CN218719362U - Heating and ventilation pipeline fixing structure - Google Patents

Heating and ventilation pipeline fixing structure Download PDF

Info

Publication number
CN218719362U
CN218719362U CN202222984769.4U CN202222984769U CN218719362U CN 218719362 U CN218719362 U CN 218719362U CN 202222984769 U CN202222984769 U CN 202222984769U CN 218719362 U CN218719362 U CN 218719362U
Authority
CN
China
Prior art keywords
cross beam
heating
fixing structure
pipeline
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222984769.4U
Other languages
Chinese (zh)
Inventor
龚莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Shundi Construction Engineering Co ltd
Original Assignee
Suzhou Shundi Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Shundi Construction Engineering Co ltd filed Critical Suzhou Shundi Construction Engineering Co ltd
Priority to CN202222984769.4U priority Critical patent/CN218719362U/en
Application granted granted Critical
Publication of CN218719362U publication Critical patent/CN218719362U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a warm logical pipeline fixed knot constructs relates to pipeline installation technical field. The utility model comprises a beam, wherein hanging rods are arranged at both ends of the beam through the matching of bolts and nuts; the T-shaped sliding rail is arranged on the cross beam and extends along the length direction of the cross beam, a sliding block is sleeved on the T-shaped sliding rail in a sliding mode, and a knob with the end part abutting against the cross beam penetrates through the sliding block in a threaded mode; the utility model discloses when the warm logical pipeline of installation, establish slider slip cover on the crossbeam, be connected two jibs and crossbeam fixedly again and fix two jibs on the building, will warm logical pipeline at last and place in the mounting bracket through two clamp splices fixed warm logical pipeline, when two adjacent warm logical pipeline butt joints installation, corresponding slip slider, make two adjacent warm ports of logical pipeline align, it is fixed with the slider again, install holistic structure, can carry out corresponding adjustment to the position of warm logical pipeline to actual conditions, and the installation efficiency is improved.

Description

Heating and ventilation pipeline fixing structure
Technical Field
The utility model relates to a pipeline installation technical field, concretely relates to heating and ventilation pipeline fixed knot constructs.
Background
The heating ventilation pipeline has a wide application range, and is mainly used for a purification system return air pipe, a central air-conditioning ventilation pipe, an industrial air supply and exhaust ventilation pipe, an environmental protection system suction and exhaust air pipe, a mining gas drainage pipe, a mining glue-coated cloth air cylinder and the like.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: for solving the problem in the above background, the utility model provides a warm logical pipeline fixed knot constructs.
The utility model discloses a realize above-mentioned purpose and specifically adopt following technical scheme:
warm pipeline fixed knot that leads to constructs includes:
the lifting device comprises a cross beam, wherein two ends of the cross beam are respectively provided with a hanging rod through the matching of a bolt and a nut;
the T-shaped sliding rail is arranged on the cross beam and extends along the length direction of the cross beam, a sliding block is sleeved on the T-shaped sliding rail in a sliding mode, and a knob with the end part abutting against the cross beam penetrates through the sliding block in a threaded mode;
the mounting frame is in an inverted U-shaped structure and is arranged on the sliding block;
two clamp blocks, one of them the clamp block sets firmly one side inner wall of mounting bracket, the opposite side inner wall bolt of mounting bracket runs through there is the lead screw, another the clamp block rotates to set up the free end of lead screw just is located in the mounting bracket, another be provided with the tip activity on the clamp block and run through the guide bar of mounting bracket.
Furthermore, the clamp splice is the V-arrangement structure, all the array runs through on two sides of clamp splice and sets up a plurality of and the wearing groove of tip intercommunication, two the wearing groove crisscross setting of clamp splice.
Further, the inner walls of the two clamping blocks are provided with rubber pads.
Further, a plurality of vertical rods are arranged on the sliding block, cushion blocks are arranged on the mounting rack, the cushion blocks are slidably sleeved on the vertical rods, and springs are arranged between the cushion blocks and the sliding block, the springs are sleeved on the vertical rods.
Furthermore, a groove is formed in the T-shaped sliding rail along the length direction of the T-shaped sliding rail, a plurality of idler wheels are arranged in the groove along the length direction of the T-shaped sliding rail in an array mode, and the idler wheels are in rolling lap joint with the sliding blocks.
Furthermore, gaps are reserved between two ends of the T-shaped sliding rail and the two hanging rods respectively.
Furthermore, slots are formed in the opposite sides of the two hanging rods, and two ends of the cross beam are respectively inserted into the two slots.
Further, two inner included angles of the mounting rack are connected with reinforcing ribs.
The utility model has the advantages as follows: when the warm logical pipeline of installation, establish slider slip cover on the crossbeam in advance, the slider need not to be fixed this moment, be connected two jibs with the crossbeam again fixedly and fix two jibs on the building, place warm logical pipeline at last and fix warm logical pipeline through two clamp splices in the mounting bracket, when the warm logical pipeline is fixed after needs and adjacent pipeline butt joint installation, can be according to the corresponding slip slider in position, thereby make the port of two adjacent warm logical pipelines align, the knob conflict crossbeam of twisting again, thereby it is fixed with the slider, install holistic structure, it is more convenient when the fixed warm logical pipeline of installation, can carry out corresponding adjustment to the position of warm logical pipeline to actual conditions, and the installation efficiency is improved.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is an exploded view of a part of the three-dimensional structure of the present invention;
FIG. 3 is an exploded view of another part of the three-dimensional structure of the present invention;
FIG. 4 is an enlarged view of the point A of FIG. 1 according to the present invention;
reference numerals: 1. a cross beam; 2. a boom; 3. a T-shaped slide rail; 4. a slider; 5. a mounting frame; 6. a clamping block; 7. a screw rod; 8. a rubber pad; 9. a vertical rod; 10. cushion blocks; 11. a spring; 12. a roller; 13. and (5) reinforcing ribs.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention.
As shown in fig. 1 to 4, the heating and ventilating duct fixing structure includes: the beam 1, both ends of the beam 1 are fitted with the suspender 2 through the bolt and nut; the T-shaped sliding rail 3 is arranged on the cross beam 1 and extends along the length direction of the cross beam, a sliding block 4 is sleeved on the T-shaped sliding rail 3 in a sliding mode, and a knob of which the end part is abutted against the cross beam 1 penetrates through the sliding block 4 in a threaded mode; the mounting frame 5 is in an inverted U-shaped structure and is arranged on the sliding block 4; two clamping blocks 6, wherein one clamping block 6 is fixedly arranged on the inner wall of one side of the mounting frame 5, a screw rod 7 penetrates through a bolt on the inner wall of the other side of the mounting frame 5, the other clamping block 6 is rotatably arranged at the free end of the screw rod 7 and is positioned in the mounting frame 5, a guide rod with the end part movably penetrating through the mounting frame 5 is arranged on the other clamping block 6, when the heating and ventilation pipeline is mounted, a sliding block 4 is sleeved on a cross beam 1 in advance in a sliding manner, the sliding block 4 is not required to be fixed, two hanging rods 2 are respectively and fixedly arranged at two ends of the cross beam 1 through the matching of the bolt and a nut, the two hanging rods 2 are fixedly connected with a building, finally the heating and ventilation pipeline is arranged in the mounting frame 5 and is positioned on one clamping block 6, the screw rod 7 is twisted to rotate and move, so as to drive the other clamping block 6 to abut against the heating and ventilation pipeline, two clamp splice 6 contradict warm logical pipeline centre gripping, utilize conflict frictional force, in order to reach the effect that will warm logical pipeline is fixed, need when adjacent pipeline butt joint installation after warm logical pipeline is fixed, can be according to warm logical pipeline butt joint mouth's position, slider 4 slides correspondingly, thereby make the port of two adjacent warm logical pipelines align, after two adjacent warm logical pipelines align, the knob conflict crossbeam 1 of twisting again, utilize conflict frictional force, thereby it is fixed with slider 4, in order to realize will warm logical pipeline and lie in the rigidity on crossbeam 1, install holistic structure, it is more convenient when the fixed warm logical pipeline of installation, can carry out corresponding adjustment to the position of warm logical pipeline to the real-time condition, and the installation efficiency is improved.
As shown in fig. 2, in some embodiments, the clamping block 6 is a V-shaped structure, the two sides of the clamping block 6 are all provided with a plurality of through grooves communicated with the end portion in an array manner, the through grooves of the two clamping blocks 6 are arranged in a staggered manner, the clamping block 6 is configured into a V-shaped structure, the through grooves are formed in the clamping block 6, when the heating and ventilation pipeline is fixed, the two clamping blocks 6 can be close to each other, and the through grooves are arranged in a staggered manner, so that the clamping fixing effect on the heating and ventilation pipeline is good, and the heating and ventilation pipeline is also suitable for heating and ventilation pipelines of different sizes, and the universality of the whole device is improved.
As shown in fig. 2, in some embodiments, the inner walls of the two clamping blocks 6 are provided with rubber pads 8, in order to prolong the service life of the heating and ventilation pipeline, the outer wall of the heating and ventilation pipeline is generally coated with a protective paint, and the rubber pads 8 are arranged to prevent the clamping blocks 6 from rigidly clamping the pipeline, which causes abrasion of the protective paint, so as to protect the heating and ventilation pipeline.
As shown in fig. 2, in some embodiments, a plurality of vertical rods 9 are arranged on the slider 4, a cushion block 10 is arranged on the mounting rack 5, the cushion block 10 is slidably sleeved on the plurality of vertical rods 9, a spring 11 sleeved on the vertical rods 9 is installed between the cushion block 10 and the slider 4, preferably, a plurality of mounting tables are constructed on the cushion block 10, the plurality of mounting tables are movably penetrated through the plurality of vertical rods 9 respectively, the free ends of the vertical rods 9 are provided with limit blocks, the cushion block 10 is slidably arranged on the plurality of vertical rods 9, and the spring 11 sleeved on the vertical rods 9 is arranged between the cushion block 10 and the slider 4, so that the heating ventilation pipeline is not rigidly connected with the cross beam 1 after being fixed, when vibration is caused by internal ventilation pipeline wind pressure or external factors, the elastic force of the spring 11 is abutted to buffer, and the heating ventilation pipeline is protected.
As shown in fig. 4, in some embodiments, a groove is formed in the T-shaped slide rail 3 along the length direction of the T-shaped slide rail, a plurality of rollers 12 are arranged in the groove along the length direction array, the plurality of rollers 12 are all in rolling lap joint with the sliding block 4, the warm ventilation pipeline is placed in the mounting frame 5, and is influenced by gravity of the warm ventilation pipeline, the sliding block 4 has certain friction resistance when sliding with the T-shaped slide rail 3, the friction resistance is reduced by the rollers 12 when the sliding block 4 slides, and the sliding block 4 is more convenient and rapid when the working personnel adjust the position of the warm ventilation pipeline.
As shown in fig. 1, in some embodiments, gaps are left between two ends of the T-shaped slide rail 3 and the two suspenders 2, respectively, and by reserving the gaps, when a heating and ventilation pipeline is subsequently added, the suspenders 2 do not need to be removed, and a fixing device (a slider 4, an installation frame 5, two clamping blocks 6, a screw rod 7, and the like) for fixing the heating and ventilation pipeline can be directly added by sliding through the reserved gaps.
As shown in fig. 3, in some embodiments, the opposite sides of the two suspension rods 2 are both configured with slots, and two ends of the cross beam 1 are respectively inserted into the two slots, so that after the suspension rods 2 are connected with the cross beam 1, bolts and nuts do not bear stress such as gravity, but play a role in assisting locking, thereby improving the stability of the cross beam 1 after being connected with the suspension rods 2.
As shown in fig. 2, in some embodiments, the two inner included angles of the mounting frame 5 are both connected with a reinforcing rib 13, and the reinforcing rib 13 is arranged to enhance the strength of the two side walls of the mounting frame 5, so that the heating and ventilation pipeline is more stable after being fixed.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (8)

1. Warm pipeline fixed knot that leads to constructs, its characterized in that includes:
the device comprises a cross beam (1), wherein suspenders (2) are arranged at two ends of the cross beam (1) through matching of bolts and nuts;
the T-shaped sliding rail (3) is arranged on the cross beam (1) and extends along the length direction of the cross beam, a sliding block (4) is sleeved on the T-shaped sliding rail (3) in a sliding mode, and a knob of which the end part is abutted against the cross beam (1) penetrates through the sliding block (4) in a threaded mode;
the mounting rack (5) is of an inverted U-shaped structure and is arranged on the sliding block (4);
two clamp splice (6), one of them clamp splice (6) set firmly one side inner wall of mounting bracket (5), the opposite side inner wall bolt of mounting bracket (5) runs through there is lead screw (7), another clamp splice (6) rotate to set up the free end of lead screw (7) and be located in mounting bracket (5), another be provided with the tip activity on clamp splice (6) and run through the guide bar of mounting bracket (5).
2. The heating and ventilation pipeline fixing structure according to claim 1, wherein the clamping block (6) is in a V-shaped structure, a plurality of through grooves communicated with the end portion are formed in the two side edges of the clamping block (6) in an array mode, and the through grooves of the two clamping blocks (6) are arranged in a staggered mode.
3. The heating and ventilation pipe fixing structure according to claim 1, wherein the inner walls of the two clamping blocks (6) are provided with rubber pads (8).
4. The heating and ventilation pipeline fixing structure according to claim 1, wherein a plurality of vertical rods (9) are arranged on the sliding block (4), a cushion block (10) is arranged on the mounting rack (5), the cushion block (10) is slidably sleeved on the plurality of vertical rods (9), and a spring (11) sleeved on the vertical rods (9) is arranged between the cushion block (10) and the sliding block (4).
5. The heating and ventilation pipeline fixing structure according to claim 1, wherein a groove is formed in the T-shaped sliding rail (3) along the length direction of the T-shaped sliding rail, a plurality of rollers (12) are arranged in the groove in an array manner along the length direction of the T-shaped sliding rail, and the rollers (12) are in rolling lap joint with the sliding block (4).
6. The heating and ventilation pipe fixing structure according to claim 1, wherein a gap is left between each end of the T-shaped sliding rail (3) and each of the two hanger rods (2).
7. The heating and ventilation duct fixing structure according to claim 1, wherein opposite sides of the two hanger rods (2) are each configured with a slot, and both ends of the cross beam (1) are inserted into the two slots, respectively.
8. The heating and ventilation pipe fixing structure according to claim 1, wherein reinforcing ribs (13) are connected to both inner included angles of the mounting frame (5).
CN202222984769.4U 2022-11-09 2022-11-09 Heating and ventilation pipeline fixing structure Active CN218719362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222984769.4U CN218719362U (en) 2022-11-09 2022-11-09 Heating and ventilation pipeline fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222984769.4U CN218719362U (en) 2022-11-09 2022-11-09 Heating and ventilation pipeline fixing structure

Publications (1)

Publication Number Publication Date
CN218719362U true CN218719362U (en) 2023-03-24

Family

ID=85612463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222984769.4U Active CN218719362U (en) 2022-11-09 2022-11-09 Heating and ventilation pipeline fixing structure

Country Status (1)

Country Link
CN (1) CN218719362U (en)

Similar Documents

Publication Publication Date Title
CN209637196U (en) A kind of anti-falling device of attached lifting scaffold
CN218719362U (en) Heating and ventilation pipeline fixing structure
CN110318467B (en) Steel structure crossbeam
CN209642176U (en) A kind of stockbridge damper reset clamp device of anti-slip
CN113356539B (en) Glass curtain wall mounting fixture
CN102343895B (en) Connection structure of parking bracing wires for wheel parking system
CN112398072B (en) Cable fixing frame for mining equipment
CN204651794U (en) Fastening clip for cable
CN210577538U (en) C-shaped bracket arm with adjustable fixed angle
CN218267616U (en) A hang subassembly for building air conditioner pipeline
CN2853533Y (en) Arc rop-grippers
CN207763133U (en) A kind of air conditioner mounting bracket
CN218178099U (en) Central air conditioning tuber pipe gallows
CN213171015U (en) Suspension and compensation device for indoor traction type construction elevator
CN214512332U (en) Tensioning tool
CN213655915U (en) Warm logical pipeline of building engineering lays fixing device
CN215568747U (en) Air pipe with multi-angle connector
CN212509818U (en) Adjustable air conditioner water pipe mounting support hanger below dn100
CN220320651U (en) Air duct with mounting structure
CN219471304U (en) Curtain wall glass's suspended structure
CN219760547U (en) Mounting structure of bridge frame and support hanger
CN215829726U (en) Aluminum curtain wall with sound insulation effect
CN221240046U (en) Threading device
CN221408359U (en) Hose fixing structure for laying cables in suspended ceiling
CN212929011U (en) Pipeline fixing support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant