CN218713832U - Seepage and drainage civil grille - Google Patents

Seepage and drainage civil grille Download PDF

Info

Publication number
CN218713832U
CN218713832U CN202222992411.6U CN202222992411U CN218713832U CN 218713832 U CN218713832 U CN 218713832U CN 202222992411 U CN202222992411 U CN 202222992411U CN 218713832 U CN218713832 U CN 218713832U
Authority
CN
China
Prior art keywords
fixedly connected
main part
main body
plate
sliding connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222992411.6U
Other languages
Chinese (zh)
Inventor
崔康伟
张天柱
张中华
刘强
张治升
聂宏娟
张旭峰
宋未莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Aokid New Material Technology Co ltd
Original Assignee
Henan Aokid New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Aokid New Material Technology Co ltd filed Critical Henan Aokid New Material Technology Co ltd
Priority to CN202222992411.6U priority Critical patent/CN218713832U/en
Application granted granted Critical
Publication of CN218713832U publication Critical patent/CN218713832U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a civil engineering technical field specifically is a seepage drainage building grille. The utility model discloses, including first main part, the second main part has been placed to the lateral wall of first main part, the lateral wall of first main part and second main part all is equipped with positioner, positioner is including four mounts, two liang of a set of four the inner wall of mount respectively with the lateral wall sliding connection of first main part and second main part, two liang of a set of four the equal sliding connection in inside of mount has the atress board, the lower fixed surface of atress board is connected with the pressure plate, the inside sliding connection of atress board has the atress pole, the sliding surface of atress pole is connected with the mounting panel, the lower fixed surface of mounting panel is connected with the connecting plate, the lower fixed surface of connecting plate is connected with the triangular prism, the lateral wall of triangular prism is isosceles triangle. The problem of skew can appear when percolating and draining building grille installs is solved.

Description

Seepage and drainage civil grille
Technical Field
The utility model relates to a civil engineering technical field especially relates to a seepage drainage building grille.
Background
The seepage and drainage civil grille is a device for seepage and drainage laid on a foundation when a road is built, and is used for increasing the bearing capacity of the foundation and prolonging the service life of the foundation.
Staff can adopt a large amount of "U" shape nails to fix when fixing seepage drainage civil engineering grid among the prior art, when seepage drainage civil engineering grid takes place the skew and need dismantle the installation again, needs the staff to rise repeatedly and dismantles "U" shape nail, has reduced staff's work efficiency.
In order to solve the problem that the skew can appear when oozing drainage building grille installation, prior art adopts the both sides of oozing drainage building grille to place two boards and handles, but because ooze drainage building grille's material is softer, can lead to the condition that the board takes place to buckle with the junction of oozing drainage building grille to appear, lay of ground leads to workman's power too big to lead to board and ooze drainage building grille to appear keeping away from usually longer easily in addition, and then lead to reducing the problem to oozing drainage building grille's utilization ratio.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the drainage civil grille can deviate when being installed, and providing the drainage civil grille.
In order to achieve the above purpose, the utility model adopts the following technical scheme: including first main part, the second main part has been placed to the lateral wall of first main part, the lateral wall of first main part and second main part all is equipped with positioner, positioner is including four mounts, two liang of a set of four the inner wall of mount respectively with the lateral wall sliding connection of first main part and second main part, two liang of a set of four the equal sliding connection in inside of mount has the atress board, the lower fixed surface of atress board is connected with the pressure plate, the inside sliding connection of atress board has the atress pole, the sliding surface of atress pole is connected with the mounting panel, the lower fixed surface of mounting panel is connected with the connecting plate, the lower fixed surface of connecting plate is connected with the triangular prism, the lateral wall of triangular prism is isosceles triangle, the lateral wall fixed connection of connecting plate and mount, two baffles of the equal fixedly connected with in both ends of atress pole, the mounting panel is close to one side fixedly connected with backup pad of atress board, the inside threaded connection of backup pad has the screw rod, the lower fixed surface of screw rod is connected with the curved plate.
The effect that above-mentioned part reaches is: pierce the ground with the triangular prism, made things convenient for the staff to the fixed between connecting plate and the ground, place the inside of mount with first main part again, take place to rock in order to prevent to receive seepage drainage geogrid exogenic action and lead to reducing staff's work efficiency, only need rotate the screw rod, the screw rod can extrude the curved plate, the curved plate of effect of receiving the power can the downstream and promote the atress pole and make relative motion, the baffle at atress pole both ends has been avoided the atress pole to take place the skew after the effect of power, also improved the stability between atress pole and mounting panel and the atress board, the atress pole can drive the atress board and extrude downwards and pressurize fixedly to first main part, the pressure plate of atress board lower fixed surface connection has increased the area of contact between atress board and the first main part, also avoided the atress board to a certain extent to exert pressure how big and lead to first main part to take place deformation or damage.
Preferably, one side of the connecting plate close to the fixing frame is slidably connected with a moving plate, one side of the connecting plate close to the fixing frame is fixedly connected with a fixing plate, the inner thread of the fixing plate is connected with a driving rod, and the end face of the driving rod is rotatably connected with the moving plate.
The effect that above-mentioned part reaches is: the movable plate is extruded by the rotary driving rod, the first main body can be moved by the movable plate under the action of force, the stability between the first main body and the fixing frame is improved, the worker can conveniently position the seepage and drainage civil grille with different sizes, and the worker can conveniently align the first main body with the fixing frame.
Preferably, the upper surface of the curved plate is fixedly connected with a limiting rod, and the surface of the limiting rod is connected with the inner portion of the supporting plate in a sliding mode.
The effect that above-mentioned part reaches is: the limiting rod on the curved plate avoids the deviation of the curved plate along with the torsion of the screw rod, and the pressure is conveniently applied to the stress plate by the working personnel.
Preferably, one side of the second main body, which is close to the first main body, is provided with a connecting device, the connecting device comprises an installation frame, the inner wall of the installation frame is fixedly connected with the surface of the second main body, the side wall of the installation frame is slidably connected with a pull rod, the end face of the pull rod is fixedly connected with a ball body, and one side of the second main body, which is close to the pull rod, is provided with a limit groove.
The effect that above-mentioned part reaches is: pulling pull rod, pull rod can drive the spheroid and be close to the inner wall of installing frame, at this moment places the inner wall of installing frame with first main part again, and after removing a locating position, spacing groove in the first main part aligns with the spheroid, and the staff promotes the pull rod, and the pull rod can drive the inner wall that the spheroid entered into the spacing groove, has improved the stability between first main part and the second main part, has reduced the loss that causes infiltration drainage building grille during the construction.
Preferably, the inner wall of the mounting frame is fixedly connected with a spring, one end, far away from the mounting frame, of the spring is fixedly connected with the ball body, and the spring is wound on the surface of the pull rod.
The effect that above-mentioned part reaches is: the elastic force of the spring can push the ball body to enter the inner wall of the limiting groove, so that the situation that a worker hands in person is avoided as much as possible, and the working efficiency of the worker is improved.
Preferably, the notch of the limiting groove in the first main body is fixedly connected with a limiting ring, and the limiting ring is made of rubber.
The effect that above-mentioned part reaches is: the spacing ring of spacing groove port has improved the continuity between spheroid and the first main part, has increased the frictional force between the inner wall of spacing groove and the spheroid.
In summary, the following steps:
the utility model discloses in, through setting up positioner, avoided the staff as far as to appear oozing the condition that drainage geogrid took place the skew when installing, also made things convenient for the staff to ooze drainage geogrid to the variation in size and carried out positioning work, increased and oozed the stability between drainage geogrid and the ground, improved staff's work efficiency.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic perspective view of another embodiment of the present invention;
fig. 3 is an enlarged view of a portion a of fig. 1 according to the present invention;
fig. 4 is an enlarged view of fig. 1 at B of the present invention;
fig. 5 is an enlarged view of the position C of fig. 2 according to the present invention.
Illustration of the drawings: 1. a first body; 2. a second body; 3. a positioning device; 301. a connecting plate; 302. mounting a plate; 303. a support plate; 304. a limiting rod; 305. a screw; 306. a fixing plate; 307. a drive rod; 308. a triangular prism; 309. a pressure plate; 310. moving the plate; 311. a stress plate; 312. a baffle plate; 313. a curved plate; 314. a stress beam; 315. a fixed mount; 4. a connecting device; 41. a limiting groove; 42. a limiting ring; 43. installing a frame; 44. a pull rod; 45. a sphere; 46. a spring.
Detailed Description
Referring to fig. 1, the utility model provides a technical scheme: the utility model provides a seepage drainage geogrid, includes first main part 1, and second main part 2 has been placed to the lateral wall of first main part 1, and the lateral wall of first main part 1 and second main part 2 all is equipped with positioner 3, and one side that second main part 2 is close to first main part 1 is equipped with connecting device 4.
The specific arrangement and function of the positioning means 3 and the connecting means 4 will be described in detail below.
Referring to fig. 1 and 3, in the present embodiment: the side walls of the first main body 1 and the second main body 2 are both provided with a positioning device 3, the positioning device 3 comprises four fixing frames 315, the inner walls of every two groups of four fixing frames 315 are respectively in sliding connection with the side walls of the first main body 1 and the second main body 2, the insides of every two groups of four fixing frames 315 are respectively in sliding connection with a stress plate 311, the lower surface of the stress plate 311 is fixedly connected with a pressure plate 309, the inside of the stress plate 311 is in sliding connection with a stress rod 314, the surface of the stress rod 314 is in sliding connection with a mounting plate 302, the lower surface of the mounting plate 302 is fixedly connected with a connecting plate 301, the lower surface of the connecting plate 301 is fixedly connected with a triangular prism 308, the side wall of the triangular prism 308 is in an isosceles triangle shape, the side wall of the connecting plate 301 is fixedly connected with the side walls of the fixing frames 315, two ends of the stress rod 314 are both fixedly connected with two baffle plates 312, one side of the mounting plate 302 close to the stress plate 311 is fixedly connected with a supporting plate 303, the screw 305 is connected with the internal thread of the supporting plate 303, the curved plate 313 is fixedly connected to the lower surface of the screw 305, the triangular prism 308 is penetrated into the foundation, the fixing between the connecting plate 301 and the foundation by workers is facilitated, then the first main body 1 is placed in the fixing frame 315, in order to prevent the working efficiency of the workers from being reduced due to shaking caused by the external force of the seepage and drainage geogrid, only the screw 305 needs to be rotated, the screw 305 can extrude the curved plate 313, the curved plate 313 under the action of force can move downwards and push the stress rod 314 to move relatively, the baffle plates 312 at the two ends of the stress rod 314 avoid the stress rod 314 from being deflected after being under the action of force, the stability between the stress rod 314 and the mounting plate 302 and the stress plate 311 is also improved, the stress rod 314 can drive the stress plate 311 to extrude downwards to pressurize and fix the first main body 1, the pressure plate 309 fixedly connected with the lower surface of the stress plate 311 increases the contact area between the stress plate 311 and the first main body 1, and avoids deformation or damage of the first main body 1 caused by large pressure applied by the stress plate 311 to a certain extent, one side of the connecting plate 301 close to the fixing frame 315 is slidably connected with the movable plate 310, one side of the connecting plate 301 close to the fixing frame 315 is fixedly connected with the fixed plate 306, the internal thread of the fixed plate 306 is connected with the driving rod 307, the end surface of the driving rod 307 is rotatably connected with the movable plate 310, the driving rod 307 is rotated to extrude the movable plate 310, the movable plate 310 under the action of force can move the first main body 1, the stability between the first main body 1 and the fixing frame 315 is improved, positioning work of seepage and drainage civil grids with different sizes by workers is facilitated, the workers align the first main body 1 and the fixing frame 315 conveniently, the limiting rod 304 is fixedly connected with the upper surface of the curved plate 313, the surface of the limiting rod 304 is slidably connected with the inner part of the supporting plate 303, the limiting rod 304 on the curved plate 313 avoids the curved plate 313 from deviation along with the torsion of the curved plate 305, and facilitates pressurization of the workers on the stress plate 311.
Referring to fig. 1, 2, 4 and 5, specifically, a connecting device 4 is disposed on one side of the second body 2 close to the first body 1, the connecting device 4 includes a mounting frame 43, an inner wall of the mounting frame 43 is fixedly connected to a surface of the second body 2, a pull rod 44 is slidably connected to a side wall of the mounting frame 43, a ball 45 is fixedly connected to an end surface of the pull rod 44, a position-limiting groove 41 is disposed on one side of the second body 2 close to the pull rod 44, the pull rod 44 is pulled, the pull rod 44 drives the ball 45 to close to the inner wall of the mounting frame 43, at this time, the first body 1 is placed on the inner wall of the mounting frame 43, after moving a certain position, the position-limiting groove 41 on the first body 1 aligns with the ball 45, a worker pushes the pull rod 44, the pull rod 44 drives the ball 45 to enter the inner wall of the position-limiting groove 41, stability between first main part 1 and the second main part 2 has been improved, the loss that causes infiltration drainage geogrid during the construction has been reduced, the inner wall fixedly connected with spring 46 of installing frame 43, the one end and spheroid 45 fixed connection of installing frame 43 are kept away from to spring 46, spring 46 twines on the surface of pull rod 44, spring 46's elastic force effect can promote spheroid 45 to enter into the inner wall of spacing groove 41, the condition of staff's hands-on has been avoided appearing as far as, staff's work efficiency has been improved, the notch fixedly connected with spacing ring 42 of spacing groove 41 on first main part 1, spacing ring 42 is the rubber material, the spacing ring 42 of spacing groove 41 port has improved the connectivity between spheroid 45 and the first main part 1, the frictional force between the inner wall of spacing groove 41 and the spheroid 45 has been increased.
The working principle is as follows:
the worker places the seepage and drainage geogrid on a beaten foundation, so that the service life of the foundation is prolonged, in order to prevent the worker from shifting to reduce the working efficiency of the worker when the worker installs the seepage and drainage geogrid, only the triangular prism 308 needs to be penetrated into the foundation, the worker can conveniently fix the connecting plate 301 and the foundation, then the first main body 1 is placed inside the fixing frame 315, in order to prevent the worker from shaking due to the action of external force of the seepage and drainage geogrid to reduce the working efficiency of the worker, only the screw 305 needs to be rotated, the screw 305 can extrude the curved plate 313, the curved plate 313 under the action of the force can move downwards and push the stress rod 314 to move relatively, the baffle plates 312 at the two ends of the stress rod 314 avoid the shifting after the stress rod 314 is acted by the force, the stability between the stress rod 314 and the mounting plate 302 and the stress plate 311 is also improved, the stress rod 314 can drive the stress plate 311 to extrude the first main body 1 downwards to fix the first main body 1 under the action of the pressure, the pressure plate 309 fixedly connected with the lower surface of the stress plate 311 increases the stress plate 311, the contact area between the first main body 1 and the first main body 1, the first main body 315, the stress plate 310 can be conveniently positioned, the first main body 310 can conveniently move, the first main body 310 can conveniently, the stress plate 310 can be prevented from shifting, the stress plate 310, the stress rod 310 can be positioned, the first main body 310, through setting up positioner 3, avoided the staff to appear oozing the circumstances that the drainage geogrid took place the skew when installing as far as, also made things convenient for the staff to ooze the drainage geogrid of variation in size and carried out positioning work, increased the stability between drainage geogrid and the ground of oozing, improved staff's work efficiency.
In order to prevent the junction between the first main body 1 and the second main body 2 from generating excessive repeated laying to cause unnecessary economic waste, only a worker pulls the pull rod 44, the pull rod 44 can drive the ball 45 to be close to the inner wall of the installation frame 43, at this time, the first main body 1 is placed on the inner wall of the installation frame 43, after the first main body 1 is moved to a certain position, the limiting groove 41 on the first main body 1 is aligned with the ball 45, the worker pushes the pull rod 44, the pull rod 44 can drive the ball 45 to enter the inner wall of the limiting groove 41, the stability between the first main body 1 and the second main body 2 is improved, the loss caused by the seepage and drainage civil grille during construction is reduced, the elastic action of the spring 46 can push the ball 45 to enter the inner wall of the limiting groove 41, the condition that the worker hands are in person is avoided as much as possible, the working efficiency of the worker is improved, the limiting ring 42 at the port of the limiting groove 41 improves the connectivity between the ball 45 and the first main body 1, the friction between the inner wall of the limiting groove 41 and the ball 45 is increased, the drainage utilization rate of the first main body and the second main body is improved.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.

Claims (6)

1. A water seepage and drainage civil grille comprises a first main body (1) and is characterized in that: the second main body (2) is placed on the side wall of the first main body (1), the side walls of the first main body (1) and the second main body (2) are respectively provided with a positioning device (3), each positioning device (3) comprises four fixing frames (315), every two of the four fixing frames (315) are in a group, the inner walls of the fixing frames (315) are respectively in sliding connection with the side walls of the first main body (1) and the second main body (2), every two of the four fixing frames (315) are in a group, stress plates (311) are all in sliding connection in the fixing frames (315), pressure plates (309) are fixedly connected to the lower surfaces of the stress plates (311), stress rods (314) are in sliding connection in the stress plates (311), mounting plates (302) are in sliding connection on the surfaces of the stress rods (314), connecting plates (301) are fixedly connected to the lower surfaces of the mounting plates (302), triangular columns (308) are fixedly connected to the side walls of the triangular columns (308), the side walls of the connecting plates (301) are in isosceles triangles, the side walls of the mounting plates (305) are fixedly connected with two retaining plates (312), and two retaining plates (303) are close to the screw threads (303), the lower surface of the screw (305) is fixedly connected with a curved plate (313).
2. A percolation and drainage geogrid, according to claim 1, characterised in that: one side sliding connection that connecting plate (301) is close to mount (315) has movable plate (310), one side fixedly connected with fixed plate (306) that connecting plate (301) is close to mount (315), the internal thread of fixed plate (306) is connected with actuating lever (307), the terminal surface and the movable plate (310) of actuating lever (307) are rotated and are connected.
3. A percolation and drainage geogrid, according to claim 1, characterised in that: the upper surface of curved plate (313) is fixedly connected with gag lever post (304), the inside sliding connection of gag lever post (304) and backup pad (303).
4. A percolation and drainage geogrid, according to claim 1, characterised in that: one side that second main part (2) are close to first main part (1) is equipped with connecting device (4), connecting device (4) are including installing frame (43), the inner wall of installing frame (43) is connected with the fixed surface of second main part (2), the lateral wall sliding connection of installing frame (43) has pull rod (44), the terminal surface fixedly connected with spheroid (45) of pull rod (44), spacing groove (41) have been seted up to one side that second main part (2) are close to pull rod (44).
5. A percolation and drainage geogrid, according to claim 4, characterised in that: the inner wall of the mounting frame (43) is fixedly connected with a spring (46), one end, far away from the mounting frame (43), of the spring (46) is fixedly connected with a ball body (45), and the spring (46) is wound on the surface of the pull rod (44).
6. A percolation/drainage geogrid, according to claim 4, characterized in that: the notch of spacing groove (41) fixedly connected with spacing ring (42) on first main part (1), spacing ring (42) are the rubber material.
CN202222992411.6U 2022-11-10 2022-11-10 Seepage and drainage civil grille Active CN218713832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222992411.6U CN218713832U (en) 2022-11-10 2022-11-10 Seepage and drainage civil grille

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222992411.6U CN218713832U (en) 2022-11-10 2022-11-10 Seepage and drainage civil grille

Publications (1)

Publication Number Publication Date
CN218713832U true CN218713832U (en) 2023-03-24

Family

ID=85613267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222992411.6U Active CN218713832U (en) 2022-11-10 2022-11-10 Seepage and drainage civil grille

Country Status (1)

Country Link
CN (1) CN218713832U (en)

Similar Documents

Publication Publication Date Title
CN111677036B (en) Construction equipment is seted up to building escape canal
CN214305574U (en) Highway pipeline laying device
CN114775634B (en) Auxiliary construction equipment for deep foundation pit support of building construction
CN205314542U (en) Construction liquid die plate device that climbs
CN218713832U (en) Seepage and drainage civil grille
CN113668344A (en) Construction auxiliary device is backfilled in maintenance of highway section
CN206468001U (en) A kind of stress check calculation device
CN215252817U (en) Pile foundation reinforcing and supporting device
CN116480151A (en) Automatic deep concrete pouring equipment
CN211395652U (en) Steel-pipe pile foundation reinforced structure
CN115045289A (en) Supporting pile foundation pit supporting device for engineering and using method thereof
CN213869051U (en) Building structure reinforcing and connecting device
CN218324296U (en) Novel enclosure
CN221502035U (en) Automatic water control cofferdam for sloping field
CN216976049U (en) A hydraulic pipeline supports connecting device for hydraulic engineering
CN219060071U (en) Collapse-preventing supporting structure for deep foundation pit
CN221681749U (en) Ditch side soil retaining device
CN218990245U (en) Bearing platform template supporting structure
CN217204133U (en) Foundation pit supporting structure for pipeline drainage engineering
CN218346839U (en) Prevent mashed root device of wall body
CN220014578U (en) Frame building bears girder segment joint reinforced structure
CN220414311U (en) Non-perforating buttress retaining wall
CN220580584U (en) Built-in fitting fixing device
CN221778983U (en) Template for building construction
CN217760104U (en) Prestress tension frame