CN218665045U - Portable hoisting steel frame - Google Patents

Portable hoisting steel frame Download PDF

Info

Publication number
CN218665045U
CN218665045U CN202222953932.0U CN202222953932U CN218665045U CN 218665045 U CN218665045 U CN 218665045U CN 202222953932 U CN202222953932 U CN 202222953932U CN 218665045 U CN218665045 U CN 218665045U
Authority
CN
China
Prior art keywords
fixedly connected
frame
rope
lifting
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222953932.0U
Other languages
Chinese (zh)
Inventor
周东武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongyi Technology Dongguan Co ltd
Original Assignee
Dongguan Tianhongsheng Automation Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Tianhongsheng Automation Equipment Co ltd filed Critical Dongguan Tianhongsheng Automation Equipment Co ltd
Priority to CN202222953932.0U priority Critical patent/CN218665045U/en
Application granted granted Critical
Publication of CN218665045U publication Critical patent/CN218665045U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种便携式吊装钢架,包括两个支撑座和龙门架,所述龙门架固定连接于两个所述支撑座的顶部之间,所述龙门架内壁的两侧均设置有滑动组件,两个所述滑动组件之间设置有横板,所述横板的底部固定连接有辅助吊绳,所述辅助吊绳的底端固定连接有安装座,所述安装座的内部插接有安装块,所述安装块的两侧均开设有插孔,所述安装座的两侧均嵌设有卡紧组件,所述安装块的底部固定连接有吊钩,所述龙门架的顶部设置有起吊组件。本实用新型通过滑动组件的设置能够对横板进行限位,进而间接对起吊绳进行限位,提高了起吊绳的稳定性,有效的降低了晃动的幅度,从而提高了起吊的安全性。

Figure 202222953932

The utility model discloses a portable hoisting steel frame, which comprises two support seats and a gantry frame, the gantry frame is fixedly connected between the tops of the two support seats, and both sides of the inner wall of the gantry frame are provided with A sliding assembly, a horizontal plate is arranged between the two sliding assemblies, the bottom of the horizontal plate is fixedly connected with an auxiliary lifting rope, the bottom end of the auxiliary lifting rope is fixedly connected with a mounting seat, and the inner plug of the mounting seat A mounting block is connected, both sides of the mounting block are provided with sockets, both sides of the mounting seat are embedded with clamping components, the bottom of the mounting block is fixedly connected with a hook, and the gantry frame The top is provided with lifting components. The utility model can limit the position of the horizontal plate through the setting of the sliding assembly, and then indirectly limit the position of the lifting rope, improves the stability of the lifting rope, effectively reduces the shaking range, and thus improves the safety of lifting.

Figure 202222953932

Description

一种便携式吊装钢架A portable hoisting steel frame

技术领域technical field

本实用新型涉及吊装钢架技术领域,尤其涉及一种便携式吊装钢架。The utility model relates to the technical field of hoisting steel frames, in particular to a portable hoisting steel frame.

背景技术Background technique

在对重量比较重的设备或物品等进行装、运、安装以及维修等工作中,需要使用到各种吊装器具将设备、工件、器具、材料等吊起,并将其转运至合适的位置。In the work of loading, transporting, installing and maintaining heavy equipment or articles, it is necessary to use various lifting devices to lift equipment, workpieces, appliances, materials, etc., and transfer them to a suitable position.

现有的对地面上的设备或工件等进行起吊时,需要使用到吊装钢架,通常采用电机带动卷绳筒对吊绳进行收卷,从而带动吊绳底端的吊钩向上移动,实现将待起吊的设备或工件等吊起,然而现有的吊装钢架通常不具备对吊绳进行限位的功能,在对设备或工件进行起吊时,或吊起后对设备或工件进行移动时,容易发生大幅度晃动,稳定性较差,存在一定的安全隐患。When the existing equipment or workpieces on the ground are hoisted, a hoisting steel frame is required. Usually, a motor is used to drive the rope reel to wind up the sling, thereby driving the hook at the bottom of the sling to move upwards to realize the lifting of the sling. However, the existing hoisting steel frame usually does not have the function of limiting the lifting rope. When lifting the equipment or workpiece, or when moving the equipment or workpiece after lifting, it is easy to Large shaking occurs, the stability is poor, and there are certain potential safety hazards.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种便携式吊装钢架。The purpose of the utility model is to solve the shortcomings in the prior art, and propose a portable hoisting steel frame.

为了实现上述目的,本实用新型采用了如下技术方案:一种便携式吊装钢架,包括两个支撑座和龙门架,所述龙门架固定连接于两个所述支撑座的顶部之间,所述龙门架内壁的两侧均设置有滑动组件,两个所述滑动组件之间设置有横板,所述横板的底部固定连接有辅助吊绳,所述辅助吊绳的底端固定连接有安装座,所述安装座的内部插接有安装块,所述安装块的两侧均开设有插孔,所述安装座的两侧均嵌设有卡紧组件,所述安装块的底部固定连接有吊钩,所述龙门架的顶部设置有起吊组件。In order to achieve the above object, the utility model adopts the following technical solution: a portable hoisting steel frame, including two support bases and a gantry frame, the gantry frame is fixedly connected between the tops of the two support bases, the Both sides of the inner wall of the gantry frame are provided with sliding assemblies, a horizontal plate is arranged between the two sliding assemblies, the bottom of the horizontal plate is fixedly connected with an auxiliary lifting rope, and the bottom end of the auxiliary lifting rope is fixedly connected with a mounting A mounting block is plugged into the mounting block, both sides of the mounting block are provided with sockets, both sides of the mounting seat are embedded with clamping components, and the bottom of the mounting block is fixedly connected There is a hook, and the top of the gantry frame is provided with a lifting assembly.

通过滑动组件的设置能够对横板进行限位,进而间接对起吊绳进行限位,提高了起吊绳的稳定性,有效的降低了晃动的幅度,从而提高了起吊的安全性;通过辅助吊绳的设置便于工作人员对吊钩进行一定范围内的移动,进而便于将吊钩钩设在待起吊设备或工件上的吊环上。The setting of the sliding component can limit the position of the horizontal plate, and then indirectly limit the position of the lifting rope, which improves the stability of the lifting rope, effectively reduces the shaking range, and thus improves the safety of lifting; through the auxiliary lifting rope The setting is convenient for the staff to move the hook within a certain range, and then it is convenient for the hook to be set on the lifting ring on the equipment to be lifted or the workpiece.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述龙门架的顶部开设有过绳孔。The top of the gantry is provided with a rope hole.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述滑动组件包括固定连接于龙门架内壁上的滑轨,所述滑轨的内部滑动连接有滑块,所述滑块与横板固定连接。The slide assembly includes a slide rail fixedly connected to the inner wall of the gantry frame, a slide block is slidably connected to the inside of the slide rail, and the slide block is fixedly connected to the horizontal plate.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述卡紧组件包括嵌设于安装座上的固定框,所述固定框内壁的顶部和底部之间滑动连接有活动块,所述活动块的一侧固定连接有插杆,且所述活动块的另一侧固定连接有拉绳。The clamping assembly includes a fixed frame embedded on the mounting base, a movable block is slidably connected between the top and bottom of the inner wall of the fixed frame, one side of the movable block is fixedly connected with an insertion rod, and the movable The other side of the block is fixedly attached with a drawstring.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述拉绳的另一端固定连接有拉块,所述活动块的一侧且位于拉绳的外表面固定连接有弹簧。The other end of the pull cord is fixedly connected with a pull block, and one side of the movable block is fixedly connected with a spring on the outer surface of the pull cord.

通过手动拉动拉块带动拉绳移动,拉绳移动带动活动块移动,活动块移动对弹簧进行挤压,且活动块移动带动插杆退出插孔,从而使得插杆对安装块的限位作用消失,向下移动安装块即可将安装块从安装座的内部拔出,从而实现对吊钩的拆卸,反之,可以实现对吊钩的安装,结构简单,操作便捷,便于工作人员对吊钩进行更换。By manually pulling the pull block to drive the pull rope to move, the pull rope moves to drive the movable block to move, the movable block moves to squeeze the spring, and the movable block moves to drive the insertion rod to exit the socket, so that the limit effect of the insertion rod on the installation block disappears , move the mounting block down to pull out the mounting block from the inside of the mounting seat, so as to realize the disassembly of the hook, on the contrary, the installation of the hook can be realized, the structure is simple, the operation is convenient, and it is convenient for the staff to carry out the installation of the hook replace.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述起吊组件包括固定连接于龙门架顶部的起吊电机,所述起吊电机的输出端固定连接有卷绳筒,所述卷绳筒的外表面固定连接有起吊绳,所述起吊绳的另一端穿过过绳孔并与横板的顶部固定连接。The hoisting assembly includes a hoisting motor fixedly connected to the top of the gantry frame, the output end of the hoisting motor is fixedly connected with a rope drum, the outer surface of the rope drum is fixedly connected with a hoisting rope, and the other end of the hoisting rope Pass through the rope hole and be fixedly connected with the top of the horizontal board.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述支撑座内壁的一侧固定连接有驱动电机,所述驱动电机的输出端固定连接有双向丝杆,所述双向丝杆的外表面螺纹连接有两个螺纹块,所述螺纹块的底部铰接有第一支撑框,所述第一支撑框内壁的两侧之间转动连接有第二支撑框。One side of the inner wall of the support base is fixedly connected with a drive motor, the output end of the drive motor is fixedly connected with a bidirectional screw rod, and the outer surface of the two-way screw rod is threaded with two threaded blocks, and the bottom of the threaded block A first support frame is hinged, and a second support frame is rotatably connected between the two sides of the inner wall of the first support frame.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述第二支撑框内壁的两侧之间转动连接有移动轮,且所述第二支撑框远离移动轮的一端与支撑座的内壁铰接,通过移动轮的设置便于对装置进行移动,提高了装置移动的便携性。The two sides of the inner wall of the second supporting frame are rotatably connected with moving wheels, and the end of the second supporting frame far away from the moving wheels is hinged to the inner wall of the support seat, and the setting of the moving wheels facilitates the movement of the device, improving the Portability of device movement.

本实用新型具有如下有益效果:The utility model has the following beneficial effects:

1、与现有技术相比,该便携式吊装钢架,通过滑动组件的设置能够对横板进行限位,进而间接对起吊绳进行限位,提高了起吊绳的稳定性,有效的降低了晃动的幅度,从而提高了起吊的安全性;通过辅助吊绳的设置便于工作人员对吊钩进行一定范围内的移动,进而便于将吊钩钩设在待起吊设备或工件上的吊环上,进而便于对设备或工件进行起吊。1. Compared with the existing technology, the portable hoisting steel frame can limit the position of the horizontal plate through the setting of the sliding component, and then indirectly limit the position of the lifting rope, which improves the stability of the lifting rope and effectively reduces the shaking Therefore, the safety of lifting is improved; through the setting of the auxiliary lifting rope, it is convenient for the staff to move the lifting hook within a certain range, and then it is convenient to set the lifting hook on the lifting ring on the equipment to be lifted or the workpiece, which is convenient Lift equipment or workpieces.

2、与现有技术相比,该便携式吊装钢架,通过手动拉动拉块带动拉绳移动,拉绳移动带动活动块移动,活动块移动对弹簧进行挤压,且活动块移动带动插杆退出插孔,从而使得插杆对安装块的限位作用消失,向下移动安装块即可将安装块从安装座的内部拔出,从而实现对吊钩的拆卸,反之,可以实现对吊钩的安装,结构简单,操作便捷,便于工作人员对吊钩进行更换。2. Compared with the existing technology, the portable hoisting steel frame drives the pull rope to move by manually pulling the pull block, the pull rope moves to drive the movable block to move, the movable block moves to squeeze the spring, and the movable block moves to drive the insertion rod to exit Jack, so that the limit effect of the insertion rod on the installation block disappears, and the installation block can be pulled out from the inside of the installation seat by moving the installation block downwards, so as to realize the disassembly of the hook. On the contrary, the installation of the hook can be realized Installation, simple structure, convenient operation, convenient for staff to replace the hook.

附图说明Description of drawings

图1为本实用新型提出的一种便携式吊装钢架的整体结构立体图;Fig. 1 is a perspective view of the overall structure of a portable hoisting steel frame proposed by the utility model;

图2为本实用新型提出的一种便携式吊装钢架的支撑座的内部结构立体图;Fig. 2 is a three-dimensional view of the internal structure of a support seat of a portable hoisting steel frame proposed by the utility model;

图3为本实用新型提出的一种便携式吊装钢架的安装座和安装块的剖面结构示意图。Fig. 3 is a schematic cross-sectional structure diagram of a mounting seat and a mounting block of a portable hoisting steel frame proposed by the utility model.

图例说明:illustration:

1、支撑座;2、龙门架;3、横板;4、辅助吊绳;5、安装座;6、安装块;7、插孔;8、吊钩;9、过绳孔;10、滑轨;11、滑块;12、固定框;13、活动块;14、插杆;15、拉绳;16、拉块;17、弹簧;18、起吊电机;19、卷绳筒;20、起吊绳;21、驱动电机;22、双向丝杆;23、螺纹块;24、第一支撑框;25、第二支撑框;26、移动轮。1. Support seat; 2. Gantry frame; 3. Horizontal plate; 4. Auxiliary lifting rope; 5. Mounting seat; 6. Mounting block; 7. Jack; 8. Hook; Rail; 11, slider; 12, fixed frame; 13, movable block; 14, inserting rod; 15, pull rope; 16, pull block; 17, spring; 18, lifting motor; 19, rope reel; 20, lifting Rope; 21, drive motor; 22, two-way screw mandrel; 23, thread block; 24, first support frame; 25, second support frame; 26, moving wheel.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

参照图1-3,本实用新型提供的一种便携式吊装钢架:包括两个支撑座1和龙门架2,龙门架2固定连接于两个支撑座1的顶部之间,龙门架2内壁的两侧均设置有滑动组件,两个滑动组件之间设置有横板3,横板3的底部固定连接有辅助吊绳4,辅助吊绳4的底端固定连接有安装座5,安装座5的内部插接有安装块6,安装块6的两侧均开设有插孔7,安装座5的两侧均嵌设有卡紧组件,安装块6的底部固定连接有吊钩8,龙门架2的顶部设置有起吊组件。Referring to Figures 1-3, a portable hoisting steel frame provided by the utility model includes two support bases 1 and a gantry frame 2, the gantry frame 2 is fixedly connected between the tops of the two support bases 1, and the inner wall of the gantry frame 2 Both sides are provided with sliding components, and a horizontal plate 3 is arranged between the two sliding components. The interior of the installation block 6 is plugged with a mounting block 6, and both sides of the mounting block 6 are provided with jacks 7, and both sides of the mounting seat 5 are embedded with clamping components. The bottom of the mounting block 6 is fixedly connected with a hook 8, and the gantry frame The top of 2 is provided with hoisting assembly.

龙门架2的顶部开设有过绳孔9。The top of the gantry 2 offers a rope hole 9.

滑动组件包括固定连接于龙门架2内壁上的滑轨10,滑轨10的内部滑动连接有滑块11,滑块11与横板3固定连接。The slide assembly includes a slide rail 10 fixedly connected to the inner wall of the gantry frame 2 , a slide block 11 is slidably connected inside the slide rail 10 , and the slide block 11 is fixedly connected with the horizontal plate 3 .

卡紧组件包括嵌设于安装座5上的固定框12,固定框12内壁的顶部和底部之间滑动连接有活动块13,活动块13的一侧固定连接有插杆14,且活动块13的另一侧固定连接有拉绳15。The clamping assembly includes a fixed frame 12 embedded on the mounting base 5, a movable block 13 is slidably connected between the top and the bottom of the inner wall of the fixed frame 12, and one side of the movable block 13 is fixedly connected with an insertion rod 14, and the movable block 13 The other side is fixedly connected with stay cord 15.

拉绳15的另一端固定连接有拉块16,活动块13的一侧且位于拉绳15的外表面固定连接有弹簧17。The other end of the pull cord 15 is fixedly connected with a pull block 16 , and one side of the movable block 13 and the outer surface of the pull cord 15 are fixedly connected with a spring 17 .

起吊组件包括固定连接于龙门架2顶部的起吊电机18,起吊电机18的输出端固定连接有卷绳筒19,卷绳筒19的外表面固定连接有起吊绳20,起吊绳20的另一端穿过过绳孔9并与横板3的顶部固定连接。The hoisting assembly includes a hoisting motor 18 fixedly connected to the top of the gantry frame 2, the output end of the hoisting motor 18 is fixedly connected with a rope drum 19, the outer surface of the rope drum 19 is fixedly connected with a hoisting rope 20, and the other end of the hoisting rope 20 is worn Cross the rope hole 9 and be fixedly connected with the top of the horizontal plate 3.

支撑座1内壁的一侧固定连接有驱动电机21,驱动电机21的输出端固定连接有双向丝杆22,双向丝杆22的外表面螺纹连接有两个螺纹块23,螺纹块23的底部铰接有第一支撑框24,第一支撑框24内壁的两侧之间转动连接有第二支撑框25。One side of the inner wall of the support seat 1 is fixedly connected with a driving motor 21, and the output end of the driving motor 21 is fixedly connected with a bidirectional screw rod 22, and the outer surface of the bidirectional screw rod 22 is threaded with two threaded blocks 23, and the bottom of the threaded block 23 is hinged. There is a first support frame 24, and a second support frame 25 is rotatably connected between the two sides of the inner wall of the first support frame 24.

第二支撑框25内壁的两侧之间转动连接有移动轮26,且第二支撑框25远离移动轮26的一端与支撑座1的内壁铰接。The two sides of the inner wall of the second supporting frame 25 are rotatably connected with moving wheels 26 , and the end of the second supporting frame 25 away from the moving wheels 26 is hinged to the inner wall of the supporting seat 1 .

工作原理:工作时,当需要使用该便携式吊装钢架对地面上的设备或工件进行起吊时,通过移动轮26的设置便于对装置进行移动,提高了装置移动的便携性,将装置移动至适宜的位置后,随后启动驱动电机21,驱动电机21的输出端转动带动双向丝杆22转动,双向丝杆22转动带动外表面螺纹连接的螺纹块23向相对的一侧移动,进而通过第一支撑框24和第二支撑框25带动移动轮26向上移动,使得移动轮26缩回支撑座1内部,并使得移动轮26脱离地面,从而使得支撑座1与地面接触,通过支撑座1对装置进行支撑,提高了装置的稳定性,避免在对设备进行起吊时装置发生移动,提高了装置使用的安全性;Working principle: When working, when it is necessary to use the portable hoisting steel frame to lift equipment or workpieces on the ground, the setting of the moving wheels 26 facilitates the movement of the device, which improves the portability of the device and moves the device to a suitable position. After the position, then start the driving motor 21, the output end of the driving motor 21 rotates to drive the two-way screw rod 22 to rotate, and the rotation of the two-way screw rod 22 drives the threaded block 23 that is threaded on the outer surface to move to the opposite side, and then through the first support The frame 24 and the second support frame 25 drive the moving wheel 26 to move upwards, so that the moving wheel 26 retracts into the support seat 1, and the moving wheel 26 is separated from the ground, so that the support seat 1 is in contact with the ground, and the device is carried out through the support seat 1. The support improves the stability of the device, prevents the device from moving when the equipment is lifted, and improves the safety of the device;

随后根据待起吊设备或工件的实际情况更换相适配的吊钩8,通过手动拉动拉块16带动拉绳15移动,拉绳15移动带动活动块13移动,活动块13移动对弹簧17进行挤压,且活动块13移动带动插杆14退出插孔7,从而使得插杆14对安装块6的限位作用消失,向下移动安装块6即可将安装块6从安装座5的内部拔出,从而实现对吊钩8的拆卸,反之,可以实现对吊钩8的安装,结构简单,操作便捷,便于工作人员对吊钩8进行更换;Subsequently, replace the suitable suspension hook 8 according to the actual situation of the lifting equipment or the workpiece, and drive the stay cord 15 to move by manually pulling the pull block 16, and the stay cord 15 moves to drive the movable block 13 to move, and the movable block 13 moves to squeeze the spring 17 Press, and the movable block 13 moves to drive the insertion rod 14 to withdraw from the socket 7, so that the limiting effect of the insertion rod 14 on the installation block 6 disappears, and the installation block 6 can be pulled out from the inside of the installation seat 5 by moving the installation block 6 downward. out, so as to realize the disassembly of the hook 8, on the contrary, the installation of the hook 8 can be realized, the structure is simple, the operation is convenient, and it is convenient for the staff to replace the hook 8;

当吊钩8更换完成后,将吊钩8钩在待起吊设备或工件上的吊环上,启动起吊电机18,起吊电机18的输出端转动带动卷绳筒19转动,卷绳筒19转动对起吊绳20进行收卷,进而实现对设备或工件进行起吊,在起吊的过程中,通过滑动组件的设置能够对横板3进行限位,进而间接对起吊绳20进行限位,提高了起吊绳20的稳定性,有效的降低了晃动的幅度,从而提高了起吊的安全性。After the suspension hook 8 is replaced, the suspension hook 8 is hooked on the suspension ring on the equipment to be lifted or the workpiece, and the lifting motor 18 is started, and the output end of the lifting motor 18 rotates to drive the rope reel 19 to rotate, and the rope reel 19 rotates against the lifting ring. The rope 20 is rewound, and then the equipment or the workpiece is lifted. During the lifting process, the horizontal plate 3 can be limited by the setting of the sliding assembly, and then the lifting rope 20 can be indirectly limited, and the lifting rope 20 can be improved. Excellent stability, effectively reducing the shaking range, thus improving the safety of lifting.

最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the utility model, and is not intended to limit the utility model, although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art , it can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements on some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model, All should be included within the protection scope of the present utility model.

Claims (8)

1. The utility model provides a portable hoist and mount steelframe, includes two supporting seats (1) and portal frame (2), its characterized in that: portal frame (2) fixed connection is in two between the top of supporting seat (1), the both sides of portal frame (2) inner wall all are provided with sliding assembly, two be provided with diaphragm (3) between the sliding assembly, supplementary lifting rope (4) of the bottom fixedly connected with of diaphragm (3), bottom fixedly connected with mount pad (5) of supplementary lifting rope (4), the inside of mount pad (5) is pegged graft and is had installation piece (6), jack (7) have all been seted up to the both sides of installation piece (6), the both sides of mount pad (5) all inlay and are equipped with the chucking subassembly, the bottom fixedly connected with lifting hook (8) of installation piece (6), the top of portal frame (2) is provided with and lifts by crane the subassembly.
2. The portable hoisting steel frame of claim 1, which is characterized in that: the top of the portal frame (2) is provided with a rope passing hole (9).
3. The portable hoisting steel frame of claim 1, which is characterized in that: the sliding assembly comprises a sliding rail (10) fixedly connected to the inner wall of the portal frame (2), a sliding block (11) is connected to the inside of the sliding rail (10) in a sliding mode, and the sliding block (11) is fixedly connected with the transverse plate (3).
4. The portable hoisting steel frame of claim 1, which is characterized in that: the chucking subassembly is including inlaying fixed frame (12) of locating on mount pad (5), sliding connection has movable block (13) between the top of fixed frame (12) inner wall and the bottom, one side fixedly connected with inserted bar (14) of movable block (13), just opposite side fixedly connected with stay cord (15) of movable block (13).
5. The portable hoisting steel frame of claim 4, which is characterized in that: the other end of the pull rope (15) is fixedly connected with a pull block (16), and one side of the movable block (13) and the outer surface of the pull rope (15) are fixedly connected with a spring (17).
6. The portable hoisting steel frame of claim 2, which is characterized in that: the lifting assembly comprises a lifting motor (18) fixedly connected to the top of the portal frame (2), the output end of the lifting motor (18) is fixedly connected with a rope drum (19), the outer surface of the rope drum (19) is fixedly connected with a lifting rope (20), and the other end of the lifting rope (20) penetrates through the rope hole (9) and is fixedly connected with the top of the transverse plate (3).
7. The portable hoisting steel frame of claim 1, which is characterized in that: one side fixedly connected with driving motor (21) of supporting seat (1) inner wall, the two-way lead screw (22) of output fixedly connected with of driving motor (21), the surface threaded connection of two-way lead screw (22) has two screw thread pieces (23), the bottom of screw thread piece (23) articulates there is first carriage (24), it is connected with second carriage (25) to rotate between the both sides of first carriage (24) inner wall.
8. The portable hoisting steel frame of claim 7, which is characterized in that: the two sides of the inner wall of the second supporting frame (25) are rotatably connected with moving wheels (26), and one end, far away from the moving wheels (26), of the second supporting frame (25) is hinged to the inner wall of the supporting seat (1).
CN202222953932.0U 2022-11-07 2022-11-07 Portable hoisting steel frame Active CN218665045U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222953932.0U CN218665045U (en) 2022-11-07 2022-11-07 Portable hoisting steel frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222953932.0U CN218665045U (en) 2022-11-07 2022-11-07 Portable hoisting steel frame

Publications (1)

Publication Number Publication Date
CN218665045U true CN218665045U (en) 2023-03-21

Family

ID=85569380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222953932.0U Active CN218665045U (en) 2022-11-07 2022-11-07 Portable hoisting steel frame

Country Status (1)

Country Link
CN (1) CN218665045U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117228544A (en) * 2023-11-15 2023-12-15 青岛力克川液压机械有限公司 A gantry crane equipment driven by a hydraulic motor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117228544A (en) * 2023-11-15 2023-12-15 青岛力克川液压机械有限公司 A gantry crane equipment driven by a hydraulic motor
CN117228544B (en) * 2023-11-15 2024-02-20 青岛力克川液压机械有限公司 A gantry crane equipment driven by a hydraulic motor

Similar Documents

Publication Publication Date Title
CN112850514B (en) Multi-adjusting-mode crane capable of realizing stable feeding
CN210286550U (en) Automatic change mechanical equipment hoisting accessory
CN221680616U (en) Building engineering lifting device
CN210885009U (en) Equipment hoisting alignment device for wind power generation
CN210133823U (en) Portable lifting device for electric power engineering
CN218025211U (en) Hoisting device for civil construction
CN219194167U (en) A self-propelled hoist trolley spreader
CN212151475U (en) Hydraulic lifting device for warp knitting workshop
CN217894999U (en) Hoisting trolley with movable motor
CN217676476U (en) Lifting device convenient to adjust rotation angle
CN214399581U (en) Lifting device for electromechanical engineering
CN214935746U (en) Masonry lifting machine for high-rise building construction
CN215364607U (en) Pneumatic lifting maintenance platform
CN115924029A (en) Host entry tool and its usage method
CN221939985U (en) Auxiliary tooling for mechanical equipment installation
CN218810110U (en) Building construction hoisting device
CN222846307U (en) An improved internal support type sling
CN221500487U (en) Reciprocating elevator
CN219044808U (en) Crane with adjustable arm length
CN217837524U (en) Building stone processing loading attachment
CN221662397U (en) A kind of lifting device for processing aluminum profiles
CN219792362U (en) Hoisting mechanism for test bench
CN223016320U (en) Portal crane with anti-swing structure
CN222907322U (en) A construction lifting equipment with lifting equipment
CN111704023A (en) Lifting tool and method for dual fuel diesel engine cylinder block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20260119

Address after: 523000 Guangdong Province Dongguan City Qishi Town Xin Nan Second Industrial Road No. 19 Building 1 Room 102

Patentee after: Dongyi Technology (Dongguan) Co.,Ltd.

Country or region after: China

Address before: 523000 Guangdong Province Dongguan City Huangjiang Town Gongchang Road 799 Building 1 Room 101

Patentee before: Dongguan Tianhongsheng Automation Equipment Co.,Ltd.

Country or region before: China