CN218719633U - Two-in two-out faucet embedded main body - Google Patents

Two-in two-out faucet embedded main body Download PDF

Info

Publication number
CN218719633U
CN218719633U CN202222990292.0U CN202222990292U CN218719633U CN 218719633 U CN218719633 U CN 218719633U CN 202222990292 U CN202222990292 U CN 202222990292U CN 218719633 U CN218719633 U CN 218719633U
Authority
CN
China
Prior art keywords
ppr
main part
interface
main body
tap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222990292.0U
Other languages
Chinese (zh)
Inventor
龚小洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222990292.0U priority Critical patent/CN218719633U/en
Application granted granted Critical
Publication of CN218719633U publication Critical patent/CN218719633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • Y02A20/411Water saving techniques at user level

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

The utility model discloses a two advance pre-buried main parts of tap of two plays, including PPR tap main part, the bottom of PPR tap main part is equipped with a plurality of PPR interface of intaking, the front portion of PPR tap main part be equipped with a plurality of with the play water interface of PPR interface intercommunication of intaking, PPR interface of intaking, play water interface with PPR tap main part integrated into one piece, the left and right sides of PPR tap main part all is equipped with a mounting panel, the mounting panel is equipped with a plurality of mounting holes, the mounting hole is rectangular shape setting, the top of PPR tap main part is equipped with panel screw mounting hole. The utility model discloses simple structure, it is small, corrosivity is strong, and is tasteless nontoxic, long service life, it is easy to intake and connect, and the installation is simple and easy swift, installation labour saving and time saving, and the installation effectiveness is high, and the installation cost is low, and the installation is firm, brings the convenience for the user, with various bathroom product firm in connection, can not flagging and droing in the product use, consumer experience is good.

Description

Two-in two-out faucet embedded main body
Technical Field
The utility model relates to a tap technical field, concretely relates to two advance two tap pre-buried main parts of play.
Background
Along with the requirement of people on the quality of life is gradually improved, the embedded main body of the faucet does not occupy space and is deeply liked by consumers due to the attractiveness and the practicability of the embedded main body of the faucet. But the pre-buried main part of current tap is generally made by the copper casting, and is bulky, when intaking interface and advance water piping connection, because of current water pipe is mostly the PPR pipe, in the connection process, need be at the tip installation metal joint of PPR pipe, again with intake interface connection, connect the installation difficulty, waste time and energy, the installation effectiveness is low, and installation cost is high, brings inconvenience for the user. Therefore, there is a need for improvements in the prior art to avoid the disadvantages of the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the shortcoming and not enough among the prior art, provide a simple structure, simple to operate's two tap pre-buried main parts of advancing two.
The utility model discloses a realize through following technical scheme:
the utility model provides a two advance pre-buried main parts of tap of two plays, includes PPR tap main part, the bottom of PPR tap main part is equipped with a plurality of PPR interface of intaking, the front portion of PPR tap main part be equipped with a plurality of with the play water interface of PPR interface intercommunication of intaking, PPR interface of intaking, play water interface with PPR tap main part integrated into one piece, the left and right sides of PPR tap main part all is equipped with a mounting panel, the mounting panel is equipped with a plurality of mounting holes, the mounting hole is rectangular shape setting, the top of PPR tap main part is equipped with panel screw mounting hole.
Further, a first level gauge is installed on the front side of the PPR faucet main body.
Further, a second level gauge is installed on the top of the PPR faucet main body.
Furthermore, the left side and the right side of the PPR faucet main body are both provided with reinforcing ribs connected with the mounting plate.
Further, the first gradienter is a strip-shaped gradienter.
Further, the second level is a circular level.
Further, the water outlet connector is a brass water outlet connector.
Further, the front side of the PPR faucet main body is provided with a mounting groove for positioning and mounting the first level gauge.
Furthermore, the top of the PPR faucet main body is provided with a mounting hole for positioning and mounting the second level gauge.
Furthermore, the number of PPR water inlet interfaces is two, and the number of water outlet interfaces is two.
Compared with the prior art, the utility model discloses a bottom of PPR tap main part is equipped with a plurality of PPR interface of intaking, the front portion of PPR tap main part is equipped with a plurality of interfaces of intaking that intake with PPR and communicate, PPR interface of intaking, go out interface and PPR tap main part integrated into one piece, make the pre-buried main part of tap small, strong corrosivity, tasteless nontoxic, natural environment normal use and the following normal use of 90 degrees high temperature under normal temperature, product life reaches more than 50 years, water connection is easy, PPR interface of intaking is direct to be connected with PPR pipe hot melt and accomplishes the connection of intaking promptly, the installation is simple and easy swift, installation labour saving and time saving, the installation effectiveness is high, installation cost is low, bring the convenience for the user, the left and right sides through PPR tap main part all is equipped with a mounting panel, the mounting panel is equipped with a plurality of mounting holes, the mounting hole is rectangular shape setting, the top of PPR tap main part is equipped with the panel screw mounting hole, make the installation of tap firm, the installation of pre-buried main part of tap is adjusted easily, the application scope is wide, firm with faucet and firm in connection with water outlet nozzle or all kinds of decorative panel, product drooping, the product can not drop, consumer can not better, consumer can not drop.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a two-in two-out faucet embedded main body of the present invention;
fig. 2 is an exploded view of the pre-buried main body of the faucet with two inlets and two outlets.
In the figure: 1-PPR faucet body; 2-PPR water inlet interface; 3-water outlet interface; 4-mounting a plate; 5-mounting holes; 6-a first level; 7-a second level; 8-panel screw mounting holes; 9-reinforcing ribs; 10-mounting grooves; 11-mounting holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
As shown in fig. 1 and 2 the utility model discloses a two advance pre-buried main part of tap of two plays, including PPR leading main part 1, PPR leading main part 1's bottom is equipped with a plurality of PPR interface 2 of intaking, PPR leading main part 1's front portion is equipped with a plurality of with the PPR interface 3 of intaking that 2 communicate of interface, PPR interface 2 of intaking, interface 3 and PPR leading main part 1 integrated into one piece go out, PPR leading main part 1's the left and right sides all is equipped with a mounting panel 4, mounting panel 4 is equipped with a plurality of mounting holes 5, mounting hole 5 is rectangular shape setting, PPR leading main part 1's top is equipped with panel screw mounting hole 8. The bottom through PPR tap main part 1 is equipped with a plurality of PPR interface 2 of intaking, the front portion of PPR tap main part 1 is equipped with a plurality of water outlet 3 that intake interface 2 intercommunication with PPR, PPR intake interface 2, water outlet 3 and PPR tap main part 1 integrated into one piece, make the pre-buried main part of tap small, corrosivity is strong, it is tasteless nontoxic, natural environment normal use and normal use below 90 degrees high temperature under normal temperature, product life is more than 50 years, it is easy to intake the water connection, PPR intake interface 2 is direct to be connected with PPR pipe hot melt promptly and accomplish into water and be connected, the installation is simple and easy swift, installation labour saving and time saving, the installation effectiveness is high, installation cost is low, bring convenience for the user, all be equipped with a mounting panel 4 through the left and right sides of PPR tap main part 1, mounting panel 4 is equipped with a plurality of mounting holes 5, mounting holes 5 are rectangular shape and set up, the top of PPR tap main part 1 is equipped with panel screw mounting hole 8, make the installation of tap pre-buried firm, the installation position is easy to adjust, the panel installation is wide in a wide application scope, firm with decoration panel and firm with the faucet type product, all kinds of water outlet type, can not flagging experience, consumer can not drop in the use, the process, can not be better.
A first level gauge 6 is installed to the front side of the PPR tap main body 1, and horizontal installation about the pre-buried main part of tap makes things convenient for.
A second level meter 7 is installed at the top of the PPR faucet main body 1, and therefore front and back horizontal installation of the faucet embedded main body is facilitated.
The left and right sides of the PPR faucet body 1 are provided with the reinforcing ribs 9 for connecting the mounting plate 4, so that the mounting plate 4 is firmer in structure, and the faucet embedded body is more stable to install.
First spirit level 6 is rectangular shape spirit level, does benefit to the level calibration about the pre-buried main part of tap.
The second gradienter 7 is a circular gradienter, and is beneficial to the front and back horizontal calibration of the embedded main body of the faucet.
As a specific implementation manner, the water outlet 3 is a brass water outlet, so that the water outlet connection is more stable, and in a specific implementation, the water outlet 3 may also be another metal interface.
The front side of leading main part 1 of PPR is equipped with the mounting groove 10 that supplies the location installation of first spirit level 6, makes things convenient for the firm location installation of first spirit level 6.
The top of the PPR tap main body 1 is provided with a mounting hole 11 for positioning and mounting the second level gauge 7, so that the second level gauge 7 can be conveniently and stably positioned and mounted.
As a specific embodiment, the number of the PPR water inlet ports 2 is two, and the number of the water outlet ports 3 is two.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a two advance the pre-buried main part of tap of two plays which characterized in that: including PPR tap main part, the bottom of PPR tap main part is equipped with a plurality of PPR interface of intaking, PPR tap main part's front portion be equipped with a plurality of with the interface of going out of PPR interface intercommunication of intaking, PPR interface of intaking, interface of going out with PPR tap main part integrated into one piece, the left and right sides of PPR tap main part all is equipped with a mounting panel, the mounting panel is equipped with a plurality of mounting holes, the mounting hole is rectangular shape setting, the top of PPR tap main part is equipped with panel screw mounting hole.
2. The embedded main body of the two-inlet and two-outlet faucet of claim 1, which is characterized in that: a first level meter is installed on the front side of the PPR faucet main body.
3. The embedded main body of the two-inlet and two-outlet faucet of claim 1, which is characterized in that: and a second level gauge is installed at the top of the PPR faucet main body.
4. The embedded main body of the two-inlet and two-outlet faucet of claim 1, which is characterized in that: the left and right sides of PPR tap main part all is equipped with the strengthening rib of connecting the mounting panel.
5. The embedded main body of the two-inlet and two-outlet faucet of claim 2, wherein: the first gradienter is a strip-shaped gradienter.
6. The embedded main body of the two-inlet and two-outlet faucet of claim 3, wherein: the second level is a circular level.
7. The embedded main body of the two-inlet and two-outlet faucet of claim 1, which is characterized in that: the water outlet interface is a brass water outlet interface.
8. The embedded main body of the two-inlet and two-outlet faucet of claim 2, wherein: the front side of the PPR faucet main body is provided with a mounting groove for positioning and mounting the first level gauge.
9. The embedded main body of the two-inlet and two-outlet faucet of claim 3, wherein: and the top of the PPR faucet main body is provided with a mounting hole for positioning and mounting the second level gauge.
10. The embedded main body of the two-inlet and two-outlet faucet of claim 1, which is characterized in that: the quantity of PPR interface of intaking is two, the quantity of interface of going out water is two.
CN202222990292.0U 2022-11-10 2022-11-10 Two-in two-out faucet embedded main body Active CN218719633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222990292.0U CN218719633U (en) 2022-11-10 2022-11-10 Two-in two-out faucet embedded main body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222990292.0U CN218719633U (en) 2022-11-10 2022-11-10 Two-in two-out faucet embedded main body

Publications (1)

Publication Number Publication Date
CN218719633U true CN218719633U (en) 2023-03-24

Family

ID=85612560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222990292.0U Active CN218719633U (en) 2022-11-10 2022-11-10 Two-in two-out faucet embedded main body

Country Status (1)

Country Link
CN (1) CN218719633U (en)

Similar Documents

Publication Publication Date Title
CN218719633U (en) Two-in two-out faucet embedded main body
CN201090787Y (en) Stainless steel water tap special for constant temperature bathtub
CN211113910U (en) Connecting joint for quick-mounting faucet
CN213685399U (en) Shower main body water outlet structure capable of being adjusted up and down
CN215176059U (en) Water heater of full hidden installation stringing
CN214743506U (en) Novel water knockout drum
CN216951775U (en) Digital display concealed faucet
CN218779590U (en) Concealed inner body combined structure
CN205013847U (en) Shower faucet engine fixed structure
CN217539698U (en) Pre-buried formula shower system
CN218651562U (en) Bottom plate and shower for shower
CN210859949U (en) Novel faucet structure
CN221208509U (en) Top spraying of two-way water outlet
CN215568382U (en) Waterfall type basin faucet
CN212698660U (en) Shower device
CN216743183U (en) Assembled duplex pipe fitting connecting rod
CN103307315A (en) Faucet three-way valve
CN211951830U (en) Cold and hot water pipe duplex accessory
CN207553215U (en) A kind of concealed tap structure
CN219825466U (en) Waterway system of integrated cabinet
CN217927721U (en) Pentagonal water distributor
CN213268139U (en) Shower base
CN215908457U (en) Big shower body
CN217502679U (en) Shower valve with water diversion valve core assembly
CN210859900U (en) Water tap structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant