CN218668629U - Building wall assistor for house construction project - Google Patents

Building wall assistor for house construction project Download PDF

Info

Publication number
CN218668629U
CN218668629U CN202222286497.0U CN202222286497U CN218668629U CN 218668629 U CN218668629 U CN 218668629U CN 202222286497 U CN202222286497 U CN 202222286497U CN 218668629 U CN218668629 U CN 218668629U
Authority
CN
China
Prior art keywords
building
pipe
assistor
wall
cement bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222286497.0U
Other languages
Chinese (zh)
Inventor
刘桐利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202222286497.0U priority Critical patent/CN218668629U/en
Application granted granted Critical
Publication of CN218668629U publication Critical patent/CN218668629U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a building wall assistor for building construction projects, which comprises a lapping rod, a sliding pipe, a cement bucket and a pouring pipe; the lap bar is hung in the air and is in a straight rod shape, the sliding pipe sleeve is arranged on the lap bar, a threaded connecting pipe with an internal thread structure is arranged in the pipe below the sliding pipe, a threaded connecting rod matched with the internal thread structure is arranged above the cement bucket, the cement bucket is fixedly connected with the sliding pipe through the threaded connecting rod and the threaded connecting pipe, a discharge through hole is formed in the bottom of the cement bucket, and a pouring pipe is connected to the discharge through hole. The utility model discloses a building engineering assistor of building a wall in room, structural design is simple, low cost, through laying the pole of taking can carry out rational planning to the route of building engineering assistor of building a wall in room, the cement bucket can slide on the pole of taking through the slide pipe, grout in the cement bucket can flow out under the action of gravity through pouring the pipe to the operation of watering grout when supplementary building a wall the operation, the cement bucket need not artifical portable, highly matches with current artifical building a wall operation flow, application prospect is good.

Description

Building wall assistor for house construction project
Technical Field
The utility model relates to a construction auxiliary assembly technical field relates to a building engineering assistor of building a wall in room.
Background
The wall building is an important process in the building construction, and at present, field constructors often hold the mortar bucket with one hand and hold construction tool-floating tool with the other hand when building the wall, and the operation is inconvenient, consumes time and labor, and has low construction efficiency, thereby greatly influencing the construction speed.
In order to solve the problems of low efficiency and poor precision of the current wall building construction, the following technologies are developed by technical personnel in the field: CN 202220427951.7 discloses a wall building assistor for a house construction project, which performs wall building work by a groove die and a traction rope, and can replace manual observation for dropping lines to ensure vertical stacking of upper-layer bricks and lower-layer bricks, thereby improving the construction process and ensuring the construction quality; CN 202122088188.8 discloses a wall building assistor for house construction engineering, which achieves the effect of filling and beautifying by placing a large rotating wheel into a wall gap to roll cement, and keeps the large rotating wheel vertically placed on the wall surface by symmetrically installing and adjusting small rotating wheels at two sides of the large rotating wheel, the small rotating wheels at two sides can rotate to adjust the height by combining a nut and a screw rod with a spring sleeve, so as to play a role of freely adjusting the required depth of the wall gap, and a mud scraper with adjustable angle is arranged at the tail part of a handle, so that the problem of cement overflow can be solved at one time in the process of rapid mud gap, and the safety problem of uneven stress of the wall body, which is avoided by uniform mud gap, is realized while the working efficiency is improved; CN 202123326521.0 discloses a building engineering assistor of building a wall, it passes through the cooperation between hopper and the lifting unit, electric putter's output drives the connecting plate lift adjustment, and the connecting plate drives the otic placode lift adjustment of both sides, the otic placode passes through the montant and drives the telescopic movement of bar shaped plate in the square groove on the frame, can make the hopper go up and down to the height of building a wall, the current building engineering assistor of building a wall has been solved, in the use, be not convenient for send the concrete to the problem of the height of the required height of building a wall. Although above-mentioned device can improve the efficiency of construction of building a wall, it all has the structure comparatively complicated, and the problem that the cost is higher, and the manual work flow of building a wall that is most often used at present matches the degree relatively poor.
Therefore, the development of the wall building auxiliary tool which has the advantages of simple structure, low cost, high matching degree with the manual wall building operation process and capability of greatly improving the wall building construction efficiency has practical significance.
SUMMERY OF THE UTILITY MODEL
Because prior art has above-mentioned defect, the utility model provides a simple structure, low cost, with artifical operation flow degree of matching of building a wall high and can improve the appurtenance of building a wall of efficiency of construction of building a wall greatly, overcome current appurtenance of building a wall structure comparatively complicated, the cost is higher, with the artifical operation flow degree of matching relatively poor defect.
In order to achieve the above object, the present invention provides the following technical solutions:
a building construction engineering wall building assistor comprises a bridging rod, a sliding pipe, a cement bucket and a pouring pipe;
the building rod is hung in the air and is in a straight rod shape, the sliding pipe sleeve is arranged on the building rod, a threaded connecting pipe with an internal thread structure is arranged below the sliding pipe, a threaded connecting rod matched with the internal thread structure is arranged above the cement bucket, the cement bucket is fixedly connected with the sliding pipe through the threaded connecting rod and the threaded connecting pipe, a discharge through hole is formed in the bottom of the cement bucket, and a pouring pipe is connected with the discharge through hole.
The utility model discloses an engineering assistor of building a wall is built in room, structural design is simple, therefore, the carrier wave prepaid electric energy meter is low in cost, can carry out rational planning to the route of engineering assistor of building a wall is built in room through laying the pole (the route of laying of taking the pole), the cement bucket can slide on taking the pole through the slide pipe, cement bucket accessible threaded connection pole, threaded connection pipe adjustment height, grout in the cement bucket can flow out under the action of gravity through pouring the pipe, with the operation of pouring the grout during the operation of building a wall in the assistance, the cement bucket need not artifical portable, highly match with current artifical operation flow of building a wall, application prospect is good.
As a preferred technical scheme:
according to the wall building assistor for the house building engineering, the cement barrel is of a hollow cylindrical structure with two closed ends.
According to the wall building assistor for the house building engineering, the top of the cement bucket is provided with the feeding through hole, and the feeding through hole is provided with the hopper for communicating the inside of the cement bucket with the outside.
According to the wall building assistor for the house building engineering, the threaded connecting pipe is vertically connected with the sliding pipe, and the whole body formed by connecting the threaded connecting pipe and the sliding pipe is T-shaped.
According to the wall building assistor for the house building engineering, the threaded connecting pipe is welded with the sliding pipe.
According to the building engineering wall building assistor for the house building, the threaded connecting rod is provided with the external thread structure matched with the internal thread structure.
According to the wall building assistor for the house building engineering, the lapping rod is a stainless steel rod and is in clearance fit with the sliding pipe.
According to the wall building assistor for the house building engineering, the discharge through hole is provided with the leakage pipe, and the leakage pipe is connected with the pouring pipe in a sealing manner.
According to the wall building assistor for the house building project, the pouring pipe is a rubber pipe and is in threaded connection with the leakage pipe.
According to the building wall assistor for the house construction project, the hopper, the leakage pipe and the threaded connecting rod are respectively fixed with the cement barrel through welding.
The above technical solutions are only a feasible technical solution of the present invention, the protection scope of the present invention is not limited thereto, and those skilled in the art can reasonably adjust the specific design according to the actual needs.
Above-mentioned utility model has following advantage or beneficial effect:
(1) The utility model discloses a building engineering assistor of building a wall in room, structural design is simple, can rationally plan the route of building engineering assistor of building a wall in room through laying the pole of taking (the route of laying of taking the pole), and the cement bucket can slide on taking the pole through the slip pipe, and the grout in the cement bucket can flow out under the action of gravity through pouring the pipe to the operation of watering the grout when assisting the operation of building a wall, and the cement bucket need not artifical portable, highly matches with current manual work operation flow of building a wall;
(2) The utility model discloses a building wall assistor of engineering is built in room, low cost, cement bucket accessible threaded connection pole, threaded connection pipe height-adjusting, the suitability is good, and application prospect is good.
Drawings
The invention and its features, aspects and advantages will become more apparent from a reading of the following detailed description of non-limiting embodiments with reference to the attached drawings. Like reference symbols in the various drawings indicate like elements. The drawings are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention.
Fig. 1 is a schematic structural view of the wall building assistor for building construction provided by the utility model;
FIG. 2 is a cross-sectional view of FIG. 1;
the reference numbers in the figures: 1. a cement bucket; 2. pouring a pipe; 3. building a rod; 4. a slide pipe; 5. a threaded connection pipe; 6. a threaded connecting rod; 7. a hopper; 8. and (4) a leakage pipe.
Detailed Description
The structure of the present invention will be further described with reference to the drawings and specific examples, which should not be construed as limiting the invention.
Example 1
The utility model provides a building engineering assistor in room, as shown in fig. 1 and fig. 2, including straight rod-like take pole 3, it has can free gliding slide pipe 4 to take pole 3 to go up the cover, the perpendicular intercommunication in slide pipe 4 center department has pipe-shaped threaded connection pipe 5, be furnished with screw-thread fit's threaded connection pole 6 in the threaded connection pipe 5, 6 tip vertical connection of threaded connection pole have cement bucket 1, 1 top intercommunication of cement bucket has hopper 7, 1 bottom center department of cement bucket vertical intercommunication has bushing 8, bushing 8 end seal intercommunication has a section to pour pipe 2.
The lapping rod 3 is made of stainless steel, is firm and durable, has good corrosion resistance, and is in clearance fit with the sliding pipe 4. The sliding pipe 4 and the threaded connecting pipe 5 are both made of stainless steel, are firm and durable, have good corrosion resistance, and are connected with the sliding pipe 4 and the threaded connecting pipe 5 through welding. The cement bucket 1, the threaded connecting rod 6, the hopper 7 and the leakage pipe 8 are made of stainless steel, the cement bucket is firm and durable, the corrosion resistance is good, and the cement bucket 1 is connected with the threaded connecting rod 6, the hopper 7 and the leakage pipe 8 through welding. The pouring pipe 2 is made of rubber materials, is soft in material, easy to deform and good in elasticity, and the pouring pipe 2 is connected with the leakage pipe 8 through threads.
This building engineering assistor of building a wall can be with grout stirring well pour into cement bucket 1 from hopper 7 when using, will pour the bending of pipe 2 up, prevent that grout from flowing out. Set up 3 levels of taking pole in the room and build scaffold frame suitable position, then rotatory thread connecting rod 6 in threaded connection pipe 5, the height of cement bucket 1 has been adjusted, then slide 4 to suitable position (can set up centre gripping fixing device about the slide if necessary on taking pole 3, so that it is fixed with taking pole with the slide), will pour 2 mouths of pipe and face to the fragment of brick, fall grout and build the wall on the brick, it is very laborsaving to operate, has improved work efficiency. This building engineering assistor of building a wall in room can erect, and the supplementary grout that provides, and convenient operation is laborsaving, removes very in a flexible way, has improved the work efficiency of building a wall.
Adopt this room to build a wall engineering assistor can be with grout stirring well pour into the cement bucket from the hopper when using, will pour the pipe bending up, prevent that grout from flowing out. The building rod is horizontally erected at a proper position of the building scaffold, then the threaded connecting rod is rotated in the threaded connecting pipe, the height of the cement barrel is adjusted, then the sliding pipe slides to the proper position on the building rod, the pouring pipe orifice faces to the brick block, cement paste is poured on the brick to build a wall, the operation is very labor-saving, and the working efficiency is improved. This building engineering assistor of building a wall in room can erect, and the supplementary grout that provides, and convenient operation is laborsaving, removes very in a flexible way, has improved the work efficiency of building a wall.
Those skilled in the art will appreciate that variations may be implemented by those skilled in the art in combination with the prior art and the above-described embodiments, and will not be described herein in detail. Such variations do not affect the essence of the present invention, and are not described herein.
The above description is directed to the preferred embodiment of the present invention. It is to be understood that the invention is not limited to the particular embodiments described above, and that devices and structures not described in detail are understood to be implemented in a manner common in the art; without departing from the scope of the invention, it is intended that the present invention shall not be limited to the above-described embodiments, but that the present invention shall include all the modifications and variations of the embodiments. Therefore, any simple modification, equivalent change and modification made to the above embodiments by the technical entity of the present invention all still fall within the protection scope of the technical solution of the present invention, where the technical entity does not depart from the content of the technical solution of the present invention.

Claims (10)

1. The utility model provides a building engineering assistor of building a wall which characterized in that: comprises a lapping rod, a sliding pipe, a cement bucket and a pouring pipe;
the building rod is hung and is established in the air and it is straight rod-shaped, and the sliding tube cover is established on the building rod, and the below of sliding tube is equipped with intraductal threaded connection who opens and has the internal thread structure, the top of cement bucket be equipped with the threaded connection pole that the internal thread structure matches, the cement bucket passes through threaded connection pole, threaded connection pipe and sliding tube fixed connection, and open the bottom of cement bucket has the discharging through hole, and discharging through hole department is connected with pours the pipe.
2. The building construction engineering wall building assistor of claim 1, wherein the cement barrel is a hollow cylindrical structure with two closed ends.
3. The building engineering assistor of claim 2, wherein a feeding through hole is formed in the top of the cement barrel, and a hopper communicating the inside of the cement barrel with the outside is arranged at the feeding through hole.
4. The building engineering wall laying assistor of claim 1, wherein the threaded connection pipe is vertically connected with the sliding pipe, and the whole body formed by connecting the threaded connection pipe and the sliding pipe is T-shaped.
5. The building construction engineering wall building assistor of claim 4, wherein the threaded connection pipe is welded with the slide pipe.
6. The building construction engineering wall building assistor of claim 1, wherein the threaded connection rod is provided with an external thread structure matching the internal thread structure.
7. The building engineering wall building assistor of claim 1, wherein the tie bar is a stainless steel bar, and the tie bar is in clearance fit with the slide tube.
8. The building engineering wall building assistor of claim 3, wherein a leakage pipe is arranged at the discharge through hole, and the leakage pipe is connected with the pouring pipe in a sealing manner.
9. The building engineering wall assistor of claim 8, wherein the pouring pipe is a rubber pipe, and the pouring pipe is in threaded connection with the drain pipe.
10. The building engineering wall building assistor of claim 8, wherein the hopper, the leakage pipe and the threaded connection rod are respectively fixed with the cement bucket by welding.
CN202222286497.0U 2022-08-30 2022-08-30 Building wall assistor for house construction project Active CN218668629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222286497.0U CN218668629U (en) 2022-08-30 2022-08-30 Building wall assistor for house construction project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222286497.0U CN218668629U (en) 2022-08-30 2022-08-30 Building wall assistor for house construction project

Publications (1)

Publication Number Publication Date
CN218668629U true CN218668629U (en) 2023-03-21

Family

ID=85554398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222286497.0U Active CN218668629U (en) 2022-08-30 2022-08-30 Building wall assistor for house construction project

Country Status (1)

Country Link
CN (1) CN218668629U (en)

Similar Documents

Publication Publication Date Title
CN109208754A (en) A kind of support construction and its construction method of house construction engineering cantilevered plate
CN207296408U (en) Portable concrete constructional column irrigation device
CN207983691U (en) A kind of Rock And Soil slip casting flow-dividing control converting system
CN218668629U (en) Building wall assistor for house construction project
CN209760844U (en) Liftable vibration gravity flow masonry mortar plastering device
CN208056648U (en) A kind of grout sleeve device
CN209397940U (en) A kind of novel scraping slurry tool
CN108340495A (en) A kind of Rock And Soil slip casting flow-dividing control converting system and its application method
CN210049073U (en) Line drawing device for highway engineering
CN212832395U (en) Culvert pipe lifting device that municipal construction used
CN209162762U (en) A kind of cement mortar for constructional engineering joint filling device
CN208056663U (en) A kind of auxiliary tool for construction
CN208455690U (en) A kind of wet filling formula concreting top surface detection device of pile foundation
CN217897217U (en) Wall masonry device
CN213268998U (en) Building wall assistor is built in room
CN217629926U (en) A rotatable cloth instrument for well inner wall concrete placement
CN206554089U (en) A kind of armlet of artificial digging pile pours instrument
CN214462760U (en) Building wall assistor is built in room
CN218029197U (en) Concrete gap grouting device for building
CN214740019U (en) Auxiliary device is built to jiao chi stone building
CN211007554U (en) Fitment is with strickleing cement device off
CN218621725U (en) Road crack pouring device for engineering
CN220746931U (en) Water conservancy construction cementer
CN210151744U (en) Movable grouting clamping device for foundation construction
CN209614687U (en) A kind of Tower crane standard section main chord positioning group mounted welder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant