CN218715732U - Fence capable of removing dust and reducing noise and comprehensively arranging pipelines - Google Patents

Fence capable of removing dust and reducing noise and comprehensively arranging pipelines Download PDF

Info

Publication number
CN218715732U
CN218715732U CN202222843596.4U CN202222843596U CN218715732U CN 218715732 U CN218715732 U CN 218715732U CN 202222843596 U CN202222843596 U CN 202222843596U CN 218715732 U CN218715732 U CN 218715732U
Authority
CN
China
Prior art keywords
enclosure
pipeline
main body
foundation
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222843596.4U
Other languages
Chinese (zh)
Inventor
郭均杰
门士彬
魏强
艾热提·艾比布拉
谷佳霖
王宗汉
徐广辉
李岩宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Zhejiang Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202222843596.4U priority Critical patent/CN218715732U/en
Application granted granted Critical
Publication of CN218715732U publication Critical patent/CN218715732U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses an enclosure capable of removing dust and reducing noise and comprehensively arranging pipelines, which comprises an enclosure main body, an enclosure foundation (2), an acoustic board (3), a spraying system (4) and a pipeline laying frame body; the enclosure foundation (2) is constructed below the ground and arranged along the boundary of a building construction area, and the lower end of the enclosure main body is fixedly embedded in the enclosure foundation (2), so that the enclosure main body is vertically arranged at the boundary of the building construction area; the sound-absorbing plate (3) is arranged on the inner wall of the enclosure main body, and the spraying system (4) is arranged on the upper part of the inner wall of the sound-absorbing plate (3) and faces the interior of the building construction area; the pipeline is laid the support body and is set up and just be located the inboard of abatvoix (3) on enclosing fender basis (2), and a plurality of pipeline is laid the support body and is set up along the length direction interval that encloses fender basis (2), and the pipeline is laid on a plurality of pipeline is laid the support body. The utility model discloses have dust removal, fall and make an uproar, pipeline synthesize function such as arrange.

Description

Enclosure capable of removing dust, reducing noise and comprehensively arranging pipelines
Technical Field
The utility model relates to an enclose the fender, especially relate to an ability removes dust and falls to make an uproar and pipeline synthesizes the fender that encloses of arranging.
Background
For the safety of building construction, it is common in the prior art to provide a barrier between the building construction area and the external area for separating the building construction area. The fender that encloses of prior art is mostly made by the metal sheet, and the metal sheet encloses and closes around building construction area, has following technical problem:
1. the structural firmness of the metal plate enclosure is poor, the metal plate enclosure is easy to deform and damage or even collapse after being subjected to external force, and certain potential safety hazards exist.
2. The enclosure in the prior art only has a blocking function and is single in function, the problem of environmental pollution caused by noise, raised dust, sewage outflow and the like generally existing in a construction site can not be solved, the construction environment is not facilitated, and the contradiction between a construction party and surrounding residents is easily caused.
3. Because the building construction environment is complicated, the requirement to functions such as fire control, drainage, cable erection is higher, and prior art encloses the fender and does not have fire control and drainage performance, can't satisfy the user demand.
Therefore, it is desirable to provide an enclosure capable of removing dust and reducing noise and realizing comprehensive arrangement of pipelines.
Disclosure of Invention
An object of the utility model is to provide a can remove dust and fall and make an uproar and pipeline synthesize fender that encloses of arranging has the dust removal, falls and makes an uproar, pipeline synthesize function such as arrange.
The utility model discloses a realize like this:
a fence capable of removing dust and reducing noise and comprehensively arranging pipelines comprises a fence main body, a fence foundation, an acoustic board, a spraying system and a pipeline arrangement frame body; the enclosure foundation is constructed below the ground and arranged along the boundary of the building construction area, and the lower end of the enclosure main body is fixedly embedded in the enclosure foundation, so that the enclosure main body is vertically arranged at the boundary of the building construction area; the sound-absorbing plate is arranged on the inner wall of the enclosure main body, and the spraying system is arranged on the upper part of the inner wall of the sound-absorbing plate and faces the interior of the building construction area; the pipeline is laid the support body and is set up and just be located the inboard of abatvoix enclosing on keeping off the basis, and a plurality of pipeline is laid the support body and is set up along the length direction interval that encloses and keep off the basis, and the pipeline is laid on a plurality of pipeline is laid the support body.
The enclosure main body comprises an inner upright post, an outer upright post and a main body bracket; the lower ends of the inner stand columns and the outer stand columns are fixedly embedded in the enclosure foundation, the inner stand columns are arranged on the inner sides of the outer stand columns in parallel, and the plurality of inner stand columns and the plurality of outer stand columns are arranged at intervals along the boundary of the building construction area; the main body bracket is arranged between the inner upright posts and the outer upright posts, and the bottom of the main body bracket is erected on the enclosure foundation; the sound absorption plates are arranged on the inner end faces of the inner upright columns, and the pipeline laying frame body is arranged on the inner sides of the inner upright columns.
The fence foundation is internally provided with a fixing frame, the fixing frame is formed by connecting three pairwise vertical rod pieces, and the bottoms of the inner stand column and the outer stand column are respectively arranged at the connecting nodes of the three rod pieces.
The top of the sound-absorbing board is bent inwards to form an arc-shaped structure, and the top of the main body support extends inwards to the top of the arc-shaped structure of the sound-absorbing board.
The pipeline laying frame body comprises a bearing column, a first functional frame, a first supporting seat, a second functional frame and a second supporting seat; the bearing column is vertically arranged on the enclosure foundation and is positioned on the inner side of the inner upright column; the first functional frame is arranged on the upper part of the bearing column through a first supporting seat, and the cable is arranged on the first functional frame; the second functional frame is arranged at the lower part of the bearing column through a second supporting seat, and the fire fighting pipeline is arranged on the second functional frame.
The construction of building construction region in be under construction and have the escape canal, the escape canal is along enclosing the inboard setting that keeps off the basis, the escape canal is connected to drainage system.
Compared with the prior art, the utility model, following beneficial effect has:
1. the utility model discloses owing to be equipped with and enclose the fender main part and enclose the fender basis, will enclose the bottom of keeping off the main part and fix in enclosing the fender basis to utilize to pour and enclose the setting stability that the fender basis effectively improved and enclose the fender main part in the below ground, avoid enclosing the fender main part and topple over when external force striking, guaranteed to enclose the fender effect that encloses of keeping off the main part.
2. The utility model discloses owing to be equipped with abatvoix and spraying system, can influence outside region through abatvoix greatly reduced building construction region's noise, spray water smoke through spraying system, form dust fall dust removal protective screen between building construction region and outside region, promote greatly and enclose the dust removal of keeping off the main part and fall the performance of making an uproar.
3. The utility model discloses owing to be equipped with the pipeline and lay the support body, can lay the support body according to the in-service use demand through the supporting seat on the support body, be used for laying of functional part such as pipeline, cable conductor to satisfy various functional requirements in the construction, and make full use of the space in the construction area, be favorable to ensureing that the inside overall arrangement of construction area is neat and construction safety.
4. The utility model discloses owing to be equipped with the escape canal, the inside on fender basis is being enclosed in the border department setting of escape canal along the construction region, can collect the sewage of outside overflow in the construction region and discharge to drainage system after, avoid the construction sewage outflow to outside region and polluted environment.
Drawings
FIG. 1 is a front view of the enclosure with dust removal, noise reduction and comprehensive arrangement of pipelines;
FIG. 2 is a side sectional view of the enclosure with dust removal, noise reduction and comprehensive arrangement of pipelines;
fig. 3 is the utility model discloses can remove dust and fall make an uproar and pipeline synthesize arrange enclose in enclosing the fender and enclose the plane section view of fender basis.
In the figure, 11 inner columns, 12 outer columns, 13 main body supports, 2 enclosure foundations, 21 fixing frames, 3 sound absorption boards, 4 spraying systems, 51 bearing columns, 52 first function frames, 53 first supporting seats, 54 second function frames, 55 second supporting seats, 56 fire-fighting pipelines and 6 drainage ditches.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to fig. 1 and 2, the enclosure capable of removing dust and reducing noise and comprehensively arranging pipelines comprises an enclosure main body, an enclosure foundation 2, an acoustic board 3, a spraying system 4 and a pipeline arrangement frame body; the enclosure foundation 2 is constructed below the ground and arranged along the boundary of a building construction area, and the lower end of the enclosure main body is fixedly embedded in the enclosure foundation 2, so that the enclosure main body is vertically arranged at the boundary of the building construction area; the acoustic board 3 is arranged on the inner wall of the enclosure main body (namely, the side of the enclosure main body in the building construction area), and the spraying system 4 is arranged on the upper part of the inner wall of the acoustic board 3 (namely, the side of the acoustic board 3 in the building construction area) and faces the inside of the building construction area; the pipeline is laid the support body and is set up and just be located the inboard of abatvoix 3 enclosing on keeping off basis 2, and a plurality of pipeline is laid the support body and is set up along the length direction interval that encloses and keep off basis 2, and the pipeline is laid on a plurality of pipeline is laid the support body.
Enclose fender basis 2 construction in the below ground, will enclose the fender main part and install on enclosing fender basis 2, can improve the installation stability who encloses fender basis 2, avoid toppling over under the exogenic action. Through enclosing fender basis 2 and realizing building construction region and outside region's isolation, realize making an uproar falling of building construction through abatvoix 3, form the dust removal protective screen through spraying system 4 between building construction region and outside region, the at utmost reduces the environmental impact of raise dust to outside region. Simultaneously, through the setting of pipeline laying support body, can be used to lay facilities such as pipelines commonly used in building construction such as fire control pipeline, cable, be convenient for use, make full use of space improves the functionality.
Referring to fig. 1 and 2, the enclosure main body includes an inner upright post 11, an outer upright post 12 and a main body bracket 13; the lower ends of the inner upright columns 11 and the outer upright columns 12 are fixedly embedded in the enclosure foundation 2, the inner upright columns 11 are arranged on the inner sides of the outer upright columns 12 in parallel, and the inner upright columns 11 and the outer upright columns 12 are arranged at intervals along the boundary of a building construction area; the main body bracket 13 is arranged between the inner upright posts 11 and the outer upright posts 12, and the bottom of the main body bracket 13 is erected on the enclosure foundation 2; the sound-absorbing boards 3 are arranged on the inner end faces of the inner upright columns 11, and the pipeline laying frame body is arranged on the inner sides of the inner upright columns 11.
The inner column 11, the outer column 12 form protection and support in the inboard and the outside of main part support 13, improve whole structural strength who encloses fender major structure, set up the convenience, can adopt modes such as spiro union, welding to realize the concatenation between two adjacent main part supports 13 to guarantee to enclose to keep off the main part and enclose at the periphery of whole building construction region and close and form effectual protection, easily dismantle and have enough to meet the need the use.
Referring to fig. 2 and fig. 3, a fixing frame 21 is disposed in the enclosure foundation 2, the fixing frame 21 is formed by connecting three two vertical rods, and the bottoms of the inner upright post 11 and the outer upright post 12 are respectively disposed at the connecting nodes of the three rods.
Through the bottom of two liang of vertically member bars fixed inner column 11 and outer column 12, enclose simultaneously through concrete placement and keep off basis 2 with the fixed portion of inner column 11 and outer column 12 bury underground in the inside of enclosing fender basis 2, reduce the focus that encloses the fender main part to the assurance is enclosed the stability that sets up of keeping off the main part.
Referring to fig. 2, the top of the sound-absorbing plate 3 is curved inward to form an arc structure, and the top of the main body support 13 extends inward to the top of the arc structure of the sound-absorbing plate 3, so that the noise blocking capability of the sound-absorbing plate 3 can be improved, the outward transmission of sound waves can be reduced, and the influence of building noise on the outside area can be reduced to the greatest extent.
Referring to fig. 1 and fig. 2, the pipeline layout frame body includes a bearing column 51, a first functional frame 52, a first support seat 53, a second functional frame 54 and a second support seat 55; the bearing column 51 is vertically arranged on the enclosure foundation 2 and is positioned on the inner side of the inner upright post 11; the first functional frame 52 is arranged at the upper part of the bearing column 51 through a first supporting seat 53, and the cable is arranged on the first functional frame 52; the second functional frame 54 is arranged at the lower part of the bearing column 51 through a second supporting seat 55, and a fire fighting pipeline 56 is arranged on the second functional frame 54.
The setting height and the number of the bearing columns 51 can be determined according to the layout requirements of functional parts such as actual pipelines, the types and the weights of the functional parts such as pipelines and the like which can be arranged according to actual needs can be selected by each functional frame and the supporting seat, so that the layout requirements of fire fighting pipelines 56, cables and the like are met, the function of the enclosure is improved, and the space in a building construction area can be fully utilized.
Referring to fig. 2, a drainage ditch 6 is constructed in the construction area of the building, the drainage ditch 6 is arranged along the inner side of the enclosure foundation 2, and the drainage ditch 6 is connected to a drainage system.
The drainage ditch 6 can be used for collecting water flowing outwards in the construction area of the building and discharging the water to a drainage system, so that the sewage is prevented from flowing to the external area to cause environmental pollution.
Referring to fig. 1 to fig. 3, the construction method of the present invention is:
enclose fender basis 2 through concrete placement formation in the subaerial below of the border department in the construction area, enclose fender basis 2 and can adopt integral type structure (not shown in the figure) or two split type structures that the cross-section is 600 × 600mm for fixed mounting inner column 11 and outer column 12. Before pouring and enclosing fender basis 2, enclose the two liang of vertical welding of three pre-buried member bars in keeping off basis 2 and make mount 21 to with the bottom of inner column 11 and outer column 12 and the connected node welded fastening of two mount 21, thereby bury the lower extreme of inner column 11 and outer column 12 in enclosing fender basis 2 with fixed underground, guaranteed to enclose the stability that sets up of keeping off the main part.
The height of the fixing frame 21 is 300mm, the length is 400mm, and the width is 400mm.
The main body support 13 is fixed between the inner upright post 11 and the outer upright post 12, the arrangement distance of the inner upright post 11 and the arrangement distance of the outer upright post 12 can be determined according to actual requirements, and the distance between the inner upright post 11 and the outer upright post 12 can be determined according to the thickness of the main body support 13. The main body bracket 13 is installed between the inner upright post 11 and the outer upright post 12 and is erected on the enclosure foundation 2, so that a stable enclosure structure is formed.
The inner upright post 11 and the outer upright post 12 can be made of round steel tubes with the diameter of 76mm, the height of the inner upright post 11 is 3900mm, the height of the outer upright post 12 is 2900mm, and the distance between the inner upright post 11 and the outer upright post 12 is 600mm. The main body support 13 can be made of channel steel, the channel steel is transversely, longitudinally and obliquely arranged to form a three-dimensional net structure and is fixedly connected between the inner stand column 11 and the outer stand column 12, the structural strength is high, and the erection is convenient.
According to the requirement of sound insulation function, the sound-absorbing board 3 can be arranged on the inner end face of the inner upright post 11, the sound-absorbing board 3 is arranged along the boundary of a building construction area, the top of the sound-absorbing board 3 is inwards bent by 150 degrees to form an arc surface structure, good sound insulation function is guaranteed, and building construction noise is reduced. In order to ensure the stability of the arrangement of the top arc structure of the sound-absorbing board 3, the main body bracket 13 can be extended inwards to form a reliable tie between the top of the arc structure of the sound-absorbing board 3 and the top of the inner upright post 11. The thickness and the material of acoustic baffle 3 can be selected according to actual conditions, and acoustic baffle 3 and inner column 11 are the same height, and the cambered surface structure height of acoustic baffle 3 is 500mm.
According to the fire-fighting function demand, can be at the interior wall mounting spraying system 4 of abatvoix 3, spraying system 4 can adopt prior art's spraying equipment and connect the water source, and spraying system 4 sets up highly can install according to actual demand. Form dust fall dust removal protective screen through spraying water smoke in building construction region and outside region, the at utmost reduces the raise dust excessive.
The bearing column 51 can be made of channel steel, the height of the channel steel can be determined according to the number of the functional frames, and the specification of the channel steel can be determined according to the bearing requirements of the functional frames. The bearing column 51 is fixedly connected with the sound-absorbing board 3 and the enclosure foundation 2 through bolts.
According to the cable laying requirement, the first functional frame 52 can adopt a cable bridge frame in the prior art, the first supporting seat 53 can adopt channel steel, the first supporting seat 53 is fixed at the top of the bearing column 51 in a welding mode, a screwing mode and the like, and the cable bridge frame is installed on the first supporting seat 53 and can be used for laying cables.
According to the arrangement requirement of the fire fighting pipeline, the second functional frame 54 can adopt a U-shaped hoop, the second supporting seat 55 can be erected by adopting a square steel pipe and is arranged on the bearing column 51, and the fire fighting pipeline 56 is erected on the square steel pipe and is locked on the square steel pipe through the inverted U-shaped hoop.
According to the functional requirements of building construction, a functional frame can be additionally arranged on the bearing column 51 to meet the actual use requirements.
According to the drainage requirement, in the ground construction drainage ditch 6 of the construction area, the drainage ditch 6 can be arranged along the inner side of the enclosure foundation 2, and the drainage ditch 6 can extend into a municipal drainage or construction engineering drainage system, so that the drainage in the construction area is facilitated, and the outflow of sewage is avoided.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention, therefore, any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention should be included in the scope of the present invention.

Claims (6)

1. The utility model provides a can remove dust and fall and enclose fender that arranges with pipeline is synthesized which characterized by: the enclosure comprises an enclosure main body, an enclosure foundation (2), an acoustic board (3), a spraying system (4) and a pipeline laying frame body; the enclosure foundation (2) is constructed below the ground and arranged along the boundary of a building construction area, and the lower end of the enclosure main body is fixedly embedded in the enclosure foundation (2), so that the enclosure main body is vertically arranged at the boundary of the building construction area; the sound-absorbing plate (3) is arranged on the inner wall of the enclosure main body, and the spraying system (4) is arranged on the upper part of the inner wall of the sound-absorbing plate (3) and faces the interior of the building construction area; the pipeline is laid the support body and is set up and just be located the inboard of abatvoix (3) on enclosing fender basis (2), and a plurality of pipeline is laid the support body and is set up along the length direction interval that encloses fender basis (2), and the pipeline is laid on a plurality of pipeline is laid the support body.
2. The enclosure capable of removing dust and reducing noise and realizing comprehensive arrangement of pipelines as claimed in claim 1, which is characterized in that: the enclosure main body comprises an inner upright post (11), an outer upright post (12) and a main body bracket (13); the lower ends of the inner upright columns (11) and the outer upright columns (12) are fixedly embedded in the enclosure foundation (2), the inner upright columns (11) are arranged on the inner sides of the outer upright columns (12) in parallel, and the inner upright columns (11) and the outer upright columns (12) are arranged at intervals along the boundary of a building construction area; the main body bracket (13) is arranged between the inner upright columns (11) and the outer upright columns (12), and the bottom of the main body bracket (13) is arranged on the enclosure foundation (2); the sound absorption plates (3) are arranged on the inner end faces of the inner upright columns (11), and the pipeline laying frame body is arranged on the inner sides of the inner upright columns (11).
3. The enclosure capable of removing dust and reducing noise and realizing comprehensive arrangement of pipelines as claimed in claim 2, wherein: the fence is characterized in that a fixing frame (21) is arranged in the fence foundation (2), the fixing frame (21) is formed by connecting three pairwise vertical rod pieces, and the bottoms of the inner upright column (11) and the outer upright column (12) are respectively arranged at the connecting nodes of the three rod pieces.
4. The enclosure capable of removing dust and reducing noise and realizing comprehensive arrangement of pipelines as claimed in claim 2, wherein: the top of the sound-absorbing board (3) is bent inwards to form an arc-shaped structure, and the top of the main body support (13) extends inwards to the top of the arc-shaped structure of the sound-absorbing board (3).
5. The enclosure capable of removing dust and reducing noise and realizing comprehensive arrangement of pipelines as claimed in claim 2, wherein: the pipeline laying frame body comprises a bearing column (51), a first functional frame (52), a first supporting seat (53), a second functional frame (54) and a second supporting seat (55); the bearing column (51) is vertically arranged on the enclosure foundation (2) and is positioned on the inner side of the inner upright column (11); the first functional frame (52) is arranged at the upper part of the bearing column (51) through a first supporting seat (53), and the cable is arranged on the first functional frame (52); the second functional frame (54) is arranged at the lower part of the bearing column (51) through a second supporting seat (55), and the fire-fighting pipeline (56) is arranged on the second functional frame (54).
6. The enclosure capable of removing dust and reducing noise and realizing comprehensive arrangement of pipelines as claimed in claim 1, which is characterized in that: building construction region in be under construction and have escape canal (6), escape canal (6) are along enclosing the inboard setting that keeps off basis (2), escape canal (6) are connected to drainage system.
CN202222843596.4U 2022-10-25 2022-10-25 Fence capable of removing dust and reducing noise and comprehensively arranging pipelines Active CN218715732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222843596.4U CN218715732U (en) 2022-10-25 2022-10-25 Fence capable of removing dust and reducing noise and comprehensively arranging pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222843596.4U CN218715732U (en) 2022-10-25 2022-10-25 Fence capable of removing dust and reducing noise and comprehensively arranging pipelines

Publications (1)

Publication Number Publication Date
CN218715732U true CN218715732U (en) 2023-03-24

Family

ID=85592457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222843596.4U Active CN218715732U (en) 2022-10-25 2022-10-25 Fence capable of removing dust and reducing noise and comprehensively arranging pipelines

Country Status (1)

Country Link
CN (1) CN218715732U (en)

Similar Documents

Publication Publication Date Title
CN218715732U (en) Fence capable of removing dust and reducing noise and comprehensively arranging pipelines
CN217897363U (en) Building construction safety device
CN216665241U (en) Construction site enclosure device for building engineering management
CN108193695A (en) A kind of enclosure structure of foundation pit of subway station support and construction method
CN211523222U (en) Thermal power plant confined space deep basal pit pond construction safety enclosure device
CN113323425B (en) Multi-purpose nondestructive rapid mounting and dismounting edge-facing protective net
CN212926573U (en) Sound absorption and insulation enclosing wall for transformer substation
CN211974258U (en) Aerial platform
CN217353838U (en) Take gabion enclosure of pipeline crane span structure
KR101421652B1 (en) System Form for Slit of Caisson and Caisson Construction Method Using the Same
CN217151537U (en) Construction is with bordering on building and enclosing fender
CN218668839U (en) Enclose fender facility with water and electricity bearing structure
CN204782128U (en) Sound arrester of transformer substation and overall structure of fire wall
CN212801528U (en) Tubular pile construction protection sound-proof wall
CN218540431U (en) Safety protection platform equipment suitable for construction of pier column in water
CN218176905U (en) Miniature steel-pipe pile construction sound insulation canopy
CN220521918U (en) Combined type finalized steel pipe supporting temporary scaffold
CN211447475U (en) Assembled water and electricity circuit discharges wallboard and assembled wall structure
CN215488061U (en) Supporting and fixing structure for fire pump pipe or water supply pipe
CN218438431U (en) Detachable sound-proof wall reinforcing apparatus of rice font
CN207553710U (en) A kind of base station supporting rack and base station
CN217782795U (en) Safe operation platform for prefabricating construction of circular pipe culvert
KR200227450Y1 (en) a dust proof and sound proof panel for the fence to construct around a construction spot
CN215520079U (en) Building construction protector
CN216947943U (en) Box culvert enclosure type protective structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant