CN218725432U - Rock soil sample drilling device for geological exploration - Google Patents

Rock soil sample drilling device for geological exploration Download PDF

Info

Publication number
CN218725432U
CN218725432U CN202222294224.0U CN202222294224U CN218725432U CN 218725432 U CN218725432 U CN 218725432U CN 202222294224 U CN202222294224 U CN 202222294224U CN 218725432 U CN218725432 U CN 218725432U
Authority
CN
China
Prior art keywords
frame
fixed mounting
wall
block
drill bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222294224.0U
Other languages
Chinese (zh)
Inventor
朱鹏瑞
王亚民
聂智超
尹纪龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Research Institute for Water Transport Engineering MOT
Original Assignee
Tianjin Research Institute for Water Transport Engineering MOT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Research Institute for Water Transport Engineering MOT filed Critical Tianjin Research Institute for Water Transport Engineering MOT
Priority to CN202222294224.0U priority Critical patent/CN218725432U/en
Application granted granted Critical
Publication of CN218725432U publication Critical patent/CN218725432U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model belongs to the technical field of sampling equipment, and a ground class sample bores gets device for geological survey is disclosed, comprising a base plate, the top fixed mounting of bottom plate has the frame, top fixedly connected with diaphragm between the inner wall of frame both sides, the middle part movable mounting of diaphragm bottom has the removal frame, the through-hole has been seted up at the top of diaphragm. The utility model discloses a frame is removed in the setting, the slab, brake motor, revolve board and fixed block, through starting brake motor, can be so that the pivot drives revolves the board and take place to rotate with the fixed block, because the rotation of fixed block, will drive the slab motion, simultaneously because the design of slider, the slab will drive the slider at the inside side-to-side motion of through-hole, because the motion of slider, will drive and remove the frame side-to-side motion, thereby can adjust the position of removing the frame, the effect of being convenient for adjust the sample position has finally been realized, thereby staff's work efficiency has been improved.

Description

Rock soil sample drilling device for geological exploration
Technical Field
The utility model belongs to the technical field of the sampling equipment, specifically a ground class sample bores gets device for geological survey.
Background
At present, the staff often need use the sample to bore and get the device when carrying out geological survey, thereby can bore and get the ground sample, make things convenient for the staff to detect, though current sample bores and gets the device and can realize boring the automation of ground and get, but in the in-service use process, the drill bit often is hindered by hard stone in the ground easily at the in-process that bores downwards, thereby lead to the sample failure, and then the staff need bore the sample and get the device and change the position and take a sample again, thereby work efficiency has been influenced, consequently, need improve it.
SUMMERY OF THE UTILITY MODEL
The utility model aims at above problem, the utility model provides a ground class sample bores gets device for geological survey has the advantage of being convenient for adjust sample position.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a ground class sample bores gets device for geological survey, comprising a base plate, the top fixed mounting of bottom plate has the frame, top fixedly connected with diaphragm between the inner wall of frame both sides, the middle part movable mounting of diaphragm bottom has the removal frame, the through-hole has been seted up at the top of diaphragm, the top fixed mounting who removes the frame has the slider that is located the through-hole inside, the other end of slider passes the through-hole and extends to the last surface and the fixedly connected with flat piece of diaphragm, the apical pore has been seted up on the top of flat piece, the middle part fixed mounting on frame inner wall top has brake motor, the fixed cover of the other end of brake motor output shaft has been cup jointed the pivot, the other end fixedly connected with rotor plate of pivot, the bottom of rotor plate and the top swing joint of flat piece, the bottom fixed mounting of rotor plate has the fixed block that is located the apical pore inside, the surface of fixed block and the inner wall swing joint of apical pore.
As the utility model discloses it is preferred, the middle part movable mounting who removes the frame inner wall has the lifter plate, the top fixed mounting who removes the frame inner wall has a driving motor, the fixed cup joint of the other end of a driving motor output shaft has the lead screw, the other end of lead screw runs through the lifter plate and extends to the bottom of removing the frame inner wall, the screw thread of lead screw surface and the screw thread looks adaptation of lifter plate inner wall.
As the utility model discloses it is preferred, the top fixed mounting of lifter plate has the second driving motor who is located first driving motor the place ahead, the other end of second driving motor output shaft is fixed to be cup jointed the circle axle, the bottom of circle axle is run through the lifter plate and is removed the frame and extend to the below and the fixedly connected with drill bit that remove the frame.
As the utility model discloses it is preferred, the top fixed mounting of drill bit has the square, the other end of square extend to the inside of circle axle and with the inner wall swing joint of circle axle, the side opening has been seted up to the bottom on circle axle right side, the central groove has been seted up on the right side of square, the screw has been cup jointed to the inside screw thread of square, the other end of screw passes side opening and central groove and extends to the right side of circle axle, the screw thread looks adaptation of the screw surface and side opening, central inslot wall.
As the utility model discloses it is preferred, the positive movable mounting of drill bit has the baffle, spacing hole has been seted up at the top of drill bit, the top fixed mounting of baffle has the fixture block that is located spacing downthehole portion, the antiskid groove has all been seted up at the middle part of baffle both sides.
As the utility model discloses it is preferred, the top fixed mounting of drill bit has the arc piece that is located the fixture block top, the bolt has been cup jointed in the inside activity of arc piece, the bottom of bolt runs through the arc piece and extends to the inside of fixture block, the top of bolt runs through the arc piece and extends to the top and the fixedly connected with of arc piece and draws the piece.
As the utility model discloses it is preferred, the surface activity of bolt has cup jointed the flexible spring that is located the arc piece and draws between the piece, the one end fixed mounting of flexible spring draws the bottom of piece, the other end fixed mounting of flexible spring is on the top of arc piece.
As the utility model discloses it is preferred, the bottom hole that is located the drill bit below is seted up on the bottom plate top, the bottom movable mounting of bottom plate has the universal wheel.
As the utility model discloses it is preferred, the equal fixed mounting in middle part of frame both sides has the handle, the quantity of handle is two, two the handle is about the circular axis central symmetry.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a frame is removed in the setting, the slab, brake motor, revolve board and fixed block, through starting brake motor, can be so that the pivot drives revolves the board and take place to rotate with the fixed block, because the rotation of fixed block, will drive the slab motion, simultaneously because the design of slider, the slab will drive the slider at the inside side-to-side motion of through-hole, because the motion of slider, will drive and remove the frame side-to-side motion, thereby can adjust the position of removing the frame, the effect of being convenient for adjust the sample position has finally been realized, thereby staff's work efficiency has been improved.
2. The utility model discloses a set up baffle, fixture block, bolt, draw piece and flexible spring, draw the piece through upwards pulling, can drive bolt upward movement and tensile flexible spring, when the bottom of bolt breaks away from the inside of fixture block, just removed the fixed effect to the fixture block to can stimulate the baffle through the antiskid groove, make baffle and fixture block break away from the front of bolt, and then realized the dismantlement to the baffle, thereby made things convenient for the staff to take out the inside ground sample of drill bit.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic front sectional view of the present invention;
FIG. 3 is a schematic side sectional view of the present invention;
fig. 4 is a schematic back structure diagram of the present invention;
FIG. 5 is an enlarged view of a portion of the structure at A in FIG. 1;
FIG. 6 is a schematic view of a portion B of FIG. 2;
fig. 7 is a partially enlarged structural view at C in fig. 3.
In the figure: 1. a base plate; 2. a frame; 3. a transverse plate; 4. moving the frame; 5. a through hole; 6. a slider; 7. flat blocks; 8. a top hole; 9. a brake motor; 10. a rotating shaft; 11. rotating the plate; 12. a fixed block; 13. a lifting plate; 14. a first drive motor; 15. a lead screw; 16. a second drive motor; 17. a circular shaft; 18. a drill bit; 19. a block; 20. a side hole; 21. a central slot; 22. a screw; 23. a baffle plate; 24. a limiting hole; 25. a clamping block; 26. an anti-slip groove; 27. an arc-shaped block; 28. a bolt; 29. pulling the block; 30. a flexible spring; 31. a bottom hole; 32. a universal wheel; 33. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 to 7, the utility model provides a ground class sample bores gets device for geological survey, comprising a base plate 1, the top fixed mounting of bottom plate 1 has frame 2, top fixedly connected with diaphragm 3 between the inner wall of 2 both sides of frame, the middle part movable mounting of diaphragm 3 bottom has removal frame 4, through-hole 5 has been seted up at diaphragm 3's top, the top fixed mounting that removes frame 4 has slider 6 that is located through-hole 5 inside, slider 6's the other end passes through-hole 5 and extends to diaphragm 3's upper surface and fixedly connected with flat 7, apical pore 8 has been seted up on flat 7's top, the middle part fixed mounting on frame 2 inner wall top has brake motor 9, the other end of brake motor 9 output shaft is fixed to be cup jointed pivot 10, the other end fixedly connected with of pivot 10 revolves board 11, the bottom of revolves board 11 and the top swing joint of flat 7, the bottom fixed mounting of revolves board 11 has fixed block 12 that is located apical pore 8 inside, the surface of fixed block 12 and the inner wall swing joint of apical pore 8.
Through starting brake motor 9, can be so that pivot 10 drives and revolves board 11 and fixed block 12 and take place to rotate, because the design of slider 6, the rotation of fixed block 12 will drive the horizontal migration of flat block 7 to make flat block 7 drive slider 6 at the inside horizontal migration of through-hole 5, because the motion of slider 6, will drive and remove frame 4 horizontal migration, thereby can adjust the position that removes frame 4.
Referring to fig. 2 to 4, the middle part of the inner wall of the movable frame 4 is movably provided with a lifting plate 13, the top end of the inner wall of the movable frame 4 is fixedly provided with a first driving motor 14, the other end of the output shaft of the first driving motor 14 is fixedly sleeved with a lead screw 15, the other end of the lead screw 15 penetrates through the lifting plate 13 and extends to the bottom of the inner wall of the movable frame 4, and the thread on the outer surface of the lead screw 15 is matched with the thread on the inner wall of the lifting plate 13.
As a technical optimization scheme of the utility model, through starting first driving motor 14, can be so that lead screw 15 takes place to rotate to can make lifter plate 13 reciprocate.
Referring to fig. 1 to 5, a second driving motor 16 located in front of the first driving motor 14 is fixedly installed at the top end of the lifting plate 13, a circular shaft 17 is fixedly sleeved at the other end of an output shaft of the second driving motor 16, and a drill 18 is fixedly connected to the bottom end of the circular shaft 17, penetrates through the lifting plate 13 and the moving frame 4, and extends to the lower side of the moving frame 4.
As a technical optimization scheme of the utility model, through starting second driving motor 16, can be so that circle axle 17 drives drill bit 18 and takes place to rotate.
Referring to fig. 6, a block 19 is fixedly mounted at the top end of the drill 18, the other end of the block 19 extends into the circular shaft 17 and is movably connected with the inner wall of the circular shaft 17, a side hole 20 is formed at the bottom end of the right side of the circular shaft 17, a central groove 21 is formed at the right side of the block 19, a screw 22 is sleeved on the internal thread of the block 19, the other end of the screw 22 penetrates through the side hole 20 and the central groove 21 and extends to the right side of the circular shaft 17, and the thread on the outer surface of the screw 22 is matched with the threads on the inner walls of the side hole 20 and the central groove 21.
As a technical optimization scheme of the utility model, through the design of screw 22, can make things convenient for staff's dismouting drill bit 18 to be convenient for take out the ground sample of 18 inside of drill bits.
Referring to fig. 1, 5 and 7, a baffle 23 is movably mounted on the front surface of the drill 18, a limiting hole 24 is formed in the top of the drill 18, a clamping block 25 located in the limiting hole 24 is fixedly mounted on the top of the baffle 23, and anti-slip grooves 26 are formed in the middle portions of two sides of the baffle 23.
As a technical optimization scheme of the utility model, through the design in antiskid groove 26, can make things convenient for the staff to take off baffle 23 to can acquire the inside ground sample of drill bit 18.
Referring to fig. 5 and 7, an arc block 27 located above the fixture block 25 is fixedly mounted at the top end of the drill 18, a bolt 28 is movably sleeved inside the arc block 27, the bottom end of the bolt 28 penetrates through the arc block 27 and extends into the fixture block 25, and the top end of the bolt 28 penetrates through the arc block 27 and extends above the arc block 27 and is fixedly connected with a pull block 29.
As a technical optimization scheme of the utility model, through pulling pull block 29, can make bolt 28 break away from the inside of fixture block 25 to can remove the fixed effect to baffle 23.
Referring to fig. 5 and 7, a flexible spring 30 located between the arc block 27 and the pulling block 29 is movably sleeved on the outer surface of the latch 28, one end of the flexible spring 30 is fixedly installed at the bottom end of the pulling block 29, and the other end of the flexible spring 30 is fixedly installed at the top end of the arc block 27.
As a technical optimization scheme of the utility model, elasticity through flexible spring 30 resumes the effect for draw the trend of piece 29 to the downstream, thereby can fix bolt 28 in fixture block 25's inside, prevent that bolt 28 from rocking because of the accident and coming off from fixture block 25's inside.
Referring to fig. 1 to 4, a bottom hole 31 is formed at the top end of the bottom plate 1 and located below the drill bit 18, and a universal wheel 32 is movably mounted at the bottom end of the bottom plate 1.
As a technical optimization scheme of the utility model, through the design of universal wheel 32, can make things convenient for staff's mobile device.
Referring to fig. 1, 2 and 4, two handles 33 are fixedly mounted at the middle portions of both sides of the frame 2, and the two handles 33 are centrosymmetric about the circular shaft 17.
As a technical optimization scheme of the utility model, through the design of handle 33, can make things convenient for staff's push-and-pull equipment.
The utility model discloses a theory of operation and use flow:
firstly, the worker can start the second driving motor 16, because of the operation of the second driving motor 16, the round shaft 17 can drive the drill bit 18 to rotate, then the first driving motor 14 can be started, because of the operation of the first driving motor 14, the lead screw 15 can be rotated, because of the adaptation of the thread on the outer surface of the lead screw 15 and the thread on the inner wall of the lifting plate 13, the lifting plate 13 can be moved downwards due to the rotation of the lead screw 15, because of the movement of the lifting plate 13, the second driving motor 16, the round shaft 17 and the drill bit 18 can be driven to move downwards together, so that the rock soil sample can be drilled downwards, when the downward movement of the drill bit 18 is obstructed, the worker can reset the drill bit 18 and then start the brake motor 9, because of the operation of the brake motor 9, the rotating shaft 10 can drive the rotary plate 11 and the fixed block 12 to rotate, meanwhile, because of the design of the slide block 6, the rotation of the fixed block 12 can drive the flat block 7 to move left and right, because of the slide block 7, the slide block 6 can be driven to move left and right inside the through hole 5, because of the slide 6, the left and right movement of the first driving frame 4 can be driven, thereby the left and right movement of the first driving motor 16, the drill bit 17, thereby the final sampling efficiency is improved, and right movement of the left and right movement of the sampling efficiency is achieved.
When the staff need take out the inside ground sample of drill bit 18, at first can rotate screw 22, screw 22 is unscrewed from the inside of central groove 21, thereby the fixed effect to square 19 and drill bit 18 has been removed, then drill bit 18 is taken off, later the staff can upwards stimulate pull block 29, make bolt 28 upward movement and tensile flexible spring 30, when the bottom of bolt 28 breaks away from the inside of fixture block 25, just the fixed effect to fixture block 25 has been removed, thereby can pull baffle 23 through antiskid groove 26, make baffle 23 and fixture block 25 break away from the front of bolt 28, and then realized the dismantlement to baffle 23, thereby made things convenient for the staff to take out the inside ground sample of drill bit 18.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a ground class sample bores gets device for geological survey, includes bottom plate (1), its characterized in that: the utility model discloses a brake device, including bottom plate (1), the top fixed connection of bottom plate (1) has frame (2), top fixedly connected with diaphragm (3) between frame (2) both sides inner wall, the middle part movable mounting of diaphragm (3) bottom has removal frame (4), through-hole (5) have been seted up at the top of diaphragm (3), the top fixed mounting that removes frame (4) has slider (6) that are located through-hole (5) inside, the other end of slider (6) passes through-hole (5) and extends to the upper surface and the fixedly connected with flat block (7) of diaphragm (3), apical pore (8) have been seted up on the top of flat block (7), the middle part fixed mounting on frame (2) inner wall top has brake motor (9), the other end fixed cup joint of brake motor (9) output shaft has pivot (10), the other end fixedly connected with of pivot (10) revolves board (11), revolve the bottom of board (11) and the top swing joint of flat block (7), the bottom fixed mounting of board (11) has fixed block (12) that is located apical pore (8) inside, the surface and the swing joint of fixed block (12).
2. The apparatus for drilling the geotechnical sample according to claim 1, wherein: the utility model discloses a portable electronic device, including removal frame (4), the middle part movable mounting who removes frame (4) inner wall has lifter plate (13), the top fixed mounting who removes frame (4) inner wall has first driving motor (14), the fixed cover of the other end of first driving motor (14) output shaft has lead screw (15), the other end of lead screw (15) runs through lifter plate (13) and extends to the bottom that removes frame (4) inner wall, the screw thread of lead screw (15) surface and the screw thread looks adaptation of lifter plate (13) inner wall.
3. The apparatus for drilling geotechnical specimens for geological exploration according to claim 2, wherein: the top fixed mounting of lifter plate (13) has second driving motor (16) that is located first driving motor (14) the place ahead, the other end of second driving motor (16) output shaft is fixed the cup joint and is had a circle axle (17), the bottom of circle axle (17) runs through lifter plate (13) and removes frame (4) and extends to below and the fixedly connected with drill bit (18) that remove frame (4).
4. The apparatus for drilling geotechnical specimens for geological exploration according to claim 3, wherein: the top fixed mounting of drill bit (18) has square (19), the other end of square (19) extends to the inside of circle axle (17) and with the inner wall swing joint of circle axle (17), side opening (20) have been seted up to the bottom on circle axle (17) right side, central groove (21) have been seted up on the right side of square (19), screw (22) have been cup jointed to the internal thread of square (19), the other end of screw (22) passes side opening (20) and central groove (21) and extends to the right side of circle axle (17), the screw thread of screw (22) surface and the screw thread looks adaptation of side opening (20), central groove (21) inner wall.
5. The apparatus for drilling geotechnical specimens for geological exploration according to claim 3, wherein: the front face of the drill bit (18) is movably provided with a baffle (23), the top of the drill bit (18) is provided with a limiting hole (24), the top of the baffle (23) is fixedly provided with a clamping block (25) located in the limiting hole (24), and the middle parts of two sides of the baffle (23) are provided with anti-skidding grooves (26).
6. The apparatus for drilling the geotechnical sample according to claim 3, wherein: the top fixed mounting of drill bit (18) has arc piece (27) that are located fixture block (25) top, bolt (28) have been cup jointed in the inside activity of arc piece (27), the bottom of bolt (28) runs through arc piece (27) and extends to the inside of fixture block (25), the top of bolt (28) runs through arc piece (27) and extends to the top and the fixedly connected with of arc piece (27) and draws piece (29).
7. The apparatus for drilling geotechnical specimens for geological exploration according to claim 6, wherein: the outer surface activity of bolt (28) is cup jointed and is located arc piece (27) and draw flexible spring (30) between piece (29), the one end fixed mounting of flexible spring (30) draws the bottom of piece (29), the other end fixed mounting of flexible spring (30) is on the top of arc piece (27).
8. The apparatus for drilling geotechnical specimens for geological exploration according to claim 1, wherein: the drilling tool is characterized in that a bottom hole (31) located below the drill bit (18) is formed in the top end of the bottom plate (1), and universal wheels (32) are movably mounted at the bottom end of the bottom plate (1).
9. The apparatus for drilling geotechnical specimens for geological exploration according to claim 1, wherein: the middle parts of the two sides of the frame (2) are fixedly provided with handles (33), the number of the handles (33) is two, and the handles (33) are symmetrical about the center of the circular shaft (17).
CN202222294224.0U 2022-08-31 2022-08-31 Rock soil sample drilling device for geological exploration Expired - Fee Related CN218725432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222294224.0U CN218725432U (en) 2022-08-31 2022-08-31 Rock soil sample drilling device for geological exploration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222294224.0U CN218725432U (en) 2022-08-31 2022-08-31 Rock soil sample drilling device for geological exploration

Publications (1)

Publication Number Publication Date
CN218725432U true CN218725432U (en) 2023-03-24

Family

ID=85631442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222294224.0U Expired - Fee Related CN218725432U (en) 2022-08-31 2022-08-31 Rock soil sample drilling device for geological exploration

Country Status (1)

Country Link
CN (1) CN218725432U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116146104A (en) * 2023-04-18 2023-05-23 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Rock and soil layer drilling device for hydrogeological survey

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116146104A (en) * 2023-04-18 2023-05-23 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Rock and soil layer drilling device for hydrogeological survey

Similar Documents

Publication Publication Date Title
CN218725432U (en) Rock soil sample drilling device for geological exploration
CN210863229U (en) Sampling device for geological exploration
CN111673917B (en) Building wall punching device and using method thereof
CN214687309U (en) Concrete that can fixed point processing punches and uses electric hammer
CN116698495A (en) Geological mineral exploration device and method
CN211401725U (en) Geotechnical engineering stone sampling device convenient to control depth
CN212857824U (en) Door and window drilling machine convenient to collect sweeps
CN212300902U (en) Automatic analysis device for road
CN211598499U (en) Geology reconnaissance probing device
CN213510427U (en) Drilling device for coal mine
CN218629075U (en) Soil sampling equipment
CN215520759U (en) Geological exploration perforating device for sampling
CN213775265U (en) Drilling equipment is used in road bridge construction
CN112664139B (en) Adjustable multi-angle drilling rig for coal mining
CN217602586U (en) Drilling machine for road exploration
CN210487320U (en) Sampling device for geological mineral exploration
CN214502967U (en) Highway bridge tunnel detects with sampling device that punches
CN220687237U (en) Underwater down-the-hole drill with adjustable drilling angle
CN215218110U (en) Sample collecting device for soil remediation
CN213714776U (en) Novel non-disturbance sampler suitable for lower soil
CN217560999U (en) Automatic core drilling machine for road detection
CN220081304U (en) Be applied to rare metal's of pegmatite prospecting drilling equipment
CN213627449U (en) Downhole tool of downhole multi-branch ultrashort radius horizontal drilling completion system
CN220932412U (en) Sampling device for detecting soil
CN214309598U (en) Soil sampling drilling tool device for geological exploration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230324

CF01 Termination of patent right due to non-payment of annual fee