CN218712986U - Equipment of getting prefabricated tubular pile that sinks convenient to equipment - Google Patents

Equipment of getting prefabricated tubular pile that sinks convenient to equipment Download PDF

Info

Publication number
CN218712986U
CN218712986U CN202222917052.8U CN202222917052U CN218712986U CN 218712986 U CN218712986 U CN 218712986U CN 202222917052 U CN202222917052 U CN 202222917052U CN 218712986 U CN218712986 U CN 218712986U
Authority
CN
China
Prior art keywords
equipment
tubular pile
cylinder
screw thread
thick bamboo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222917052.8U
Other languages
Chinese (zh)
Inventor
周永鹏
官凤洲
霍斌
史文博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Dingbian Wind Power Generation Co ltd
Datang Shaanxi Power Generation Co Ltd
Original Assignee
Datang Dingbian Wind Power Generation Co ltd
Datang Shaanxi Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Dingbian Wind Power Generation Co ltd, Datang Shaanxi Power Generation Co Ltd filed Critical Datang Dingbian Wind Power Generation Co ltd
Priority to CN202222917052.8U priority Critical patent/CN218712986U/en
Application granted granted Critical
Publication of CN218712986U publication Critical patent/CN218712986U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a tubular pile construction technical field specifically is an equipment of getting prefabricated tubular pile that sinks convenient to equipment, including a base, a first screw thread section of thick bamboo, telescopic hydraulic cylinder, connecting rod and a second screw thread section of thick bamboo, a first screw thread section of thick bamboo is installed in the fixed embedding in top of base, telescopic hydraulic cylinder is installed to the inside screw thread of a first screw thread section of thick bamboo. Through the rope system on the go-between, through cup jointing a fixed cylinder on the prefabricated tubular pile that sinks, the pulling is the rope downwards, make the support column rotate around the pivot, utilize lever principle, implement through lever principle, can take out the prefabricated tubular pile that sinks with the manual work of less strength, greatly increased the settlement fault handling speed, rotate telescopic pneumatic cylinder and the separation of first screw thread section of thick bamboo, pull supporting shoe and stopper separation, the pulling connecting block separates with the support column, effectively avoid geographical condition's restriction, conveniently carry equipment work, save time and energy, strengthen the practicality of this equipment of getting the prefabricated tubular pile that sinks.

Description

Equipment of getting prefabricated tubular pile that sinks convenient to equipment
Technical Field
The utility model relates to a tubular pile construction technical field specifically is an equipment of getting prefabricated tubular pile that sinks convenient to equipment.
Background
The new energy capital construction has become an important push hand for pulling the economy, stability and economy. And part of photovoltaic projects are positioned in the coal mining subsidence area and bear the treatment work of the coal mining subsidence area. However, as the production period increases, part of the precast tubular pile is settled or even sunk, and the precast tubular pile which is already sunk needs to be taken out, so that equipment for taking out the sunk precast tubular pile is needed.
The existing part of pre-support tubular piles are settled or sunk, so that stress deformation of a photovoltaic module, a support and the like is caused, the sunk pre-support tubular piles need to be taken out in time for reducing loss caused by settlement, but the sunk pre-support tubular piles cannot reach the sunk positions due to the limitation of geographical conditions and crops, and the sunk pre-support tubular piles cannot be taken out in time.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a get equipment of prefabricated tubular pile that sinks convenient to equipment to solve the problem that proposes in the above-mentioned background art. In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides an equipment of getting prefabricated tubular pile that sinks convenient to equipment, includes base, a first screw thread section of thick bamboo, telescopic pneumatic cylinder, connecting rod and a second screw thread section of thick bamboo, a first screw thread section of thick bamboo is installed in the fixed embedding in top of base, telescopic pneumatic cylinder is installed to the inside screw thread of a first screw thread section of thick bamboo, telescopic pneumatic cylinder's top fixedly connected with connecting rod, the top threaded connection of connecting rod has a second screw thread section of thick bamboo, the top fixedly connected with connecting seat of a second screw thread section of thick bamboo, threaded connection has the pivot on the connecting seat, the connecting seat rotates through the pivot and is connected with the support column, the equal sliding connection in both ends of support column has the connecting block, respectively fixedly connected with mount pad and go-between on the surface of two connecting blocks, threaded connection has the bolt on the support column, the support column rotates through the bolt and is connected with the supporting shoe, equal fixedly connected with stopper on the surface of mount pad and go-between, threaded connection has the connecting axle on the mount pad, the spliced pole obtains the fixed cylinder of bottom fixedly connected with threaded rod.
Preferably, the base is in threaded connection with four connecting pins, and the four connecting pins are distributed on the base in a rectangular shape.
Preferably, the rotating shaft penetrates through the supporting column movably, sliding grooves are formed in two ends of the supporting column, and the connecting block is located inside the sliding grooves.
Preferably, the number of the threaded rods is two, the two threaded rods are symmetrically distributed relative to the fixed cylinder, and the tail ends of the threaded rods movably penetrate through the fixed cylinder.
Preferably, the connecting shaft movably penetrates through the top of the connecting column, the top of the base is respectively provided with a groove and a thread groove, and the first thread cylinder is located inside the groove.
Preferably, the number of the bolts, the number of the supporting blocks and the number of the limiting blocks are two, and the two supporting blocks are correspondingly clamped with the two limiting blocks.
Compared with the prior art, the beneficial effects of the utility model are that:
in the utility model, the rope is tied on the connecting ring, the fixing cylinder is sleeved on the sinking precast tubular pile, the rope is pulled downwards, so that the supporting column rotates around the rotating shaft, the lever principle is utilized, the implementation is carried out through the lever principle, the sinking precast tubular pile can be manually taken out with less strength, and the sinking fault processing speed is greatly increased;
the utility model discloses in, rotate telescopic pneumatic cylinder and the separation of a screw thread section of thick bamboo, pull supporting shoe and stopper separation, pulling connecting block and support column separation effectively avoid geographical condition's restriction, conveniently carry equipment work, save time and energy, strengthen this practicality of getting equipment of prefabricated tubular pile that sinks.
Drawings
Fig. 1 is a schematic view of a front perspective structure of the present invention;
fig. 2 is a schematic bottom perspective view of the present invention;
fig. 3 is a schematic top view of the three-dimensional structure of the present invention;
fig. 4 is a schematic left-side view of the three-dimensional structure of the present invention.
In the figure: 1. a base; 2. a first threaded barrel; 3. a telescopic hydraulic cylinder; 4. a connecting rod; 5. a second threaded barrel; 6. a connecting seat; 7. a rotating shaft; 8. a support pillar; 9. connecting blocks; 10. a bolt; 11. a support block; 12. a limiting block; 13. a mounting seat; 1301. a connecting shaft; 14. connecting columns; 15. a fixed cylinder; 16. a threaded rod; 17. a connecting ring; 18. and (7) connecting pins.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by the staff of ordinary skill in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: the utility model provides a get equipment of prefabricated tubular pile that sinks convenient to equipment, the on-line screen storage device comprises a base 1, first screw thread section of thick bamboo 2, telescopic hydraulic cylinder 3, connecting rod 4 and second screw thread section of thick bamboo 5, first screw thread section of thick bamboo 2 is installed to the fixed embedding in top of base 1, telescopic hydraulic cylinder 3 is installed to the inside screw thread of first screw thread section of thick bamboo 2, telescopic hydraulic cylinder 3's top fixedly connected with connecting rod 4, connecting rod 4's top threaded connection has second screw thread section of thick bamboo 5, the top fixedly connected with connecting seat 6 of second screw thread section of thick bamboo 5, threaded connection has pivot 7 on connecting seat 6, connecting seat 6 rotates through pivot 7 and is connected with support column 8, the equal sliding connection in both ends of support column 8 has connecting block 9, respectively fixedly connected with mount pad 13 and go-between 17 on the surface of two connecting blocks 9, threaded connection has bolt 10 on the support column 8, support column 8 rotates through bolt 10 and is connected with supporting shoe 11, equal fixedly connected with stopper 12 on the surface of mount pad 13 and 17, threaded connection has connecting axle 1301 on the mount pad 13, mount pad 13 rotates through connecting axle 1301, connecting post 14, bottom fixedly connected with solid fixed cylinder 15 has threaded rod 16.
In this embodiment, as shown in fig. 1, 2, 3 and 4, the base 1 is screwed with four connecting pins 18, and the four connecting pins 18 are distributed on the base 1 in a rectangular shape.
In this embodiment, as shown in fig. 1, fig. 2, fig. 3, and fig. 4, the rotating shaft 7 movably penetrates through the supporting column 8, sliding grooves are formed at both ends of the supporting column 8, and the connecting block 9 is located inside the sliding grooves.
In this embodiment, as shown in fig. 1, 2, 3, and 4, the number of the threaded rods 16 is two, the two threaded rods 16 are symmetrically distributed about the fixed cylinder 15, and the ends of the threaded rods 16 movably penetrate through the fixed cylinder 15.
In this embodiment, as shown in fig. 1, fig. 2, fig. 3 and fig. 4, the connecting shaft 1301 movably penetrates through the top of the connecting column 14, the top of the base 1 is provided with a groove and a thread groove, respectively, the first thread cylinder 2 is located inside the groove, and the connecting pin 18 penetrates through the thread groove in a threaded manner.
In this embodiment, as shown in fig. 1, fig. 2, fig. 3, and fig. 4, the number of the bolts 10, the number of the supporting blocks 11, and the number of the limiting blocks 12 are two, and the two supporting blocks 11 are correspondingly connected with the two limiting blocks 12 in a clamping manner.
The utility model discloses a use method and advantage: this kind of equipment of getting prefabricated tubular pile that sinks convenient to equipment when using, the working process as follows:
as shown in fig. 1, fig. 2, fig. 3 and fig. 4, when the equipment for taking the sunken precast tubular pile is used, firstly, an external power supply is applied to the electric equipment in the equipment for taking the sunken precast tubular pile, the equipment for taking the sunken precast tubular pile is installed at a specified position, then, the telescopic hydraulic cylinder 3 is opened, the top end of the telescopic hydraulic cylinder 3 pushes the connecting rod 4 to move to the specified position, then, the connecting rod is tied on the connecting ring 17 through a rope, the fixing cylinder 15 is sleeved on the sunken precast tubular pile, then, the threaded rod 16 is screwed, the threaded rod 16 is connected with the corresponding part of the sunken precast tubular pile, then, the rope is pulled downwards, the supporting column 8 rotates around the rotating shaft 7, the implementation is carried out through the lever principle by utilizing the lever principle, the sunken precast tubular pile can be manually taken out with small force, and the sunken failure processing speed is greatly increased; meanwhile, a threaded rod 16 with proper length is selected according to the size of the prefabricated pipe pile, when the device needs to be disassembled and assembled, the telescopic hydraulic cylinder 3 is rotated to be separated from the first threaded cylinder 2, the supporting block 11 is pulled to be separated from the limiting block 12, the connecting block 9 is pulled to be separated from the supporting column 8, the device for taking the sunken prefabricated pipe pile is convenient to assemble, and the device is quite convenient to use, effectively avoids the limitation of geographical conditions, is convenient to carry and assemble, saves time and energy, enhances the practicability of the device for taking the sunken prefabricated pipe pile, solves the problem that the existing partial pre-supported pipe pile is settled or sunk, leads to stress deformation of photovoltaic modules, supports and the like, and solves the problem that the sunken prefabricated pipe pile needs to be taken out in time for reducing the loss caused by settlement, but is limited by geographical conditions and crops, and part of machinery cannot reach the sunken position, and leads to the sunken pre-supported pipe pile cannot be taken out in time.
The foregoing shows and describes the basic principles, essential features, and advantages of the invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a get equipment of prefabricated tubular pile that sinks convenient to equipment which characterized in that: the connecting device comprises a base (1), a first thread cylinder (2), a telescopic hydraulic cylinder (3), a connecting rod (4) and a second thread cylinder (5), wherein the first thread cylinder (2) is installed at the top of the base (1) in a fixed embedding manner, the telescopic hydraulic cylinder (3) is installed on the internal thread of the first thread cylinder (2), the connecting rod (4) is fixedly connected to the top of the telescopic hydraulic cylinder (3), the second thread cylinder (5) is connected to the top of the connecting rod (4) in a threaded manner, the connecting seat (6) is fixedly connected to the top of the second thread cylinder (5), a rotating shaft (7) is connected to the connecting seat (6) in a threaded manner, the supporting column (8) is rotatably connected to the connecting seat (6) through the rotating shaft (7), connecting blocks (9) are slidably connected to the two ends of the supporting column (8), a mounting seat (13) and a connecting ring (17) are fixedly connected to the outer surfaces of the two connecting blocks (9) respectively, a bolt (10) is connected to the supporting column (8) through the bolt (11), a limiting block (13) is rotatably connected to the outer surface of the mounting seat (13) and a connecting ring (17), and a connecting shaft (12) is connected to the connecting seat (1301), the mounting seat (13) is rotatably connected with a connecting column (14) through a connecting shaft (1301), the connecting column (14) obtains a fixed cylinder (15) fixedly connected with the bottom end, and a threaded rod (16) is connected to the fixed cylinder (15) through threads.
2. The equipment for conveniently assembling a sunken precast tubular pile according to claim 1, wherein: threaded connection has connecting pin (18) on base (1), the quantity of connecting pin (18) is four, four connecting pin (18) are the rectangle and distribute on base (1).
3. The equipment for conveniently assembling a sunken precast tubular pile according to claim 1, wherein: the rotating shaft (7) movably penetrates through the supporting column (8), sliding grooves are formed in two ends of the supporting column (8), and the connecting block (9) is located inside the sliding grooves.
4. The equipment for conveniently assembling a sunken precast tubular pile according to claim 1, wherein: the number of the threaded rods (16) is two, the two threaded rods (16) are symmetrically distributed relative to the fixed cylinder (15), and the tail ends of the threaded rods (16) movably penetrate through the fixed cylinder (15).
5. The equipment for conveniently assembling a sunken precast tubular pile according to claim 1, wherein: the connecting shaft (1301) movably penetrates through the top of the connecting column (14), the top of the base (1) is provided with a groove and a thread groove respectively, and the first thread cylinder (2) is located inside the groove.
6. The equipment for conveniently assembling a sunken precast tubular pile according to claim 1, wherein: the number of the bolts (10), the number of the supporting blocks (11) and the number of the limiting blocks (12) are two, and the two supporting blocks (11) are correspondingly clamped with the two limiting blocks (12).
CN202222917052.8U 2022-11-02 2022-11-02 Equipment of getting prefabricated tubular pile that sinks convenient to equipment Active CN218712986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222917052.8U CN218712986U (en) 2022-11-02 2022-11-02 Equipment of getting prefabricated tubular pile that sinks convenient to equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222917052.8U CN218712986U (en) 2022-11-02 2022-11-02 Equipment of getting prefabricated tubular pile that sinks convenient to equipment

Publications (1)

Publication Number Publication Date
CN218712986U true CN218712986U (en) 2023-03-24

Family

ID=85598836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222917052.8U Active CN218712986U (en) 2022-11-02 2022-11-02 Equipment of getting prefabricated tubular pile that sinks convenient to equipment

Country Status (1)

Country Link
CN (1) CN218712986U (en)

Similar Documents

Publication Publication Date Title
CN218712986U (en) Equipment of getting prefabricated tubular pile that sinks convenient to equipment
CN104912191A (en) Assembled concrete fabricated column splicing device and use method of splicing device
CN201635416U (en) Device for replacing principle materials of iron tower
CN109209445B (en) Fixed mounting structure of tunnel support mounting net
CN204753815U (en) Simple and easy assembly quality of assembled precast concrete post
CN210917964U (en) Building structure post reinforcing bar continuous-connection auxiliary support
CN212258363U (en) Cable trench support
CN211176051U (en) Surveying instrument for natural resource management
CN212358853U (en) Prefabricated column for assembly type building frame structure
CN213807565U (en) Anchor rod drill bit convenient to disassemble and assemble
CN216519011U (en) Hoop device convenient for fixing single pile for offshore platform
CN213394279U (en) Portable cableway support
CN220538866U (en) Assembled building steel construction
CN219527268U (en) Concrete placement strutting arrangement
CN213978821U (en) A fender pile for hydraulic engineering
CN219219331U (en) Assembled building truss
CN220827800U (en) Guide cap for anchor rod or pile foundation
CN215630824U (en) Convenient to use's assembled building wall connecting device
CN214940141U (en) Pile foundation construction auxiliary platform for foundation engineering
CN110745698B (en) Portable framework hoisting device
CN217130528U (en) Ocean engineering submarine pipeline erecting device
CN216892497U (en) Combined pile foundation structure
CN214497973U (en) Building structure design wall column base connecting device
CN211776324U (en) Power equipment for clamping power pole
CN215329848U (en) Bored concrete pile reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant