CN218708895U - Pipeline replacement construction equipment - Google Patents

Pipeline replacement construction equipment Download PDF

Info

Publication number
CN218708895U
CN218708895U CN202222338420.3U CN202222338420U CN218708895U CN 218708895 U CN218708895 U CN 218708895U CN 202222338420 U CN202222338420 U CN 202222338420U CN 218708895 U CN218708895 U CN 218708895U
Authority
CN
China
Prior art keywords
bevel gear
holder
axle
construction equipment
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222338420.3U
Other languages
Chinese (zh)
Inventor
刘波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huiyuan Electric Power Construction Engineering Co ltd
Original Assignee
Shandong Huiyuan Electric Power Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huiyuan Electric Power Construction Engineering Co ltd filed Critical Shandong Huiyuan Electric Power Construction Engineering Co ltd
Priority to CN202222338420.3U priority Critical patent/CN218708895U/en
Application granted granted Critical
Publication of CN218708895U publication Critical patent/CN218708895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a construction technical field is changed to the pipeline, specifically indicates a construction equipment is changed to pipeline, including supporting the underframe, it is connected with heightening mechanism to support the underframe, heightening mechanism top is equipped with the mount, be equipped with multidirectional regulation fixture on the mount, multidirectional regulation fixture top is equipped with the supporting head, multidirectional regulation fixture includes interior axle, sleeve shaft, U type frame, bevel gear one, connecting axle and bevel gear two, can drive U type frame swing back and forth when interior axle and sleeve shaft rotate simultaneously, interior axle is static, and adjustable connecting axle horizontal hunting when the sleeve shaft rotates to adjust the clamping head the clamp mouth orientation and the installation direction adaptation of pipeline.

Description

Pipeline replacement construction equipment
Technical Field
The utility model relates to a construction technical field is changed to the pipeline, specifically indicates a construction equipment is changed to pipeline.
Background
Boiler pipeline can be ageing after long-time the use, leakproofness and heat insulating ability descend, consequently need change after using certain years, dismantle at the pipeline and change the in-process, need carry out the support to the pipeline in advance, pound when avoiding the pipeline to dismantle and fall, tie up the pipeline behind the use elevating platform equipment lifting and tie up fixedly at present many, and this kind of non-professional equipment is difficult to stable fixing to the fixed unstability of pipeline, especially the pipeline that the slope was installed.
SUMMERY OF THE UTILITY MODEL
Aiming at the situation, in order to overcome the defects of the prior art, the scheme provides the pipeline replacement construction equipment.
The utility model adopts the following technical scheme: this scheme pipeline replacement construction equipment, including supporting the underframe, it is connected with heightening mechanism to support the underframe, heightening mechanism top is equipped with the mount, be equipped with multidirectional regulation fixture on the mount, multidirectional regulation fixture top is equipped with the clamping head, multidirectional regulation fixture includes interior axle, sleeve shaft, U type frame, bevel gear one, connecting axle and bevel gear two, interior axle and sleeve shaft rotate respectively and run through on locating the double-phase relative lateral wall of mount, interior axle one end is rotated and is located in the sleeve shaft, interior epaxial in U type frame pot head is located to interior, the other end of U type frame rotates the cover and locates on the sleeve shaft, bevel gear one set is located on the sleeve shaft, the connecting axle rotates and locates U type frame top, bevel gear two locates the bottom of connecting axle and meshes with bevel gear one.
As the further optimization of this scheme, the supporting head is including the housing of locating the connecting axle top, be equipped with the dead lever in the housing, the dead lever both ends slide respectively and cup joint and are equipped with holder one and holder two, holder one and holder two extend to the outside of housing from the export roll-off at housing top, all be connected with the spring between holder one and the housing lateral wall, between holder two and the housing lateral wall, be equipped with the telescopic link in the housing, the top of telescopic link is equipped with the horizontal pole, the horizontal pole both ends are all articulated to be equipped with the pulling pole, and are two sets of the pulling pole is articulated with holder one and holder two respectively.
According to the further optimization of the scheme, the height adjusting mechanism comprises a fixed cylinder, a lead screw and an auxiliary rod, the fixed cylinder is arranged on the bottom side of the fixed frame and penetrates through the supporting bottom frame in a sliding mode, the lead screw is arranged in the supporting bottom frame in a rotating mode, the fixed cylinder is arranged on the lead screw through an inner threaded hole in a sleeved mode, and the auxiliary rod is arranged on the fixed frame and penetrates through the supporting bottom frame in a sliding mode.
Preferably, a third bevel gear is sleeved on the screw rod, a third motor is arranged on the support bottom frame, a fourth bevel gear is arranged on an output shaft of the third motor, and the fourth bevel gear is meshed with the third bevel gear.
Preferably, the fixing frame is provided with a first motor and a second motor, and the first motor and the second motor are respectively connected with the inner shaft and the sleeve shaft.
Adopt above-mentioned structure the utility model discloses the beneficial effect who gains as follows:
according to the scheme, the height adjusting mechanism can be used for adjusting the height of the clamping opening according to the installation height of the pipeline; meanwhile, the multi-direction adjusting clamping mechanism is used for adjusting the direction of the clamping opening to adapt to the installation position of the pipeline.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the overall structure of the pipeline replacement construction equipment according to the scheme;
fig. 2 is a schematic structural view of a multidirectional adjusting and clamping mechanism of the pipeline replacement construction equipment in the scheme.
The device comprises a supporting bottom frame 1, a supporting bottom frame 2, a moving wheel 3, a fixed frame 4, an inner shaft 5, a sleeve shaft 6, a U-shaped frame 7, a bevel gear I, 8, a connecting shaft 9, a bevel gear II, 10, a housing 11, a fixed rod 12, a clamping piece I, 13, a clamping piece II, 14, a spring 15, a telescopic rod 16, a cross rod 17, a pulling rod 18, a fixed cylinder 19, a screw rod 20, an auxiliary rod 21, a bevel gear III, 22, a motor III, a motor 23, a gear IV, 24, a motor I, 25 and a motor II.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
As shown in fig. 1-2, the present solution pipeline replacement construction equipment includes a supporting bottom frame 1, the supporting bottom frame 1 is connected with a height adjustment mechanism, a fixing frame 3 is disposed on the top of the height adjustment mechanism, a multi-direction adjustment clamping mechanism is disposed on the fixing frame 3, a clamping head is disposed on the top of the multi-direction adjustment clamping mechanism, the multi-direction adjustment clamping mechanism includes an inner shaft 4, a sleeve shaft 5, a U-shaped frame 6, a bevel gear one 7, a connecting shaft 8 and a bevel gear two 9, the inner shaft 4 and the sleeve shaft 5 are respectively rotatably disposed on two opposite sidewalls of the fixing frame 3, one end of the inner shaft 4 is rotatably disposed in the sleeve shaft 5, one end of the U-shaped frame 6 is sleeved on the inner shaft 4, the other end of the U-shaped frame 6 is rotatably sleeved on the sleeve shaft 5, the connecting shaft 8 is rotatably disposed on the top of the U-shaped frame 6, the bevel gear two 9 is disposed at the bottom end of the connecting shaft 8 and is engaged with the bevel gear one 7, the bevel gear numbers on the bevel gear one 7 and the two bevel gear 9 are equal, the inner shaft 4 and the sleeve shaft 5 can drive the U-shaped frame 6 to swing back and forth when the inner shaft 4 and forth, the sleeve shaft 5 rotates, the connecting shaft 4 and left and right, the sleeve shaft 8 can adjust the clamping mechanism, thereby, the clamp opening of the motor is connected with a motor 24 and a motor 24, and a motor 24 are disposed on the fixing frame, and a motor 5.
As shown in fig. 2, the clamping head is including locating the housing 10 on 8 tops of connecting axle, be equipped with dead lever 11 in the housing 10, 11 both ends of dead lever slide respectively and cup joint and be equipped with holder one 12 and holder two 13, holder one 12 and two 13 export roll-offs at housing 10 top extend to the outside of housing 10, between holder one 12 and the housing 10 lateral wall, all be connected with spring 14 between holder two 13 and the housing 10 lateral wall, be equipped with telescopic link 15 in the housing 10, telescopic link 15's top is equipped with horizontal pole 16, horizontal pole 16 both ends all articulate and are equipped with pulling rod 17, two sets of pulling rod 17 are articulated with holder one 12 and holder two 13 respectively.
As shown in fig. 1, the height adjusting mechanism includes a fixed cylinder 18, a screw rod 19 and an auxiliary rod 20, the fixed cylinder 18 is disposed at the bottom side of the fixed frame 3 and slidably penetrates through the supporting bottom frame 1, the screw rod 19 is rotatably disposed in the supporting bottom frame 1, the fixed cylinder 18 is sleeved on the screw rod 19 through an internal threaded hole, the auxiliary rod 20 is disposed on the fixed frame 3 and slidably penetrates through the supporting bottom frame 1, a third bevel gear 21 is sleeved on the screw rod 19, a third motor 22 is disposed on the supporting bottom frame 1, a fourth bevel gear 23 is disposed on an output shaft of the third motor 22, and the fourth bevel gear 23 is meshed with the third bevel gear 21.
As shown in fig. 1, the bottom of the supporting base frame 1 is provided with moving wheels 2.
When the adjustable clamping head is used specifically, the third motor 22 drives the screw rod 19 to rotate, the adjustable fixing barrel 18 extends out of the height of the supporting bottom frame 1, the clamping opening is driven to be at a proper height, then the first motor 24 and the second motor 25 are used for controlling the inner shaft 4 and the sleeve shaft 5, the inner shaft 4 and the sleeve shaft 5 can drive the U-shaped frame 6 to swing back and forth when rotating simultaneously, the inner shaft 4 is static, the adjustable connecting shaft 8 swings left and right when the sleeve shaft 5 rotates, and therefore the clamping opening orientation of the clamping head is adjusted to be matched with the installation direction of a pipeline.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a construction equipment is changed to pipeline which characterized in that: including supporting underframe (1), it is connected with heightening mechanism to support underframe (1), heightening mechanism's top is equipped with mount (3), be equipped with multidirectional regulation fixture on mount (3), multidirectional regulation fixture top is equipped with the centre gripping head, multidirectional regulation fixture includes interior axle (4), cover axle (5), U type frame (6), bevel gear (7), connecting axle (8) and bevel gear two (9), interior axle (4) and cover axle (5) rotate respectively to run through on locating the double-phase relative lateral wall of mount (3), interior axle (4) one end is rotated and is located in cover axle (5), on interior axle (4) is located to U type frame (6) one pot head, the other end of U type frame (6) is rotated the cover and is located on cover axle (5), bevel gear one (7) cover is located on cover axle (5), connecting axle (8) are rotated and are located U type frame (6) top, bevel gear two (9) are located the bottom of connecting axle (8) and are engaged with bevel gear (7).
2. The pipe replacement construction equipment according to claim 1, wherein: the clamping head is including locating housing (10) on connecting axle (8) top, be equipped with dead lever (11) in housing (10), dead lever (11) both ends slide respectively and cup joint and are equipped with holder (12) and holder two (13), the export roll-off at holder (12) top and holder two (13) are followed housing (10) and are extended to the outside of housing (10), between holder (12) and housing (10) lateral wall, between holder two (13) and housing (10) lateral wall all be connected with spring (14), be equipped with telescopic link (15) in housing (10), the top of telescopic link (15) is equipped with horizontal pole (16), horizontal pole (16) both ends all articulate and are equipped with and pull pole (17), two sets of pull pole (17) articulate with holder (12) and holder two (13) respectively.
3. The pipe replacement construction equipment according to claim 1, wherein: heightening mechanism includes solid fixed cylinder (18), lead screw (19) and auxiliary rod (20), gu fixed cylinder (18) are located mount (3) bottom side and are slided and run through support underframe (1), lead screw (19) are rotated and are located in support underframe (1), gu fixed cylinder (18) are located on lead screw (19) through interior threaded hole cover, auxiliary rod (20) are located on mount (3) and are slided and run through support underframe (1) and set up.
4. The pipe replacement construction equipment according to claim 3, wherein: the lead screw (19) is sleeved with a third bevel gear (21), the support bottom frame (1) is provided with a third motor (22), an output shaft of the third motor (22) is provided with a fourth bevel gear (23), and the fourth bevel gear (23) is meshed with the third bevel gear (21).
5. The pipe replacement construction equipment according to claim 1, wherein: the fixing frame (3) is provided with a first motor (24) and a second motor (25), and the first motor (24) and the second motor (25) are respectively connected with the inner shaft (4) and the sleeve shaft (5).
6. The pipe replacement construction equipment according to claim 1, wherein: the number of teeth on the first bevel gear (7) is equal to that on the second bevel gear (9).
7. The pipe replacement construction equipment according to claim 1, wherein: the bottom of the supporting bottom frame (1) is provided with a moving wheel (2).
CN202222338420.3U 2022-09-02 2022-09-02 Pipeline replacement construction equipment Active CN218708895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222338420.3U CN218708895U (en) 2022-09-02 2022-09-02 Pipeline replacement construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222338420.3U CN218708895U (en) 2022-09-02 2022-09-02 Pipeline replacement construction equipment

Publications (1)

Publication Number Publication Date
CN218708895U true CN218708895U (en) 2023-03-24

Family

ID=85630849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222338420.3U Active CN218708895U (en) 2022-09-02 2022-09-02 Pipeline replacement construction equipment

Country Status (1)

Country Link
CN (1) CN218708895U (en)

Similar Documents

Publication Publication Date Title
CN207801835U (en) Adjustable photovoltaic support
CN218612613U (en) Automatic welding device for boiler header pipe joint
CN215846636U (en) Semi-automatic welding device for steel pipe pole cross arm of power transmission tower
CN217229360U (en) Manipulator convenient for adjusting clamping angle
CN218708895U (en) Pipeline replacement construction equipment
CN116892295A (en) Glass curtain wall installation auxiliary positioning device with good applicability
CN218398190U (en) Industrial robot's centre gripping arm hand
CN215215431U (en) Installation auxiliary stand among electromechanical engineering
CN215116969U (en) Adjustable correcting workbench for microscope correction
CN211004347U (en) Electronic lifting equipment of transformer
CN221346360U (en) Bracket for construction of steel structure main body
CN217126768U (en) Pipeline installation hoisting device for building installation engineering
CN218193524U (en) Roller carrier with spacing adjustment and height adjustment functions
CN214291678U (en) Slide rail formula welding auxiliary device
CN221265622U (en) Adjustable office desk for engineering cost
CN215356870U (en) Steel pipe lifting welding device
CN218341359U (en) Accurate positioning and correcting device for bridge bracket arm
CN211712020U (en) Three-level screw rod adjusting device
CN218361440U (en) Quick correcting unit of transmission line crimping pipe
CN221135831U (en) Overturning table for locomotive traction motor assembly
CN219840842U (en) Fan fixing mechanism for fan bracket installation
CN218992880U (en) Automatic locking angle regulation support
CN220312250U (en) Spring steel wire butt welding machine
CN217923884U (en) Box type non-negative pressure water supply equipment with fixed support
CN221313012U (en) Welding device for metal tiles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant