CN218720655U - Integrated gas circuit device - Google Patents

Integrated gas circuit device Download PDF

Info

Publication number
CN218720655U
CN218720655U CN202222831772.2U CN202222831772U CN218720655U CN 218720655 U CN218720655 U CN 218720655U CN 202222831772 U CN202222831772 U CN 202222831772U CN 218720655 U CN218720655 U CN 218720655U
Authority
CN
China
Prior art keywords
gas
trunk line
gas circuit
pipeline
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222831772.2U
Other languages
Chinese (zh)
Inventor
姚精
阮洋兵
罗松
朱龙龙
史其麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiding Conch Panjiang Cement Co ltd
Anhui Conch Cement Co Ltd
Anhui Conch Holdings Co Ltd
Original Assignee
Guiding Conch Panjiang Cement Co ltd
Anhui Conch Cement Co Ltd
Anhui Conch Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiding Conch Panjiang Cement Co ltd, Anhui Conch Cement Co Ltd, Anhui Conch Holdings Co Ltd filed Critical Guiding Conch Panjiang Cement Co ltd
Priority to CN202222831772.2U priority Critical patent/CN218720655U/en
Application granted granted Critical
Publication of CN218720655U publication Critical patent/CN218720655U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model discloses an integrated gas circuit device, include air compressor machine, wall body and be used for gas transportation's gas circuit part, the gas circuit part is including the trunk line of locating air compressor machine one end, locate the first gas water filter of trunk line one end, a plurality of branch pipes of locating on the trunk line cambered surface and locate the ball valve at branch pipe middle part, one side of wall body is seted up flutedly, in the recess was located to the trunk line, through setting up air compressor machine, wall body, trunk line, first gas water filter, branch pipe, recess and ball valve etc. solved and possessed through the installation of integrated gas pipeline, used the gas transportation of ball valve switch as the sectional type, realized the advantage of multipoint mode gas sharing through a pipeline circulation to the access point behind the air compressor machine compressed gas, solved current integrated gas circuit pipeline when laying, often need lay a plurality of pipelines, to a plurality of points air feed alone to so that guarantee atmospheric pressure's stability, the laying time of pipeline is longer, and consume the problem of manpower.

Description

Integrated gas circuit device
Technical Field
The utility model belongs to the technical field of integrated gas circuit, especially, relate to an integrated gas circuit device.
Background
Integrated gas circuit can be used often in workshop factory building, in equipment trouble, is convenient for utilize integrated gas circuit to overhaul, and current integrated gas circuit pipeline often need lay a plurality of pipelines when laying, to the independent air feed of a plurality of points to in order to guarantee the stability of atmospheric pressure, the lay time of pipeline is longer, and consumes the manpower.
SUMMERY OF THE UTILITY MODEL
Problem to prior art exists, the utility model provides an integrated gas circuit device possesses through integrated gas piping erection, use ball valve switch as the gas transportation of sectional type, air compressor machine compressed gas is back through a pipeline circulation to maintenance point, realize the advantage of multipoint mode gas sharing, current integrated gas circuit pipeline has been solved and when laying, often need lay a plurality of pipelines, to a plurality of independent air feeds, so that guarantee the stability of atmospheric pressure, the laying time of pipeline is longer, and consume the problem of manpower.
The utility model discloses a realize like this, an integrated gas circuit device, include air compressor machine, wall body and be used for gas transportation's gas circuit part, the gas circuit part is including the trunk line of locating air compressor machine one end, locate the first gas water filter of trunk line one end, a plurality of pipeline of locating in the trunk line cambered surface and the ball valve of locating the pipeline middle part, one side of wall body is seted up flutedly, the trunk line is located in the recess.
As the utility model discloses it is preferred, one side of wall body is equipped with a plurality of air drum crimps the ware, the one end of lateral conduit is equipped with the air drum quick-operation joint, the one end and the air drum quick-operation joint grafting cooperation of air drum crimps the ware.
As the utility model discloses preferred, one side of lateral duct is equipped with second air water filter.
As the utility model discloses it is preferred, the one end of small transfer line is provided with the tee bend interface, the both ends of tee bend interface are connected fixedly with the trunk line respectively.
As the utility model discloses it is preferred, one side of wall body is equipped with fixed buckle, the inboard and the tributary canal joint of fixed buckle.
As the utility model discloses preferred, one side of wall body is equipped with a plurality of couples.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the air compressor machine, the wall body, the trunk line, first vapor filter, the small transfer line, recess and ball valve etc, it is used for laying of trunk line to have reached through seting up the recess in one side of wall body, simultaneously through set up the ball valve on each small transfer line, can pass through trunk line and small transfer line inflow respectively through the air compressor machine conveying gas and overhaul the operation point, the switch of overhaul the point is controlled through solitary ball valve respectively, simultaneously at the first vapor filter of the one end installation of trunk line, when increasing enough assurance gas drying, realize the gaseous sharing of multiple-point type, make the utilization efficiency of resource increase.
2. The utility model discloses a set up the drum crimper and the quick-operation joint of air drum, can make each maintenance point all can utilize the drum crimper and the quick-operation joint of air drum to peg graft fast to and utilize the length that the drum crimper extends the pipeline, the easy access point uses.
3. The utility model discloses a set up second air water filter, can make the in-process of gas transportation, need pass through first air water filter and second air water filter, can carry out double filtration to gas, guaranteed gaseous quality.
4. The utility model discloses a set up three way connection, can overlap the tooth through the mantle fiber machine at the junction of trunk line and small transfer line and cross the back, can adopt three way connection to carry out quick installation, and then can reduce the time of pipe laying to a certain extent.
5. The utility model discloses a set up fixed buckle, can make the branch pipe say and fix through fixed buckle and wall body, stability when guaranteeing that the branch pipe says and lays.
6. The utility model discloses a set up the couple, can make the drum crimper put convenient to use on the wall body through the couple.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is an enlarged schematic view of the embodiment of the present invention at B in fig. 1;
fig. 3 is an enlarged schematic view of the embodiment of the present invention at C in fig. 1;
fig. 4 is a top view of fig. 1 according to an embodiment of the present invention.
In the figure: 1. an air compressor; 2. a wall body; 3. a main pipeline; 4. a first gas-water filter; 5. a pipeline is branched; 6. a ball valve; 7. a groove; 8. an air drum crimper; 9. an air drum quick connector; 10. a second gas-water filter; 11. a three-way interface; 12. fixing the buckle; 13. and (4) hanging hooks.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 4, the embodiment of the utility model provides an integrated gas circuit device, including air compressor machine 1, wall body 2 and the gas circuit part that is used for gas transportation, the gas circuit part is including trunk line 3 of locating 1 one end of air compressor machine, the first gas water filter 4 of locating 3 one ends of trunk line, a plurality of 3 cambered upward branch pipes of trunk line 5 of locating and locate the ball valve 6 at branch pipe 5 middle part, recess 7 has been seted up to one side of wall body 2, trunk line 3 is located in recess 7.
The scheme is adopted: through setting up air compressor machine 1, wall body 2, trunk line 3, first vapor filter 4, small transfer line 5, recess 7 and ball valve 6 etc, it is used for laying of trunk line 3 to have reached through seting up recess 7 in one side of wall body 2, simultaneously through setting up ball valve 6 on each small transfer line 5, can flow into each maintenance operation point through trunk line 3 and small transfer line 5 through air compressor machine 1 conveying gas, the switch of maintenance point is controlled through solitary ball valve 6 respectively, simultaneously at the first vapor filter of trunk line 3's one end installation, when increasing enough assurance gas drying, realize the gaseous sharing of multiple-point type, make the utilization efficiency of resource increase.
Referring to fig. 1 and 2, a plurality of air drum crimpers 8 are arranged on one side of the wall body 2, an air drum quick connector 9 is arranged at one end of the branch pipe 5, and one end of each air drum crimper 8 is in plug-in fit with the air drum quick connector 9.
Adopt above-mentioned scheme: through setting up the air drum crimper 8 and the quick-operation joint of air drum 9, can make each maintenance point all can utilize the quick grafting of air drum crimper 8 and air drum quick-operation joint 9 to and utilize the length that the air drum crimper 8 extends the pipeline, the convenient to overhaul point uses.
Referring to fig. 2, a second air-water filter 10 is disposed at one side of the branch pipe 5.
Adopt above-mentioned scheme: through setting up second gas water filter 10, can make the in-process of gas transportation, need pass through first gas water filter 4 and second gas water filter 10, can carry out double filtration to gas, guaranteed gaseous quality.
Referring to fig. 3, one end of the branch pipe 5 is provided with a three-way connector 11, and two ends of the three-way connector 11 are respectively connected and fixed with the main pipe 3.
Adopt above-mentioned scheme: through setting up three way connection, can overlap the tooth through the mantle fiber machine at the junction of trunk line 3 and small transfer line 5 and cross the back, can adopt tee bend interface 11 to carry out quick installation, and then can reduce the time of pipe laying to a certain extent.
Referring to fig. 4, a fixing buckle 12 is arranged on one side of the wall 2, and the inner side of the fixing buckle 12 is clamped with the branch pipe 5.
Adopt above-mentioned scheme: through setting up fixed buckle 12, can make a pipeline 5 can fix with wall body 2 through fixed buckle 12, stability when guaranteeing a pipeline 5 and lay.
Referring to fig. 2, a plurality of hooks 13 are provided at one side of the wall body 2.
Adopt above-mentioned scheme: through setting up couple 13, can make the drum crimper 8 hang through couple 13 and put convenient to use on wall body 2.
When using, at first set up recess 7 on the ground of factory building and be used for laying of trunk line 3, then cover the tooth through the mantle fiber machine at trunk line 3 and branch pipeline 5's junction and cross the back, can adopt tee bend interface 11 to carry out quick installation, and then can reduce the time of pipe laying to a certain extent, set up ball valve 6 on each branch pipeline 5 simultaneously, and set up gas drum quick-operation joint 9 in the one end of branch pipeline 5, be used for the quick grafting of gas drum crimper 8 and gas drum quick-operation joint 9, the length of extension pipeline, the inspection point of being convenient for uses, when using, each ball valve 6 is in the closure state, need when certain check point uses, only need open ball valve 6 that inspection point, circulate to the inspection point through a pipeline after through air compressor machine 1 compressed gas, at this in-process, gas need pass through first air water filter 4 and second air water filter 10, can carry out double filtration to gas, the quality of gas has been guaranteed, at last recess 7 is filled the solidification again can.
In summary, the following steps: this integrated gas circuit device, through setting up air compressor machine 1, wall body 2, trunk line 3, first air water filter 4, branch pipeline 5, recess 7 and ball valve 6 etc, it installs through integrated gas pipeline to have solved, use the gas transportation of ball valve 6 switch as the sectional type, 1 compressed gas of air compressor machine is back through a plurality of pipeline circulation to maintenance point, realize the gaseous shared advantage of multipoint formula, it is when laying to have solved current integrated gas circuit pipeline, often need lay a plurality of pipelines, supply gas alone a plurality of points, so that guarantee the stability of atmospheric pressure, the laying time of pipeline is longer, and consume the problem of manpower.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an integrated gas circuit device, includes air compressor machine (1), wall body (2) and is used for gaseous gas circuit part who carries, its characterized in that: the gas circuit part is including trunk line (3) of locating air compressor machine (1) one end, first gas water filter (4) of locating trunk line (3) one end, a plurality of pipeline (5) of locating on trunk line (3) cambered surface and ball valve (6) of locating pipeline (5) middle part, recess (7) have been seted up to one side of wall body (2), in recess (7) are located in trunk line (3).
2. An integrated gas circuit device according to claim 1, wherein: one side of wall body (2) is equipped with a plurality of air drum crimpers (8), the one end of branch pipeline (5) is equipped with air drum quick-operation joint (9), the one end and the air drum quick-operation joint (9) grafting cooperation of air drum crimper (8).
3. An integrated gas circuit device in accordance with claim 1, wherein: and a second gas-water filter (10) is arranged on one side of the branch pipeline (5).
4. An integrated gas circuit device according to claim 3, wherein: one end of the branch pipeline (5) is provided with a three-way connector (11), and two ends of the three-way connector (11) are fixedly connected with the main pipeline (3) respectively.
5. An integrated gas circuit device according to claim 1, wherein: one side of wall body (2) is equipped with fixed buckle (12), the inboard and the branch pipeline (5) joint of fixed buckle (12).
6. An integrated gas circuit device in accordance with claim 5, wherein: and a plurality of hooks (13) are arranged on one side of the wall body (2).
CN202222831772.2U 2022-10-26 2022-10-26 Integrated gas circuit device Active CN218720655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222831772.2U CN218720655U (en) 2022-10-26 2022-10-26 Integrated gas circuit device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222831772.2U CN218720655U (en) 2022-10-26 2022-10-26 Integrated gas circuit device

Publications (1)

Publication Number Publication Date
CN218720655U true CN218720655U (en) 2023-03-24

Family

ID=85591450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222831772.2U Active CN218720655U (en) 2022-10-26 2022-10-26 Integrated gas circuit device

Country Status (1)

Country Link
CN (1) CN218720655U (en)

Similar Documents

Publication Publication Date Title
CN218720655U (en) Integrated gas circuit device
CN104019368A (en) Pipeline internal recycling device
CN204756251U (en) Antiskid silk connection pipe fitting
CN210194326U (en) Vacuum system for wire part and press part of paper machine
CN209818984U (en) Quick-connection one-way stop valve with spring self-locking function
CN208619866U (en) A kind of construction pipeline support equipment
CN217926223U (en) Intermittent large-flow gas transmission air compression station
CN205816277U (en) A kind of integrated feed arrangement
CN208268591U (en) A kind of connection structure of follow-on exhaust pipe and silencer
CN214148914U (en) Waste heat utilization device at top of tube bundle dryer in corn starch processing
CN217503974U (en) Double-row pipe and double-row pipeline for bathtub heat compensating device
CN218152842U (en) Pipeline protector for municipal water supply
CN211289141U (en) Air draft pipeline
CN210801545U (en) Clean idle call tuber pipe
CN211821170U (en) Sewage PVC composite pipe for home decoration
CN217813843U (en) Air inlet pipeline structure of oxygen compressor
CN214305645U (en) Economical glass fiber composite color steel air pipe
CN210104865U (en) Water supply pipeline with novel structure
CN218671584U (en) Steam buffer device
CN209557854U (en) A kind of cooling water pipe quick coupling
CN217633323U (en) Wall-mounted gas pipeline mounting pipe hoop
CN211503170U (en) Laboratory exhaust pipe capable of preventing condensate water from flowing outwards
CN211121441U (en) L-shaped integrated elbow connected with gas meter
CN216385863U (en) Automatic change gas processing apparatus
CN209944004U (en) Closed-loop air supply path structure of air compressor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant