CN218712689U - Hydraulic engineering gate installation structure - Google Patents

Hydraulic engineering gate installation structure Download PDF

Info

Publication number
CN218712689U
CN218712689U CN202222734737.9U CN202222734737U CN218712689U CN 218712689 U CN218712689 U CN 218712689U CN 202222734737 U CN202222734737 U CN 202222734737U CN 218712689 U CN218712689 U CN 218712689U
Authority
CN
China
Prior art keywords
fixed mounting
mounting
hydraulic engineering
roof
flashboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222734737.9U
Other languages
Chinese (zh)
Inventor
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jinfan Engineering Construction Supervision Co ltd
Original Assignee
Tianjin Jinfan Engineering Construction Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Jinfan Engineering Construction Supervision Co ltd filed Critical Tianjin Jinfan Engineering Construction Supervision Co ltd
Priority to CN202222734737.9U priority Critical patent/CN218712689U/en
Application granted granted Critical
Publication of CN218712689U publication Critical patent/CN218712689U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gates (AREA)

Abstract

The application discloses hydraulic engineering gate opening mounting structure relates to hydraulic engineering's technical field, including the floodgate frame, the top of floodgate frame is provided with the roof, the inside slidable mounting of floodgate frame has the flashboard, the top fixed mounting of roof has the hoist engine, one side fixed mounting of roof has the guide holder, the leading wheel is installed in the inside rotation of guide holder, be located in the guide holder one side of leading wheel is rotated and is installed spacing round, the inside fixed mounting of hoist engine has the rope, the rope is worn to establish between leading wheel and the spacing round, the bottom fixed mounting of rope has the connecting plate, the bottom fixed mounting of connecting plate has the broken ice awl of a plurality of, the inside fixed mounting of flashboard has the hot plate. The application a hydraulic engineering gate installation structure, simple structure, convenient to use, the connectivity is strong, improves the result of use of flashboard, the flashboard of being convenient for maintains and changes.

Description

Hydraulic engineering gate installation structure
Technical Field
The application relates to hydraulic engineering's technical field especially relates to a hydraulic engineering sluice gate mounting structure.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purpose of removing harm and benefiting, and is also called as water engineering, water is a valuable resource essential for human production and life, but the naturally existing state of the water does not completely meet the requirement of human, and water flow can be controlled only by building the hydraulic engineering to prevent flood disasters and adjust and distribute water quantity so as to meet the requirement of life and production of people on water resources.
The existing gate opening with a buffering function for the hydraulic engineering, as described in the patent with the publication number of CN211057742U, comprises a gate, wherein a plurality of water flow buffering structures are arranged on the front wall surface of the gate and at a position 1/2 away from the lower wall surface, and a gate lifting structure is arranged on the upper wall surface of the gate; wherein, rivers buffer structure mainly includes: the device comprises a support, an arc-shaped baffle shaft, an arc-shaped baffle torsion spring, an arc-shaped baffle stress dynamometer, a straight baffle shaft and a straight baffle torsion spring; the support is installed to the preceding wall surface of gate and apart from the department of wall 1/2 down, the through-hole has been seted up to the support lateral wall face.
In view of the above-mentioned related technologies, the inventor believes that when the gate is used in winter, the water surface in the canal freezes, and the ice cubes are fixed with the gate, so that the gate cannot be opened, and the drainage of the gate is affected.
SUMMERY OF THE UTILITY MODEL
In order to improve the sluice gate when using winter, the surface of water freezes in the ditch, and the ice-cube is fixed with the flashboard, causes the flashboard can't open, influences the problem of sluice gate drainage, and this application provides a hydraulic engineering sluice gate mounting structure.
The application provides a hydraulic engineering gate installation structure adopts following technical scheme:
the utility model provides a hydraulic engineering gate opening mounting structure, includes the floodgate frame, the top of floodgate frame is provided with the roof, the inside slidable mounting of floodgate frame has the flashboard, the top fixed mounting of roof has the hoist engine, one side fixed mounting of roof has the guide holder, the leading wheel is installed in the inside rotation of guide holder, lie in the guide holder one side of leading wheel is rotated and is installed spacing wheel, the inside fixed mounting of hoist engine has the rope, the rope is worn to establish between leading wheel and the spacing wheel, the bottom fixed mounting of rope has the connecting plate, the bottom fixed mounting of connecting plate has a plurality of to break the ice awl, the inside fixed mounting of flashboard has the hot plate.
Through adopting above-mentioned technical scheme, through being provided with the hoist engine on the roof, the rope passes the guide holder, plays the guide effect to the rope through the leading wheel, through spacing round, plays spacing effect to the rope, unreels through the hoist engine, makes the rope descend, drives the connecting plate and descends, destroys the ice surface of flashboard department through the cone that opens ice of connecting plate bottom, through being provided with the hot plate, is convenient for melt adnexed ice-cube on the flashboard fast, improves the practicality of flashboard.
Optionally, the bottom fixed mounting of roof has the hydraulic stem, the bottom fixed mounting of hydraulic stem has the connecting block, the top fixed mounting of flashboard has the installation piece, the mounting groove has been seted up to the connecting block bottom, the installation piece with the mounting groove is pegged graft, the cavity has been seted up in the connecting block, the connecting block is located the two-way screw rod is installed to the cavity internal rotation, the equal threaded mounting in both ends of two-way screw rod has movable inserted bar, the cross section of activity inserted bar is the L type, the slot has all been seted up to the both sides of installation piece, activity inserted bar with slot sliding plug.
Through adopting above-mentioned technical scheme, peg graft with the mounting groove through the installation piece, the rethread rotates two-way screw rod, makes two activity inserted bars and slot slip grafting, and the reinforcing connectivity is convenient for connecting block and flashboard are installed and are dismantled, make things convenient for the later stage to maintain the flashboard and change.
Optionally, the bottom end of the movable insertion rod is fixedly provided with a guide rod, the connecting block is located at the bottom end of the cavity and provided with a sliding groove, and the bottom end of the guide rod slides in the sliding groove.
Through adopting above-mentioned technical scheme, through the cooperation of guide bar and spout, play spacing guide effect to the activity inserted bar.
Optionally, a hand wheel is arranged on one side of the bidirectional screw, and a spongy cushion is sleeved on the outer side of the hand wheel.
By adopting the technical scheme, the bidirectional screw rod is convenient to rotate by arranging the hand wheel.
Optionally, a limiting block is fixedly mounted on one side of the hand wheel, a limiting groove is formed in one side of the bidirectional screw, the limiting block is connected with the limiting groove in an inserting mode, and the cross section of the limiting groove is a square.
Through adopting above-mentioned technical scheme, peg graft through stopper and spacing groove, conveniently make hand wheel installation and dismantlement.
Optionally, a battery box is fixedly mounted at the top end of the top plate, and a wire is fixedly connected between the battery box and the heating plate.
Through adopting above-mentioned technical scheme, provide the power for the hot plate through the battery case.
Optionally, a corrugated pipe is sleeved outside the hydraulic rod, and the top end and the bottom end of the corrugated pipe are respectively and fixedly connected with the top plate and the connecting block.
Through adopting above-mentioned technical scheme, through being provided with the bellows, play the guard action to the hydraulic stem.
Optionally, bolts are installed on two sides of the top end of the top plate in a threaded mode, and the top plate and the gate frame are fixed through the bolts.
Through adopting above-mentioned technical scheme, through being provided with the bolt, make roof easy to assemble and dismantle, strengthen the connectivity.
To sum up, the present application includes the following beneficial effects:
through being provided with the hoist engine on the roof, the rope passes the guide holder, play the guide effect to the rope through the leading wheel, through spacing round, play spacing effect to the rope, unreel through the hoist engine, make the rope descend, drive the connecting plate and descend, the ice surface of flashboard department is destroyed through the awl of opening ice of connecting plate bottom, through being provided with the hot plate, be convenient for melt the ice-cube that adheres to on the flashboard fast, the practicality of flashboard is improved, peg graft with the mounting groove through the installation piece, rethread rotates the two-way screw rod, make two activity inserted bars and slot slip grafting, the reinforcing connectivity, be convenient for the connecting block to install and dismantle with the flashboard, make things convenient for the later stage to maintain and change the flashboard, cooperation through guide bar and spout, play spacing guide effect to the activity inserted bar, through being provided with the hand wheel, be convenient for rotating the two-way screw rod, peg graft with the spacing groove through the stopper, conveniently make the hand wheel installation and dismantlement, play the guard action to the hydraulic stem through being provided with the bellows, through being provided with the bolt, make the roof easy to install and dismantle, the reinforcing connectivity, provide the power for the hot plate through the battery case.
Drawings
FIG. 1 is a schematic overall structure of the present application;
FIG. 2 is a schematic diagram of the internal structure of the present application;
FIG. 3 is an enlarged schematic view of region A in FIG. 1;
fig. 4 is an enlarged schematic view of a region B in fig. 2.
Description of reference numerals: 1. a gate frame; 2. a top plate; 3. a gate plate; 4. a winch; 5. a guide seat; 6. a guide wheel; 7. a limiting wheel; 8. a rope; 9. a connecting plate; 10. breaking ice cones; 11. heating plates; 12. a battery case; 13. a hydraulic lever; 14. connecting blocks; 15. mounting a block; 16. mounting grooves; 17. a cavity; 18. a bidirectional screw; 19. a movable inserted link; 20. a slot; 21. a guide bar; 22. a chute; 23. a hand wheel; 24. a limiting block; 25. a limiting groove; 26. a bellows; 27. and (4) bolts.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
Example (b):
the embodiment of the application discloses hydraulic engineering gate installation structure. Referring to fig. 1, a hydraulic engineering gate mounting structure, including floodgate frame 1, the top of floodgate frame 1 is provided with roof 2, and the inside slidable mounting of floodgate frame 1 has flashboard 3, and the equal screw thread in top both sides of roof 2 installs bolt 27, fixes through bolt 27 between roof 2 and the floodgate frame 1, through being provided with bolt 27, makes roof 2 easy to assemble and dismantlement, reinforcing connectivity.
Referring to fig. 1-3, a hydraulic rod 13 is fixedly mounted at the bottom end of the top plate 2, a connecting block 14 is fixedly mounted at the bottom end of the hydraulic rod 13, a corrugated pipe 26 is sleeved on the outer side of the hydraulic rod 13, the top end and the bottom end of the corrugated pipe 26 are fixedly connected with the top plate 2 and the connecting block 14 respectively, and the hydraulic rod 13 is protected by the corrugated pipe 26. The inside fixed mounting of flashboard 3 has heating plate 11, and the top fixed mounting of roof 2 has battery case 12, and fixedly connected with wire between battery case 12 and the heating plate 11 provides the power for heating plate 11 through battery case 12. Through being provided with hot plate 11, be convenient for melt adnexed ice-cube on the flashboard 3 fast, improve flashboard 3's practicality.
Referring to fig. 2-4, a mounting block 15 is fixedly mounted at the top end of the gate plate 3, a mounting groove 16 is formed in the bottom end of the connecting block 14, the mounting block 15 is inserted into the mounting groove 16, a cavity 17 is formed in the connecting block 14, a bidirectional screw 18 is rotatably mounted in the cavity 17 through the connecting block 14, movable insertion rods 19 are threadedly mounted at two ends of the bidirectional screw 18, the cross section of each movable insertion rod 19 is of an L shape, slots 20 are formed in two sides of the mounting block 15, the movable insertion rods 19 are slidably inserted into the slots 20, the mounting block 15 is inserted into the mounting groove 16 through the mounting block 15, the two movable insertion rods 19 are slidably inserted into the slots 20 through rotation of the bidirectional screw 18, connectivity is enhanced, the connecting block 14 and the gate plate 3 can be conveniently mounted and dismounted, and the gate plate 3 can be conveniently maintained and replaced at a later stage.
Referring to fig. 2-4, a hand wheel 23 is arranged on one side of the bidirectional screw 18, a spongy cushion is sleeved on the outer side of the hand wheel 23, and the bidirectional screw 18 can be conveniently rotated by arranging the hand wheel 23. A limiting block 24 is fixedly mounted on one side of the hand wheel 23, a limiting groove 25 is formed in one side of the bidirectional screw 18, the limiting block 24 is connected with the limiting groove 25 in an inserting mode, the cross sections of the limiting block 24 and the limiting groove 25 are square, and the limiting block 24 is connected with the limiting groove 25 in an inserting mode, so that the hand wheel 23 can be conveniently mounted and dismounted.
Referring to fig. 2-4, a guide rod 21 is fixedly installed at the bottom end of the movable insertion rod 19, a sliding groove 22 is formed in the bottom end of the connecting block 14, which is located in the cavity 17, the bottom end of the guide rod 21 slides in the sliding groove 22, and the guide rod 21 is matched with the sliding groove 22 to limit and guide the movable insertion rod 19.
Referring to fig. 1-3, a winch 4 is fixedly installed at the top end of a top plate 2, a guide seat 5 is fixedly installed at one side of the top plate 2, a guide wheel 6 is rotatably installed inside the guide seat 5, a limiting wheel 7 is rotatably installed at one side of the guide wheel 6 inside the guide seat 5, a rope 8 is fixedly installed inside the winch 4, the rope 8 is inserted between the guide wheel 6 and the limiting wheel 7, a connecting plate 9 is fixedly installed at the bottom end of the rope 8, a plurality of ice breaking cones 10 are fixedly installed at the bottom end of the connecting plate 9, the rope 8 passes through the guide seat 5, the rope 8 is guided by the guide wheel 6, the rope 8 is limited by the limiting wheel 7, the rope 8 descends by unwinding of the winch 4 to drive the connecting plate 9 to descend, and the ice surface at the flashboard 3 is damaged by the ice breaking cones 10 at the bottom end of the connecting plate 9,
the application principle of a hydraulic engineering gate mounting structure of this application embodiment is:
when the water surface of the ditch is frozen and needs to be drained, the winch 4 is started, the rope 8 is made to pass through the guide seat 5, the rope 8 is guided by the guide wheel 6, the limiting wheel 7 is used for limiting the rope 8, the winch 4 is used for unreeling, the rope 8 is made to descend, the connecting plate 9 is driven to descend, the ice surface at the flashboard 3 is damaged by the ice breaking cone 10 at the bottom end of the connecting plate 9, the heating plate 11 is arranged, ice blocks attached to the flashboard 3 can be quickly melted, the practicability of the flashboard 3 is improved, the mounting block 15 is connected with the mounting groove 16 in an inserting mode, the two movable insertion rods 19 are connected with the inserting grooves 20 in a sliding mode through the rotating bidirectional screw rod 18, the connectivity is enhanced, the connecting block 14 and the flashboard 3 can be conveniently mounted and dismounted, the flashboard 3 can be conveniently maintained and replaced in the later period, the movable insertion rods 19 can be guided in a limiting mode through the matching of the guide rod 21 and the sliding groove 22, the handwheel 23 is conveniently rotated, the bidirectional screw rod 18 is connected with the limiting groove 25 through the limiting block 24, the handwheel 25, the mounting and dismounting of the handwheel 23 are conveniently, the bellows 26 is convenient for mounting and dismounting of the hydraulic rod 13, the bolt 13, the heating plate 2 is conveniently, the heating plate 12 is conveniently mounted and used for conveniently providing the convenience for mounting and dismounting for the convenience of the mounting, and dismounting of the heating plate for the heating plate 12, and dismounting.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a hydraulic engineering gate installation structure, includes floodgate frame (1), the top of floodgate frame (1) is provided with roof (2), the inside slidable mounting of floodgate frame (1) has flashboard (3), its characterized in that: the top fixed mounting of roof (2) has hoist engine (4), one side fixed mounting of roof (2) has guide holder (5), leading wheel (6) are installed in the inside rotation of guide holder (5), be located in guide holder (5) one side of leading wheel (6) is rotated and is installed spacing round (7), the inside fixed mounting of hoist engine (4) has rope (8), rope (8) are worn to establish between leading wheel (6) and spacing round (7), the bottom fixed mounting of rope (8) has connecting plate (9), the bottom fixed mounting of connecting plate (9) has a plurality of broken ice awl (10), the inside fixed mounting of flashboard (3) has hot plate (11).
2. The hydraulic engineering gate installation structure of claim 1, wherein: the utility model discloses a hydraulic ram, including roof (2), installation piece (16), mounting groove (16), installation piece (15), mounting groove (16), cavity (17) have been seted up in connecting block (14), connecting block (14) are located two-way screw rod (18) are installed to cavity (17) internal rotation, activity inserted bar (19) are installed to the equal screw thread in both ends of two-way screw rod (18), the cross section of activity inserted bar (19) is the L type, slot (20) have all been seted up to the both sides of installation piece (15), activity inserted bar (19) with slot (20) slip grafting, the bottom fixed mounting of roof (2) has connecting block (14), the top fixed mounting of flashboard (3) has installation piece (15), mounting groove (16) have been seted up to connecting block (14) bottom, installation piece (15) with mounting groove (16) are pegged graft.
3. The hydraulic engineering gate mounting structure of claim 2, wherein: the bottom fixed mounting of activity inserted bar (19) has guide bar (21), connecting block (14) are located spout (22) have been seted up to bottom in cavity (17), the bottom of guide bar (21) is in spout (22) slide.
4. A hydraulic engineering gate installation structure according to claim 3, characterized in that: a hand wheel (23) is arranged on one side of the bidirectional screw (18), and a spongy cushion is sleeved on the outer side of the hand wheel (23).
5. The hydraulic engineering gate installation structure of claim 4, wherein: one side fixed mounting of hand wheel (23) has stopper (24), spacing groove (25) have been seted up to one side of two-way screw rod (18), stopper (24) with spacing groove (25) are pegged graft, stopper (24) with the cross section of spacing groove (25) is the square.
6. The hydraulic engineering gate installation structure of claim 1, wherein: a battery box (12) is fixedly mounted at the top end of the top plate (2), and a wire is fixedly connected between the battery box (12) and the heating plate (11).
7. The hydraulic engineering gate installation structure of claim 2, wherein: the outside cover of hydraulic stem (13) is equipped with bellows (26), the top and the bottom of bellows (26) respectively with roof (2) and connecting block (14) fixed connection.
8. The hydraulic engineering gate mounting structure of claim 1, wherein: the bolt (27) are installed on two sides of the top end of the top plate (2) in a threaded mode, and the top plate (2) and the gate frame (1) are fixed through the bolt (27).
CN202222734737.9U 2022-10-13 2022-10-13 Hydraulic engineering gate installation structure Active CN218712689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222734737.9U CN218712689U (en) 2022-10-13 2022-10-13 Hydraulic engineering gate installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222734737.9U CN218712689U (en) 2022-10-13 2022-10-13 Hydraulic engineering gate installation structure

Publications (1)

Publication Number Publication Date
CN218712689U true CN218712689U (en) 2023-03-24

Family

ID=85585811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222734737.9U Active CN218712689U (en) 2022-10-13 2022-10-13 Hydraulic engineering gate installation structure

Country Status (1)

Country Link
CN (1) CN218712689U (en)

Similar Documents

Publication Publication Date Title
CN202440933U (en) Backward flow preventing flap valve of drain pipe
CN112227235A (en) Bridge is consolidated and is prevented roof beam body structure that falls
CN218712689U (en) Hydraulic engineering gate installation structure
CN106592745B (en) Well lid floatage-type is from opening/closing system and its working method
CN104988885A (en) Rotary gate automatically controlled by waterpower and provided with horizontal shaft
CN204626351U (en) Transverse axis waterpower self-control rotary gate
CN117513260A (en) Drainage structure combining diversion tunnel, drainage tunnel and vertical shaft type flood drainage tunnel
CN205776105U (en) A kind of Auto-drainage dam
CN216405293U (en) Slope reinforcing device for hydraulic engineering construction
CN215758870U (en) Sluice for hydraulic engineering
CN207063093U (en) A kind of automatic control cuts dirty reverse-filling equipment
CN212641385U (en) Flexible opening and closing bidirectional control gate for urban municipal drainage
CN213173603U (en) Over-and-under type water sluicegate for hydraulic engineering
CN211872875U (en) Hydraulic engineering slope bearing structure
CN112301832A (en) Concrete road surface waterproof construction
CN220079895U (en) Narrow river course barricade reinforcing apparatus
CN206561935U (en) A kind of mill tailings storehouse water surface icebreaking device
CN2030209U (en) Folding multi-hinged-steel gate
CN108914891A (en) A kind of steel dam valve and its application method with lock in lock
KR102683446B1 (en) Apparatus for discharge of lower accumulated water in Movable Weir Gate
CN217174636U (en) A over-and-under type gate structure for hydraulic engineering
CN218713799U (en) Anti-blocking type drainage wellhead
CN203113294U (en) Miter gate reverse water stopping device
CN217678924U (en) Working gate blade
CN104863254B (en) C-type Hydro-automatic gate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant