CN218699910U - Cover half device for construction - Google Patents
Cover half device for construction Download PDFInfo
- Publication number
- CN218699910U CN218699910U CN202222781795.7U CN202222781795U CN218699910U CN 218699910 U CN218699910 U CN 218699910U CN 202222781795 U CN202222781795 U CN 202222781795U CN 218699910 U CN218699910 U CN 218699910U
- Authority
- CN
- China
- Prior art keywords
- side baffle
- wall
- sliding
- building construction
- construction according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 238000007790 scraping Methods 0.000 claims description 21
- 238000009435 building construction Methods 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 8
- 230000006835 compression Effects 0.000 claims description 6
- 238000007906 compression Methods 0.000 claims description 6
- 238000010030 laminating Methods 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims 1
- 239000007924 injection Substances 0.000 claims 1
- 238000001746 injection moulding Methods 0.000 abstract description 3
- 239000004568 cement Substances 0.000 description 9
- 241000826860 Trapezium Species 0.000 description 3
- 238000007599 discharging Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005498 polishing Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a cover half device for construction belongs to cover half device technical field, include: the side baffle comprises a bottom plate, two side baffles and two side baffles positioned between the two side baffles; the top end of the side baffle is connected with two connecting blocks, the upper surface of each connecting block is provided with a moving frame in an L-shaped structure in a fitting manner, the inner wall of the vertical section of the moving frame is connected with a second sliding block, the second sliding block is in sliding connection with a second sliding groove formed in the outer wall of the side baffle, the top end of the side baffle is provided with a plurality of threaded holes which are arranged at equal intervals, and the threaded holes, the connecting blocks and the moving frame are locked and fixed through locking bolts; the integrative injection moulding in top of bottom plate has the joint piece of two symmetry settings, the joint groove of being connected with joint piece block is seted up to the bottom surface of side shield. This cover half device for construction, simple structure has practiced thrift a large amount of manpowers.
Description
Technical Field
The utility model belongs to the technical field of the cover half device, especially, relate to a cover half device for construction.
Background
With the progress of science and technology and the development of society, road and bridge buildings gradually tend to be modularized, and the modularized buildings have the advantages of being simple to process, low in cost, capable of greatly shortening the construction period and the like;
in the correlation technique, the module need use the mould in the manufacture process, and conventional bridge module mould includes die block and side form, and the side form encloses by four steel form boards and establishes to form, because the template size is fixed, so correspond the module of each kind of specification, all need prepare one set of mould, and mould cost is higher during the construction.
Therefore, the fixed die device for building construction is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving prior art, the mould need be used to the module in the manufacturing process, and conventional bridge module mould includes die block and side form, and the side form encloses by four steel form and establishes to constitute, because the size of template is fixed, so correspond the module of each kind of specification, all need prepare one set of mould, the higher problem of mould cost during the construction, and the cover half device for the construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a cover half device for construction includes:
the side baffle comprises a bottom plate, two side baffles and two side baffles positioned between the two side baffles;
the top of limit baffle is connected with two connecting blocks, and the upper surface laminating of connecting block is provided with the removal frame of L type structure, be connected with second slider on the inner wall of the vertical section of removal frame, and two sliding connection of spout that second slider and side shield outer wall were seted up, the screw hole that a plurality of equidistance were arranged is seted up on the top of side shield, and through locking bolt locking between screw hole, connecting block and the removal frame and fix.
Through above-mentioned technical scheme, remove frame and connecting block and pass through locking bolt and the different built-up connection of a plurality of screw holes to adjust the distance between two limit baffles, can produce the module of the different specifications of multiunit, improve the device's practicality.
Preferably, the integrative injection moulding in top of bottom plate has the joint piece of two symmetry settings, the joint groove of being connected with joint piece block is seted up to the bottom surface of side shield.
Through above-mentioned technical scheme, be convenient for install or dismantle bottom plate, two side shields and two limit baffles.
Preferably, the inner wall of the side baffle is provided with a first sliding groove, a first sliding block is connected to the first sliding groove in a sliding mode, a scraping rod is arranged between the first sliding blocks, and the top end of the scraping rod is connected with a handle.
Through above-mentioned technical scheme, use through the cooperation of handle, spout one and slider one, drive and scrape the pole and carry out transverse motion, shakeout the cement of pouring into, unnecessary cement falls down from the discharge gate on the side shield, has saved the manual work to the operation of polishing on uneven surface, has practiced thrift a large amount of manpowers.
Preferably, the outer wall of the first sliding block is connected with a fixing frame of a U-shaped structure, the outer walls of two sides of the fixing frame are provided with positioning holes, the outer walls of two sides of the scraping rod are provided with two moving holes, the moving holes are connected with positioning pins matched and connected with the positioning holes in a sliding mode, and the positioning pins are connected with the inner walls of the moving holes through compression springs.
Through above-mentioned technical scheme, scrape the pole and insert between two fixed frames for the locating pin receives the extrusion, and through compression spring's elasticity effect, make locating pin and the locating hole on the fixed frame be connected, thereby be convenient for install or dismantle the pole of scraping.
Preferably, the vertical section of the clamping block is of a trapezoidal structure.
Through above-mentioned technical scheme, the joint piece of trapezium structure improves joint strength between bottom plate and the side board.
Preferably, a sealing gasket is connected in a groove formed in the outer walls of the two sides of the side baffle, and the other end of the sealing gasket abuts against the inner wall of the side baffle.
Through above-mentioned technical scheme, through the setting of sealed the pad, guarantee the leakproofness between side shield and the limit baffle.
Preferably, a discharge port is formed in the outer side wall of the side baffle, and a lower port of the discharge port is parallel to the bottom surface of the scraping rod.
Through above-mentioned technical scheme, when scraping the material of pole, discharge unnecessary cement through the discharge gate.
To sum up, the utility model discloses a technological effect and advantage: according to the fixed die device for building construction, the movable frame and the connecting block are connected with the plurality of threaded holes in different combinations through the locking bolts, so that the distance between the two side baffles is adjusted, a plurality of groups of modules with different specifications can be manufactured, and the practicability of the device is improved;
the scraping rod is driven to transversely move through the matching use of the handle, the sliding groove I and the sliding block I, poured cement is flattened, and redundant cement falls from a discharge hole in the side baffle, so that the manual polishing operation on the uneven surface is omitted, and a large amount of manpower is saved; this cover half device for construction, simple structure has practiced thrift a large amount of manpowers.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged view of the structure a in fig. 1 according to the present invention;
FIG. 3 is a schematic view of the combination structure of the scraping rod and the fixing frame of the present invention;
fig. 4 is a schematic structural diagram of the side baffle of the present invention.
In the figure: 1. a base plate; 2. a side dam; 3. an edge baffle; 4. a scraping rod; 5. a handle; 6. a clamping block; 7. a first sliding chute; 8. connecting blocks; 9. a movable frame; 10. locking the bolt; 11. a second sliding block; 12. a second chute; 13. a threaded hole; 14. a first sliding block; 15. a fixing frame; 16. positioning pins; 17. a compression spring; 18. positioning holes; 19. a discharge port; 20. and a gasket.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1, 2 and 3, a stationary mold device for construction includes: the sealing structure comprises a bottom plate 1, two side baffles 2 and two side baffles 3 positioned between the two side baffles 2, wherein sealing gaskets 20 are connected in grooves formed in the outer walls of the two sides of each side baffle 3, and the other ends of the sealing gaskets 20 are abutted against the inner walls of the side baffles 2, so that the sealing property of an inner cavity of a mold is ensured, and cement is prevented from flowing out from gaps between the side baffles 2;
the top of limit baffle 3 is connected with two connecting blocks 8, and the upper surface laminating of connecting block 8 is provided with the removal frame 9 of L type structure, be connected with two 11 of slider on the inner wall of the vertical section of removal frame 9, and two 12 sliding connection of spout that two 11 of slider and 2 outer walls of side shield were seted up, the screw hole 13 that a plurality of equidistance were arranged is seted up on the top of side shield 2, and screw hole 13, it is fixed through locking bolt 10 locking between connecting block 8 and the removal frame 9, remove frame 9 and connecting block 8 through locking bolt 10 and the different built-up connection of a plurality of screw holes 13, thereby adjust the distance between two limit baffles 3, can produce the module of the different specifications of multiunit.
Referring to fig. 1, the integrative injection moulding in top of bottom plate 1 has the joint piece 6 that two symmetries set up, and the joint groove of being connected with 6 blocks of joint piece is seted up to the bottom surface of side shield 2, and the vertical section of joint piece 6 is the trapezium structure, and the joint piece 6 of trapezium structure improves joint strength between bottom plate 1 and the side shield, and is convenient for install or dismantle bottom plate 1, two side shields 2 and two side shields 3.
Referring to fig. 3 and 4, first sliding grooves 7 are formed in the inner walls of the two side guards 2, first sliding grooves 14 are slidably connected to the first sliding grooves 7, a scraping rod 4 is arranged between the first sliding blocks 14, the top end of the scraping rod 4 is connected with a handle 5, a fixing frame 15 of a U-shaped structure is connected to the outer wall of the first sliding block 14, positioning holes 18 are formed in the outer walls of the two sides of the fixing frame 15, two moving holes are formed in the outer walls of the two sides of the scraping rod 4, a positioning pin 16 matched and connected with the positioning holes 18 is slidably connected in each moving hole, the positioning pin 16 is connected with the inner wall of each moving hole through a compression spring 17, the scraping rod 4 is inserted between the two fixing frames 15, the positioning pin 16 is extruded, the positioning pin 16 is connected with the positioning holes 18 in the fixing frame 15 through the elastic effect of the compression spring 17, the scraping rod 4 is convenient to install or disassemble, a discharging hole 19 is formed in the outer side guard 3, a lower end of the discharging hole 19 is parallel to the bottom surface of the scraping rod 4, and when the scraping rod 4 is scraped, and excessive water is discharged through the discharging hole 19.
The working principle is as follows: when using, at first through two joint pieces 6 with two 2 joints of side shield in the both sides on bottom plate 1, insert two side shield 3 between two side shield 2 after that, utilize locking bolt 10 with connecting block 8 afterwards, it is fixed to remove frame 9 and screw hole 13 and connect, fix the reinforcing bar and place in the mould after that, and to leading-in right amount cement in the mould, through handle 5, spout 7 and 14 cooperation of slider are used, it carries out transverse motion to drive scraping rod 4, shakeouts the cement of pouring, unnecessary cement falls down from discharge gate 19 on side shield 3, stop work waits for it to solidify, after solidifying, with bottom plate 1, side shield 2 and side shield 3 demolish can.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. A cover half device for construction includes:
the side baffle plate comprises a bottom plate (1), two side baffle plates (2) and two side baffle plates (3) positioned between the two side baffle plates (2);
its characterized in that, the top of side shield (3) is connected with two connecting blocks (8), and the upper surface laminating of connecting block (8) is provided with removal frame (9) of L type structure, be connected with two (11) of slider on the inner wall of the vertical section of removal frame (9), and two (12) sliding connection of spout that two (11) of slider and side shield (2) outer wall were seted up, screw hole (13) that a plurality of equidistance were arranged are seted up on the top of side shield (2), and are fixed through locking bolt (10) locking between screw hole (13), connecting block (8) and the removal frame (9).
2. The fixed die device for building construction according to claim 1, wherein two symmetrically arranged clamping blocks (6) are integrally injection molded at the top end of the bottom plate (1), and clamping grooves clamped and connected with the clamping blocks (6) are formed in the bottom surface of the side baffle (2).
3. A fixed die device for building construction according to claim 1, wherein the inner walls of the two side baffles (2) are provided with first sliding grooves (7), first sliding blocks (14) are connected in the first sliding grooves (7) in a sliding manner, a scraping rod (4) is arranged between the two first sliding blocks (14), and the top end of the scraping rod (4) is connected with a handle (5).
4. A fixed die device for building construction according to claim 3, wherein the outer wall of the first sliding block (14) is connected with a fixed frame (15) with a U-shaped structure, the outer walls of the two sides of the fixed frame (15) are respectively provided with a positioning hole (18), the outer walls of the two sides of the scraping rod (4) are respectively provided with two moving holes, the moving holes are internally and slidably connected with positioning pins (16) which are matched and connected with the positioning holes (18), and the positioning pins (16) are connected with the inner walls of the moving holes through compression springs (17).
5. A fixed die device for building construction according to claim 2, wherein the vertical section of the clamping block (6) is a trapezoidal structure.
6. A fixed die device for building construction according to claim 1, characterized in that the groove formed on the outer wall of the two sides of the side baffle (3) is connected with a sealing gasket (20), and the other end of the sealing gasket (20) is abutted against the inner wall of the side baffle (2).
7. A fixed die device for building construction according to claim 1, wherein the outer side wall of the side baffle (3) is provided with a discharge hole (19), and the lower port of the discharge hole (19) is arranged in parallel with the bottom surface of the scraping rod (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222781795.7U CN218699910U (en) | 2022-10-21 | 2022-10-21 | Cover half device for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222781795.7U CN218699910U (en) | 2022-10-21 | 2022-10-21 | Cover half device for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218699910U true CN218699910U (en) | 2023-03-24 |
Family
ID=85588563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222781795.7U Expired - Fee Related CN218699910U (en) | 2022-10-21 | 2022-10-21 | Cover half device for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218699910U (en) |
-
2022
- 2022-10-21 CN CN202222781795.7U patent/CN218699910U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109944461B (en) | High-rise building connecting beam horizontal hole plugging structure and construction method thereof | |
CN111360982A (en) | PC component manufacturing and forming machine and manufacturing and forming method | |
CN218699910U (en) | Cover half device for construction | |
CN216372666U (en) | Autoclaved aerated concrete production mold | |
CN210791416U (en) | Quick forming die for concrete pouring | |
CN106217611B (en) | A kind of adjustable curb stone mould | |
CN214871425U (en) | Concrete prefabricated part mould with three-dimensional positioning slurry leakage prevention plate | |
CN216152643U (en) | Hollow concrete pier mould | |
CN216609432U (en) | A general side forms for PC trade preparation superimposed sheet component | |
CN216372671U (en) | Solid brick embryo mould of concrete | |
CN213533158U (en) | Fixing device is used in production of cement superimposed sheet | |
CN212385649U (en) | Flashing PC steel mould is decorated to roofing parapet | |
CN210375928U (en) | Self-vibration concrete test mould | |
CN219445458U (en) | Green shaping template of prefabricated shear force wall keyway and mould | |
CN108145831B (en) | Building module shaping mould case | |
CN207630231U (en) | A kind of brick-making mould of included material scraping plate | |
CN206011400U (en) | A kind of adjustable curb stone mould | |
CN210233412U (en) | Recycled aggregate concrete root stone preparation mould | |
CN213288579U (en) | Combined casting die | |
CN218314202U (en) | Pouring mold for building prefabricated wall | |
CN220972752U (en) | Concrete pier-wrapping die suitable for different sizes | |
CN220699956U (en) | Polymer mortar shaping auxiliary device | |
CN219081002U (en) | Self-supporting detachable steel bar truss template connecting piece | |
CN215212182U (en) | Indoor ground concrete pouring device | |
CN113478624B (en) | Side mold capable of being recycled for producing laminated plate and using method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230324 |