CN218713292U - Prefabricated inspection shaft is pour in drawing of patterns - Google Patents

Prefabricated inspection shaft is pour in drawing of patterns Download PDF

Info

Publication number
CN218713292U
CN218713292U CN202222477452.1U CN202222477452U CN218713292U CN 218713292 U CN218713292 U CN 218713292U CN 202222477452 U CN202222477452 U CN 202222477452U CN 218713292 U CN218713292 U CN 218713292U
Authority
CN
China
Prior art keywords
well frame
well
concatenation
pouring
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222477452.1U
Other languages
Chinese (zh)
Inventor
高博
刘飞
温海舟
弥承斌
赵新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanggu Tianma Building Materials Co ltd
Original Assignee
Yanggu Tianma Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanggu Tianma Building Materials Co ltd filed Critical Yanggu Tianma Building Materials Co ltd
Priority to CN202222477452.1U priority Critical patent/CN218713292U/en
Application granted granted Critical
Publication of CN218713292U publication Critical patent/CN218713292U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a prefabricated inspection shaft is pour in drawing of patterns, including inspection end well and a plurality of concatenation well frame subassembly, the top of inspection end well is equipped with a plurality of concatenation well frame subassemblies, a plurality of concatenation well frame subassemblies block from bottom to top in proper order connects, and a plurality of concatenation well frame subassemblies are all including pouring the well frame, splice ring and last splice ring down, and the fixed periphery of pouring the well frame bottom is provided with splice ring down, and the fixed location inserted block that is provided with a plurality of evenly distributed of periphery of splice ring bottom down, the fixed periphery of pouring well frame top is provided with splice ring, the utility model relates to a prefabricated inspection shaft is pour in drawing of patterns, and this inspection shaft is through addding splice ring on pouring the well frame, and the cooperation that utilizes butt joint arc groove and location inserted column can realize stacking of well frame fast fixedly, and assembly efficiency is high reliable and stable, has increased the peripheral reinforcement stupefied strip of reinforcement mesh cooperation in pouring the well frame to can improve the structural strength of inspection shaft, bearing capacity and shock resistance are strong.

Description

Prefabricated inspection shaft is pour in drawing of patterns
Technical Field
The utility model relates to a prefabricated inspection shaft technical field specifically is a prefabricated inspection shaft is pour in drawing of patterns.
Background
The inspection well is used for the maintenance of power supply, water supply, drainage, pollution discharge, communication, cable television, gas pipes, street lamp lines and the like of urban underground infrastructure, is convenient to install, is generally arranged at a pipeline intersection, a turning part, a pipe diameter or gradient changing part and a straight pipe section at a certain distance, and is convenient for regular inspection of auxiliary structures. In order to improve the assembly efficiency of the inspection well, a prefabricated inspection well poured by concrete is generally adopted to be spliced and assembled to form an inspection well body. Traditional and common prefabricated inspection shaft piles up in proper order from bottom to top in the foundation ditch through concrete placement ring more, forms inspection shaft body structure, and this kind of inspection shaft has following not enoughly:
1. the whole concrete pouring ring has poor structural strength and is easy to collide and damage, and the butt joint and fixation of the two pouring rings cannot be quickly realized in the assembling process;
2. the inspection well is easily influenced by ground settlement in the long-term use process, and has poor settlement resistance.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated inspection shaft is pour in drawing of patterns to concrete placement who provides in solving above-mentioned background art encircles holistic structural strength relatively poor, is easily damaged by the collision, and the butt joint that can't realize two blocks of rings of pouring fast in the assembling process is fixed easily receives the influence that ground subsides with the inspection shaft in long-term use, the poor problem of anti settlement ability.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prefabricated inspection shaft is pour in drawing of patterns, includes inspection end well and a plurality of concatenation well frame subassembly, the top of inspection end well is equipped with a plurality of concatenation well frame subassemblies, and is a plurality of concatenation well frame subassembly is block connection in proper order from bottom to top, and is a plurality of concatenation well frame subassembly all includes pours the well frame, splices ring and last concatenation ring down, the fixed concatenation ring down that is provided with in periphery of pouring the well frame bottom, the fixed location inserted block that is provided with a plurality of evenly distributed of the fixed periphery of splices ring bottom down, the fixed concatenation ring that is provided with in periphery of pouring well frame top, a plurality of butt joint arc grooves have been seted up to the periphery of going up the concatenation ring, go up to splice ring and splice down and be equipped with a plurality of reinforcement stupefied strip, this inspection shaft is through building the concatenation ring on the well frame, and the cooperation that utilizes butt joint arc groove and location inserted column can realize fast that the well frame stacks fixedly, and assembly efficiency is high reliable and stable, adds reinforcement stupefied strip in pouring the well frame to cooperate peripheral reinforcement to can improve the structural strength of inspection shaft, bearing capacity and shock resistance.
Preferably, an inspection opening is formed in one side of the inspection bottom well, so that the inspection work of workers is facilitated.
Preferably, the pouring well frame comprises a concrete pouring layer and a reinforcing mesh reinforcement, the reinforcing mesh reinforcement is fixedly arranged inside the concrete pouring layer, the structural strength of the inspection well can be improved, and the bearing capacity and the impact resistance are high.
Preferably, the both sides of pouring the well frame have all been seted up and have been prevented subsiding the jack, two the equal block in inside of preventing subsiding the jack is connected with prevents subsiding and inserts the post, can insert in peripheral ground after the assembly to resist subsiding the influence that causes the inspection shaft, long service life.
Preferably, the positioning insertion blocks are respectively arranged corresponding to the plurality of butt joint arc grooves, the well frames can be quickly stacked and fixed by means of matching of the butt joint arc grooves and the positioning insertion columns, and the assembling efficiency is high, stable and reliable.
Preferably, the inner side wall of the pouring well frame is provided with inspection climbing frames which are uniformly distributed, so that inspection personnel can climb in and out conveniently.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the inspection well, the splicing rings are additionally arranged on the pouring well frame, the well frame can be quickly stacked and fixed by matching the butt arc grooves and the positioning inserting columns, the assembly efficiency is high, stable and reliable, and reinforcing fillets which are matched with the periphery of a reinforcing steel bar net are additionally arranged in the pouring well frame, so that the structural strength of the inspection well can be improved, and the bearing capacity and the impact resistance are high;
2. every is pour and all is equipped with on the well frame and prevents subsiding and inserts the post, can insert in peripheral ground after the assembly to resist the influence that subsides caused the inspection shaft, long service life, safety and stability.
Drawings
FIG. 1 is a schematic structural view of the inspection well of the present invention;
FIG. 2 is a schematic structural view of the spliced well frame assembly of the present invention;
FIG. 3 is a top cross-sectional view of the present invention of the spliced well frame assembly;
fig. 4 is an assembly sectional view of the inspection well of the present invention.
In the figure: 1. inspecting the bottom well; 2. an inspection opening; 3. splicing the well frame assembly; 31. pouring a well frame; 311. pouring a concrete layer; 312. reinforcing the reinforcing mesh; 32. a lower splice ring; 33. an upper splice ring; 34. anti-settling jacks; 35. reinforcing the fillet; 36. checking the climbing frame; 37. butting the arc grooves; 38. positioning the insert block; 39. prevent subsiding and insert the post.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-4, the utility model provides a prefabricated inspection shaft is pour in drawing of patterns, including inspection shaft 1 and a plurality of concatenation well frame subassembly 3, the top of inspection shaft 1 is equipped with a plurality of concatenation well frame subassemblies 3, a plurality of concatenation well frame subassemblies 3 block-connect from bottom to top in proper order, a plurality of concatenation well frame subassemblies 3 all include the concatenation well frame 31, lower concatenation ring 32 and upper concatenation ring 33, the periphery of the bottom of the concatenation well frame 31 is fixed and is provided with lower concatenation ring 32, the periphery of the bottom of lower concatenation ring 32 is fixed and is provided with a plurality of evenly distributed's location inserted block 38, the periphery of the top of the concatenation well frame 31 is fixed and is provided with upper concatenation ring 33, the periphery of upper concatenation ring 33 is equipped with a plurality of butt joint arc groove 37, be equipped with a plurality of reinforcement fillet 35 between upper concatenation ring 33 and the lower concatenation ring 32, one side of inspection shaft 1 is equipped with inspection mouth 2, the pouring well frame 31 comprises a concrete pouring layer 311 and a reinforcing steel bar mesh 312, the reinforcing steel bar mesh 312 is fixedly arranged inside the concrete pouring layer 311, anti-settlement insertion holes 34 are formed in two sides of the pouring well frame 31, anti-settlement insertion posts 39 are connected inside the two anti-settlement insertion holes 34 in a clamping mode, positioning insertion blocks 38 are arranged corresponding to the butt joint arc grooves 37 respectively, inspection climbing frames 36 are evenly distributed on the inner side wall of the pouring well frame 31, the inspection well is high in assembly efficiency, stability and reliability by means of the fact that splicing rings are additionally arranged on the pouring well frame 31, the well frame can be quickly stacked and fixed through cooperation of the butt joint arc grooves 37 and the positioning insertion blocks 38, the reinforcing steel bar mesh 312 is additionally arranged in the pouring well frame 31 to be matched with the peripheral reinforcing ribs 35, and therefore the structural strength, the bearing capacity and the shock resistance of the inspection well can be improved.
When the embodiment of the application is used: the method is characterized in that pits matched with an inspection bottom well 1 are dug at the installation part of the existing inspection well, the wall of the pit is reinforced, the inspection bottom well 1 is placed at the bottom of the pit, a plurality of spliced well frame assemblies 3 are sequentially and vertically stacked and placed, in the stacking and placing process, a positioning insertion block 38 is required to be inserted and clamped into a butt joint arc groove 37, a splicing ring is additionally arranged on a pouring well frame 31 of the inspection well, the well frames can be quickly stacked and fixed by utilizing the matching of the butt joint arc groove 37 and the positioning insertion block 38, the assembly efficiency is high, stable and reliable, a reinforcing steel bar net 312 is additionally arranged in the pouring well frame 31 to be matched with a peripheral reinforcing rib 35, the structural strength of the inspection well can be improved, the bearing capacity and the impact resistance are high, the anti-settling insertion column 39 is inserted into the well after the well body is assembled, the anti-settling insertion column 39 is inserted into the wall of the pit, then the gap between the well body and the pit is filled with soil and leveled, the anti-settling foundation can be arranged after the well body is assembled, and the safety and the service life of the inspection well is prolonged.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a prefabricated inspection shaft is pour in drawing of patterns, includes inspection shaft (1) and a plurality of concatenation well frame subassembly (3), its characterized in that: the top of inspection end well (1) is equipped with a plurality of concatenation well frame subassemblies (3), and is a plurality of concatenation well frame subassembly (3) from bottom to top block in proper order connects, and is a plurality of concatenation well frame subassembly (3) all is including pouring well frame (31), lower concatenation ring (32) and last concatenation ring (33), the fixed concatenation ring (32) down that is provided with in periphery of pouring well frame (31) bottom, the fixed location inserted block (38) that are provided with a plurality of evenly distributed in periphery of concatenation ring (32) bottom down, the fixed concatenation ring (33) of being provided with in periphery on pouring well frame (31) top, go up the periphery of concatenation ring (33) and seted up a plurality of butt joint arc groove (37), it is equipped with a plurality of reinforcement stupefied strip (35) to go up between concatenation ring (33) and the concatenation ring (32) down.
2. The demolded cast prefabricated inspection shaft according to claim 1, wherein: an inspection opening (2) is formed in one side of the inspection bottom well (1).
3. The demolded cast prefabricated inspection well according to claim 1, wherein: the pouring well frame (31) comprises a concrete pouring layer (311) and a reinforcing steel bar net (312), wherein the reinforcing steel bar net (312) is fixedly arranged inside the concrete pouring layer (311).
4. The demolded cast prefabricated inspection well according to claim 1, wherein: anti-settlement insertion holes (34) are formed in the two sides of the pouring well frame (31), and anti-settlement insertion holes (34) are connected with anti-settlement insertion columns (39) in an all-clamping mode.
5. The demolded cast prefabricated inspection shaft according to claim 1, wherein: the positioning insertion blocks (38) are respectively arranged corresponding to the butt joint arc grooves (37).
6. The demolded cast prefabricated inspection shaft according to claim 1, wherein: and the inner side wall of the pouring well frame (31) is provided with uniformly distributed inspection climbing frames (36).
CN202222477452.1U 2022-09-20 2022-09-20 Prefabricated inspection shaft is pour in drawing of patterns Active CN218713292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222477452.1U CN218713292U (en) 2022-09-20 2022-09-20 Prefabricated inspection shaft is pour in drawing of patterns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222477452.1U CN218713292U (en) 2022-09-20 2022-09-20 Prefabricated inspection shaft is pour in drawing of patterns

Publications (1)

Publication Number Publication Date
CN218713292U true CN218713292U (en) 2023-03-24

Family

ID=85634879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222477452.1U Active CN218713292U (en) 2022-09-20 2022-09-20 Prefabricated inspection shaft is pour in drawing of patterns

Country Status (1)

Country Link
CN (1) CN218713292U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117846029A (en) * 2024-01-08 2024-04-09 中铁三局集团广东建设工程有限公司 Cast-in-place concrete inspection well construction process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117846029A (en) * 2024-01-08 2024-04-09 中铁三局集团广东建设工程有限公司 Cast-in-place concrete inspection well construction process

Similar Documents

Publication Publication Date Title
CN111648228A (en) Assembled pier and construction process thereof
CN105756070B (en) A kind of Fabricated Structure for Support of Excavation system based on prefabricated components
CN218713292U (en) Prefabricated inspection shaft is pour in drawing of patterns
CN105863042A (en) All-steel structure building and construction method thereof
CN114592436B (en) Pier capping beam lower support system and construction method thereof
CN111779025A (en) In-situ protection structure crossing foundation pit municipal pipe network box culvert and construction method
CN116856932B (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN116695715A (en) Inflatable fore shaft pipe and construction method thereof applied to underground diaphragm wall
CN114775692B (en) Reinforcing structure and reinforcing method for pavement around inspection well
CN212248272U (en) Concrete body supporting system for high-strength precipitation
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN213926319U (en) Assembled cylindrical steel cofferdam
CN215801653U (en) Prefabricated spliced elevator foundation pit device
CN217923644U (en) Small-size foundation ditch quick support device
CN218667596U (en) Convenient equipment precipitation well wellhead assembly
CN220827822U (en) City miniaturized open caisson
CN110952453B (en) Construction method of abutment structure
CN211446570U (en) Abutment structure
CN118029423A (en) High-filling-soil fully-assembled high-pile-cap tower crane foundation and construction method thereof
CN214657592U (en) Firm type concrete drainage inspection shaft
CN114855819B (en) Municipal road deep foundation pit supporting structure and construction process
CN212614750U (en) Subway access structure for preventing local settlement
CN111535183B (en) Bridge pile foundation construction equipment of water conservancy construction environmental protection
CN219100147U (en) Anti-floating structure combining convex crown beam and square capping beam
CN111794340B (en) Drainage pipeline structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant