fixed connection of mounting panel (7), spliced pole (6) correspond the slide opening sliding connection who sets up with elevating platform (95) lower extreme respectively, the upper end of elevating platform (95) all is provided with push rod (96), the upper end of push rod (96) all is provided with splint (97), splint (97) correspond with vertical adjacent spacing splint (98) upper and lower position respectively.
3. The constructional engineering steel bar detection device of claim 2, wherein: fixed establishment (9) still include screw rod (91), slider (93), mount pad (94) and connecting rod (99), screw rod (91) rotate respectively through the bearing and connect in the inside left and right sides of base (1), screw rod (91) respectively with the screw hole threaded connection that slider (93) lower extreme set up, slider (93) all with the diapire sliding connection of base (1), rotate through the round pin axle in the mounting groove that slider (93) upper end set up and be connected with connecting rod (99), mount pad (94) all set up in the lower extreme of elevating platform (95), the upper end of connecting rod (99) is connected through the lower extreme rotation of round pin axle with vertical adjacent mount pad (94) respectively.
4. The constructional engineering steel bar detection device of claim 3, wherein: the fixing mechanism (9) further comprises belt pulleys (92), the belt pulleys (92) are arranged at the front ends of the screws (91), and the two belt pulleys (92) are in transmission connection through a belt.
5. The constructional engineering steel bar detection device of claim 3, wherein: still include motor (14), motor (14) set up in the right side of base (1) front end, the rear end of motor (14) output shaft and the front end fixed connection of screw rod (91) on right side, and the input of motor (14) is connected with the output electricity of singlechip (2).
6. The constructional engineering steel bar detection device of claim 1, wherein: still include traveller (10) and spring (13), traveller (10) respectively with the sliding opening sliding connection that base (1) upper end set up, the lower extreme of traveller (10) all is provided with the baffle, the upper end of traveller (10) all with the lower extreme fixed connection of backup pad (11), spring (13) set up respectively between the lower extreme of the upper end of base (1) and backup pad (11), the outside of traveller (10) upside is all located in spring (13).
7. The constructional engineering steel bar detection device of claim 6, wherein: the pressure detection device is characterized by further comprising a pressure detector (12), wherein the pressure detector (12) is arranged in the middle of the upper end of the base (1), and the pressure detector (12) is located on the lower side of the supporting plate (11).
CN202222969866.6U 2022-11-08 2022-11-08 Building engineering reinforcing bar check out test set Active CN218726115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222969866.6U CN218726115U (en) 2022-11-08 2022-11-08 Building engineering reinforcing bar check out test set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222969866.6U CN218726115U (en) 2022-11-08 2022-11-08 Building engineering reinforcing bar check out test set

Publications (1)

Publication Number Publication Date
CN218726115U true CN218726115U (en) 2023-03-24

Family

ID=85611511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222969866.6U Active CN218726115U (en) 2022-11-08 2022-11-08 Building engineering reinforcing bar check out test set

Country Status (1)

Country Link
CN (1) CN218726115U (en)

Similar Documents

Publication Publication Date Title
CN212082792U (en) Building engineering scaffold frame is set up quality and is checked and accepted verifying attachment
CN211452823U (en) Stress application beam device of door and window physical property detection equipment
CN211727326U (en) Taper wire-wound sieve tube forming device
CN218726115U (en) Building engineering reinforcing bar check out test set
CN210570453U (en) Flatness detection device for pipe fitting machining
CN219434541U (en) Steel intensity detection device for building detection
CN217982996U (en) Auxiliary mounting bracket for transformer for power engineering
CN214308784U (en) Verticality detection device for pile body of prestressed pipe pile
CN215626554U (en) Temporary slideway convenient to hoist and mount
CN114704724B (en) Auxiliary system for power grid planning topology analysis
CN217393360U (en) Novel structure is corrected to panel level
CN214162189U (en) Fixed frock is used in machining
CN212513990U (en) Quality detection device for prefabricated groove template production
CN210893200U (en) Adjustable environment monitoring equipment
CN211697299U (en) Aluminum alloy bending degree detection assembly
CN218674515U (en) Steel wire strength detection device
CN113118658A (en) Bridge steel structure installation and construction method
CN220322335U (en) Solar cell panel silk screen thickness detection equipment
CN215788487U (en) Aluminum profile cutting device
CN213001997U (en) Bending device for iron art guardrail rail
CN218954422U (en) Pressure transmitter fixing frame
CN217304691U (en) Elevator door mechanical strength inspection device
CN218239670U (en) Steel construction beam column bending strength testing arrangement
CN214463901U (en) Steel pipe sliding device for inclined shaft
CN214503172U (en) Building engineering reinforcing bar quality testing equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant